Price Mix and Yield Variance
Price Mix and Yield Variance
Actual Production
Production 40 batches
Materials used and purchased
Crab 28.50% 2,285.70 7.50
Shrimp 45.50% 3,649.10 4.40 per lb
Oyster 26.00% 2,085.20 4.95
lbs 8,020.00 attributable to the 40 batches
Labor incurred
Category A 90.00% 450.00 10.5
per hr
Category B 10.00% 50.00 14.4
hrs 500.00
Actual Rate Actual Mix Actual Hours
Category A 10.5 90% 500 4,725.00
Category B 14.4 10% 500 720.00 5,445.00
Mix Variance
Yield Variance
Actual Price Actual Mix Actual Quantity
Crab 7.50 28.50% 8,020.00 17,142.75
Shrimp 4.40 45.50% 8,020.00 16,056.04
Osyter 4.95 26.00% 8,020.00 10,321.74 43,520.53
Mix Variance
Yield Variance