KING SALMAN PARK

CP-3 Infrastructure & Operation


Maintenance Building

ATP-2: PRE-COMMISSIONING COMPLETION CERTIFICATE

ATP-2 Certificate no : Contractor / Supplier

System Name:

Location Area : Date

S/N Items to be Verified YES NO REMARKS

1 Check ATP-1 Certificate is signed

2 Check T&C Procedure is approved

Check complete system is ready for pre-commssioning and


3
neccessary safety measures were taken.

Check all Pre-commisioinig reports (For example - TAB


reports for HVAC, Flusing reports for chilled water system,
4
Cold test reports for Panels etc ) are available and signed
by the supplier / 3rd party.

Conclusion :
I declare that the Pre-commissioning activities were carried out for the above System/Equipment and approved, signed by
supplier/ 3rd party & FHJV as part of ATP-2 process and there is no objection to proceed to ATP-3 Process.

Remarks

Company Name Position Signature Date

Supplier Engineer

Third Party Engineer

FHJV Site Engineer

FHJV T&C Engineer

PMCM Site Engineer

PMCM T&C Engineer