2 DINNING ROOM
a Supply, Fabricating, Fixing & Making of MS Structure
Frame for Fixing of HDHMR / BWP Board over it as per the
Layout, It Shall be achived by using 40mm x 40mm 14
SWG MS Hollow Tube having thickness of 2mm, This
Tubular Pipe will cut and Welded at site, The tube will
fix/Weld in both verticla & horizontal way for proper
support and streghnt of the structure the MS Frame will fix
in the wall by using the Clit Fastner by Hmmering it in the 176 Sqft 425 74800.00
wall and Fixing the Structure in it. The Cost also includes
Loading, Unloading, Lifting & applying of Red oxide primer
in the tube as required.
b Supplying, Cutting & Fixing of 18mm HDHMR / BWP Board
in the MS Struture as per the layout, it will be fixed in both
vertical and horizontal way and shall fix using self drilling
Screws in the MS Structure as required to complete.(Paint,
POP, MS/SS Sheet & Wooden Cornice/Moulding Cost not 192 Sqft 420 80640.00
included, it shall be charged Seperatly)
3 MASTER BEDROOM
a Supply, Fabricating, Fixing & Making of MS Structure
Frame for Fixing of HDHMR / BWP Board over it as per the
Layout, It Shall be achived by using 40mm x 40mm 14
SWG MS Hollow Tube having thickness of 2mm, This
Tubular Pipe will cut and Welded at site, The tube will
fix/Weld in both verticla & horizontal way for proper
support and streghnt of the structure the MS Frame will fix
in the wall by using the Clit Fastner by Hmmering it in the 75 Nos. 425 31875.00
wall and Fixing the Structure in it. The Cost also includes
Loading, Unloading, Lifting & applying of Red oxide primer
in the tube as required.
PAYMENT TERMS :-
1. 15
2. 50 %
% Running
Advance Payment
Payment After
Against Work Order.
Completion of MS Structure of Lift Lobby & MasterBedroom.
NOTE -
1. GST WILL BE CHARGED 18% AS PER GOVT. RULE IN THE TAXABLE AMOUNT.
2. IF ANY CHANGES DONE AT SITE/NEW POINTS ADDED OR REDO WORK DONE IT WILL BE CHARGED ON
ACTUAL.
3. THE AREA QUANTITY SHALL BE TAKEN FROM LAYOUT.
4. IF ACTUAL AREA MEASUREMENT IS DIFFERENT FROM GIVEN ESTIMATE THEN IT WILL BE CHARGED
AS PER ACTUAL MEASUREMENT.