Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Oxidation Ditch

1 Jumlah = 8 bak
2 Debit rencana = Qaverage
= 0,286 m3/detik
= 24676,30 m3/hari
3 Debit tiap bak = Qave/jumlah bak
= 0,036 m3/detik
= 12338,15 m3/hari
4 Waktu detensi (td) = 24 jam 18-48 jam
5 Volume tiap unit (V) = Q x td
= 3084,54 m³
6 Volume loading (V load) = 0,30 kgBOD/m3.hari 0.1-0.6 kgBOD/m3.hari
7 Beban organik per unit = BODin x Q
= 880,94 kgBOD/hari
8 Cek V load = Beban organik / Q
= 0,29 m2
Volume reaktor = Beban organik / V load
= 3084,54
10 Cek td = Vol.reaktor/Qtiap bak
= 24,00 jam
11 Dimensi OD =
a Kedalaman (H) = 3 m
b Lebar dasar (Ld) = 13 m
c Lebar permukaan (Lp) = 19 m
d Jarak antar ditch = 2 m
Perhitungan ditch melingkar =
e Diameter atas = 40 m
f Diameter bawah = 34 m
g Luas atas = 1257,14 m²
h Luas bawah = 908,29 m²
i V ditch melingkar = 3234,00 m³
j V ditch memanjang = 149,46 m³
12 Ac = 0,5 x (Ld + Lp) x H
= 48 m²
13 Panjang (P) = V reaktor / Ac
= 64,30 m
14 Luas lahan tiap unit = P x Lp
= 1221,70 m²
15 Kebutuhan lahan = Luas lahan x Jumlah
= 9773,6