7 CO-AXIAL CABLE
Supply, laying, installing, testing & commissioning of RJ6 in
25mm MS & PVC conduits as required and including all
accessories such as modular Jack with modular plate and
the box covered with front modular plat & all necessary
associated hardware including
ferrules etc. as per the specifications complete as required.
Make Payment through Cheque, DD or NEFT/RTGS in Favour of For Darshini Electrical & Interiors
DARSHINI ELECTRICAL AND INTERIORS
A/C No. 202911100005075. DIFFERENCE
Bank :- Union Bank of India
Branch :- Khanpur, Delhi
IFSC Code :- UBIN0820296 Authorized Signatory
PAYMENT TERMS :-
1. 50 % Advance Payment Against Work Order.
2. 15 % Running Payment After Completion of Conduit Work.
3. 10 % Running Payment After Completion of Wiring Work.
4. 05 % Runnig Payment After Completion of Lighting
5. 10 % Running Payment on Fixing of Power Receptacles.
6. 10 % After Handover.
NOTE -
1. GST WILL BE CHARGED 18% AS PER GOVT. RULE IN THE TAXABLE AMOUNT.
2. IF ANY CHANGES DONE AT SITE/NEW POINTS ADDED OR REDO WORK DONE IT WILL BE CHARGED ON
ACTUAL.
3. IF ACTUAL AREA MEASUREMENT IS DIFFERENT FROM GIVEN ESTIMATE THEN IT WILL BE CHARGED
AS PER ACTUAL MEASUREMENT.
4. ALL MATERIALS AND WORK EXECUTIONS ARE AS PER DLF NORMS ONLY.
5. FOR AUTOMATION ONLY WIRING WILL BE DONE... KEYPADS, GANG BOXES, MODULES,
AUTOMATION DB AND MCB & AC THERMOSTATE WORK NOT IN OUR SCOPE.
6. NOTE - COST DIFFERENCE FOR GLASS PLATE TO METAL PLATES NOT INCLUDED IN THE COST SO IT
WILL BE CHARGED EXTRA ON ACTUAL.
RATE AMOUNT
275 1,430,000.00
N SLD 120,000.00
1550000