Tugas RSM (Flow Manufacturing & Costs)
Tugas RSM (Flow Manufacturing & Costs)
Proses Manufaktur
No Main Component Sub-Component
Variasi 1 Variasi 2 Variasi 3
Persiapan Raw Material (Equal Angle) Persiapan Raw Material (Equal Angle) Persiapan Raw Material (Equal Angle)
Cutting with Cutting Wheel Cutting with High Pressure Waterjet Cutting with Plasma Cutting
Frame Grinding Hasil Cutting Grinding Hasil Cutting Grinding Hasil Cutting
Welding with SMAW Process Welding with SMAW Process Welding with SMAW Process
Persiapan Raw Material (SS304) Persiapan Raw Material (SS304) Persiapan Raw Material (SS400)
Cutting with Laser Cutting Cutting with Laser Cutting Cutting with Plasma Cutting
Base Plate Grinding Hasil Cutting Grinding Hasil Cutting Grinding Hasil Cutting
1 Main Frame
Welding with SMAW Process Welding with SMAW Process Welding with SMAW Process
Persiapan Raw Material (SS304) Persiapan Raw Material (SS304) Persiapan Raw Material (SS400)
Cutting with Laser Cutting Cutting with Laser Cutting Cutting with Plasma Cutting
Cover Motor Grinding Hasil Cutting Grinding Hasil Cutting Grinding Hasil Cutting
Welding with SMAW Process Welding with SMAW Process Welding with SMAW Process
Persiapan Raw Material (SUS304 FG) Persiapan Raw Material (SUS304 FG) Persiapan Raw Material (SUS304 FG)
Cutting with Shearing Machine Cutting with Laser Machine Cutting with Shearing Machine
Bending Plate with Bending Machine Bending Plate with Bending Machine Bending Plate with Bending Machine
2 Cover/Body Top Cover
Drill for Hinge Hole
Install Hinge
Persiapan Raw Material (SUS304 FG) Persiapan Raw Material (SUS304 FG) Persiapan Raw Material (SUS304 FG)
Cutting with Shearing Machine Cutting with Laser Machine Cutting with Shearing Machine
Bending Plate with Bending Machine Bending Plate with Bending Machine Bending Plate with Bending Machine
2 Cover/Body Body Cover
Drill for Hinge Hole Drill for Hinge Hole Drill for Hinge Hole
Tap For Hinge Bolt Tap For Hinge Bolt Tap For Hinge Bolt
Persiapan Raw Material (SUS304 FG) Persiapan Raw Material (SUS304 FG) Persiapan Raw Material (SUS304 FG)
Cutting with Cutting Wheel Cutting with Cutting Wheel Cutting with Cutting Wheel
Main Shaft
Turning Process Turning Process Turning Process
Welding with SMAW Process Welding with SMAW Process Welding with SMAW Process
Persiapan Raw Material (SUS304 FG) Persiapan Raw Material (SUS304 FG) Persiapan Raw Material (SUS304 FG)
Finishing
Cover and Main Frame Fastened by Cover and Main Frame Fastened by Cover and Main Frame Fastened by
Bolt Bolt Bolt
Main Shaft Welded to Mixer Pipe Main Shaft Welded to Mixer Pipe Main Shaft Welded to Mixer Pipe
Attached to Cover using Pillow Block Attached to Cover using Pillow Block Attached to Cover using Pillow Block
and Ball Bearing and Ball Bearing and Ball Bearing
Main Shaft Coupled to Electric Motor Main Shaft Coupled to Electric Motor Main Shaft Coupled to Electric Motor
using Taper Bush and Rubber Coupling using Taper Bush and Rubber Coupling using Taper Bush and Rubber Coupling
Electric Motor Connected to Switch Electric Motor Connected to Switch Electric Motor Connected to Switch
and Relay for On/Off and Relay for On/Off and Relay for On/Off
Emergency Push Button Connected to Emergency Push Button Connected to Emergency Push Button Connected to
Relay for Switch Off Electrical Relay for Switch Off Electrical Relay for Switch Off Electrical
Persiapan Raw Material (SUS304 FG) Persiapan Raw Material (SUS304 FG) Persiapan Raw Material (SUS304 FG)
Cutting with Shearing Machine Cutting with Laser Machine Cutting with Shearing Machine
Bending Plate with Bending Machine Bending Plate with Bending Machine Bending Plate with Bending Machine
2 Cover/Body Top Cover
Drill for Hinge Hole
Install Hinge
2 Biaya Mesin
2.1 Shearing
2.1.1 Daya (Listrik) hari 1 40788,72 1 40788,72
2.1.2 Man Power Rate orang 1 5100000 1 21074,38
2.1.3 Biaya Maintenance hari 1 100000 1 100000
2.1.4 Depresiasi Mesin tahun 10 75000000 30991,74
Biaya Harian Shearing Rp192.855
Oli Transmisi
Penggantian Oli Transmisi pcs 18 1885890 4,5 419086,67
Penambahan Oli Transmisi liter 1 104771,67 2 209543,33
Biaya Oli Bending Rp628.630
2.5 Painting
2.5.1 Daya (Listrik) hari 1 8837,56 1 8837,556
2.5.2 Man Power Rate orang 1 5100000 1 21074,38
2.5.3 Biaya Maintenance hari 1 100000 1 100000
2.5.4 Depresiasi Mesin tahun 10 7887000 3259,09
Biaya Harian Painting Rp133.171
3 Biaya QC
3.1 Man Power Rate orang 1 5100000 1 21074,38
3.2 Output/Day pcs 8
4.5 Tooling
4.5.1 Software AutoCAD/Fusion hari 365 7789800 1 311592,0
Biaya Tooling PC Rp311.592
2 Biaya Mesin
2.1 Laser Cutting
2.1.1 Daya (Listrik) hari 1 40788,72 1 40788,72
2.1.2 Man Power Rate orang 1 5100000 1 21074,38
2.1.3 Biaya Maintenance hari 1 100000 1 100000
2.1.4 Depresiasi Mesin tahun 10 104895000 43345,04
Biaya Harian Laser Cutting Rp205.208
Oli Transmisi
Penggantian Oli Transmisi pcs 18 1885890 4,5 419086,67
Penambahan Oli Transmisi liter 1 104771,67 2 209543,33
Biaya Oli Bending Rp628.630
2.5 Painting
2.5.1 Daya (Listrik) hari 1 8837,56 1 8837,556
2.5.2 Man Power Rate orang 1 5100000 1 21074,38
2.5.3 Biaya Maintenance hari 1 100000 1 100000
2.5.4 Depresiasi Mesin tahun 10 7887000 3259,09
Biaya Harian Painting Rp133.171
3 Biaya QC
3.1 Man Power Rate orang 1 5100000 1 21074,38
3.2 Output/Day pcs 8
4.5 Tooling
4.5.1 Software AutoCAD/Fusion hari 365 7789800 1 311592,0
Biaya Tooling PC Rp311.592
2 Biaya Mesin
2.1 Shearing
2.1.1 Daya (Listrik) hari 1 40788,72 1 40788,72
2.1.2 Man Power Rate orang 1 5100000 1 21074,38
2.1.3 Biaya Maintenance hari 1 100000 1 100000
2.1.4 Depresiasi Mesin tahun 10 75000000 30991,74
Biaya Harian Shearing Rp192.855
Oli Transmisi
Penggantian Oli Transmisi pcs 18 1885890 4,5 419086,67
Penambahan Oli Transmisi liter 1 104771,67 2 209543,33
Biaya Oli Bending Rp628.630
2.3 Drilling
2.3.1 Daya (Listrik) hari 1 4758,68 1 4758,684
2.3.2 Man Power Rate orang 1 5100000 1 21074,38
2.3.3 Biaya Maintenance hari 1 100000 1 100000
2.3.4 Depresiasi Mesin tahun 5 427150 353,02
Biaya Harian Drilling Rp126.186
2.6 Painting
2.6.1 Daya (Listrik) hari 1 8837,56 1 8837,556
2.6.2 Man Power Rate orang 1 5100000 1 21074,38
2.6.3 Biaya Maintenance hari 1 100000 1 100000
2.6.4 Depresiasi Mesin tahun 10 7887000 3259,09
Biaya Harian Painting Rp133.171
3 Biaya QC
3.1 Man Power Rate orang 1 5100000 1 21074,38
3.2 Output/Day pcs 8
4.5 Tooling
4.5.1 Software AutoCAD/Fusion hari 365 7789800 1 311592,0
Biaya Tooling PC Rp311.592