Bill of Engeneering Measurement and Evaluation For The Reconstruction From Railway Boundary To Okpokiri Road Umuehim, Isiala Ngwa South, Abia State Recent 2
Bill of Engeneering Measurement and Evaluation For The Reconstruction From Railway Boundary To Okpokiri Road Umuehim, Isiala Ngwa South, Abia State Recent 2
Bill of Engeneering Measurement and Evaluation For The Reconstruction From Railway Boundary To Okpokiri Road Umuehim, Isiala Ngwa South, Abia State Recent 2
2.01 Clear both sides of the existing road 19,800 M2 1,000 19,800,000
to the required width of all bush,
shrubs, and grass including
removal/disposal of topsoil to a
depth not less than 150mm
4.03 Provide and lay prime coat using 12,045 M2 1,100 13,249,500
MC-1 cutback bitumen and blind
with sharp sand.
SUBTOTAL 1 1,559,710,750
SUBTOTAL 2 1,637,696,287.20