PROJECT: @Project@

UNIT: @UnitRef@ TAG No: @TagRef@

SYSTEM: @SystemRef@ TAG DESCRIPTION: @TagDescription@

SUB SYSTEM: @SubSystemRef@ CREATE DATE: @TagCheckDocCreatedDate@

Mechanical Completion Electrical

LV Distribution Board (Lighting/Small Power) HKN-E05A


Data Sheet @Datasheet@
Drawing Reference @TagPrimaryDrawing@
Area Classification Zone 1 / Zone 2 / Non-Hazardous Installation Indoor / Outdoor
System Voltage / V, 3 Ph + N Rated Current A Freq’cy Hz Encl. Prot’n IP
Manufacturer @TagManufacturer@ Model/Type @Model@
Serial No. @TagSerialNum@ no.:
PO No.
Test Equipment Make Model Serial No. Cal. Expiry Date
IR Tester
Punch
No. Items to be Checked OK N/A
List
01 Name plate/labelling/I.D. tags are correct.   
02 Fixing and mounting is correct.   
03 No mechanical damage and complete: no missing parts/components.   
Earthing is correct: earth bar, feeder cable earthing, external earthing, panel and door
04 earthing, metal covers earthed and earthing connections correct and tight. Measure resistance between   
feeder cable earth and external earth: Ω
05 Phase, circuit and component identification and labelling are correct as per design drawings.   
All components (switches, MCB’s. MCCB’s, RCCB’s, panelmeters, CT’s, panel heaters etc.) have correct
06
current and voltage rating as per design drawings.   
07 Manual operation of switches, MCB’s. MCCB’s, RCCB’s, pushbuttons etc. is correct.   
08 Cable entry, gland types, glanding & termination are correct and unused holes are sealed.   
09 Busbar and all internal cabling & wiring are neat and undamaged, all connections are tight and correct.   
Insulation Resistance Test (Busbar) – 1000VDC, 1 minute. Acceptable IR Value: > 20 MΩ
10 L1 – L2, L3, N, E L2 – L1, L3, N, E L3 – L1, L2, N, E N – L1, L2, L3, E   
MΩ MΩ MΩ MΩ
11 Panel heaters are correctly installed, measure IR: M Ω.   
12 Door seals and lock are correct, door closes properly, doorlock keys are handed over.   
13 Ingress Protection (IP) is correct as per design. For outdoor installation: canopy is installed.   
14 Check internal area of panel is clean and free from debris.   
15 Red Line mark-up drawings are complete and attached.   
Comments:

Completed By Accepted By

Signature
Name
Date
Company

C-1/2+@TagCheckId@
C-1/2+@TagCheckId@

Page 1 of 2
PROJECT: @Project@

UNIT: @UnitRef@ TAG No: @TagRef@

SYSTEM: @SystemRef@ TAG DESCRIPTION: @TagDescription@

SUB SYSTEM: @SubSystemRef@ CREATE DATE: @TagCheckDocCreatedDate@

C-2/2+@TagCheckId@
C-2/2+@TagCheckId@

Page 2 of 2

You might also like