Unit Acceptance Checklist For Fixtures Installation 35C Mayon St, Santa Mesa Heights, Quezon City, Metro

a Mesa Heights, Quezon City, Metro Manila


(T&B)

Project :
Verge
Date Prepared : 06/04/24
Reliance, corner Mayflower St, Mandaluyong
Location : Inspection Date & Time :
Plumbing System
Scope : Floor and Unit:

Complied Certified by
Work Item Inspected Date Completed Remarks
Yes (Name and Signature)
Area has doorman
Has main door with lock
Each TnB units has door installed
Key was endorsed to _____________________________ on ____________________:
Checking of TSP vs Actual
Stubout locations are correct (for drain line)
Stubout locations are correct (for gate valve)
Stubouts must be accessible for installation
Complete tiles
Complete grout
Free from hollow and cracked concrete (kapak)
Cut of tiles from stubout is exact / fit to the accessories
Painting works are done
Area is cleaned and free from debris
Passed Flow Test based on Functionality Standard
With Pipe Blockers
Other Observations:

Must be signed by MDC or endorsing Subcon and AMICI QA/QC.


INSPECTED AND AGREED BY:
NAME COMPANY AND POSITION SIGNATURE DATE
MDC Representative

RUIN NAMO MDC MEPFS ENGR.


AMICI Representative

MARIANITO JACILA AMICI – PROJECT IN CHARGE


BOS-QA-FRM-007-v01