Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SIP Reporting Steps - 2024

 "Company Name (by 21-06-2024)"


 "Topic Name (by 25-06-2024)"
 "Reporting 1: Dt.: 27-06-2024"

[Executive Summary | Industry Overview | Company Overview - Project Report Document as


attachment]

 "Reporting 2: Dt.:01-07-2024"

[Functional Department - Project Report Document as attachment]

 "Reporting 3: Dt.: 5-07-2024"

[Research / Survey Design Discussion & Approval - Outline in a separate Word file/ppt format as
attachment]

 "Reporting 4: Dt.: 07-07-2024"

[Questionnaire / Secondary data source Approval - Link for Google form/ Secondary Data Source / a
separate Word document containing either a questionnaire or secondary data source links as an
attachment]

 "Reporting 5: Dt.: 10-07-2024"

[Starting date for Data Interpretation / Analysis - Documents for collected or secondary data and Project
Report including content till Research / Survey Design in Project Report Document as attachment]

 "Reporting 6: Dt.: 23-07-2024

[Add Data Interpretation | Findings | Conclusion | Bibliography | Annexure to the project report - the
complete project report draft document to be submitted as attachment]

 "Reporting 7: Dt.: Will be declared later on"

[Final Project Report Document for Plagiarism Check as attachment]

 "Reporting 8: Dt.: Will be declared later on"

Plagiarism Percentage - Guides are requested to forward the emails of students to the library's email id
for the same and get the report by 03:00 pm to enter the % from the report here]

 "Reporting 9: Dt.: Will be declared later on"

[Presentation on the Project Report as attachment]

You might also like