SSC JE 2024 Foundation Batch

Pramod Sir Highway


Rajat Sir Steel

DATE DAY CHAPTER TOPIC Hours TIME

DATE DAY CHAPTER TOPIC Hours TIME 19 -January Friday Introduction 1hrs 3:00PM-4:00PM
Highway development
and planning
22 -January Monday Introduction 1Hrs 2:00PM-3:00PM 22 -January Monday All Plans 1hrs 3:00PM-4:00PM

GENERAL DESIGN
23 -January Tuesday Theory of design 1Hrs 2:00PM-3:00PM 23 -January Tuesday Cross sectional elements-1 1hrs 3:00PM-4:00PM
REQIREMENTS

24 -January Wednesday Permissible stresses 1Hrs 2:00PM-3:00PM 24 -January Wednesday Cross sectional elements-2 1hrs 3:00PM-4:00PM

25 -January Thursday Basics and types of connections 1Hrs 2:00PM-3:00PM 25 -January Thursday Sight distance-1 1hrs 3:00PM-4:00PM

29 -January Monday Design of rivets connections 1Hrs 2:00PM-3:00PM 29 -January Monday Geometric Design Sight distance-2 1hrs 3:00PM-4:00PM

30 -January Tuesday Design of bolted connections 1Hrs 2:00PM-3:00PM 30 -January Tuesday Horizontal and Vertical alignment-1 1hrs 3:00PM-4:00PM

31 -January Wednesday CONNECTIONS Design of welded connections 1Hrs 2:00PM-3:00PM 31 -January Wednesday Horizontal and Vertical alignment-2 1hrs 3:00PM-4:00PM

Eccentric bolted and welded


1 -February Thursday 1Hrs 2:00PM-3:00PM 1 -February Thursday Horizontal and Vertical alignment-3 1hrs 3:00PM-4:00PM
connections - 1

Eccentric bolted and welded Traffic characteristics and voulme


2 -February Friday 1Hrs 2:00PM-3:00PM 2 -February Friday 1hrs 3:00PM-4:00PM
connections - 2 study

Eccentric bolted and welded


5 -February Monday 1Hrs 2:00PM-3:00PM 5 -February Monday Traffic speed and capacity studies 1hrs 3:00PM-4:00PM
connections - 3

6 -February Tuesday WSM theory for tension members 1Hrs 2:00PM-3:00PM 6 -February Tuesday Traffic capacity studies-1 1hrs 3:00PM-4:00PM
TENSION MEMBERS Traffic Engineering
Design of tension members, lug
7 -February Wednesday 1Hrs 2:00PM-3:00PM 7 -February Wednesday Traffic capacity studies-2 1hrs 3:00PM-4:00PM
angles

8 -February Thursday Introduction 1Hrs 2:00PM-3:00PM 8 -February Thursday Traffic control devices-1 1hrs 3:00PM-4:00PM

9 -February Friday Slenderness ratio, effective length 1Hrs 2:00PM-3:00PM 9 -February Friday Traffic control devices-2 1hrs 3:00PM-4:00PM
COMPRESSION MEMBERS
12 -February Monday Design of compression members 1Hrs 2:00PM-3:00PM 12 -February Monday Flexible pavement-1 1hrs 3:00PM-4:00PM

13 -February Tuesday Lacings and battens 1Hrs 2:00PM-3:00PM 13 -February Tuesday Flexible pavement-2 1hrs 3:00PM-4:00PM
Pavement Design
14 -February Wednesday Introduction 1Hrs 2:00PM-3:00PM 12 -February Monday Rigid pavement-1 1hrs 3:00PM-4:00PM
PLASTIC ANALYSIS
Plastic section modulus, shape
15 -February Thursday 1Hrs 2:00PM-3:00PM 13 -February Tuesday Rigid pavement-2 1hrs 3:00PM-4:00PM
factor
16 -February Friday Determination of collapse load 1Hrs 2:00PM-3:00PM 14 -February Wednesday Testing of materials 1hrs 3:00PM-4:00PM
Highway materials and
Plastic analysis for beams and constructions
19 -February Monday 1Hrs 2:00PM-3:00PM 15 -February Thursday Marshall mix method 1hrs 3:00PM-4:00PM
frames

Primary and secondary criteria


20 -February Tuesday BEAMS 1Hrs 2:00PM-3:00PM 16 -February Friday Live doubt and miscellaneous-1 1 hrs 3:00PM-4:00PM
for deisgn of beams

GIRDERS AND INDUSTRIAL Stiffners, gantry girders, roof LIVE DOUBT AND
21 -February Wednesday 1Hrs 2:00PM-3:00PM 19 -February Monday Live doubt and miscellaneous-2 1 hrs 3:00PM-4:00PM
BUILDINGS truss MISCELLANEOUS

22 -February Thursday Live doubt and miscellaneous-1 1Hrs 2:00PM-3:00PM 20 -February Tuesday Live doubt and miscellaneous-3 1 hrs 3:00PM-4:00PM

LIVE DOUBT AND


23 -February Friday Live doubt and miscellaneous-2 1Hrs 2:00PM-3:00PM End of Subject
MISCELLANEOUS

26 -February Monday Live doubt and miscellaneous-3 1 hrs 2:00PM-3:00PM

Pramod Sir Enviroment


End of Subject

Date Day Chapter Topic Hours Timing

Rajat Sir RCC 21 -February Wednesday Water Demand 1hrs 3:00PM-4:00PM


Raw Water Engineering
22 -February Thursday Population Forecast 1hrs 3:00PM-4:00PM

Date Day Chapter Topic Hours Timing 23 -February Friday Physical Water Quality Parameters 1hrs 3:00PM-4:00PM

27 -February Tuesday INTRODUCTION Concrete 1hrs 2:00PM-3:00PM 26 -February Monday Chemical Water Quality Parameters 1hrs 3:00PM-4:00PM
Quality Water
Parameters
28 -February Wednesday Concrete mix 1hrs 2:00PM-3:00PM 27 -February Tuesday Hardness of Water 1hrs 3:00PM-4:00PM

29 -February Thursday CONCRETE TECHNOLOGY Important Test & IS CODE 1hrs 2:00PM-3:00PM 28 -February Wednesday Nitrogen Content 1hrs 3:00PM-4:00PM

1 -March Friday IS 456 , Codal provision 1hrs 2:00PM-3:00PM 29 -February Thursday Screnning 1hrs 3:00PM-4:00PM

Important Terms, Stress and


4 -March Monday 1hrs 2:00PM-3:00PM 1 -March Friday Aeration 1hrs 3:00PM-4:00PM
stain diagram

5 -March Tuesday BEAM Singly Reinforce Beam 1hrs 2:00PM-3:00PM 4 -March Monday Sedimentation-1 1hrs 3:00PM-4:00PM

6 -March Wednesday Doubly Reinforce Beam 1hrs 2:00PM-3:00PM 5 -March Tuesday Sedimentation-2 1hrs 3:00PM-4:00PM
Treatment of Water
7 -March Thursday FLANGE SECTION T Beam & L Beam 1hrs 2:00PM-3:00PM 6 -March Wednesday Sedimentation-3 1hrs 3:00PM-4:00PM

8 -March Friday Shear 1hrs 2:00PM-3:00PM 7 -March Thursday Filteration 1hrs 3:00PM-4:00PM

11 -March Monday SHEAR BOND & TORSION Bond & Develpoment length 1hrs 2:00PM-3:00PM 8 -March Friday Disinfection 1hrs 3:00PM-4:00PM

Torsion, Equivalent moment &


12 -March Tuesday 1hrs 2:00PM-3:00PM 11 -March Monday Water Softening 1hrs 3:00PM-4:00PM
Shear

13 -March Wednesday Introduction, Types of column 1hrs 2:00PM-3:00PM 12 -March Tuesday Dead End 1hrs 3:00PM-4:00PM
Distribution System
Concentric column, Axially
14 -March Thursday 1hrs 2:00PM-3:00PM 13 -March Wednesday Grid System and Trap 1hrs 3:00PM-4:00PM
loaded column
COLUMN
Codal Provision Related to Chemical Waste Water Treatment
15 -March Friday 1hrs 2:00PM-3:00PM 14 -March Thursday 1hrs 3:00PM-4:00PM
column Plant
Quality of Waste Water
Column design, Spiral reinforced
18 -March Monday 1hrs 2:00PM-3:00PM 15 -March Friday BOD 1hrs 3:00PM-4:00PM
column
19 -March Tuesday Definition, Codal provision 1hrs 2:00PM-3:00PM 18 -March Monday COD 1hrs 3:00PM-4:00PM
SLAB
Disposal of Sewage
20 -March Wednesday Slab design 1hrs 2:00PM-3:00PM 19 -March Tuesday Dilution 1hrs 3:00PM-4:00PM
Effluent

21 -March Thursday Codal Provision 1hrs 2:00PM-3:00PM 20 -March Wednesday Design of Sewer Design of Sewer 1hrs 3:00PM-4:00PM
FOOTING
22 -March Friday Footing design 1hrs 2:00PM-3:00PM 21 -March Thursday Grit Chamber 1hrs 3:00PM-4:00PM

26 -March Tuesday Method of prestressing 1hrs 2:00PM-3:00PM 22 -March Friday Sedimentation 1hrs 3:00PM-4:00PM
Sewage Treatment
27 -March Wednesday Stress calculation 1hrs 2:00PM-3:00PM 26 -March Tuesday Trickling Filter 1hrs 3:00PM-4:00PM
PRESTRESS CONCRETE
28 -March Thursday Pre & post tensioning 1hrs 2:00PM-3:00PM 27 -March Wednesday Activated Sludge 1hrs 3:00PM-4:00PM

29 -March Friday Prestressing losses 1hrs 2:00PM-3:00PM 28 -March Thursday Disposal of MSW 1hrs 3:00PM-4:00PM
Solid Waste Management
1 -April Monday Live doubt and miscellaneous-1 1 hrs 2:00PM-3:00PM 29 -March Friday Noise Pollution 1hrs 3:00PM-4:00PM

LIVE DOUBT AND


2 -April Tuesday MISCELLANEOUS Live doubt and miscellaneous-2 1 hrs 2:00PM-3:00PM 1 -April Monday Live doubt and miscellaneous-1 1 hrs 3:00PM-4:00PM

3 -April Wednesday Live doubt and miscellaneous-3 1 hrs 2:00PM-3:00PM 2 -April Tuesday LIVE DOUBT AND Live doubt and miscellaneous-2 1 hrs 3:00PM-4:00PM
MISCELLANEOUS

3 -April Wednesday Live doubt and miscellaneous-3 1 hrs 3:00PM-4:00PM


End of Subject

End Of Subject

Rajat Sir Structure


Pramod Sir Railway Engineering
4 -April Thursday Static indeterminacy 1 hrs 2:00PM-3:00PM
INDETERMINACY
5 -April Friday Kinematic indeterminacy 1 hrs 2:00PM-3:00PM Date Day Chapter Topic Hours Timing

8 -April Monday Slope and deflections, theorems 1 hrs 2:00PM-3:00PM 4 -April Thursday Rail and rails joint 1hrs 3:00PM-4:00PM
METHODS OF ANALYSIS
Analysis of indeterminate
9 -April Tuesday 1 hrs 2:00PM-3:00PM 5 -April Friday Defect in rail 1hrs 3:00PM-4:00PM
structures

Method of joints and method of


10 -April Wednesday 1 hrs 2:00PM-3:00PM 8 -April Monday Gauge in railway track 1hrs 3:00PM-4:00PM
sections
TRUSSES
11 -April Thursday Analysis of trusses 1 hrs 2:00PM-3:00PM 9 -April Tuesday Classification of sleeper 1hrs 3:00PM-4:00PM

12 -April Friday ILD for simply supported beams 1 hrs 2:00PM-3:00PM 10 -April Wednesday Track fastener 1hrs 3:00PM-4:00PM
INFLUENCE LINE DIAGRAM
Railway engg
15 -April Monday Rolling loads 1 hrs 2:00PM-3:00PM 11 -April Thursday Ballast 1hrs 3:00PM-4:00PM

16 -April Tuesday Analysis of 3 hinged arches 1 hrs 2:00PM-3:00PM 12 -April Friday Geometric design 1 1hrs 3:00PM-4:00PM
ARCHES
17 -April Wednesday Analysis of 2 hinged arches 1 hrs 2:00PM-3:00PM 15 -April Monday Geometric design 2 1hrs 3:00PM-4:00PM

18 -April Thursday Live doubt and miscellaneous-1 1 hrs 2:00PM-3:00PM 16 -April Tuesday Superelevation 1hrs 3:00PM-4:00PM
LIVE DOUBT AND
MISCELLANEOUS
19 -April Friday Live doubt and miscellaneous-2 1 hrs 2:00PM-3:00PM 17 -April Wednesday Transition curve 1hrs 3:00PM-4:00PM

LIVE DOUBT AND


End of Subject 18 -April Thursday Live doubt and miscellaneous-1 1 hrs 3:00PM-4:00PM
MISCELLANEOUS
19 -April Friday Live doubt and miscellaneous-2 1 hrs 3:00PM-4:00PM

End Of Subject
Rajat Sir Surveying

Date Day Chapter Topic Hours Timing Pramod Sir Estimation and costing
22 -April Monday Types of surveying 1 hrs 2:00PM-3:00PM

23 -April Tuesday INTRODUCTION Principal of Survey 1 hrs 2:00PM-3:00PM Date Day Chapter Topic Hours Timing

24 -April Wednesday Vernier caliper and types 1 hrs 2:00PM-3:00PM 22 -April Monday Type of estimation and plinth 1hrs 3:00PM-4:00PM

25 -April Thursday Chain line 1 hrs 2:00PM-3:00PM 23 -April Tuesday Included and excluded in plith 1hrs 3:00PM-4:00PM

26 -April Friday Types of chain 1 hrs 2:00PM-3:00PM 24 -April Wednesday Floor area ratio and detail estimation 1hrs 3:00PM-4:00PM
CHAIN SURVEY
29 -April Monday Tape, Correction in chain Survey 1 hrs 2:00PM-3:00PM 25 -April Thursday Unit of measurement 1hrs 3:00PM-4:00PM

Types of correction in chain


30 -April Tuesday 1 hrs 2:00PM-3:00PM 26 -April Friday Major item work 1hrs 3:00PM-4:00PM
Survey, Normal Tension

Bearing & measurement of


1 -May Wednesday 1 hrs 2:00PM-3:00PM 29 -April Monday Estimation method Bentup bar and brick soling 1hrs 3:00PM-4:00PM
Bearing

2 -May Thursday Whole circle bearing 1 hrs 2:00PM-3:00PM 30 -April Tuesday Sinking fund and depriciation 1hrs 3:00PM-4:00PM

3 -May Friday Reduce bearing system 1 hrs 2:00PM-3:00PM 1 -May Wednesday Quality of various item work 1hrs 3:00PM-4:00PM
COMPASS SURVEY
6 -May Monday Fore bearing 1 hrs 2:00PM-3:00PM 2 -May Thursday Long wall and short wall method 1hrs 3:00PM-4:00PM

7 -May Tuesday Back bearing calculation 1 hrs 2:00PM-3:00PM 3 -May Friday Centre line method 1hrs 3:00PM-4:00PM

Important definition & closing


8 -May Wednesday 1 hrs 2:00PM-3:00PM 4 -May Saturday Doubt Class 1hrs 3:00PM-4:00PM
error

LIVE DOUBT AND


9 -May Thursday Important Definition 1 hrs 2:00PM-3:00PM 6 -May Monday Live doubt and miscellaneous-1 1 hrs 3:00PM-4:00PM
MISCELLANEOUS

10 -May Friday Method to find the RL 1 hrs 2:00PM-3:00PM


End of Subject
13 -May Monday HI Method 1 hrs 2:00PM-3:00PM
LEVELLING
14 -May Tuesday Rise and Fall Method 1 hrs 2:00PM-3:00PM

15 -May Wednesday Reciprocal levelling 1 hrs 2:00PM-3:00PM Pramod Sir Hydrology


16 -May Thursday Calculation of RL 1 hrs 2:00PM-3:00PM

17 -May Friday Important Definition 1 hrs 2:00PM-3:00PM Date Day Chapter Topic Hours Timing
CONTOURING
20 -May Monday Methods 1 hrs 2:00PM-3:00PM 7 -May Tuesday Stage and form of precipitation 1hrs 3:00PM-4:00PM
Hydrology cycle
21 -May Tuesday Instruments of plane table survey 1 hrs 2:00PM-3:00PM 8 -May Wednesday Index of wetness 1hrs 3:00PM-4:00PM
PLANE TABLE SURVEY
Arithmatic mean methodand thessen
22 -May Wednesday Setting of plane table 1 hrs 2:00PM-3:00PM 9 -May Thursday Measurement of rainfall 1hrs 3:00PM-4:00PM
polygon method
23 -May Thursday Methods 1 hrs 2:00PM-3:00PM 10 -May Friday Estimation of missing data 1hrs 3:00PM-4:00PM

24 -May Friday Instrument 1 hrs 2:00PM-3:00PM 13 -May Monday Mass curve and hytograph 1hrs 3:00PM-4:00PM
TACHEOMETRIC SURVEY Consistency of record
Tachometric Equation &
25 -May Saturday 1 hrs 2:00PM-3:00PM 14 -May Tuesday Method to determination 1hrs 3:00PM-4:00PM
Measurement

27 -May Monday Types of Curve 1 hrs 2:00PM-3:00PM 15 -May Wednesday Probability method 1hrs 3:00PM-4:00PM
CURVE
28 -May Tuesday Important terms & Formula 1 hrs 2:00PM-3:00PM 16 -May Thursday Flood Infiltration w index and phi index 1hrs 3:00PM-4:00PM

29 -May Wednesday Calculation of Area 1 hrs 2:00PM-3:00PM 17 -May Friday Hydrograph 1hrs 3:00PM-4:00PM
AREA & VOLUME
LIVE DOUBT AND
30 -May Thursday Calculation of Volume 1 hrs 2:00PM-3:00PM 18 -May Saturday Live doubt and miscellaneous-1 1hrs 3:00PM-4:00PM
MISCELLANEOUS

31 -May Friday Live doubt and miscellaneous-1 1 hrs 2:00PM-3:00PM


End of Subject
LIVE DOUBT AND
3 -June Monday Live doubt and miscellaneous-2 1 hrs 2:00PM-3:00PM
MISCELLANEOUS

4 -June Tuesday Live doubt and miscellaneous-3 1 hrs 2:00PM-3:00PM

End of Subject

Rajat Sir SOIL


Rahul sir Strength of Materials
Date Day Chapter Hours Timing

5 -March Tuesday INTRODUCTION Definitions, Types of soil 1,5 hrs 4:00PM-5:30PM Chapter Topic Hours Timing

Important Relationships,
6 -March Wednesday 1,5 hrs 4:00PM-5:30PM 8 -February Thursday Basic introduction , Load classifcation 1hrs 1:00PM-2:00PM
Properties of soil
PROPERTIES OF SOIL
Calculation of water content &
7 -March Thursday 1,5 hrs 4:00PM-5:30PM 9 -February Friday Concept of stress and strain 1hrs 1:00PM-2:00PM
unit weight

8 -March Friday Soil Classification System 1,5 hrs 4:00PM-5:30PM 12 -February Monday Mechanical properties of materials 1hrs 1:00PM-2:00PM

11 -March Monday CLASSIFICATION OF SOIL ISSCS System 1,5 hrs 4:00PM-5:30PM 13 -February Tuesday STRESS AND STRAIN Stress vs strain curve for all materials 1hrs 1:00PM-2:00PM

Coarse grain and fine grain soil


12 -March Tuesday 1,5 hrs 4:00PM-5:30PM 14 -February Wednesday Elastic constant 1hrs 1:00PM-2:00PM
classification

13 -March Wednesday Stress calculation, Effective Stress 1,5 hrs 4:00PM-5:30PM 15 -February Thursday Concepts of deformation-1 1hrs 1:00PM-2:00PM
EFFECTIVE STRESS
Normal stress, pore water
14 -March Thursday 1,5 hrs 4:00PM-5:30PM 16 -February Friday Concepts of deformation-2 1hrs 1:00PM-2:00PM
pressure

15 -March Friday CAPILLARITY Capillarity of soil 1,5 hrs 4:00PM-5:30PM 19 -February Monday STRAIN ENERGY Strain energy due axial and self weight 1hrs 1:00PM-2:00PM

18 -March Monday Permeability of soil 1,5 hrs 4:00PM-5:30PM 20 -February Tuesday Thermal stress under free expansion 1hrs 1:00PM-2:00PM
PERMEABILITY THERMAL STRESS
important formula Related to Thermal stress under fixed ,
19 -March Tuesday 1,5 hrs 4:00PM-5:30PM 21 -February Wednesday 1hrs 1:00PM-2:00PM
permeability composite beam

Seepage Analysis, Important Shear in rectangular and triangular


20 -March Wednesday SEEPAGE 1,5 hrs 4:00PM-5:30PM 22 -February Thursday SHEAR IN BEAM 1hrs 1:00PM-2:00PM
Theories section
21 -March Thursday Vertical stress 1,5 hrs 4:00PM-5:30PM 23 -February Friday Shear in circular , IN section of beam 1hrs 1:00PM-2:00PM
STRESS DISTRIBUTION
Important formula Related to
22 -March Friday 1,5 hrs 4:00PM-5:30PM 26 -February Monday Bending equation 1hrs 1:00PM-2:00PM
vertical stress
BENDING IN BEAM
Compaction of Soil, Method of
26 -March Tuesday COMPACTION 1,5 hrs 4:00PM-5:30PM 27 -February Tuesday Application of bending equation 1hrs 1:00PM-2:00PM
compaction

Consolidation of Soil,
27 -March Wednesday 1,5 hrs 4:00PM-5:30PM 28 -February Wednesday Torsion equation 1hrs 1:00PM-2:00PM
Consolidation formula
TORSION IN SHAFT
28 -March Thursday CONSOLIDATION NC SOIL & OC SOIL 1,5 hrs 4:00PM-5:30PM 29 -February Thursday Torsion equation application 1hrs 1:00PM-2:00PM

Important graph & degree of Concepts of normal and shear stress


29 -March Friday 1,5 hrs 4:00PM-5:30PM 1 -March Friday 1hrs 1:00PM-2:00PM
consolidation in oblique plane

1 -April Monday SHEAR STESS OF SOIL Calculation of Shear Strength 1,5 hrs 4:00PM-5:30PM 4 -March Monday Combined stress Concepts of principle plane ,stress 1hrs 1:00PM-2:00PM

2 -April Tuesday Earth pressure calculation 1,5 hrs 4:00PM-5:30PM 5 -March Tuesday Mohr Circle 1hrs 1:00PM-2:00PM
EARTH PRESSURE THEORY
Active passive and earth pressure Basic , types of beam support ,
3 -April Wednesday 1,5 hrs 4:00PM-5:30PM 6 -March Wednesday 1hrs 1:00PM-2:00PM
at rest reaction calculation

4 -April Thursday Live doubt and miscellaneous-1 1,5 hrs 4:00PM-5:30PM 7 -March Thursday SFD AND BMD SFD & BMD OF Cantiliver & ssb beam 1hrs 1:00PM-2:00PM

LIVE DOUBT AND


5 -April Friday Live doubt and miscellaneous-2 1,5 hrs 4:00PM-5:30PM 8 -March Friday SFD & BMD combination of load 1hrs 1:00PM-2:00PM
MISCELLANEOUS

Basic and Method of slope and


6 -April Saturday Live doubt and miscellaneous-3 1,5 hrs 4:00PM-5:30PM 11 -March Monday 1hrs 1:00PM-2:00PM
deflection

12 -March Tuesday SLOPE AND DEFLECTION Slope and deflection of cantiliver 1hrs 1:00PM-2:00PM
End of Subject
13 -March Wednesday Slope and deflection of SSB beam 1hrs 1:00PM-2:00PM

14 -March Thursday COLUMN AND STRUT Basic and eulers and rankine formula 1hrs 1:00PM-2:00PM

THIN AND THICK Basic and thin cylinder stress


Rahul Sir Fluid Mechanics 15 -March Friday
CYLINDER calculation
1hrs 1:00PM-2:00PM

18 -March Monday Theory of failure-1 1hrs 1:00PM-2:00PM


THEORY OF FAILURE
Date Day Chapter Topic Hours Timing 19 -March Tuesday Theory of failure-2 1hrs 1:00PM-2:00PM

26 -March Tuesday Basic introduction 1hrs 1:00PM-2:00PM 20 -March Wednesday Live doubt and miscellaneous-1 1hrs 1:00PM-2:00PM

LIVE DOUBT AND


27 -March Wednesday Bulk modulus , Density 1hrs 1:00PM-2:00PM 21 -March Thursday Live doubt and miscellaneous-2 1hrs 1:00PM-2:00PM
MISCELLANEOUS

Specific gravity and Specific


28 -March Thursday 1hrs 1:00PM-2:00PM 22 -March Friday Live doubt and miscellaneous-3 1hrs 1:00PM-2:00PM
Weight
FLUID PROPERTY
29 -March Friday Viscosity 1hrs 1:00PM-2:00PM
End of Subject
1 -April Monday Newton law of viscosity 1hrs 1:00PM-2:00PM

2 -April Tuesday Fluid classification 1hrs 1:00PM-2:00PM

3 -April Wednesday SURFACE TENSION Surface tension 1hrs 1:00PM-2:00PM Pramod Sir BMC
4 -April Thursday CAPILLARY Capillary 1hrs 1:00PM-2:00PM

5 -April Friday Basic , Types of pressure 1hrs 1:00PM-2:00PM Date Day Chapter Topic Hours Timing
PRESSURE
6 -April Saturday Pascal and hydrostatic law 1hrs 1:00PM-2:00PM 5 -March Tuesday Cement Constituent of Cement 1.5hrs 5:00PM-6:30PM
8 -April Monday Pressure measuring device -1 1hrs 1:00PM-2:00PM 6 -March Wednesday Composition of Cement 1.5hrs 5:00PM-6:30PM

9 -April Tuesday Pressure measuring device -2 1hrs 1:00PM-2:00PM 7 -March Thursday Testing of Cement-1 1.5hrs 5:00PM-6:30PM

Basic concepts , principle of


10 -April Wednesday 1hrs 1:00PM-2:00PM 8 -March Friday Testing of Cement-2 1.5hrs 5:00PM-6:30PM
floatation

Stability condition of submerged


11 -April Thursday 1hrs 1:00PM-2:00PM 11 -March Monday Type of Cement 1.5hrs 5:00PM-6:30PM
body
BUOYANCY AND FLOATATION
12 -April Friday Concept of metacentre 1hrs 1:00PM-2:00PM 12 -March Tuesday Composition of good brick earth 1.5hrs 5:00PM-6:30PM
Brick
Stability condition of floating
15 -April Monday 1hrs 1:00PM-2:00PM 13 -March Wednesday Classification of brick, Test of brick 1.5hrs 5:00PM-6:30PM
body

16 -April Tuesday Hydro-static forces on plane 1hrs 1:00PM-2:00PM 14 -March Thursday Classification of rock 1.5hrs 5:00PM-6:30PM
HYDROSTATICS FORCE Rock & Stone
Hydro-static forces on curved
17 -April Wednesday 1hrs 1:00PM-2:00PM 15 -March Friday Composition & Explosive 1.5hrs 5:00PM-6:30PM
surface

18 -April Thursday Basic and types of flow 1hrs 1:00PM-2:00PM 18 -March Monday Classification of tree 1.5hrs 5:00PM-6:30PM

19 -April Friday Stream, path and streak line 1hrs 1:00PM-2:00PM 19 -March Tuesday Defect in timber, Sawing of timber 1.5hrs 5:00PM-6:30PM
FLUID KINEMATICS Timber
22 -April Monday Continuity equation 1hrs 1:00PM-2:00PM 20 -March Wednesday Seasoning 1.5hrs 5:00PM-6:30PM

23 -April Tuesday Velocity and stream function 1hrs 1:00PM-2:00PM 21 -March Thursday Wood product 1.5hrs 5:00PM-6:30PM

24 -April Wednesday Eulers , B.E equation 1hrs 1:00PM-2:00PM 22 -March Friday Paint vernish 1.5hrs 5:00PM-6:30PM
FLUID DYNAMICS Paint
25 -April Thursday Application of B.E Equation 1hrs 1:00PM-2:00PM 26 -March Tuesday Distemper 1.5hrs 5:00PM-6:30PM

Basic introduction , shear stress


26 -April Friday 1hrs 1:00PM-2:00PM 27 -March Wednesday Fat lime 1.5hrs 5:00PM-6:30PM
and velcoity profile
Lime
LAMINAR & TURBULENT
29 -April Monday Pressure drop , friction factor 1hrs 1:00PM-2:00PM 28 -March Thursday Hydraulic lime 1.5hrs 5:00PM-6:30PM
FLOW

30 -April Tuesday Turbulent flow 1hrs 1:00PM-2:00PM 29 -March Friday Classification of aggregate 1.5hrs 5:00PM-6:30PM

1 -May Wednesday Major , minor losses 1hrs 1:00PM-2:00PM 1 -April Monday Bulking of sand 1.5hrs 5:00PM-6:30PM
FLOW THROUGH PIPE Concrete technology
Concept of equivalent pipe and
2 -May Thursday 1hrs 1:00PM-2:00PM 2 -April Tuesday Water cement ratio 1.5hrs 5:00PM-6:30PM
maximum efficiency

3 -May Friday BOUNDARY LAYER THEORY Boundry layer thoery 1hrs 1:00PM-2:00PM 3 -April Wednesday Workability, Admixture 1.5hrs 5:00PM-6:30PM

6 -May Monday Free Vortex motion 1hrs 1:00PM-2:00PM 4 -April Thursday Building masonry and satir 1.5hrs 5:00PM-6:30PM
VORTEX MOTION Building construction
7 -May Tuesday Forced Vortex motion 1hrs 1:00PM-2:00PM 5 -April Friday Door and window roofing 1.5hrs 5:00PM-6:30PM

Similarity , dimensionless
8 -May Wednesday MODELLING AND SIMLITUDE 1hrs 1:00PM-2:00PM 8 -April Monday Live doubt and miscellaneous-1 1.5hrs 5:00PM-6:30PM
number

LIVE DOUBT AND


9 -May Thursday Impact of jet 1hrs 1:00PM-2:00PM 9 -April Tuesday Live doubt and miscellaneous-2 1.5hrs 5:00PM-6:30PM
MISCELLANEOUS

10 -May Friday Turbine basic , classification 1hrs 1:00PM-2:00PM 10 -April Wednesday Live doubt and miscellaneous-3 1.5hrs 5:00PM-6:30PM

Pelton wheel , francis , kaplan


13 -May Monday HYDRAULIC MACHINE 1hrs 1:00PM-2:00PM
turbine
End of Subject
14 -May Tuesday Pump-1 1hrs 1:00PM-2:00PM

15 -May Wednesday Pump-2 1hrs 1:00PM-2:00PM


16 -May Thursday Live doubt and miscellaneous-1 1hrs 1:00PM-2:00PM

LIVE DOUBT AND


17 -May Friday Live doubt and miscellaneous-2 1hrs 1:00PM-2:00PM
MISCELLANEOUS

18 -May Saturday Live doubt and miscellaneous-3 1hrs 1:00PM-2:00PM

End of Subject