INVOICE

DARSHINI ELECTRICAL & INTERIORS DATE :- 04/08/2023


B - 01, D - 113A, SRM NIVAAS, PI No. :- DEI/23-24/20
ANDHERIA MOR, CHATTARPUR,
New Delhi - 110074.
Email : - darshinielectrical95@gmail.com
GSTIN : - 07AAQFD6869C1Z2
Mob : - + 91 9560527339, 9810201460
CLIENT :- PROJECT :-
Mr. MANISH DAWAR MS STRUCTURE & WOOD WORK
628B, DLF CAMELLIAS, FOR PANELLING
GURUGRAM.
`
S.No DESCRIPTION QTY UNIT RATE AMOUNT
ELEVATION WORK OF MS STRUCTURE FRAMING WITH HDHMR / BWP BOARD FOR PANELLING
1 LIFT LOBBY
a Supply, Fabricating, Fixing & Making of MS Structure
Frame for Fixing of HDHMR / BWP Board over it as per the
Layout, It Shall be achived by using 40mm x 40mm 14
SWG MS Hollow Tube having thickness of 2mm, This
Tubular Pipe will cut and Welded at site, The tube will
fix/Weld in both verticla & horizontal way for proper
support and streghnt of the structure the MS Frame will fix
in the wall by using the Clit Fastner by Hmmering it in the 147 Sqft 425 62475.00
wall and Fixing the Structure in it. The Cost also includes
Loading, Unloading, Lifting & applying of Red oxide primer
in the tube as required.

b Supplying, Cutting & Fixing of 18mm HDHMR / BWP Board


in the MS Struture as per the layout, it will be fixed in both
vertical and horizontal way and shall fix using self drilling
Screws in the MS Structure as required to complete.(Paint
cost, MS/SS Sheet & Wooden Cornice/Moulding not 192 Sqft 420 80640.00
included, it shall be charged Seperatly)

2 DINNING ROOM
a Supply, Fabricating, Fixing & Making of MS Structure
Frame for Fixing of HDHMR / BWP Board over it as per the
Layout, It Shall be achived by using 40mm x 40mm 14
SWG MS Hollow Tube having thickness of 2mm, This
Tubular Pipe will cut and Welded at site, The tube will
fix/Weld in both verticla & horizontal way for proper
support and streghnt of the structure the MS Frame will fix
in the wall by using the Clit Fastner by Hmmering it in the 176 Sqft 425 74800.00
wall and Fixing the Structure in it. The Cost also includes
Loading, Unloading, Lifting & applying of Red oxide primer
in the tube as required.
b Supplying, Cutting & Fixing of 18mm HDHMR / BWP Board
in the MS Struture as per the layout, it will be fixed in both
vertical and horizontal way and shall fix using self drilling
Screws in the MS Structure as required to complete.(Paint,
POP, MS/SS Sheet & Wooden Cornice/Moulding Cost not 192 Sqft 420 80640.00
included, it shall be charged Seperatly)

3 MASTER BEDROOM
a Supply, Fabricating, Fixing & Making of MS Structure
Frame for Fixing of HDHMR / BWP Board over it as per the
Layout, It Shall be achived by using 40mm x 40mm 14
SWG MS Hollow Tube having thickness of 2mm, This
Tubular Pipe will cut and Welded at site, The tube will
fix/Weld in both verticla & horizontal way for proper
support and streghnt of the structure the MS Frame will fix
in the wall by using the Clit Fastner by Hmmering it in the 75 Nos. 425 31875.00
wall and Fixing the Structure in it. The Cost also includes
Loading, Unloading, Lifting & applying of Red oxide primer
in the tube as required.

b Supplying, Cutting & Fixing of 18mm HDHMR / BWP Board


in the MS Struture as per the layout, it will be fixed in both
vertical and horizontal way and shall fix using self drilling
Screws in the MS Structure as required to complete.(Paint,
POP, MS/SS Sheet & Wooden Cornice/Moulding Cost not 96 Sqft 420 40320.00
included, it shall be charged Seperatly)

4 PASSAGE AREA PANELLING


a Supply, Fabricating, Fixing & Making of MS Structure
Frame for Fixing of HDHMR Board over it as per the
Layout, It Shall be achived by using 40mm x 40mm 14
SWG MS Hollow Tube having thickness of 2mm, This
Tubular Pipe will cut and Welded at site, The tube will
fix/Weld in both verticla & horizontal way for proper
support and streghnt of the structure the MS Frame will fix
in the wall by using the Clit Fastner by Hmmering it in the 38 Sqft 425 16150.00
wall and Fixing the Structure in it. The Cost also includes
Loading, Unloading, Lifting & applying of Red oxide primer
in the tube as required.

b Supplying, Cutting & Fixing of 18mm HDHMR / BWP Board


in the MS Struture as per the layout, it will be fixed in both
vertical and horizontal way and shall fix using self drilling
Screws in the MS Structure as required to complete.(Paint,
POP, MS/SS Sheet & Wooden Cornice/Moulding Cost not 64 Sqft 420 26880.00
included, it shall be charged Seperatly)

Supply & Fixing of HDHMR Ply in all outer Corner of


5 Panelling in Dinning area & Lift Lobby as required to 217 RFT 130 28210.00
complete.

Amount in Words:- TAXABLE VALUE 441990.00


Make Payment through Cheque, DD or NEFT/RTGS in Favour of For Darshini Electrical & Interiors
DARSHINI ELECTRICAL AND INTERIORS
A/C No. 202911100005075.
Bank :- Union Bank of India
Branch :- Khanpur, Delhi
IFSC Code :- UBIN0820296 Authorized Signatory

PAYMENT TERMS :-
1. 15
2. 50 %
% Running
Advance Payment
Payment After
Against Work Order.
Completion of MS Structure of Lift Lobby & MasterBedroom.

3. 15 % Running Payment After Completion of MS Structure of Dinning & Passage Area.


4. 10 % Running Payment After Completion Plyboard Fixing in MS Structure of Lift Lobby &
MasterBedroom.
5. 10 % Running Payment After Completion Plyboard Fixing in MS Structure of Dinning & Passage Area.

NOTE -
1. GST WILL BE CHARGED 18% AS PER GOVT. RULE IN THE TAXABLE AMOUNT.
2. IF ANY CHANGES DONE AT SITE/NEW POINTS ADDED OR REDO WORK DONE IT WILL BE CHARGED ON
ACTUAL.
3. THE AREA QUANTITY SHALL BE TAKEN FROM LAYOUT.
4. IF ACTUAL AREA MEASUREMENT IS DIFFERENT FROM GIVEN ESTIMATE THEN IT WILL BE CHARGED
AS PER ACTUAL MEASUREMENT.
MATERIALS MAKE

S.No MATERIALS BRAND


1 MS TUBE TATA / JINDAL / APL APOLLO / EQUIVALENT
2 PLY BOARD CENTURY / SAINIK