Professional Documents
Culture Documents
SSC JE 2024 Foundation Batch: Rajat Sir Steel Pramod Sir Highway
SSC JE 2024 Foundation Batch: Rajat Sir Steel Pramod Sir Highway
DATE DAY CHAPTER TOPIC Hours TIME 19 -January Friday Introduction 1hrs 3:00PM-4:00PM
Highway development
and planning
22 -January Monday Introduction 1Hrs 2:00PM-3:00PM 22 -January Monday All Plans 1hrs 3:00PM-4:00PM
GENERAL DESIGN
23 -January Tuesday Theory of design 1Hrs 2:00PM-3:00PM 23 -January Tuesday Cross sectional elements-1 1hrs 3:00PM-4:00PM
REQIREMENTS
24 -January Wednesday Permissible stresses 1Hrs 2:00PM-3:00PM 24 -January Wednesday Cross sectional elements-2 1hrs 3:00PM-4:00PM
25 -January Thursday Basics and types of connections 1Hrs 2:00PM-3:00PM 25 -January Thursday Sight distance-1 1hrs 3:00PM-4:00PM
29 -January Monday Design of rivets connections 1Hrs 2:00PM-3:00PM 29 -January Monday Geometric Design Sight distance-2 1hrs 3:00PM-4:00PM
30 -January Tuesday Design of bolted connections 1Hrs 2:00PM-3:00PM 30 -January Tuesday Horizontal and Vertical alignment-1 1hrs 3:00PM-4:00PM
31 -January Wednesday CONNECTIONS Design of welded connections 1Hrs 2:00PM-3:00PM 31 -January Wednesday Horizontal and Vertical alignment-2 1hrs 3:00PM-4:00PM
6 -February Tuesday WSM theory for tension members 1Hrs 2:00PM-3:00PM 6 -February Tuesday Traffic capacity studies-1 1hrs 3:00PM-4:00PM
TENSION MEMBERS Traffic Engineering
Design of tension members, lug
7 -February Wednesday 1Hrs 2:00PM-3:00PM 7 -February Wednesday Traffic capacity studies-2 1hrs 3:00PM-4:00PM
angles
8 -February Thursday Introduction 1Hrs 2:00PM-3:00PM 8 -February Thursday Traffic control devices-1 1hrs 3:00PM-4:00PM
9 -February Friday Slenderness ratio, effective length 1Hrs 2:00PM-3:00PM 9 -February Friday Traffic control devices-2 1hrs 3:00PM-4:00PM
COMPRESSION MEMBERS
12 -February Monday Design of compression members 1Hrs 2:00PM-3:00PM 12 -February Monday Flexible pavement-1 1hrs 3:00PM-4:00PM
13 -February Tuesday Lacings and battens 1Hrs 2:00PM-3:00PM 13 -February Tuesday Flexible pavement-2 1hrs 3:00PM-4:00PM
Pavement Design
14 -February Wednesday Introduction 1Hrs 2:00PM-3:00PM 12 -February Monday Rigid pavement-1 1hrs 3:00PM-4:00PM
PLASTIC ANALYSIS
Plastic section modulus, shape
15 -February Thursday 1Hrs 2:00PM-3:00PM 13 -February Tuesday Rigid pavement-2 1hrs 3:00PM-4:00PM
factor
16 -February Friday Determination of collapse load 1Hrs 2:00PM-3:00PM 14 -February Wednesday Testing of materials 1hrs 3:00PM-4:00PM
Highway materials and
Plastic analysis for beams and constructions
19 -February Monday 1Hrs 2:00PM-3:00PM 15 -February Thursday Marshall mix method 1hrs 3:00PM-4:00PM
frames
GIRDERS AND INDUSTRIAL Stiffners, gantry girders, roof LIVE DOUBT AND
21 -February Wednesday 1Hrs 2:00PM-3:00PM 19 -February Monday Live doubt and miscellaneous-2 1 hrs 3:00PM-4:00PM
BUILDINGS truss MISCELLANEOUS
22 -February Thursday Live doubt and miscellaneous-1 1Hrs 2:00PM-3:00PM 20 -February Tuesday Live doubt and miscellaneous-3 1 hrs 3:00PM-4:00PM
Date Day Chapter Topic Hours Timing 23 -February Friday Physical Water Quality Parameters 1hrs 3:00PM-4:00PM
27 -February Tuesday INTRODUCTION Concrete 1hrs 2:00PM-3:00PM 26 -February Monday Chemical Water Quality Parameters 1hrs 3:00PM-4:00PM
Quality Water
Parameters
28 -February Wednesday Concrete mix 1hrs 2:00PM-3:00PM 27 -February Tuesday Hardness of Water 1hrs 3:00PM-4:00PM
29 -February Thursday CONCRETE TECHNOLOGY Important Test & IS CODE 1hrs 2:00PM-3:00PM 28 -February Wednesday Nitrogen Content 1hrs 3:00PM-4:00PM
1 -March Friday IS 456 , Codal provision 1hrs 2:00PM-3:00PM 29 -February Thursday Screnning 1hrs 3:00PM-4:00PM
5 -March Tuesday BEAM Singly Reinforce Beam 1hrs 2:00PM-3:00PM 4 -March Monday Sedimentation-1 1hrs 3:00PM-4:00PM
6 -March Wednesday Doubly Reinforce Beam 1hrs 2:00PM-3:00PM 5 -March Tuesday Sedimentation-2 1hrs 3:00PM-4:00PM
Treatment of Water
7 -March Thursday FLANGE SECTION T Beam & L Beam 1hrs 2:00PM-3:00PM 6 -March Wednesday Sedimentation-3 1hrs 3:00PM-4:00PM
8 -March Friday Shear 1hrs 2:00PM-3:00PM 7 -March Thursday Filteration 1hrs 3:00PM-4:00PM
11 -March Monday SHEAR BOND & TORSION Bond & Develpoment length 1hrs 2:00PM-3:00PM 8 -March Friday Disinfection 1hrs 3:00PM-4:00PM
13 -March Wednesday Introduction, Types of column 1hrs 2:00PM-3:00PM 12 -March Tuesday Dead End 1hrs 3:00PM-4:00PM
Distribution System
Concentric column, Axially
14 -March Thursday 1hrs 2:00PM-3:00PM 13 -March Wednesday Grid System and Trap 1hrs 3:00PM-4:00PM
loaded column
COLUMN
Codal Provision Related to Chemical Waste Water Treatment
15 -March Friday 1hrs 2:00PM-3:00PM 14 -March Thursday 1hrs 3:00PM-4:00PM
column Plant
Quality of Waste Water
Column design, Spiral reinforced
18 -March Monday 1hrs 2:00PM-3:00PM 15 -March Friday BOD 1hrs 3:00PM-4:00PM
column
19 -March Tuesday Definition, Codal provision 1hrs 2:00PM-3:00PM 18 -March Monday COD 1hrs 3:00PM-4:00PM
SLAB
Disposal of Sewage
20 -March Wednesday Slab design 1hrs 2:00PM-3:00PM 19 -March Tuesday Dilution 1hrs 3:00PM-4:00PM
Effluent
21 -March Thursday Codal Provision 1hrs 2:00PM-3:00PM 20 -March Wednesday Design of Sewer Design of Sewer 1hrs 3:00PM-4:00PM
FOOTING
22 -March Friday Footing design 1hrs 2:00PM-3:00PM 21 -March Thursday Grit Chamber 1hrs 3:00PM-4:00PM
26 -March Tuesday Method of prestressing 1hrs 2:00PM-3:00PM 22 -March Friday Sedimentation 1hrs 3:00PM-4:00PM
Sewage Treatment
27 -March Wednesday Stress calculation 1hrs 2:00PM-3:00PM 26 -March Tuesday Trickling Filter 1hrs 3:00PM-4:00PM
PRESTRESS CONCRETE
28 -March Thursday Pre & post tensioning 1hrs 2:00PM-3:00PM 27 -March Wednesday Activated Sludge 1hrs 3:00PM-4:00PM
29 -March Friday Prestressing losses 1hrs 2:00PM-3:00PM 28 -March Thursday Disposal of MSW 1hrs 3:00PM-4:00PM
Solid Waste Management
1 -April Monday Live doubt and miscellaneous-1 1 hrs 2:00PM-3:00PM 29 -March Friday Noise Pollution 1hrs 3:00PM-4:00PM
3 -April Wednesday Live doubt and miscellaneous-3 1 hrs 2:00PM-3:00PM 2 -April Tuesday LIVE DOUBT AND Live doubt and miscellaneous-2 1 hrs 3:00PM-4:00PM
MISCELLANEOUS
End Of Subject
8 -April Monday Slope and deflections, theorems 1 hrs 2:00PM-3:00PM 4 -April Thursday Rail and rails joint 1hrs 3:00PM-4:00PM
METHODS OF ANALYSIS
Analysis of indeterminate
9 -April Tuesday 1 hrs 2:00PM-3:00PM 5 -April Friday Defect in rail 1hrs 3:00PM-4:00PM
structures
12 -April Friday ILD for simply supported beams 1 hrs 2:00PM-3:00PM 10 -April Wednesday Track fastener 1hrs 3:00PM-4:00PM
INFLUENCE LINE DIAGRAM
Railway engg
15 -April Monday Rolling loads 1 hrs 2:00PM-3:00PM 11 -April Thursday Ballast 1hrs 3:00PM-4:00PM
16 -April Tuesday Analysis of 3 hinged arches 1 hrs 2:00PM-3:00PM 12 -April Friday Geometric design 1 1hrs 3:00PM-4:00PM
ARCHES
17 -April Wednesday Analysis of 2 hinged arches 1 hrs 2:00PM-3:00PM 15 -April Monday Geometric design 2 1hrs 3:00PM-4:00PM
18 -April Thursday Live doubt and miscellaneous-1 1 hrs 2:00PM-3:00PM 16 -April Tuesday Superelevation 1hrs 3:00PM-4:00PM
LIVE DOUBT AND
MISCELLANEOUS
19 -April Friday Live doubt and miscellaneous-2 1 hrs 2:00PM-3:00PM 17 -April Wednesday Transition curve 1hrs 3:00PM-4:00PM
End Of Subject
Rajat Sir Surveying
Date Day Chapter Topic Hours Timing Pramod Sir Estimation and costing
22 -April Monday Types of surveying 1 hrs 2:00PM-3:00PM
23 -April Tuesday INTRODUCTION Principal of Survey 1 hrs 2:00PM-3:00PM Date Day Chapter Topic Hours Timing
24 -April Wednesday Vernier caliper and types 1 hrs 2:00PM-3:00PM 22 -April Monday Type of estimation and plinth 1hrs 3:00PM-4:00PM
25 -April Thursday Chain line 1 hrs 2:00PM-3:00PM 23 -April Tuesday Included and excluded in plith 1hrs 3:00PM-4:00PM
26 -April Friday Types of chain 1 hrs 2:00PM-3:00PM 24 -April Wednesday Floor area ratio and detail estimation 1hrs 3:00PM-4:00PM
CHAIN SURVEY
29 -April Monday Tape, Correction in chain Survey 1 hrs 2:00PM-3:00PM 25 -April Thursday Unit of measurement 1hrs 3:00PM-4:00PM
2 -May Thursday Whole circle bearing 1 hrs 2:00PM-3:00PM 30 -April Tuesday Sinking fund and depriciation 1hrs 3:00PM-4:00PM
3 -May Friday Reduce bearing system 1 hrs 2:00PM-3:00PM 1 -May Wednesday Quality of various item work 1hrs 3:00PM-4:00PM
COMPASS SURVEY
6 -May Monday Fore bearing 1 hrs 2:00PM-3:00PM 2 -May Thursday Long wall and short wall method 1hrs 3:00PM-4:00PM
7 -May Tuesday Back bearing calculation 1 hrs 2:00PM-3:00PM 3 -May Friday Centre line method 1hrs 3:00PM-4:00PM
17 -May Friday Important Definition 1 hrs 2:00PM-3:00PM Date Day Chapter Topic Hours Timing
CONTOURING
20 -May Monday Methods 1 hrs 2:00PM-3:00PM 7 -May Tuesday Stage and form of precipitation 1hrs 3:00PM-4:00PM
Hydrology cycle
21 -May Tuesday Instruments of plane table survey 1 hrs 2:00PM-3:00PM 8 -May Wednesday Index of wetness 1hrs 3:00PM-4:00PM
PLANE TABLE SURVEY
Arithmatic mean methodand thessen
22 -May Wednesday Setting of plane table 1 hrs 2:00PM-3:00PM 9 -May Thursday Measurement of rainfall 1hrs 3:00PM-4:00PM
polygon method
23 -May Thursday Methods 1 hrs 2:00PM-3:00PM 10 -May Friday Estimation of missing data 1hrs 3:00PM-4:00PM
24 -May Friday Instrument 1 hrs 2:00PM-3:00PM 13 -May Monday Mass curve and hytograph 1hrs 3:00PM-4:00PM
TACHEOMETRIC SURVEY Consistency of record
Tachometric Equation &
25 -May Saturday 1 hrs 2:00PM-3:00PM 14 -May Tuesday Method to determination 1hrs 3:00PM-4:00PM
Measurement
27 -May Monday Types of Curve 1 hrs 2:00PM-3:00PM 15 -May Wednesday Probability method 1hrs 3:00PM-4:00PM
CURVE
28 -May Tuesday Important terms & Formula 1 hrs 2:00PM-3:00PM 16 -May Thursday Flood Infiltration w index and phi index 1hrs 3:00PM-4:00PM
29 -May Wednesday Calculation of Area 1 hrs 2:00PM-3:00PM 17 -May Friday Hydrograph 1hrs 3:00PM-4:00PM
AREA & VOLUME
LIVE DOUBT AND
30 -May Thursday Calculation of Volume 1 hrs 2:00PM-3:00PM 18 -May Saturday Live doubt and miscellaneous-1 1hrs 3:00PM-4:00PM
MISCELLANEOUS
End of Subject
5 -March Tuesday INTRODUCTION Definitions, Types of soil 1,5 hrs 4:00PM-5:30PM Chapter Topic Hours Timing
Important Relationships,
6 -March Wednesday 1,5 hrs 4:00PM-5:30PM 8 -February Thursday Basic introduction , Load classifcation 1hrs 1:00PM-2:00PM
Properties of soil
PROPERTIES OF SOIL
Calculation of water content &
7 -March Thursday 1,5 hrs 4:00PM-5:30PM 9 -February Friday Concept of stress and strain 1hrs 1:00PM-2:00PM
unit weight
8 -March Friday Soil Classification System 1,5 hrs 4:00PM-5:30PM 12 -February Monday Mechanical properties of materials 1hrs 1:00PM-2:00PM
11 -March Monday CLASSIFICATION OF SOIL ISSCS System 1,5 hrs 4:00PM-5:30PM 13 -February Tuesday STRESS AND STRAIN Stress vs strain curve for all materials 1hrs 1:00PM-2:00PM
13 -March Wednesday Stress calculation, Effective Stress 1,5 hrs 4:00PM-5:30PM 15 -February Thursday Concepts of deformation-1 1hrs 1:00PM-2:00PM
EFFECTIVE STRESS
Normal stress, pore water
14 -March Thursday 1,5 hrs 4:00PM-5:30PM 16 -February Friday Concepts of deformation-2 1hrs 1:00PM-2:00PM
pressure
15 -March Friday CAPILLARITY Capillarity of soil 1,5 hrs 4:00PM-5:30PM 19 -February Monday STRAIN ENERGY Strain energy due axial and self weight 1hrs 1:00PM-2:00PM
18 -March Monday Permeability of soil 1,5 hrs 4:00PM-5:30PM 20 -February Tuesday Thermal stress under free expansion 1hrs 1:00PM-2:00PM
PERMEABILITY THERMAL STRESS
important formula Related to Thermal stress under fixed ,
19 -March Tuesday 1,5 hrs 4:00PM-5:30PM 21 -February Wednesday 1hrs 1:00PM-2:00PM
permeability composite beam
Consolidation of Soil,
27 -March Wednesday 1,5 hrs 4:00PM-5:30PM 28 -February Wednesday Torsion equation 1hrs 1:00PM-2:00PM
Consolidation formula
TORSION IN SHAFT
28 -March Thursday CONSOLIDATION NC SOIL & OC SOIL 1,5 hrs 4:00PM-5:30PM 29 -February Thursday Torsion equation application 1hrs 1:00PM-2:00PM
1 -April Monday SHEAR STESS OF SOIL Calculation of Shear Strength 1,5 hrs 4:00PM-5:30PM 4 -March Monday Combined stress Concepts of principle plane ,stress 1hrs 1:00PM-2:00PM
2 -April Tuesday Earth pressure calculation 1,5 hrs 4:00PM-5:30PM 5 -March Tuesday Mohr Circle 1hrs 1:00PM-2:00PM
EARTH PRESSURE THEORY
Active passive and earth pressure Basic , types of beam support ,
3 -April Wednesday 1,5 hrs 4:00PM-5:30PM 6 -March Wednesday 1hrs 1:00PM-2:00PM
at rest reaction calculation
4 -April Thursday Live doubt and miscellaneous-1 1,5 hrs 4:00PM-5:30PM 7 -March Thursday SFD AND BMD SFD & BMD OF Cantiliver & ssb beam 1hrs 1:00PM-2:00PM
12 -March Tuesday SLOPE AND DEFLECTION Slope and deflection of cantiliver 1hrs 1:00PM-2:00PM
End of Subject
13 -March Wednesday Slope and deflection of SSB beam 1hrs 1:00PM-2:00PM
14 -March Thursday COLUMN AND STRUT Basic and eulers and rankine formula 1hrs 1:00PM-2:00PM
26 -March Tuesday Basic introduction 1hrs 1:00PM-2:00PM 20 -March Wednesday Live doubt and miscellaneous-1 1hrs 1:00PM-2:00PM
3 -April Wednesday SURFACE TENSION Surface tension 1hrs 1:00PM-2:00PM Pramod Sir BMC
4 -April Thursday CAPILLARY Capillary 1hrs 1:00PM-2:00PM
5 -April Friday Basic , Types of pressure 1hrs 1:00PM-2:00PM Date Day Chapter Topic Hours Timing
PRESSURE
6 -April Saturday Pascal and hydrostatic law 1hrs 1:00PM-2:00PM 5 -March Tuesday Cement Constituent of Cement 1.5hrs 5:00PM-6:30PM
8 -April Monday Pressure measuring device -1 1hrs 1:00PM-2:00PM 6 -March Wednesday Composition of Cement 1.5hrs 5:00PM-6:30PM
9 -April Tuesday Pressure measuring device -2 1hrs 1:00PM-2:00PM 7 -March Thursday Testing of Cement-1 1.5hrs 5:00PM-6:30PM
16 -April Tuesday Hydro-static forces on plane 1hrs 1:00PM-2:00PM 14 -March Thursday Classification of rock 1.5hrs 5:00PM-6:30PM
HYDROSTATICS FORCE Rock & Stone
Hydro-static forces on curved
17 -April Wednesday 1hrs 1:00PM-2:00PM 15 -March Friday Composition & Explosive 1.5hrs 5:00PM-6:30PM
surface
18 -April Thursday Basic and types of flow 1hrs 1:00PM-2:00PM 18 -March Monday Classification of tree 1.5hrs 5:00PM-6:30PM
19 -April Friday Stream, path and streak line 1hrs 1:00PM-2:00PM 19 -March Tuesday Defect in timber, Sawing of timber 1.5hrs 5:00PM-6:30PM
FLUID KINEMATICS Timber
22 -April Monday Continuity equation 1hrs 1:00PM-2:00PM 20 -March Wednesday Seasoning 1.5hrs 5:00PM-6:30PM
23 -April Tuesday Velocity and stream function 1hrs 1:00PM-2:00PM 21 -March Thursday Wood product 1.5hrs 5:00PM-6:30PM
24 -April Wednesday Eulers , B.E equation 1hrs 1:00PM-2:00PM 22 -March Friday Paint vernish 1.5hrs 5:00PM-6:30PM
FLUID DYNAMICS Paint
25 -April Thursday Application of B.E Equation 1hrs 1:00PM-2:00PM 26 -March Tuesday Distemper 1.5hrs 5:00PM-6:30PM
30 -April Tuesday Turbulent flow 1hrs 1:00PM-2:00PM 29 -March Friday Classification of aggregate 1.5hrs 5:00PM-6:30PM
1 -May Wednesday Major , minor losses 1hrs 1:00PM-2:00PM 1 -April Monday Bulking of sand 1.5hrs 5:00PM-6:30PM
FLOW THROUGH PIPE Concrete technology
Concept of equivalent pipe and
2 -May Thursday 1hrs 1:00PM-2:00PM 2 -April Tuesday Water cement ratio 1.5hrs 5:00PM-6:30PM
maximum efficiency
3 -May Friday BOUNDARY LAYER THEORY Boundry layer thoery 1hrs 1:00PM-2:00PM 3 -April Wednesday Workability, Admixture 1.5hrs 5:00PM-6:30PM
6 -May Monday Free Vortex motion 1hrs 1:00PM-2:00PM 4 -April Thursday Building masonry and satir 1.5hrs 5:00PM-6:30PM
VORTEX MOTION Building construction
7 -May Tuesday Forced Vortex motion 1hrs 1:00PM-2:00PM 5 -April Friday Door and window roofing 1.5hrs 5:00PM-6:30PM
Similarity , dimensionless
8 -May Wednesday MODELLING AND SIMLITUDE 1hrs 1:00PM-2:00PM 8 -April Monday Live doubt and miscellaneous-1 1.5hrs 5:00PM-6:30PM
number
10 -May Friday Turbine basic , classification 1hrs 1:00PM-2:00PM 10 -April Wednesday Live doubt and miscellaneous-3 1.5hrs 5:00PM-6:30PM
End of Subject