TODAY’S SOLUTION
1
2023-03-01
LEED Overview –
THE RATING SYSTEMS
2
2023-03-01
LEED FOR
THE DEVELOPER
3
2023-03-01
TRIPLE BOTTOM
LINE
4
2023-03-01
TRIPLE BOTTOM
LINE
10
5
2023-03-01
11
12
6
2023-03-01
13
Objectives:
•Understand the purpose of a third-party green building
rating system in the 21st century
•Define LEED and its rating systems for different
building types
•Describe how to define a green building using the
LEED rating system
•Register and prepare for the LEED Green Associate
Exam
14
7
2023-03-01
AGENDA
15
WHO AM I?
• Where I initially was exposed to LEED
• How I got involved in LEED Exam Prep
• What I am doing now
• Where to next?
• My Experience as a LEED consultant
• Why I chose to get involved in the green
building industry
• A great place to start
• Multi-Disciplinary
• It is the future of our built environment and
humanity!
16
8
2023-03-01
17
18
9
2023-03-01
19
20
10
2023-03-01
21
• Formally Acceptable
1. U.S. Green Building Council
2. USGBC
*MUST KNOW*
22
11
2023-03-01
Developing
LEED
Rating
Systems
23
LEED Principles –
TRIPLE BOTTOM LINE
Examples of buildings that do not
meet the 3 P’s
24
12
2023-03-01
SOURCE USE
25
26
13
2023-03-01
27
LEED Overview –
Familiar terms
• Hard Costs: Actual Construction (work + materials)
• Open/Closed Loop
28
14
2023-03-01
30
15
2023-03-01
31
32
16
2023-03-01
LEED BUILDING
DESIGN +
CONSTRUCTION.
Market Adaptations
33
LEED INTERIOR
DESIGN +
CONSTRUCTION.
Market Adaptations
34
17
2023-03-01
LEED FOR
OPERATIONS AND
MAINTENANCE -
Market Adaptations
35
Multifamily Midrise
• Residential Building
• 4 – 8 stories maximum
NO LEED ONLINE
36
18
2023-03-01
•Walkability
•Watershed as a source of water
•Infrastructure connecting the buildings
•Mixture of uses
37
38
19
2023-03-01
39
MUST KNOW
40
20
2023-03-01
41
LEED Overview –
HOW TO EARN POINTS
Prerequisites
• Key criteria that define green building performance
• Worth no points
• Most categories include mandatory Prerequisites
• Must meet to be eligible for certification
• MANDATORY
42
21
2023-03-01
Intents
Why the credit exists and how it promotes sustainability
Requirements
Out of scope, but helps understanding
Different ways to achieve credits to receive points
Strategies
How to meet the requirements
43
44
22
2023-03-01
45
Integrative Process
Terms:
LEED Charrette – Pre-pre design workshop with all principal team members
– A goal setting workshop
Owners Project Requirements (OPR) – Document which specifies the important concepts
which will lead to a project’s success
46
23
2023-03-01
Integrative
Process
47
• No Prerequisites
• Select a location which mitigates occupant’s impact by:
48
24
2023-03-01
Requirements:
Option 1 – Select a previously developed site
– OR -
Option 2 - Do not develop on:
1. Prime Farmland
2. Flood Plains
3. Habitat for threatened or endangered species
4. Land within 50’ of wetlands
5. Land within 100’ of water body
49
Important Terms
Brownfield – previously developed site that is
contaminated/polluted
Infill site – 75% of site is previously developed
Historic District – A group of buildings/structures that
have been deemed significant to the area
50
25
2023-03-01
Option 3: Brownfield
Remediation - Remediate the
land (+/-)
51
LTc4 – Surrounding
Density & Diverse Uses (1-
5 Points)
Intent: To conserve land and habitats by developing in
areas with existing infrastructure. To reduce driving to
amenities
Important Terms
𝐁𝐮𝐢𝐥𝐝𝐢𝐧𝐠𝐅𝐥𝐨𝐨𝐫𝐀𝐫𝐞𝐚 𝐒𝐅
𝐅𝐀𝐑 =
𝐛𝐮𝐢𝐥𝐝𝐚𝐛𝐥𝐞𝐥𝐚𝐧𝐝𝐚𝐫𝐞𝐚
52
26
2023-03-01
LTc4 – Surrounding
Density & Diverse Uses
53
54
27
2023-03-01
55
56
28
2023-03-01
57
58
29
2023-03-01
59
60
30
2023-03-01
61
62
31
2023-03-01
Sustainable Sites
63
64
32
2023-03-01
65
66
33
2023-03-01
67
Intent: To create exterior open space that encourages interaction with the
environment, social interaction, passive recreation, and physical activities.
68
34
2023-03-01
SSc5.1 SSc5.2
69
70
35
2023-03-01
SSc4: Rainwater
Management Strategies
71
72
36
2023-03-01
73
74
37
2023-03-01
75
Intent: To increase night sky access, improve nighttime visibility, and reduce the consequences of
development for wildlife and people.
1. Exterior Light Pollution – around building
2. Interior Light Pollution – Light Trespass and escaping light
76
38
2023-03-01
EXTERIOR
LIGHTING
LIGHTING
PLAN
77
78
39
2023-03-01
Water Efficiency –
79
Water Efficiency –
80
40
2023-03-01
Water Efficiency –
How we use our freshwater
In the last century, water consumption has grown at a
faster rate than population growth
8%
81
Water Efficiency –
82
41
2023-03-01
83
Sample question: Your project team manages to reduce indoor water use by 23%
and outdoor by 75%, how many points do you get under Water Efficiency?
84
42
2023-03-01
85
86
43
2023-03-01
87
Make-up water
88
44
2023-03-01
89
90
45
2023-03-01
91
92
46
2023-03-01
93
EAc1 – Enhanced
Commissioning and
Verification
94
47
2023-03-01
95
96
48
2023-03-01
Energy Performance
Points (BD+C –
Percentage
New Construction
Reduction
Only)
5%
6%
Prerequisite
1
EAc2 – Optimize Energy Performance
8% 2
10% 3
12% 4
14% 5
16% 6
18% 7
20% 8
22% 9
24% 10
26% 11
29% 12
32% 13
35% 14
38% 15
42% 16
46% 17
50% 18
54% (EP) 19
97
98
49
2023-03-01
99
Intent: To support energy management and identify opportunities for additional energy
savings by tracking building-level and system-level energy use.
100
50
2023-03-01
101
EAc6 – Enhanced
Refrigerant Management
(1 point)
Option 1 – No refrigerants
used
Option 2 – Calculation:
ODP + GWP < X
102
51
2023-03-01
PEAKER
PLANTS
103
104
52
2023-03-01
105
106
53
2023-03-01
% 𝑹𝒆𝒅𝒖𝒄𝒕𝒊𝒐𝒏 =
𝐏𝐞𝐫𝐜𝐞𝐧𝐭𝐚𝐠𝐞 𝐨𝐟 𝐠𝐫𝐞𝐞𝐧 𝐩𝐨𝐰𝐞𝐫 𝐨𝒓 𝒄𝒂𝒓𝒃𝒐𝒏 𝒐𝒇𝒇𝒔𝒆𝒕 (𝒌𝒘𝒉 𝒐𝒓 𝑪𝑶𝟐𝒆) 50% 1
𝐓𝐨𝐭𝐚𝐥 𝐛𝐮𝐢𝐥𝐝𝐢𝐧𝐠 𝐚𝐧𝐧𝐮𝐚𝐥 𝐞𝐧𝐞𝐫𝐠𝐲 𝐮𝐬𝐚𝐠𝐞 (𝐤𝐰𝐡 𝒐𝒓 𝑪𝑶𝟐𝒆)
100% 2
107
2. INDIRECT
A. REC = Renewable Energy Certificates = 1 MWh eq.
• Tradeable Commodity
B. Carbon Offsets measured in metric tonnes of CO2e
– Reduces same amount of CO2 somewhere else
108
54
2023-03-01
RECs Explained
109
2. INDIRECT
A. REC = Renewable Energy Certificates = 1 MWh
eq.
• Tradeable Commodity
B. Carbon Offsets measured in metric tonnes of
CO2e
– Reduces same amount of CO2 somewhere else
110
55
2023-03-01
111
112
56
2023-03-01
Intent:
To reduce construction and demolition waste
disposed of in landfills and incineration facilities
by recovering, reusing, and recycling materials
113
Intent:
To reduce construction and demolition waste
disposed of in landfills and incineration facilities by
recovering, reusing, and recycling materials. Construction Waste
Percentage
Points (BD+C)
Diverted
Waste Streams include:
•Deconstructed materials sent to reuse markets Plan Prerequisite
•Commingled waste 50% + 3 streams 1
•Supplier’ take-back of materials
•Reuse of materials on site 75% + 4 streams 2
114
57
2023-03-01
115
116
58
2023-03-01
117
Intent: To encourage the use of products and materials for which life-cycle
information is available and that have environmentally, economically, and
socially preferable life-cycle impacts.
118
59
2023-03-01
119
120
60
2023-03-01
121
122
61
2023-03-01
Recycled Content
Materials Reuse
(Post = 100%)
(100%)
(Pre = 50%)
123
KNOW GREEN
SCREEN!
124
62
2023-03-01
125
126
63
2023-03-01
127
RENT
$318/SQ FT/YR $20/SQ FT/YR $2.25/SQ FT/YR
128
64
2023-03-01
129
130
65
2023-03-01
131
132
66
2023-03-01
133
134
67
2023-03-01
Intent: To reduce concentrations of chemical contaminants that can damage air quality, human
health, productivity, and the environment. *MUST KNOW
THESE 3 Below*
135
Flooring 100%
CDPH Standard Method v1.1-2010
California Air Resources Board (CARB), Airborne Toxic
100% not covered by Control Measure (ATCM)
Composite wood
other categories for Ultra-Low Emitting (ULEF) or No Added
Formaldehyde Resins
ANSI/BIFMA
Standard Method M7.1-2011
Furniture At least 90%, by cost
ANSI/BIFMA e3-2011
136
68
2023-03-01
GREENSEAL
137
Intent: Minimize indoor air quality problems associated with construction + renovation
Follow Sheet Metal and Air Conditioning National Contractors Association (SMACNA)
IAQ Guidelines
138
69
2023-03-01
Intent: To establish better quality indoor air in the building after construction and
during occupancy
Option 1/2 - Full Building flushout (14000cf-air/sf-floor area) – 1 point
- OR -
Option 3 - IAQ Test after construction, before occupancy - 1 point
• Formaldehyde
• Carbon monoxide (CO)
Sample Question: What is not a priority in a building flush out: CO, CO2, TVOC or Ozone.
Answer: CO2
139
140
70
2023-03-01
141
142
71
2023-03-01
143
Option 3 – Measurement
144
72
2023-03-01
145
146
73
2023-03-01
147
148
74
2023-03-01
Innovation in Design
149
Narrative Statement of Enlighten the tenants and inform them of their current
Credit Intent energy usage with the goal of reduction
Narrative Statement describing Smart TV with real time data of building usage
Credit requirements Signage explaining the LEED Credits
150
75
2023-03-01
151
Achieve one pilot credit from USGBC’s LEED Pilot Credit Library
v5
v5
152
76
2023-03-01
153
Regional Priority
154
77
2023-03-01
155
Additional Terms
156
78
2023-03-01
THE EXAM
• 2 hours
• 100 Questions
• Multiple Choice (no part points. IE. Right or Wrong)
• Pass: 170/200 not = to 85%
• Unknown Scoring scheme
•125 = 0 = Lowest score
157
158
79
2023-03-01
What’s Included:
1. 12+ hours of in-class instruction
2. An introduction to the LEED AP and an in-depth credit by credit description of their intents, requirements,
submittals, documentation and real life examples
3. 4 Mock Exams (400 Questions) with in-depth question answers and explanations
4. LEED reference guide summary charts
5. Access to project CAD files, energy models, LEED letter templates and spreadsheet
COSTS: $100
159
NEXT STEPS
1. Go to www.leadinggreen.com
2. Sign in
A. Username –
B. Password –
3. Go to the live materials follow up button
4. Read the study guide
5. Achieve 85%+ consistently on all mock exams
6. Register with USGBC.org
• Request student discount
7. Pay for the exam
8. Schedule the exam on www.prometric.com under GBCI
9. Pass!
160
80