Bayan Palace - GEA Technical Offer CT - 3700 KW

You might also like

Download as pdf
Download as pdf
You are on page 1of 7
KHARAFI NATIONAL - KUWAIT INTER OFFICE MEMO Cost Center (ojo[1 {9{3[0 sTo[o} 10 + Mr ayer Al Fakhoury comtdenss FROM: Ghadser Nasir acpi durion [Z] DATE :29"June2013 Neicetad — REFERENCE : 3080173-RO312/13 SUBJECT :Penect:1747- nstraon Building = Quotation or Package spe SS Cooling Tower = Ontion 2 "Ren ‘We thank you for your enquiry and are plese to submit our utton fore supply of Cooling Tower from GEA Pole, Holland foe Your kad consideration Cooling tower type CMDRIY 380-DM.120405913, sake GEA/Polael Cooling Towers BN. ‘The cooing tower consists ofthe Following main part: > Durable cooling tower casing consisting of $S 316 sde panes fein a sinless set frame. > Allok, nuts fo assmbly out of sane ste > Inspection puna for access nthe cooing ower > Aeraynamie shaped GRP impeller casing ~ transton pce to the rectanslr cooing tower esng > Galvanized mild te impr frame with an axial Now iogller Sted ditty onthe sf oa geared E moter. > Highefticon film spe ofl PPPPVC. > PP water distribution system nd PVC dei elnino. > Sunless ste! supports for the cooling tower fil, water distribution satan and dit liminater. ‘GRP Louvers athe ai tak, ‘Teshnia! Daxerintion ‘The cooling tower nd al opsional at soared in this utton ae all made in acoréane withthe manufacture’ standard, For further dolls we ofr othe suche echnical sist ad dimension dang Consnstion 2 meas the last 10 digs of th cooling tower type equ“, he coling tower delivered Insluding a SS 316 cold waterbasin with hot dip anid foundation fe, Date: 22" june 2013, Ref 308M T-RISI2I3 ‘Thema performance ‘The perfomance details of the cooling tower re sticly based onthe basi design conditions 4s given inthe tecnica duta hess a attached. Diffrencesbstwecn design and nonmal ‘petting data and deviaions in process and/ oc environmental comitons Wil lead 9 8 Aiferent cooing tower performance than that i caleulted. If require we wl present & ‘comprehensive performace analysis of design ccumsances. Sooting ower eonra ‘Tae cooling tower should preferably be convlled by varying the sr Now thou the ong ‘ower. Redotion ofthe water fo ineeases the risk of loging of th il or fering of he cling over al tepertaes, Besides the possibility to switch the inpller on nd off, we can offer 3 akematives of ‘varying the alow trough the cooling tower The mos approptise option deends on the acuray ofthe ead water emperatare ta the proces sues Emotor prepared for fcqeney contol Povided Switching between high low speed oe reverse and contol of the fequney snverer ie _enealy done on te basis fcoaiauous temperate mesirement ofthe cald water ‘The temperature element isnot inched in ou scope of supply In hr standard consrcton| ur cooling towers te suitable for max. itch hi ex hos Ie required we wil present comparison in KW for the 3 lees ypes of cal of the cooing ower ‘Cooling ower consetins Inthe case ofa cooling tower constuction 3, the SS 316 cold water basin canbe aranged witha horizon or vertical iscaye ennection fer atralo foed dschare othe cold ‘wate. Cooling ower hs obs comncted ree of esions In the cas of natural discharge, the eold water cnmesion sited with an atioren cross fo emurea maxinal vate low In the ease of fored extoton the cold water discharge connection i ited with «suction tet that preven te ite of ary the pump within aimed variation othe wae lve. ‘connection for supplied water contoled bya eating valve apd an overiow crmestion also inladed with this aerate. The pefered ype of cold water connection should be ‘pected in the purchase order Environmenial noise Sound power levels as listed inthe eeicl speciation ae poliminry and aed 0 be fenfimed. Falling water and the dive equipment ate tcognzed es the rajor sound producing sources from a counter Now coaling tower. Special provision such a Mosing ise aenution and. lw” noise impeller can be inludel to aul the casiomer’s ‘ovionnenal noise requirements. IF requie we wil present compreensive nose ‘alclation incloding a Seund pressure level ealealation at a. cerain nse sete! point ‘Safe cooling toscapeon ‘The cooling towers manulsetured in accordance with the CE repulsion This meas that {he cooling tower ean be opcrated safely. Al peratonl-and-msitenance activites may ly be eared ot by qualified and. auborized personel. Realize that svt of has implications othe cooling proces. Date: 22 June 2013, Ref: S308M/-RISI2N3 Legionella risks management. The contons in the cooling tower can lead © song ‘organic growth of micro-rpansns including the Legionella tater, the last an ease Serious lng diseases. The growth of micro-organisms can effectively be govemed by 2 good ‘ater eiment and regula montrig. Emissions of droplets are minimioed by he presence ‘of dit eliminator, Inspection and minenanceensre your cooling toe ost a ptm nto, ‘The cooling tower i filly equipped to work ia aecardance withthe dfrent Exopean Directives sucha the Dutch guidlines AI 32 an the English Heath and Safay Executive (0C 285/11 evsed HS (6) 70). ‘The cooling tier meets the recommendations made in he publication 9/7 of Esovent Inthe several European counties itis mandatory tei cooling tower. Anmled Codes and ceiestes 2o0st1ce Bropean Machine Diretive NENAN 517-1 ‘Safety of machinery NEN-ENAISO 1361 Hoc Dipped Galvanized coatings on ron andtel NENENISO 14122 Staircases, cage les, platfonns and handrails NEN-ENISO 38342" Quality equiemens for fision welding of metic parts NENEN toma" Flanges alte one ANSIBIG, $1309" Flanges Amerian standard 180 1081641 en3 Mechanical Vibatons 180 14688, Insta fans Specifications for bolance suaiy” and sibraton levee Divaseas Calelton of ise emiting sources ATEX directive 9/4/CE* Explosive Codions NEN-ENIS0 90012008 Quality Contfeate TUV register 2266.7 SCC* (2085.1) Safety cerifcwe TUV reser 2266162 CTI sr-201 (02) Cooling Teehaaogy Insite register 4-24-01 GOST-R andlor RIN ceticate Export Cerificate * en reguest and with adional ose ‘Tranpocaion and asemy All cooling toner ar delivered as loose or pre-assembled pars. ‘The coling tower wil be farther assembled at pound level. The assembly requires int paved ara that extends the ‘cooling tower outline dimension witht lest? meter and tempat ay down en clos to the asembly area. The optional pice ee te assmbly as offered inthis qt nels the seafoling daring the assembly on around evel, A rae for isting the sept pts is ‘offered separately. The assembly and ly down aca an ase roads fo these wets should ‘be well acesible and suitable forthe cane and ius. Temporary pavement provisions (if pplieable) for te assembly Noor, lay down ars and sseest roads t those as tre ot inclaed inthis ff. nthe event ht farther instalation ofthe cooling towers toa cet ial levaionheiht, for ecample » concrete water basin or bung root is reqied, we psf holt the compet assembled colin tower as soon a is foundation ready fr this This approach an Kd toa substan shorter doraton time. The eapacty ofthe crane that i needed ot this, not only depends on the Weight ofthe cooing ower ante installation hit, bun 2 snoch ger extent on the oquiedcuteach fhe erane Date: 22 ne 2013, Ref S308M/TE-RISI2N3 Tnany ease the assembly doesnt include: = “Givi work, foundation bots = Connection of te eoling tower othe foundation, power supply, process and ress contol system. Temporary pavement provisions ifacessry forthe assembly and ay down te oases roads to the arse ‘Wate, power supply, pessoal roms and lighting ofthe assembly aca dig ase. = Lighting onthe cooling tower + Liphining protection system onthe cooing ower “Eat conection of the cooling owers ding assembly an afer fal nstliion * Diiling and anchor bls for conerete basin. Prices: 4 off CMDRI9 380-DM-120-P59/Bamounts to Kuwait Digan Incas: = Pan ged = Cage ladier HDGS @ n05) © Floatiag Nese Atari = Oi flag level ndeator (ip stck) = Mechanical vibration svt Spares: @ years operation) - Moor bearings, il (fo one uni, Nezles (10 pes), Eliminator (10 blocks & Fils 20 bleks) ~_ Supervision duriag astallaton, startup and comms Note: = Quoted Pie areas pr toys uency rt, Paria orders reno accept, par shipment nd invoicing are tobe allows ‘Commersial conditions Delivery Deters to site Delivers time Tobeaise Pavaent Warranty period "The waranty period anounts to 12 moat afer commissioning bits lined os xin oF 18 marae delivery ofthe materia, ‘This offer is valid for 1 month ues with ei, Date: 22 une 2013 Ref 9308M/IT-ROSI2/13 Certificates (GEA Polacel Cooling Towers has the following certiintes NEN-EN-1S0 9001:2008, Registration number 2266/8.7 SCC** (2008905). "Reglsuation number 2266/52 crisrD.201002) (Ceritcaton Vaiation Number 0425-01 “This is preliminary Price quote forthe projet, Kindly ask for Fal Binding guotein case ‘hr is eal inet ofl he project th GEA, ‘Atchmens: = Dimensional desing ‘TECHNICAL SPECIFICATION PER COOLING TOWER Tre CCMDRI® 380-D9-120-P5912 Manufacturer (GEA Polael Cooling Towers 3, Cooling prieiple Courter few ‘Number of lls 1 Color Gry Design conditions Tooting epost STEW rer To Sm Hot water temperature wre (Cold water empersire 322° Wer bulb temperature rare ‘Mas. water temperate 580°C ‘igher temperatures are posible please coma saplie. TechnialSpeifcation Height of il 1200.0 mm. Required sprayer pressure 270 KPa, mas. 49 KPa Air volume pr fan Homie External state pressure oor Number of fans L ‘Number of motors L Motor power installed sow Motor power consumption Soakw Motor speed 1480 pm Fan speed 230epm “Type of ave Tait by geared motor lstrcal soppy 400V-3Phsotte lat of motor esr Dimensions and weights Tenth arom, Wits 210 nm, Height 6060, ‘Shining weet ‘Tg (ARON) Date: 2June 2013, Ref. 9308NMIT-RDISI2I13 ORE CARON) Average evaporated Loss stmt ‘The maximum evaporation. which determines the design for the make ap ant diem be 25% ihr Drain oss Depends on the water quali Sound power cooling omer The otal sound power (PWL) ofthe cooing ower determined bythe logic summation of| ‘hepa sures: fan outlet abd a inlet. The oie athe aint x eaeed the fling of the water inthe water pa. This ose ean he axtented using Noting ois snus, a peal Polace development The valves are calculated according o DIN 48635 Sub 46 cle 3. The sound pressure at certin distance an be calculated using the ale “conversion fm sound power fo sound pressure fr counter Now colin oer PW fan ot or aaa) ‘Material speciation Fan blades type Aluninum/ 14 Fan suppor Hot dipped gavanied scl Fi ype PP/PVC 19mm. Fill suppor Stainless te 316 limite prrpve liminitoe suppor ‘Stainless sel 316 Framework Stiles tel 316 Casing Stiles steal 316/ FRP ‘Water pan basa ‘Stainless scl 316 Wate pan support ot dipped galvanic tes! Aitinlt louvers iberlassreiforead poet Wate dsibtion payers perp Fan Guard (option) alvanized Sts Cage Inder (pton) (alvanized Stes We sincerely hope that you wl Find ou oe competitive and ut your routes, Should you rogue any Tutor assisanee or carfentions plese fel fie to coat Mr. Savio Rodsigses on Ext 323, Mab: 97297221 or E-mail svi odigues@Mhcafiatonal com, Look ward to roceving your favorable response athe eit Bea ‘Ghdeer Naar Projet Manager 9308 ~ Facilites Technology Unit Enel: CMDR 380 Type Standard Drawing.

You might also like