Daily Work Report (Achievement) Date : 12-06-2023

Sl Work Description Remarks


1 Service Pile casting completed SP-36,12 Service Pile casting- 02 Nos; Total = 177/177
2 Rebar fabrication Tie Beam Ongoing
3 Tie Beam Earth Excavation Work (East Side) Ongoing
4 Pile Head Breaking Work (East Side) Ongoing
5 Tie Beam Casting (West Side)-33 m Done
6 Leveling & Dressing By Excavator Ongoing
7 Earth Shifting 2 Truck
8 Safety toolbox meeting Ongoing
9 Rebar Shifting 17 ton
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile Boring Boring Casting Qty Actual Casting Supplier Remark

Qty depth

type (nos) (m) depth (ft) (m3) Planned Qty (m3)

1 11-Mar-23 SP-19 SP 1 52.55 172.364 21.8544 23 RMC STONE ISSUE.

19 SP 1 52.55 172.364 21.8544 23 Shah


2 12-Mar-23 SP-32 SP 1 52.55 172.364 21.8544 24.5 Trimi Pipe blocked. Crown
32 SP 1 52.55 172.364 21.8544 24.5 Crown
Concrete waste due to trimi
pipe logging
3 13-Mar-23 SP-17 SP 1 52.55 172.364 21.8544 23.5
17 SP 1 52.55 172.364 21.8544 23.5 Shah
Shah, Aggregate size more
than 20 mm
4 14-Mar-23 SP-21 SP 1 52.55 172.364 21.8544 23
21 SP 1 52.55 172.364 21.8544 23 Shah
Rig machine out of service
for 24 hours.
5 15-Mar-23 SP- 28,44 SP 2 52.55 172.364 43.7088 46.4
28 SP 1 52.55 172.364 21.8544 23.4 Crown
44 SP 1 52.55 172.364 21.8544 23 Crown
6 16-Mar-23 SP- 30,55 SP 2 52.55 172.364 43.7088 45.9
30 SP 1 52.55 172.364 21.8544 23 Crown Trimi Pipe blocked.
55 SP 1 52.55 172.364 21.8544 22.9 Crown
CROWN compary RMC
pump could not supply.
7 17-Mar-23 SP- 42,39 SP 2 52.55 172.364 43.7088 45.4

CROWN compary RMC


42 SP 1 52.55 172.364 21.8544 22.9 Crown pump could not
supply.Ttime pipe jammed.

39 SP 1 52.55 172.364 21.8544 22.5 Crown


CROWN compary RMC
pump could not supply.
8 18-Mar-23 SP- 53,51 SP 2 52.55 172.364 43.7088 45.35

CROWN compary RMC


53 SP 1 52.55 172.364 21.8544 22.5 Crown pump could not supply.
Ttime pipe jammed.

CROWN compary RMC


51 SP 1 52.55 172.364 21.8544 22.85 Crown pump could not supply.
Ttime pipe jammed.

9 19-Mar-23 SP- 33,5 SP 2 52.55 172.364 44.11072 54.3


33 SP 1 52.55 172.364 22.25632 22.5 Crown SHL pump
5 SP 1 54.05 172.364 21.8544 22.3 Crown SHL pump
15.3 CB 15.3 6.88 9.5 Crown Crown Beam
10 20-Mar-23 SP- 68,45 SP 2 52.55 172.364 43.7088 44.75

68 SP 1 52.55 172.364 21.8544 22.25 Crown 4m Caving happene, SHL Pile

45 SP 1 54.05 172.364 21.8544 22.5 Crown SHL pump

11 21-Mar-23 SP- 02,81 SP 2 52.55 172.364 43.7088 44.25


2 SP 1 52.55 172.364 21.8544 22.25 Crown
81 SP 1 52.55 172.364 21.8544 22 Crown

12 22-Mar-23 SP-93,57 SP 2 52.55 172.364 43.7088 44


93 SP 1 52.55 172.364 21.8544 22.25 Crown
57 SP 1 52.55 172.364 21.8544 21.75 Crown

SP-
13 23-Mar-23
06,31,04 SP 3 52.55 172.364 65.5632 66
6 SP 1 54.05 177.284 21.8544 22 Crown
31 SP 1 52.55 172.364 21.8544 21.8 Crown SSE- Ext.Boring-1550 mm
4 SP 1 52.55 172.364 21.8544 22.2 Crown SSE- Ext.Boring-1800 mm

14 24-Mar-23 SP-91 SP 1 52.55 172.364 21.8544 21.5

91 SP 1 52.55 172.364 21.8544 21.5 Crown

SP-
15 25-Mar-23
69,54,43 SP 3 52.55 172.364 65.5632 65
69 SP 1 52.55 172.364 21.8544 21.75 Crown
54 SP 1 52.55 172.364 21.8544 21.75 Crown
43 SP 1 52.55 172.364 21.8544 21.5 Crown
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile Boring Boring Casting Qty Actual Casting Supplier Remark

Qty depth

type (nos) (m) depth (ft) (m3) Planned Qty (m3)

16 26-Mar-23 SP- SP 0 52.55 172.364 0 0 Rig machine out of service

Boring complete 49 m, after


18 SP 0 52.55 172.364 Crown that rig machine & Crain out
of service.

17 27-Mar-23 SP-18,80 SP 2 52.55 172.364 43.7088 43 Crane Problem

18 SP 1 52.55 172.364 21.8544 21.5 Crown SHL pump


80 SP 1 52.55 172.364 21.8544 21.5 Crown SHL pump

18 28-Mar-23 SP-20,92 SP 2 52.55 172.364 43.7088 43


20 SP 1 52.55 172.364 21.8544 21.5 Crown SHL pump
92 SP 1 52.55 172.364 21.8544 21.5 Crown SHL pump

19 29-Mar-23 SP-58 SP 1 52.55 172.364 21.8544 22.7

Concrete casting done


without pump (Suddenly
58 SP 1 52.55 172.364 21.8544 22.7 Crown
Crown stoped sending RMC
& Pump operator)

20 30-Mar-23 SP-03,56 SP 2 52.55 172.364 43.7088 43


3 SP 1 52.55 172.364 21.8544 21.5 Crown SHL pump
56 SP 1 52.55 172.364 21.8544 21.5 Crown SHL pump

21 31-Mar-23 SP-29,01 SP 2 52.55 172.364 43.7088 43

work stop 1.10 hour due to


29 SP 1 52.55 172.364 21.8544 21.5 Crown
rain.
Rebarcage can not being
1 SP 1 52.55 172.364 21.8544 21.5 Crown
lowered easily last 10 m
Rig machine and crane
22 1-Apr-23 SP-16,34 SP 2 52.55 172.364 43.7088 43 malfunction.

work stop 1 hour due to


16 SP 1 52.55 172.364 21.8544 21.5 Crown
rain. Pile caving 1.5 m
Rig machine 2 h and crane
34 SP 1 52.55 172.364 21.8544 21.5 Crown
malfunction.

23 2-Apr-23 SP-40,8 SP 2 52.55 172.364 43.7088 44.5 51

Casting delayed due to


40 SP 1 52.55 172.364 21.8544 23 Shah rejection of 1st TM (over
slump)
8 SP 1 52.55 172.364 21.8544 21.5 Shah

Crane and excavator out of


24 3-Apr-23 SP-46, SP 1 52.55 172.364 21.8544 21.5 service Since morning , 12
hour.
46 SP 1 52.55 172.364 21.8544 21.5 Crown

25 4-Apr-23 SP-22,52 SP 2 52.55 172.364 43.7088 43.4

22 SP 1 52.55 172.364 21.8544 21.5 Shah


52 SP 1 52.55 172.364 21.8544 21.9 Crown Extra boring 1.2 m more.

SP-
26 5-Apr-23
70,50,82 SP 3 52.55 172.364 65.5632 67

70 SP 1 52.55 172.364 21.8544 23.3 Crown


1 hour delayed due to rig
50 SP 1 52.55 172.364 21.8544 21.9 Shah
machine entry
1 Hour delayed due to vip
82 SP 1 52.55 172.364 21.8544 21.8 Shah
movement.

27 6-Apr-23 SP-67 SP 2 52.55 172.364 43.7088 44.3

38 SP 1 52.55 172.364 21.8544 22.5 Shah


67 SP 1 52.55 172.364 21.8544 21.8 Shah

28 7-Apr-23 SP-27 SP 1 52.55 172.364 21.8544 21.8

27 SP 1 52.55 172.364 21.8544 21.8 Shah RMC delayed


DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile Boring Boring Casting Qty Actual Casting Supplier Remark

Qty depth

type (nos) (m) depth (ft) (m3) Planned Qty (m3)

29 8-Apr-23 SP-65,15, SP 2 52.55 172.364 43.7088 44.3

Caving 3 m, rebar cage lifted


65 SP 1 52.55 172.364 21.8544 22.5 Shah
and reboring done.

15 SP 1 52.55 172.364 21.8544 21.8 Crown

SP-
30 9-Apr-23
77,41,63 SP 3 52.55 172.364 65.5632 65.6

Caving 3 m, rebar cage lifted


77 SP 1 52.55 172.364 21.8544 22 Shah
and reboring done.

41 SP 1 52.55 172.364 21.8544 21.8 Shah


63 SP 1 52.55 172.364 21.8544 21.8 Crown

SP-
31 10-Apr-23
13,07,66 SP 3 52.55 172.364 65.5632 66.8

13 SP 1 52.55 172.364 21.8544 22.8 Crown

7 SP 1 52.55 172.364 21.8544 21.8 Crown

66 SP 1 52.55 172.364 21.8544 22.2 Crown

SP-
32 11-Apr-23
75,94,48 SP 3 52.55 172.364 65.5632 66

75 SP 1 52.55 172.364 21.8544 21.9 Crown

94 SP 1 52.55 172.364 21.8544 22.3 Crown

48 SP 1 52.55 172.364 21.8544 21.8 Crown

SP-
33 12-Apr-23
89,79,60 SP 3 52.55 172.364 65.5632 65.4

RMC supply late due to


89 SP 1 52.55 172.364 21.8544 21.8 Crown
plant machine problem

79 SP 1 52.55 172.364 21.8544 21.8 Crown

60 SP 1 52.55 172.364 21.8544 21.8 Crown

34 13-Apr-23 SP-24, 64 SP 2 52.55 172.364 43.7088 48.6

RMC supply late due to lack


24 SP 1 52.55 172.364 21.8544 21.8 Crown
of RMC vehicals

RMC delay 02 Hours, 04 m


Trime pipe was removed
64 SP 1 52.55 172.364 21.8544 21.8 Crown due to block of the trime
pipe before the concrete
was of proper size

Crown Beam CB 5 Crown

SP-
35 14-Apr-23 90,09,76,6 SP 4 52.55 172.364 87.4176 86.8
2

Rebar cage lapping &


welding time total 5.0 hours,
90 SP 1 52.55 172.364 21.8544 21.7 Crown SSE man power work
progress slow at the night
shift.

Rebar cage lapping &


welding time total 5.0 hours,
9 SP 1 52.55 172.364 21.8544 21.8 Crown SSE man power work
progress slow at the night
shift.

76 SP 1 52.55 172.364 21.8544 21.8 Crown


62 SP 1 52.55 172.364 21.8544 21.5 Crown

36 15-Apr-23 SP-74 SP 1 52.55 172.364 21.8544 21.5

74 SP 1 52.55 172.364 21.8544 21.5 Shah RMC delayed 6:00 H

37 16-Apr-23 SP-78 SP 1 52.55 172.364 21.8544 21.5

Casting 3;30 H delayed for


78 SP 1 52.55 172.364 21.8544 21.5 Shah Re-bar case unload. RMC
delayed 3:00 H
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile Boring Boring Casting Qty Actual Casting Supplier Remark

Qty depth

type (nos) (m) depth (ft) (m3) Planned Qty (m3)

SP-
38 17-Apr-23
88,47,86 SP 3 52.55 172.364 65.5632 65.8

88 SP 1 52.55 172.364 21.8544 21.5 Shah RMC delayed 3:00 H


Boring late for technical
47 SP 1 52.55 172.364 21.8544 22.5 Shah
problem
86 SP 1 52.55 172.364 21.8544 21.8 Shah

39 29-Apr-23 SP-23,72 SP 2 52.55 172.364 43.7088 43.3

Rebar cage installing late


23 SP 1 52.55 172.364 21.8544 21.8 Shah about 02 hours due to SSE
manpower
Shah RMC delay due to
pump, Shah can't arrange
pump for concreting, Then
Concreting done without
72 SP 1 52.55 172.364 21.8544 21.5 Shah
pump

40 30-Apr-23 SP-35 SP 1 52.55 172.364 21.8544 21.8

Due to rebar shortage


35 SP 1 52.55 172.364 21.8544 21.8 Shah
progress is slow.

41 1-May-23 SP- SP 0 52.55 172.364 0 0

No Casting Due to SSE


SP 0 52.55 172.364 0 0 Manpower Problem (Rebar
Case Not Ready)

42 2-May-23 SP-105,49 SP 2 52.55 172.364 43.7088 44.6

Casting Delay for SSE


105 SP 1 52.55 172.364 21.8544 21.8 Shah Manpower Problem (Rebar
Case Not Ready)

Shah RMC Problem Stone


Size 3/4"(+)
Extra Casting for Pile Caving
(Casting Delay for SSE
49 SP 1 52.55 172.364 21.8544 22.8 Shah
Manpower Problem (Rebar
Case Not Ready))

SP-
43 3-May-23
10,87,119 SP 3 52.55 172.364 65.5632 65.4

Casting Delay for SSE


10 SP 1 52.55 172.364 21.8544 21.8 Crown Manpower Problem (Rebar
Case Not Ready)

Casting Delay for SSE


87 SP 1 52.55 172.364 21.8544 21.8 Crown Manpower Problem (Rebar
Case Not Ready)
Casting Delay for SSE
119 SP 1 52.55 172.364 21.8544 21.8 Crown Manpower Problem (Rebar
Case Not Ready)

44 4-May-23 SP-37,73 SP 2 52.55 172.364 43.7088 43.5

Casting Delay for SSE


37 SP 1 52.55 172.364 21.8544 21.8 Crown Manpower Problem (Rebar
Case Not Ready)
73 SP 1 52.55 172.364 21.8544 21.7 Crown

SP-107,11,
45 5-May-23
111 SP 3 52.55 172.364 65.5632 68.3

Extra Casting for Trime Pipe


107 SP 1 52.55 172.364 21.8544 22.8 Crown
Jam

Extra Casting for Trime Pipe


11 SP 1 52.55 172.364 21.8544 23.8 Crown
Jam
111 SP 1 52.55 172.364 21.8544 21.7 Crown
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile Boring Boring Casting Qty Actual Casting Supplier Remark

Qty depth

type (nos) (m) depth (ft) (m3) Planned Qty (m3)

SP-
46 6-May-23
85,25,59 SP 3 52.55 172.364 65.5632 65.4

85 SP 1 52.55 172.364 21.8544 21.8 Crown


25 SP 1 52.55 172.364 21.8544 21.8 Crown
59 SP 1 52.55 172.364 21.8544 21.8 Crown

47 7-May-23 SP-97,14 SP 2 52.55 172.364 43.7088 43.5

Concrete Pouring late due to


97 SP 1 52.55 172.364 21.8544 21.7 Crown
RMC supply

Consultant stopped rebar


cage lowering due to rebar
14 SP 1 52.55 172.364 21.8544 21.8 Crown
cage welding problem, RMC
supply late

SP- 123,
48 8-May-23
83, 102 SP 3 52.55 172.364 65.5632 65.3

Tremie pipe lowering late


due to machine movement,
123 SP 1 52.55 172.364 21.8544 21.7 Crown cavin 2.2 m and tremie pipe
wash, Concrete Pouring late
04 Hours due to RMC supply

83 SP 1 52.55 172.364 21.8544 21.8 Crown


102 SP 1 52.55 172.364 21.8544 21.8 Crown

49 9-May-23 SP- 26,71 SP 2 52.55 172.364 43.7088 43.4

26 SP 1 52.55 172.364 21.8544 21.7 Crown


71 SP 1 52.55 172.364 21.8544 21.7 Crown

SP- 95,
50 10-May-23
109, 135 SP 3 52.55 172.364 65.5632 66.1

95 SP 1 52.55 172.364 21.8544 21.7 Crown


109 SP 1 52.55 172.364 21.8544 21.7 Crown

Casting late due to RMC


delay, 01 m3 RMC extra
135 SP 1 52.55 172.364 21.8544 22.7 Crown ordered due to Tremie pipe
get blocked and concrete
westage

SP-
51 11-May-23
140,167 SP 2 52.55 172.364 43.7088 43.5

Rebar cage lowering 4.5


hours late due to crane
140 SP 1 52.55 172.364 21.8544 21.7 Crown
problem & earth removing
(Dependent movement)

Concreting late 12 Hours


167 SP 1 52.55 172.364 21.8544 21.8 Crown
due to VVIP movement

SP-
52 12-May-23
121,170 SP 2 52.55 172.364 43.7088 45.5

121 SP 1 52.55 172.364 21.8544 21.7 Crown

Extra RMC ordered 2 m3


170 SP 1 52.55 172.364 21.8544 23.8 Crown
due to extra boring

SP-
53 13-May-23
148,155 SP 2 52.55 172.364 43.7088 43.6

148 SP 1 52.55 172.364 21.8544 21.8 Crown


155 SP 1 52.55 172.364 21.8544 21.8 Crown

SP-
54 14-May-23
137,158 SP 2 52.55 172.364 43.7088 43.3

137 SP 1 52.55 172.364 21.8544 21.5 Crown


158 SP 1 52.55 172.364 21.8544 21.8 Crown

55 15-May-23 SP- 175 SP 1 52.55 172.364 21.8544 21.8

175 SP 1 52.55 172.364 21.8544 21.8 Crown RMC Supply Delay

SP-
56 16-May-23
133,142 SP 2 52.55 172.364 43.7088 43.5

133 SP 1 52.55 172.364 21.8544 21.8 Crown


142 SP 1 52.55 172.364 21.8544 21.7 Crown

SP-
57 17-May-23 162,173, SP 3 52.55 172.364 65.5632 65.2
144
162 SP 1 52.55 172.364 21.8544 21.8 Crown
173 SP 1 52.55 172.364 21.8544 21.8 Crown
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile Boring Boring Casting Qty Actual Casting Supplier Remark

Qty depth

type (nos) (m) depth (ft) (m3) Planned Qty (m3)


144 SP 1 52.55 172.364 21.8544 21.6 Crown
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile Boring Boring Casting Qty Actual Casting Supplier Remark

Qty depth

type (nos) (m) depth (ft) (m3) Planned Qty (m3)


SP-
58 18-May-23 101,157, SP 3 52.55 172.364 65.5632 66.5
103
101 SP 1 52.55 172.364 21.8544 21.6 Crown
157 SP 1 52.55 172.364 21.8544 21.7 Crown
103 SP 1 52.55 172.364 21.8544 23.2 Crown

59 19-May-23 SP-169,146 SP 2 52.55 172.364 43.7088 43.5

169 SP 1 52.55 172.364 21.8544 21.8 Crown


146 SP 1 52.55 172.364 21.8544 21.7 Crown

SP-165,132
60 20-May-23
,143 SP 2 52.55 172.364 43.7088 43.4

165 SP 1 52.55 172.364 21.8544 21.8 Crown


132 SP 1 52.55 172.364 21.8544 21.6 Crown

SP-
61 21-May-23 143,130, SP 2 52.55 172.364 43.7088 43.2
138
143 SP 1 52.55 172.364 21.8544 21.6 Crown
130 SP 1 52.55 172.364 21.8544 21.6 Crown

SP-
62 22-May-23 138,159, SP 3 52.55 172.364 65.5632 66.25
177
Extra RMC ordered 1.25 m3
138 SP 1 52.55 172.364 21.8544 22.95 Crown due to concrete level -
12600 down
159 SP 1 52.55 172.364 21.8544 21.6 Crown
177 SP 1 52.55 172.364 21.8544 21.7 Crown

63 23-May-23 SP-98,126 SP 2 52.55 172.364 43.7088 43.2

Casing Drive
21.05.23 ,Boring Stopped
08:00am 21.05.23
to05.30pm due to bucket
98 SP 1 52.55 172.364 21.8544 21.6 Crown
problem, Rebar cage
lowering late 01:30am to
04:am due to Rig
chainproblem

126 SP 1 52.55 172.364 21.8544 21.6 Crown

SP-174,
64 24-May-23
131 SP 2 52.55 172.364 43.7088 43.8

1. SP-174 boring ends at


06:00 pm 23.05.23 but it's
almost 07:30 am 24.05.23
rebar cage installing can't
possible due to heavy rain
174 SP 1 52.55 172.364 21.8544 22.2 Crown
and a full night soil shift. 2.
Concreting late due to the
RMC order being placed at
12:46 pm, but the company
ordered that at 1:43 pm.

Boring stopped from 06.00


pm 23.05.23 to 06:30 am
24.05.23 due to heavy rain
and soil shifting work, soil
shifting place stopped due
131 SP 1 52.55 172.364 21.8544 21.6 Crown to rain but soil shifting was
very emergency because
TBEA Safety metting
08:30am 24.05.23 then
temporary emmergency soil
shifting DPDC to Desh TV

65 25-May-23 SP-84,171 SP 2 52.55 172.364 43.7088 43.4

Concreting late 03 Hours


due to RMC concrete pipe
blocked and apx. 1.2 m3
84 SP 1 52.55 172.364 21.8544 21.7 Crown concrete westage, RMC
plant send 1.5 m3 RMC
there will be no received
copy and no bill payment,
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile Boring Boring Casting Qty Actual Casting Supplier Remark

Qty depth

type (nos) (m) depth (ft) (m3) Planned Qty (m3)

At night SSE soil shifting


only 03 truck, The project is
171 SP 1 52.55 172.364 21.8544 21.7 Crown full of soil, SSE can't shifting
soil properly that’s why
work progress is slow

SP-176,
66 26-May-23
114 SP 3 52.55 172.364 65.5632 65

Concreting late 02 Hours


due to RMC concrete ,
When concreting 01 m3
176 SP 1 52.55 172.364 21.8544 21.7 Shah then tremie pipe was torn
off and about 16 m pipe was
inside the pile, with many
tries, they lift the pipe

114 SP 1 52.55 172.364 21.8544 21.7 Shah

Boring delay 02 Hoursdue


149 SP 1 52.55 172.364 21.8544 21.6 Shah
to Bucket problem

SP-96, 110,
67 27-May-23
151 SP 3 52.55 172.364 65.5632 67.95

Concreting late 03 Hours


96 SP 1 52.55 172.364 21.8544 21.6 Crown due to soil shifting work
ongoing on(gate no. 01)

Concreting delay because


that time tremie pipe was
used for concreting Sp-96.
110 SP 1 52.55 172.364 21.8544 21.5 Crown
So, after Completing the Sp-
96 then concreting starts at
SP-110.

1. RMC supply late due to


Shah supply of RMC from
Gabtali plant, 2. Extra RMC
3.25 m3 ordered due to
151 SP 1 52.55 172.364 21.8544 24.85 Shah
caving.3. Concreting late
due to extra RMC delay
(traffic jam)4. Concrete top
level 8.7 m(0.00)

SP-122,
68 28-May-23
153,100 SP 3 52.55 172.364 65.5632 64.8

Tremie pipe lowering late


due to concreting SP-151
122 SP 1 52.55 172.364 21.8544 21.6 Shah Extra RMC concreting.
2.Concreting top level 8.8 m
(0.00)

Rebar cage lowering late


due to Crane busy for SP-
153 SP 1 52.55 172.364 21.8544 21.6 Crown 122 concreting another side
Rig Machine SR-205 cable
problem from 11:00 PM

Concreting late due to RMC


supply late, Rig machine SR-
100 SP 1 52.55 172.364 21.8544 21.6 Crown
205 out off work from 11:00
pm 27.05.2023 to still now

69 29-May-23 SP-113,124 SP 2 52.55 172.364 43.7088 43.2

113 SP 1 52.55 172.364 21.8544 21.6 Crown


124 SP 1 52.55 172.364 21.8544 21.6 Crown
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile Boring Boring Casting Qty Actual Casting Supplier Remark

Qty depth

type (nos) (m) depth (ft) (m3) Planned Qty (m3)


SP-
70 30-May-23 145,128, SP 3 52.55 172.364 65.5632 64.8
99

Concreting late due to Wash


for Pile Caving 1.5 m, RMC
145 SP 1 52.55 172.364 21.8544 21.6 Crown supply late 1.5 H, extra
casting time due to chain
problem of rig machine.

Casting delay due to crain


out of survice ( full night)
128 SP 1 52.55 172.364 21.8544 21.6 Crown and concreting delaydue to
SR-155 chain problem(9:20
am -9:55am)

Rebar Work Delay 2.5h


(manpower problem), RMC
Supply Delay due to jam
99 SP 1 52.55 172.364 21.8544 21.6 Crown
1.5h, casting delay due to
Crain of service 9 pm to
11:10 pm)

71 31-May-23 SP-163,125 SP 2 52.55 172.364 43.7088 43.6

Tremie pipe lowering delay


due to SP-99, Sp-146 casting
ongoing, concreting order
163 SP 1 52.55 172.364 21.8544 21.6 Crown delay due to pile caving 2.5
m(1.5H wash) and earth
shifting ongoing on the
south gate.

Boring Delay 7h , RMC


Supply Delay 1h, Casting
125 SP 1 52.55 172.364 21.8544 22 Crown
start delay due to rig
machine shifting

SP-
72 1-Jun-23 172,152, SP 3 52.55 172.364 65.5632 78.8
108
Soil shifting delay the work
172 SP 1 52.55 172.364 21.8544 21.6 Crown
progress (1 am to 4:30 am)
Concreting delay due to
152 SP 1 52.55 172.364 21.8544 21.6 Crown
RMC supply delay 1Hour
Crown Beam CB 14 Crown

Rebar case installing late


108 SP 1 52.55 172.364 21.8544 21.6 Crown due to SSE welder. Crown
RMC supply late 1.2 Hours
SP-
73 2-Jun-23 166,115, SP 3 52.55 172.364 65.5632 66.2
120

The rebar cage installing late


due to the soil removal, and
166 SP 1 52.55 172.364 21.8544 21.6 Crown the SSE welder
problem.RMC supply late-
1H. 2.5 m Caving appeared

Boring late 3 hours, Rebar


cage welding late 2 hours,
115 SP 1 52.55 172.364 21.8544 21.6 Crown RMC supply late due to the
2 hours late arrival of 3rd
truck.

Casting delay of 2.5 hours


due to 3.5 m Caving, Tremie
120 SP 1 52.55 172.364 21.8544 23 Crown
Pipe Jam, and 1.4 m3 extra
concrete required.

SP-
74 3-Jun-23
150,127, SP 2 52.55 172.364 43.7088 43.3

Rebar welding delay 2.5


150 SP 1 52.55 172.364 21.8544 21.6 Crown hours due to 1 welder
available at the site
RMC Supply Delay 9 H & VIP
127 SP 1 52.55 172.364 21.8544 21.7 Crown
Movement 2H

75 4-Jun-23 SP-134,164 SP 2 52.55 172.364 43.7088 43.4

Delay For VIP Movement-


134 SP 1 52.55 172.364 21.8544 21.7 Crown
6H:30m
Delay For VIP Movement-
164 SP 1 52.55 172.364 21.8544 21.7 Crown
6H:30m

SP-117,
76 5-Jun-23
168,141 SP 3 52.55 172.364 65.5632 64.8

RMC supply late due to


117 SP 1 52.55 172.364 21.8544 21.6 Crown
plant problem,
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile Boring Boring Casting Qty Actual Casting Supplier Remark

Qty depth

type (nos) (m) depth (ft) (m3) Planned Qty (m3)


Rebar cage lowering delay
141 SP 1 52.55 172.364 21.8544 21.6 Crown 09 Hours due to rebar cage
not ready

168 SP 1 52.55 172.364 21.8544 21.6 Crown

SP-
77 6-Jun-23 136,112, SP 2 52.55 172.364 43.7088 48.95
161

Crown Beam CB 5.75 Crown North Side

Concreting start delay due


136 SP 1 52.55 172.364 21.8544 21.6 Crown to Crown Beam North side
Casting that time.

Rebar cage not ready , RMC


112 SP 1 52.55 172.364 21.8544 21.6 Crown
supply late

SP-
78 7-Jun-23 161,104,14 SP 3 52.55 172.364 65.5632 64.8
7

Rebar Case delay due to


161 SP 1 52.55 172.364 21.8544 21.6 Crown Crown Beam North side
Casting running at that time.

Concreting started late 03


104 SP 1 52.55 172.364 21.8544 21.6 Crown Hours due to Crown pump
hydraulic problem.

147 SP 1 52.55 172.364 21.8544 21.6 Crown

SP-
79 8-Jun-23 156,116,15 SP 3 52.55 172.364 65.5632 64.8
4

156 SP 1 52.55 172.364 21.8544 21.6 Crown

After 16m3 concrete casting


116 SP 1 52.55 172.364 21.8544 21.6 Crown stopped 01 Hour due to
RMC pump out of service.

154 SP 1 52.55 172.364 21.8544 21.6 Crown

SP-
80 9-Jun-23 118,139,16 SP 3 52.55 172.364 65.5632 64.8
0

118 SP 1 52.55 172.364 21.8544 21.6 Crown RMC supply late 2 Hours

Concreting late due to soil


139 SP 1 52.55 172.364 21.8544 21.6 Crown shifting work at south side
gate 01.

Crown RMC supply problem


160 SP 1 52.55 172.364 21.8544 21.6 Crown full day, rebar case installing
late due to RMC problem.

SP-
81 10-Jun-23
129,106 SP 2 52.55 172.364 43.7088 43.2

RMC supply late 2 Hours due


to Crown RMC supply from
129 SP 1 52.55 172.364 21.8544 21.6 Crown Asulia Plant, Soil shifting
stopped full night due to
excavator out of service

106 SP 1 52.55 172.364 21.8544 21.6 Crown

82 11-Jun-23 SP- 61,36 SP 3 52.55 172.364 65.5632 80.3

RMC supply late 4 Hours due


to RMC vehical, Soil shifting
61 SP 1 52.55 172.364 21.8544 21.6 Crown
stopped full night due to SSE
cant manage truck

36 SP 1 52.55 172.364 21.8544 21.6 Crown


DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile Boring Boring Casting Qty Actual Casting Supplier Remark

Qty depth

type (nos) (m) depth (ft) (m3) Planned Qty (m3)


12 SP 1 52.55 172.364 21.8544 21.6 Crown RMC Supply Late 2 H

Crown Beam CB 15.5 Crown West Side

Pile 177 Nos 3872.0707 3932.30 m3


eam 50 m3
Service Pile = 3882.55 m3
Crown Beam = 49.75 m3
Crown = 3290.75 m3
Shah = 641.55 m3

Excess quantity (m3) = 60.23 m3


Total Received (Cft) = 138869.17 cft
Work Order (Cft) Shah = 36370.00 cft W/O No-49895
Balance (Cft) = 13716.87 cft
Work Order (Cft) Crown = 100576.00 cft W/O No-50313
Balance (Cft) = -15620.38 cft
Pil Planned Actual SP1 SP2 SP3 SP4 SP5 SP6 SP7 SP8 SP9 SP10 SP11 SP12 SP13
e
n
o.
Dat 11-Mar 1 1
12-Mar 2 2
13-Mar 4 3
14-Mar 6 4
15-Mar 8 6
16-Mar 10 8
17-Mar 12 10
18-Mar 14 12
19-Mar 17 14
20-Mar 20 16
21-Mar 23 18
22-Mar 26 20
23-Mar 29 23
24-Mar 32 24
25-Mar 35 27
26-Mar 38 27
27-Mar 41 29
28-Mar 44 31
29-Mar 47 32
30-Mar 50 34
31-Mar 53 36
1-Apr 56 38
2-Apr 59 39
3-Apr 62 41
4-Apr 65 43
5-Apr 68 46
6-Apr 71 48
7-Apr 74 49
8-Apr 77 51
9-Apr 80 54
10-Apr 83 57
11-Apr 86 60
12-Apr 89 63
13-Apr 92 65
14-Apr 95 69
15-Apr 98 70
16-Apr 101 71
17-Apr 104 74
18-Apr 107 74
19-Apr 110 74
20-Apr
21-Apr
22-Apr
23-Apr
24-Apr
25-Apr
26-Apr
27-Apr
28-Apr
29-Apr 110 76
30-Apr 113 76
1-May 116 77
2-May 119 79
3-May 122 82
4-May 125 84
5-May 128 87
6-May 131 90
7-May 134 92
8-May 137 95
9-May 140 97
10-May 143 100
11-May 146 102
12-May 150 104
13-May 154 106
14-May 158 108
15-May 162 109
16-May 165 111
17-May 168 114
18-May 171 117
19-May 174 119
20-May 121
21-May 123
22-May 126
23-May 128
24-May 130
25-May 132
26-May 135
27-May 138
28-May 141
29-May 143
30-May 146
31-May 148
1-Jun 151
2-Jun 154
3-Jun 156
4-Jun 158
5-Jun 161
6-Jun 163
7-Jun 166
8-Jun 169
9-Jun 172
10-Jun 174
11-Jun 177 1
12-Jun
1 1 1 1 1 1 1 1 1 1 1 1 1

200

180

160

140

120

100

80

7
68
65
62
60 59
56
53
50
47 4
46
44 43
40 41 41
38 38 39
7
68
65
62
60 59
56
53
50
47 4
46
44 43
40 41 41
38 38 39
35 36
34
32 31 32
29 29
26 27 27
23 23 24
20 20 20
17 16 18
14 14
12 12
10 10
8 8
6 6
4
3 4
1 2
0
ar ar ar ar ar ar ar ar ar ar ar ar ar ar ar ar ar ar ar ar ar pr pr pr pr pr pr
1-M 2-M 3-M 4-M 5-M 6-M 7-M 8-M 9-M 0-M 1-M 2-M 3-M 4-M 5-M 6-M 7-M 8-M 9-M 0-M 1-M 1-A 2-A 3-A 4-A 5-A 6-A 7-A
1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3
SP14 SP15 SP16 SP17 SP18 SP19 SP20 SP21 SP22 SP23 SP24 SP25 SP26 SP27 SP28 SP29 SP30 SP31 SP32
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Service Pile

14
140
137
134 EID H
131
128
125
122
119
116
113
110 110
107
104
101 10
98 97
95 95
92 92
89 90
86 87
83 84
82
80 79
77 76 76 77
74 74 74 74
71 71
68 69 70
65 65
62 63
59 60
56 57
53 54
50 51
47 48 49
46
43
41
38 39
71 71
68 69 70
65 65
62 63
59 60
56 57
53 54
50 51
47 48 49
46
43
41
38 39
36
34
32

Planned
ar ar pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr pr ay ay ay ay ay ay ay ay ay ay ay Actua
M -M 1-A 2-A 3-A 4-A 5-A 6-A 7-A 8-A 9-A 0-A 1-A 2-A 3-A 4-A 5-A 6-A 7-A 8-A 9-A 0-A 1-A 2-A 3-A 4-A 5-A 6-A 7-A 8-A 9-A 0-A -M -M -M -M -M -M -M -M -M -M -M
31 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 1 2 3 4 5 6 7 8 9 10 11 1
SP33 SP34 SP35 SP36 SP37 SP38 SP39 SP40 SP41 SP42 SP43 SP44 SP45 SP46 SP47 SP48 SP49 SP50 SP51
1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

le

177
174 174
171 172
168 169
165 166
162 163
161
158 158
156
154 154
150 151
148
146 146
143 143
140 141
137 138
135
134 EID HOLIDAY 132
131 130
128 128
125 126
122 123
121
119 119
117
114
111
108 109
106
104
102
100
97
95
92
90
87
84
82
79
Actual
ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay ay un un un un un un un un un un un un
M -M -M -M -M -M -M -M -M -M -M -M -M -M -M -M -M -M -M -M -M -M -M -M -M -M -M -M -M 1-J 2-J 3-J 4-J 5-J 6-J 7-J 8-J 9-J 0-J 1-J 2-J
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 1 1
SP52 SP53 SP54 SP55 SP56 SP57 SP58 SP59 SP60 SP61 SP62 SP63 SP64 SP65 SP66 SP67 SP68 SP69 SP70
1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

177
174
172
169
166
163
61
un -Jun -Jun -Jun -Jun -Jun -Jun
7 8 9 10 11 12
SP71 SP72 SP73 SP74 SP75 SP76 SP77 SP78 SP79 SP80 SP81 SP82 SP83 SP84 SP85 SP86 SP87 SP88 SP89
1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SP90 SP91 SP92 SP93 SP94 SP95 SP96 SP97 SP98 SP99 SP10 SP10 SP10 SP10 SP10 SP10 SP10 SP10 SP10

0 1 2 3 4 5 6 7 8
1

1
1

1
1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SP10 SP11 SP11 SP11 SP11 SP11 SP11 SP11 SP11 SP11 SP11 SP12 SP12 SP12 SP12 SP12 SP12 SP12 SP12

9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7
1

1
1
1
1 1

1 1
1

1
1

1
1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SP12 SP12 SP13 SP13 SP13 SP13 SP13 SP13 SP13 SP13 SP13 SP13 SP14 SP14 SP14 SP14 SP14 SP14 SP14

8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1

1 1

1
1
1
1
1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SP14 SP14 SP14 SP15 SP15 SP15 SP15 SP15 SP15 SP15 SP15 SP15 SP15 SP16 SP16 SP16 SP16 SP16 SP16

7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1
1
1

1
1

1
1

1 1
1 1
1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SP16 SP16 SP16 SP16 SP17 SP17 SP17 SP17 SP17 SP17 SP17 SP17 Actual Planned

6 7 8 9 0 1 2 3 4 5 6 7
1 1
1 1
1 2
1 2
2 2
2 2
2 2
2 2
2 3
2 3
2 3
2 3
3 3
1 3
3 3
0 3
2 3
2 3
1 3
2 3
2 3
2 3
1 3
2 3
2 3
3 3
2 3
1 3
2 3
3 3
3 3
3 3
3 3
2 3
4 3
1 3
1 3
3 3
0 3
0 3
2 0
0 3
1 3
2 3
3 3
2 3
3 3
3 3
2 3
3 3
2 3
3 3
2 3
2 4
2 4
2 4
1 4
2 3
3 3
3 3
2 3
2 3
2
3
2
1 2
1 2
1 3
3
3
2
3
2
1 3
1 3
2
2
1 3
2
3
3
3
2
3
0
1 1 1 1 1 1 1 1 1 1 1 1 177 177
DPDC SERVICE PILE 06/22/2024/09:39:22

Pile casted 177 Nos out of 177 pile

P10 P9 P8 P7 P6 P5 P4 P3 P2 P1

P11 P12 Casted

P13 P14 P15 P16 P17 P18 P19 P20 P21 P22 on going

P23 P24 Casing Drive

P25 P26 P27 P28 P29 P30 P31 P32 P33 P34

P35 P36

P37 P38 P39 P40 P41 P42 P43 P44 P45 P46

P47 P48

P49 P50 P51 P52 P53 P54 P55 P56 P57 P58

P59 P60

P61 P62 P63 P64 P65 P66 P67 P68 P69 P70

P71 P72

P73 P74 P75 P76 P77 P78 P79 P80 P81 P82

P83 P84

P85 P86 P87 P88 P89 P90 P91 P92 P93 P94

P95 P96

P97 P98 P99 P100 P101 P102 P103 P104 P105 P106

P107 P108

P109 P110 P111 P112 P113 P114 P115 P116 P117 P118

P119 P120

P121 P122 P123 P124 P125 P126 P127 P128 P129 P130

P131 P132

P133 P134 P135 P136 P137 P138 P139 P140 P141 P142

P143 P144 P145 P146 P147

P148 P149 P150 P151 P152 P153 P154 P155 P156 P157

P158 P159 P160 P161

P162 P163 P164 P165 P166 P167 P168 P169

P170 P171

P172 P173 P174 P175 P176 P177

Casted
on going
Casing Drive
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile type Pile Boring Boring Casting Qty Actual Remark

number Qty depth depth/Pile Casting Qty

Actual (nos) (m) (Ft) (m3) Planned (m3)


Etra concrete = 1.2 m3, SSE
1 9-Jan-23 P1-105,125 P1 2 20 65.6 17.6625 18.83 Issue, Cabin happened.
105 105 P1 1 20 65.6 8.83125 8.83
125 125 P1 1 20 65.6 8.83125 10

Progress is less due to


2 10-Jan-23 P1-129,133,137 P1 3 20 65.6 26.49375 26.49 insufficient manpower of
SSE.
129 129 P1 1 20 65.6 8.83125 8.83
133 133 P1 1 20 65.6 8.83125 8.83
137 137 P1 1 20 65.6 8.83125 8.83 Casted at night, 10.30 pm
Progress is less due to
insufficient manpower as
3 11-Jan-23 P1-141 P1 1 20 65.6 8.83125 8.83 well as Polymer Mixing
Pump malfunction.
141 141 P1 1 20 65.6 8.83125 8.83

Progress is less due to


insufficient manpower ,
4 12-Jan-23 P1-145,149,154 P1 3 20 65.6 26.49375 26.49 Delay Pile Boring Start
Work.
145 145 P1 1 20 65.6 8.83125 8.83
149 149 P1 1 20 65.6 8.83125 8.83
154 154 P1 1 20 65.6 8.83125 8.83

Progress is less due to


P1- insufficient manpower ,
5 13-Jan-23 158,162,123,113 P1 4 20 65.6 35.325 36.32 Work starts late in the
morning and polymer mixing
Pump Problem
158 158 P1 1 20 65.6 8.83125 8.83
162 162 P1 1 20 65.6 8.83125 8.83
123 123 P1 1 20 65.6 8.83125 8.83
113 113 P1 1 20 65.6 8.83125 9.83

Progress is less due to


insufficient manpower ,
6 14-Jan-23 P1-104,127,135, P1 3 20 65.6 26.49375 26.66 Work starts late in the
morning
104 104 P1 1 20 65.6 8.83125 8.83
127 127 P1 1 20 65.6 8.83125 8.83
135 135 P1 1 20 65.6 8.83125 9

Progress is less due to


P1- insufficient manpower ,
7 15-Jan-23 120,109,131,147, P1 4 20 65.6 35.325 35.32 Work starts late in the
morning
120 120 P1 1 20 65.6 8.83125 8.83
109 109 P1 1 20 65.6 8.83125 8.83
131 131 P1 1 20 65.6 8.83125 8.83
147 147 P1 1 20 65.6 8.83125 8.83

P1- Progress is less due to


8 16-Jan-23 111,143,151,155 P1 4 20 65.6 35.325 35.32 insufficient manpower,
Rebar Case Not Ready
111 111 P1 1 20 65.6 8.83125 8.83
143 143 P1 1 20 65.6 8.83125 8.83
151 151 P0 1 20 65.6 8.83125 8.83
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile type Pile Boring Boring Casting Qty Actual Remark

number Qty depth depth/Pile Casting Qty

Actual (nos) (m) (Ft) (m3) Planned (m3)


155 155 P1 1 20 65.6 8.83125 8.83
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile type Pile Boring Boring Casting Qty Actual Remark

number Qty depth depth/Pile Casting Qty

Actual (nos) (m) (Ft) (m3) Planned (m3)


Progress is less due to
P1- insufficient manpower ,
9 17-Jan-23 134,106,101,136 P1 4 20 65.6 35.325 35.16 Work starts late in the
morning
134 134 P1 1 20 65.6 8.83125 8.83
106 106 P1 1 20 65.6 8.83125 8.83
101 101 P1 1 20 65.6 8.83125 9
136 1 20 65.6 8.83125 8.5

Progress is less due to


insufficient manpower ,
10 18-Jan-23 P1-115,124,146 P1 3 20 65.6 26.49375 26.49 Work starts late in the
morning
115 115 P1 1 20 65.6 8.83125 8.83
124 124 P1 1 20 65.6 8.83125 8.83
146 146 P0 1 20 65.6 8.83125 8.83
Progress is less due to
P1-110,132,152, insufficient manpower ,
11 19-Jan-23 103,148 P1 5 20 65.6 44.15625 44.15 Work starts late in the
morning
110 110 P1 1 20 65.6 8.83125 8.83
132 132 P1 1 20 65.6 8.83125 8.83
152 152 P1 1 20 65.6 8.83125 8.83
148 148 P1 1 20 65.6 8.83125 8.83
103 103 P1 1 20 65.6 8.83125 8.83

P1- Progress is less due to


12 20-Jan-23 119,160,144,139 P1 4 20 65.6 35.325 35.64 insufficient manpower,
Rebar Case Not Ready
119 119 P1 1 20 65.6 8.83125 9.15
160 160 P1 1 20 65.6 8.83125 8.83
144 144 P1 1 20 65.6 8.83125 8.83
139 139 P1 1 20 65.6 8.83125 8.83
P1-
13 21-Jan-23 122,156,150,112,1 P1 6 20 65.6 52.9875 53.15
07,100
122 122 P1 1 20 65.6 8.83125 8.83
156 156 P1 1 20 65.6 8.83125 8.83
150 150 P1 1 20 65.6 8.83125 8.83
112 112 P1 1 20 65.6 8.83125 8.83
107 107 P1 1 20 65.6 8.83125 8.83
100 100 P1 1 20 65.6 8.83125 9.00

Progress is less due to


P1- insufficient manpower ,
14 22-Jan-23 130,142,165,153 P1 4 20 65.6 35.325 39.32 Work starts late in the
morning and polymer mixing
Pump Problem
130 130 P1 1 20 65.6 8.83125 8.83
142 142 P1 1 20 65.6 8.83125 8.83
165 165 P1 1 20 65.6 8.83125 11.33
153 153 P1 1 20 65.6 8.83125 10.33

Progress is less due to


insufficient manpower ,
15 23-Jan-23 P1-138,117,102 P1 3 20 65.6 26.49375 28.49 Work starts late in the
morning and rig machine
Problem
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile type Pile Boring Boring Casting Qty Actual Remark

number Qty depth depth/Pile Casting Qty

Actual (nos) (m) (Ft) (m3) Planned (m3)


138 138 P1 1 20 65.6 8.83125 8.83
117 117 P1 1 20 65.6 8.83125 8.83
102 102 P1 1 20 65.6 8.83125 10.83

P1-
16 24-Jan-23 161,121,108,98,15 P1 5 20 65.6 44.15625 45.32
7
161 161 P1 1 20 65.6 8.83125 8.83
121 121 P1 1 20 65.6 8.83125 8.83
108 108 P1 1 20 65.6 8.83125 8.83

98 98 P1 1 20 65.6 8.83125 9.83


Extra Concrete consumes
Due to Pile Caving

157 157 P1 1 20 65.6 8.83125 9


Extra Concrete consumes
Due to Pile Caving

P1- Progress is less due to


17 25-Jan-23 167,126,114,140,1 P1 5 20 65.6 44.15625 45.15 insufficient manpower
59 Problem

167 167 P1 1 20 65.6 8.83125 8.83


126 126 P1 1 20 65.6 8.83125 8.83
114 114 P1 1 20 65.6 8.83125 9.83
140 140 P1 1 20 65.6 8.83125 8.83
159 159 P1 1 20 65.6 8.83125 8.83

P1- Progress is less due to


18 26-Jan-23 118,128,91,95,86 P1 5 20 65.6 44.15625 44.15 insufficient manpower
Problem
118 118 P1 1 20 65.6 8.83125 8.83
128 128 P1 1 20 65.6 8.83125 8.83
91 91 P1 1 20 65.6 8.83125 8.83
95 95 P1 1 20 65.6 8.83125 8.83
86 86 P1 1 20 65.6 8.83125 8.83

Progress is less due to


19 27-Jan-23 P1-82,164,99,78 P1 4 20 65.6 35.325 34.29 insufficient manpower
Problem
82 82 P1 1 20 65.6 8.83125 8.83
164 164 P1 1 20 65.6 8.83125 8.83
99 99 P1 1 20 65.6 8.83125 7.83
78 78 P1 1 20 65.6 8.83125 8.80

Progress is less due to


insufficient rebar
20 28-Jan-23 P1-78,70,116, 166 P1 4 20 65.6 35.325 35.32 shifting,tree shifting,store
shifting Problem
78 78 P1 1 20 65.6 8.83125 8.83
70 70 P1 1 20 65.6 8.83125 8.83
116 116 P1 1 20 65.6 8.83125 8.83
166 166 P1 1 20 65.6 8.83125 8.83

P1- Progress is less due to


21 29-Jan-23 97,93,90,163,169 P1 5 20 65.6 44.15625 44.12 insufficient north site
metarials shifting Problem
97 97 P1 1 20 65.6 8.83125 8.83
93 93 P1 1 20 65.6 8.83125 8.83
90 90 P1 1 20 65.6 8.83125 8.8
163 163 P1 1 20 65.6 8.83125 8.83
169 169 P1 1 20 65.6 8.83125 8.83
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile type Pile Boring Boring Casting Qty Actual Remark

number Qty depth depth/Pile Casting Qty

Actual (nos) (m) (Ft) (m3) Planned (m3)


Progress is less due to
insufficient Rig machine
22 30-Jan-23 P1-173,3,7 P1 3 20 65.6 26.49375 27.29 battery Problem,Rmc
late,sse cran shifting
problem
173 173 P1 1 20 65.6 8.83125 8.83
3 3 P1 1 20 65.6 8.83125 8.83

7 7 P1 1 20 65.6 8.83125 9.63


Extra Concrete consumes
Due to Pile Caving

P1-84,80,76,72,
23 31-Jan-23 179,183,12 P1 7 20 65.6 61.81875 61.81

84 84 P1 1 20 65.6 8.83125 8.83


80 80 P1 1 20 65.6 8.83125 8.83
76 76 P1 1 20 65.6 8.83125 8.83
72 72 P1 1 20 65.6 8.83125 8.83
179 179 P1 1 20 65.6 8.83125 8.83
183 183 P1 1 20 65.6 8.83125 8.83
12 12 P1 1 20 65.6 8.83125 8.83

Progress is less due to the


Crain problem, VIP
24 1-Feb-23 P1-96,88,168 P1 3 20 65.6 26.49375 26.66 Movement and Police
Harassment of Government
Road Use.

96 96 P1 1 20 65.6 8.83125 8.83


88 88 P1 1 20 65.6 8.83125 8.83

168 168 P1 1 20 65.6 8.83125 9.00


Extra Concrete consumes
Due to Pile Caving
Progress is less due to the
25 2-Feb-23 P1-172,6,17,92 P1 4 20 65.6 35.325 35.49 Crain problem,
172 172 P1 1 20 65.6 8.83125 8.83
6 6 P1 1 20 65.6 8.83125 8.83
17 17 P1 1 20 65.6 8.83125 8.83

92 92 P1 1 20 65.6 8.83125 9.00


Extra Concrete consumes
Due to Pile Caving

P1-94,77,83, Progress is less due to the


26 5-Feb-23 71,170 P1 4 20 65.6 35.325 35.32 RMC Supply Problem,
94 94 P1 1 20 65.6 8.83125 8.83
77 77 P1 1 20 65.6 8.83125 8.83
83 83 P1 1 20 65.6 8.83125 8.83
71 71 P1 1 20 65.6 8.83125 8.83

Progress is less due to the


27 6-Feb-23 P1-170,175, 180 P1 3 20 65.6 26.49375 26.49 RMC Supply Problem and
VIP Movement
170 170 P1 1 20 65.6 8.83125 8.83
175 175 P1 1 20 65.6 8.83125 8.83
180 180 P1 1 20 65.6 8.83125 8.83

Progress is less due to the


28 7-Feb-23 P1-05,10,20, 15,87 P1 5 20 65.6 44.15625 44.15 RMC Supply Problem and
VIP Movement
5 5 P1 1 20 65.6 8.83125 8.83
10 10 P1 1 20 65.6 8.83125 8.83
20 20 P1 1 20 65.6 8.83125 8.83
15 15 P1 1 20 65.6 8.83125 8.83
87 87 P1 1 20 65.6 8.83125 8.83
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile type Pile Boring Boring Casting Qty Actual Remark

number Qty depth depth/Pile Casting Qty

Actual (nos) (m) (Ft) (m3) Planned (m3)


Progress is less due to the
29 8-Feb-23 P1-81,75,171 P1 3 20 65.6 26.49375 27.49 Crain problem and VIP
Movement,
81 81 P1 1 20 65.6 8.83125 8.83
75 75 P1 1 20 65.6 8.83125 8.83

171 171 P1 1 20 65.6 8.83125 9.83


Extra Concrete consumes
Due to Pile Caving

Progress is less due to the


30 9-Feb-23 P1-176,181 P1 2 20 65.6 17.6625 18.66 Crain problem,
176 176 P1 1 20 65.6 8.83125 8.83

181 181 P1 1 20 65.6 8.83125 9.83


Extra Concrete consumes
Due to Pile Caving
Progress is less due to
31 10-Feb-23 P1- 01,13,22 P1 3 20 65.6 26.49375 26.99 insufficient north site
metarials shifting Problem
1 1 P1 1 20 65.6 8.83125 8.83
13 13 P1 1 20 65.6 8.83125 8.83

22 22 P1 1 20 65.6 8.83125 9.33


Extra Concrete consumes
Due to Pile Caving

P1-
32 11-Feb-23 85,79,73,174,8,89 P1 6 20 65.6 52.9875 52.84

85 85 P1 1 20 65.6 8.83125 8.75


79 79 P1 1 20 65.6 8.83125 8.8
73 73 P1 1 20 65.6 8.83125 8.8
174 174 P1 1 20 65.6 8.83125 8.83
8 8 P1 1 20 65.6 8.83125 8.83
89 89 P1 1 20 65.6 8.83125 8.83

Progress is less due to


33 12-Feb-23 P1- 182,18 P1 2 20 65.6 17.6625 17.63 insufficient north site
metarials shifting Problem
182 182 P1 1 20 65.6 8.83125 8.83
18 18 P1 1 20 65.6 8.83125 8.8

P2- 13,14,12,16 P1
34 13-Feb-23 - 04,11, P2 & P1 6 20 65.6 36.2625 36.26
13 13 P2 1 20 65.6 4.65 4.65
14 14 P2 1 20 65.6 4.65 4.65
12 12 P2 1 20 65.6 4.65 4.65
16 16 P2 1 20 65.6 4.65 4.65
4 4 P1 1 20 65.6 8.83125 8.83
11 11 P1 1 20 65.6 8.83125 8.83

Progress is less due to


35 14-Feb-23 P2- 15 P2 1 20 65.6 4.65 6.15 insufficient north site
metarials shifting Problem

15 15 P2 1 20 65.6 4.65 6.15


Extra Concrete consumes
Due to Pile Caving
Work stop due to RMC
machine maintenance

Progress is less due to VIP


36 15-Feb-23 P1-177,185, 21,16 P1 4 20 65.6 35.325 35.62 Movement
177 177 P1 1 20 65.6 8.83125 8.83

184 184 P1 1 20 65.6 8.83125 9.13


Extra Concrete consumes
Due to Pile Caving
21 21 P1 1 20 65.6 8.83125 8.83
16 16 P1 1 20 65.6 8.83125 8.83
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile type Pile Boring Boring Casting Qty Actual Remark

number Qty depth depth/Pile Casting Qty

Actual (nos) (m) (Ft) (m3) Planned (m3)


Progress is less due to BMW
37 16-Feb-23 P1 - 09,14, 29,34 P1 4 20 65.6 35.325 35.32 Side Boundary Wall
Dismantling
9 9 P1 1 20 65.6 8.83125 8.83
14 14 P1 1 20 65.6 8.83125 8.83
29 29 P1 1 20 65.6 8.83125 8.83
34 34 P1 1 20 65.6 8.83125 8.83

Progress is less due to the


38 17-Feb-23 P1-39,44,49, 54,59 P1 5 20 65.6 44.15625 43.32 RMC Supply problem and
VIP Movement,

39 39 P1 1 20 65.6 8.83125 8.83


44 44 P1 1 20 65.6 8.83125 8.83
49 49 P1 1 20 65.6 8.83125 8.83
54 54 P1 1 20 65.6 8.83125 8
59 59 P1 1 20 65.6 8.83125 8.83

Progress is less due to the


39 18-Feb-23 P1-185,19,23 P1 3 20 65.6 26.49375 26.49 SSE Crain problem,

185 185 P1 1 20 65.6 8.83125 8.83


19 19 P1 1 20 65.6 8.83125 8.83
23 23 P1 1 20 65.6 8.83125 8.83

P1-178,28, P2- Progress is less due to VIP


40 19-Feb-23 2,4 P2 & P1 4 20 65.6 26.9625 26.96 Movement

178 178 P1 1 20 65.6 8.83125 8.83


28 28 P1 1 20 65.6 8.83125 8.83
2 2 P2 1 20 65.6 4.65 4.65
4 4 P2 1 20 65.6 4.65 4.65

Progress is less due to VIP


41 20-Feb-23 P2- 1 P2 1 20 65.6 4.65 4.65
Movement

1 1 P2 1 20 65.6 4.65 4.65

P1-48 ,38,43 p2 - 5 Progress is less due to VIP


42 21-Feb-23 P2 & P1 4 20 65.6 31.14375 31.14 Movement & SSE Excavator
problem.
48 48 P1 1 20 65.6 8.83125 8.83
38 38 P1 1 20 65.6 8.83125 8.83
43 43 P1 1 20 65.6 4.65 8.83
5 5 P2 1 20 65.6 4.65 4.65

Progress is less due to VIP


43 22-Feb-23 P1-33,63,2 P1 3 20 65.6 31.14375 31.14 Movement & SSE Excavator
problem.
33 33 P1 1 20 65.6 8.83125 8.83
63 63 P1 1 20 65.6 8.83125 8.83
2 2 P1 1 20 65.6 8.83125 8.83

P1-53,27,58,45,40 Progress is less due to VIP


44 23-Feb-23 P1 5 20 65.6 44.15625 43.97 Movement & SSE Excavator
problem.
53 53 P1 1 20 65.6 8.83125 8.83
DPDC,Shanta,Tejgaon,Dhaka.
Day Date Pile number Pile Pile type Pile Boring Boring Casting Qty Actual Remark

number Qty depth depth/Pile Casting Qty

Actual (nos) (m) (Ft) (m3) Planned (m3)


27 27 P1 1 20 65.6 8.83125 8.83
58 58 P1 1 20 65.6 8.83125 8.83
45 45 P1 1 20 65.6 8.83125 8.83
40 40 P1 1 20 65.6 8.83125 8.65

P2- 6 , P1 -30 ,P2 - Progress is less due to VIP


45 24-Feb-23 9, P2 & P1 3 20 65.6 22.78 22.13
Movement .

6 6 P2 1 20 65.6 4.65 4
30 30 P1 1 20 65.6 8.83125 8.83
9 9 P2 1 20 65.6 4.65 4.65

P2- 7,11 ,10, P1-


46 25-Feb-23 50 P2, P1 6 20 65.6 4.65 4.65

7 7 P2 1 20 65.6 4.65 4.65

11 11 P2 1 20 65.6 4.65 5.15


Extra Concrete consumes
Due to Pile Caving
10 10 P2 1 20 65.6 4.65 4.65
50 50 P1 1 20 65.6 8.83125 8.83
36 36 P1 1 20 65.6 8.83125 8.83

46 26-Feb-23 P1- 62 P1 1 20 65.6 4.65 4.65

62 62 P1 1 20 65.6 8.83125 9.49


Extra Concrete consumes
Due to Pile Caving

Concrete Summary 176 Nos 1473.918 1489.78 m3

Excess quantity (m3) = 15.86 m3

Total Received (Cft) = 52923.41 cft


Total Work Order (Cft) = 65606.00 cft W/O No-48250
Balance (Cft) = 12682.59 cft
Project: Shanta Holdings Ltd. TBEA (DPDC)
Daily work program for Contractor Workers
Service Pile Work
Responsible
Sl. Head Target Responsible
Date Work Place Work Items Helper Persons Remarks
No. Masson (%) Persons
(Cont.)
01 Service Pile Rebar Cutting & Binding Work 8 8
02 Service Pile Rebar Welding Work 4 0
03 Service Pile Boring Work & Casing Pipe Boring 4 4
04 Service Pile Rebar Cage Installation Work 2 2 Melon, Engr. Man Power 54
05 G.F Service Pile RMC Casting Work 4 4 Hemal, Meshbah, Nos Day &
06 Polymer (Powder) Mixing and maintenance 1 1 Nazmul Sharif, Nasir Night Shift
07 Pile Rig Machine Operator 3 3
08 Crane Operator 2 2
09 Excavator Operator 2
30 24
Project: Shanta Holdings Ltd. TBEA (DPDC)
Daily work program for SHL Workers
Sl. Work Date Work Place Work Description Workers Name Designation Responsibble
No. Engineer
01 Temporary Electric Work MD SALIM MAHBUB ELC

02 Cooking and Cleaning Work MD SHFIQUL COOKING


03 MD KHOLIL SARKAR OPERATOR
04 MD SHAFAYT SHIKDER WELDER
14-01-2023 Common Area
05 JAYED MIAH WELDER
Cleaning Work & Fancing Shifting Work
06 SOJIB CL
07 Akash CL
08 Kartik CL
Project: Shanta Holdings Ltd. TBEA (DPDC)
Daily Work Report (Achevement)
Shore Pile Work
Sl. Achevement
Date Work Place Work Items Work Status Remarks
No. (%)
01 Shore Pile Rebar Work Ongoing 100% 2Nos
02 Shore Pile Rebar Cage Welding Ongoing 100% 2Nos
03 Tremie Pipe Cutting & Re-Size With Fanal Fitting Done 100%
04 08-01-2023 G.F Polymer (Powder) Mixing Tank Repair Work Ongoing 50%
05 Leveling & Dressing By Excavator
06 Pile Rig Machine maintenance & Repair Ongoing
07 Rebar Received (Unloding By Caren) Done
Masonry Works
Sl. Achevement
Date Work Place Work Items Work Status Remarks
No. (%)
01 08-01-2023 G.F C.C Block Making For Shore Pile Ongoing
Common Work (SHL - C.L, E.T, Welder)
Sl. Achevement
Date Work Place Work Items Work Status Remarks
No. (%)
01 Cement Shifting Done
02 08-01-2023 G.F Sand Shifting Done
03 Cleaning Work West Side Gate Done