ADNOC Offshore Technical Standard


A0-IG-J-CP-001 November-2019

Code of Practice
For
Inspection & Testing
Requirements for New Equipment and
Materials in Manufacture

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

Copyright©2018 Abu Dhabi Company for Offshore Petroleum Operations Ltd–ADNOC Offshore

All rights reserved. The information contained in this document is regarded as confidential.
Recipient(s) other than ADNOC Offshore employees undertake both during the continuance of their
services to ADNOC Offshore and after termination to maintain in safe custody and not to use any
such information for any purpose other than a purpose falling within the scope of the Agreement or
Contract under which this document was supplied. Recipient(s) further agree not to dispose of, make
copies, in whole or in part of such information or permit the use or access of the same by any Third
Party unless the prior written permission of ADNOC Offshore Management is obtained or unless
disclosure is required by court order. None of the information contained in this documents shall be
disclosed outside the recipients own organization.

---------------------------------------------------------------------------------------------------------------

In the event of conflict between this document and relevant law or regulation, the relevant law or
regulation shall be followed, if the document creates a higher obligations, it shall be followed as long
as this also achieve full compliance with the law and regulation.

November-2019 Page 3 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

CHANGES – CURRENT

General

Text affected by the main changes in this revision is mentioned in the table below. However, if the
changes involve a whole part, section or sub-section, normally only the title will be mentioned as
“all”.

Revised Section(s)
Revision No. Revision Date Revision Description
/ Page(s)

 This revision is based on ex-


ADMA-OPCO CP-102 and issued
as unified ADNOC Offshore TSD
 Any Referenced Documents (EX-

0 November-2019 Reaffirming ADMA, or EX-ZADCO) mentioned


in this document shall be
superseded with the latest
unified ADNOC OFFSHORE TSD
(if available)

November-2019 Page 4 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

TABLE OF CONTENTS

1. Introduction .................................................................................................. 9
1.1 Preamble ................................................................................................................. 9
1.2 Purpose ................................................................................................................... 9
1.3 Scope ..................................................................................................................... 9
1.4 References .............................................................................................................. 9
1.5 Abbreviations ......................................................................................................... 10
1.6 Terms & Definitions ................................................................................................ 10
1.7 Use of Language .................................................................................................... 10
1.8 Units ..................................................................................................................... 11
1.9 Lessons Learnt ....................................................................................................... 11
1.10 Site Conditions & Data ............................................................................................ 11
1.11 Roles & Responsibilities ........................................................................................... 11
2. INSPECTION AND CERTIFICATION REQUIREMENTS .................................... 11
2.1 Pre-Manufacturing/Pre-Inspection Meeting................................................................. 11
2.2 Access to Vendor’s Facilities ..................................................................................... 11
2.3 Approval of Technical Documents of Vendors and sub-Vendors..................................... 11
2.4 Preliminary Work .................................................................................................... 12
2.5 PPM/PIM Agenda .................................................................................................... 13
2.6 Production Checks .................................................................................................. 13
2.7 Examination of the Equipment for Dispatch ................................................................ 15
2.8 Testing of the Equipment......................................................................................... 15
2.9 Preparation of the Equipment for Dispatch ................................................................. 15
2.10 Reporting .............................................................................................................. 15
2.11 Inspection & Test Plan (ITP) .................................................................................... 16
3. DESCRIPTION OF CERTIFICATION & QUALIFICATION REQUIREMENTS ...... 17
3.1 Description of Certificates in Accordance with BS EN 10204 ......................................... 17
3.2 Qualification & Competency of TPA Personnel ............................................................. 18
3.3 Consistency of Inspectors ........................................................................................ 18
4. PACKAGE AND CRITICALITY ITEMS............................................................. 19
4.1 Package Items ....................................................................................................... 19
4.2 Criticality ............................................................................................................... 19
5. EQUIPMENT/MATERIALS CERTIFICATION DESIGNATION ........................... 19

November-2019 Page 5 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

6. INSPECTION & TEST PLAN (ITP) ................................................................. 25


6.1 Legend & Definition ................................................................................................ 25
6.2 For other items ...................................................................................................... 26
6.3 Inspection & Test Plan (ITP) Series ........................................................................... 27
ITP–101 Unfired Pressure Vessel & Columns..................................................................... 28
ITP–102 Shell & Tube Heat Exchangers ........................................................................... 32
ITP–103 Air Cooled Exchangers ...................................................................................... 35
ITP–104 Shop Fabricated Pipe Work ................................................................................ 38
ITP–105 Weldable Structural Steel Material ...................................................................... 41
ITP–106 Structural Steel Work Fabrication ....................................................................... 45
ITP–107 Valves for Pipelines & Process Units .................................................................... 47
ITP–108 Safety Relief Valves .......................................................................................... 50
ITP–109 Control Valves ................................................................................................. 53
ITP–110 Flanges Forgings Including Hub Connectors & Fittings ........................................... 55
ITP–111 Expansion Bellow ............................................................................................. 57
ITP–112 Sacrificial Anodes ............................................................................................. 61
ITP–113 Storage Tanks ................................................................................................. 63
ITP–114 AC Power Generators ........................................................................................ 69
ITP–115 Column Internals ............................................................................................. 71
ITP–116 Emergency Diesel Generator .............................................................................. 73
ITP–117 Flare Package .................................................................................................. 77
ITP–118 Glass Flake Lining ............................................................................................ 81
ITP–119 GRE Piping & Fittings ........................................................................................ 84
ITP–120 GRV- RTR Pipes & Fittings ................................................................................. 87
ITP–121 Insulating Gasket Kits ....................................................................................... 89
ITP–122 SS Pipes ......................................................................................................... 91
ITP–123 Machine Monitoring System ............................................................................... 93
ITP–124 HVAC Equipment .............................................................................................. 95
ITP–125 HVAC Control System ....................................................................................... 99
ITP–126 Temporary Refuge Room (E&I) ......................................................................... 102
ITP–201 132kV & above Power Transformers and Shunt Reactors ...................................... 104
ITP–202 33kV & Below Oil Filled Power Transformers and Shunt Reactors ........................... 108
ITP–203 Dry Type Power Transformers ........................................................................... 113
ITP–204 132KV GIS ..................................................................................................... 115
ITP–205 11KV & 6.6KV AIS ........................................................................................... 121

November-2019 Page 6 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

ITP–206 415V SWGR .................................................................................................... 124


ITP–207 ECMS/PMS/EAMS ............................................................................................ 126
ITP–208 Neutral Earthing Resistor ................................................................................. 129
ITP–209 132KV Submarine Cable................................................................................... 132
ITP–210 11KV Submarine Cable .................................................................................... 136
ITP–211 Electrical Cables .............................................................................................. 140
ITP–212 AC UPS .......................................................................................................... 142
ITP–213 DC UPS .......................................................................................................... 146
ITP–214 HV/MV Electric Motors...................................................................................... 149
ITP–215 LV Electric Motors............................................................................................ 153
ITP–216 Variable Speed Drives ...................................................................................... 156
ITP–217 Electrical Heat Tracing ..................................................................................... 159
ITP–218 Navigational Aids ............................................................................................ 161
ITP–219 Solar Power Systems ....................................................................................... 163
ITP–220 Cathodic Protection System .............................................................................. 165
ITP–221 GRP Cable Trays & Ladders .............................................................................. 167
ITP–222 Electric Traction Lift ......................................................................................... 169
ITP–223 Pneumatic & Hydraulic Actuators ....................................................................... 171
ITP–224 Motorized Actuators ......................................................................................... 173
ITP–225 Analyzer System ............................................................................................. 175
ITP–226 Distribution Panel Board ................................................................................... 177
ITP–227 Flowmeter ...................................................................................................... 179
ITP–228 Instrument Tubing (SMLS Tube) ....................................................................... 181
ITP–229 Level Transmitter ............................................................................................ 183
ITP–230 Telecom System (LAN / WAN System) ............................................................... 185
ITP–231 Wellhead Control Panels ................................................................................... 188
ITP–232 LV Diesel Driven Alternators ............................................................................. 192
ITP–233 MAC DCS, ESD & F&G Systems ......................................................................... 194
ITP–234 Remote Telemetry Unit (RTU) ........................................................................... 202
ITP–301 Transmission Pipeline (Pipe Vendor) .................................................................. 204
ITP–302 Weld Overlay Pipes with UNS N06625 ................................................................ 205
ITP–303 Hot Induction Bend ......................................................................................... 208
ITP–401 Cranes Jib & Overhead ..................................................................................... 211
ITP–501 Marine Hoses .................................................................................................. 213
ITP–502 Mooring Buoys and PLEM.................................................................................. 215

November-2019 Page 7 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

ITP–503 Mooring Hawsers ............................................................................................. 217


ITP–504 Chains for Marine Services ............................................................................... 219
ITP–505 Rubstrips ....................................................................................................... 221
ITP–506 Hydraulic Clamp .............................................................................................. 223
ITP–507 Connectors ..................................................................................................... 226
ITP–601 Casing Activity ................................................................................................ 228
ITP–602 Drill Pipe ........................................................................................................ 228
ITP–603 Casing Hardware, Downhole Completion and Wireline Equipment for Sour Service .. 228
ITP–604 High Nickel Alloy Casing, Tubing and Couplings ................................................... 228
ITP–605 Wellhead and Christmas Tree Equipment to API 6A ............................................. 228
Appendix-a: Abbreviations ................................................................................ 229
Appendix-b: Definitions .................................................................................... 231
B.1: General Definition ................................................................................................... 231
Appendix-c: Referenced Documents.................................................................. 232
Appendix-D: CERTIFICATION FORM FOR EQUIPMENT / MATERIALS NOT LISTED
IN SECTION 5 OF CP-102 .................................................................................. 239
Appendix-E: Criticality rating ............................................................................ 240
ITP–111-CR1 Pumps (Centrifugal & Reciprocating) ........................................................... 242
ITP–112-CR1 Compressors (Centrifugal) ......................................................................... 245
ITP–112-CR1 Compressors (Reciprocating) ..................................................................... 248
ITP–113-CR1 Gas Turbines ............................................................................................ 251
ITP–111-CR2 Pumps (Centrifugal & Reciprocating) ........................................................... 254
ITP–112-CR2 Compressors (Centrifugal) ......................................................................... 257
ITP–112-CR2 Compressors (Reciprocating) ..................................................................... 260
ITP–113-CR2 Gas Turbines ............................................................................................ 263
ITP–111-CR3 Pumps (Centrifugal & Reciprocating) ........................................................... 266
ITP–112-CR3 Compressors (Centrifugal) ......................................................................... 269
ITP–112-CR3 Compressors (Reciprocating) ..................................................................... 272
ITP–113-CR3 Gas Turbines ............................................................................................ 275
ITP–111-CR4 Pumps (Centrifugal & Reciprocating) ........................................................... 278
ITP–112-CR4 Compressors (Centrifugal) ......................................................................... 281
ITP–112-CR4 Compressors (Reciprocating) ..................................................................... 284
ITP–113-CR4 Gas Turbines ............................................................................................ 287
Appendix-F: AUTHORITIES INVOLVED IN THIS COP ......................................... 290

November-2019 Page 8 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

1. INTRODUCTION

1.1 Preamble

1.1.1 ADNOC OFFSHORE utilizes the services of Third Party Inspection Agencies (TPA's) for
inspection and testing activities, document review and certification during procurement
of new equipment and materials in new Project and Operation.

1.1.2 This revision incorporates the feedback received from the user’s & stakeholders. It also
includes project procurement requirements. Also, this revision includes additional
Equipment and clarifies the definitions of intervention points.

1.1.3 Certification requirements and Inspection & Test Plan (ITP) for Drilling and Wellhead
Equipment can be found in the Inspection and Test Plans of relevant ex-ADMA / ex-
ADCO / ex-ZADCO Standards STD-01, STD-03, STD-124 & STD-05. Refer to items 5.30
to 5.34.

For line pipes (Item 5.35), refer to ADNOC OFFSHORE STD-02 Part-1 & 2 – applicable
for both, SAW & Seamless pipes respectively.

1.1.4 CP-102 Parts, Inspection & Test Plan (ITP) categorization and appendices may be issued
independent of the complete CP-102 document.

1.1.5 Where relevant, data collection for equipment (i.e. Works Identification Number (WIN)
/ Unique Tracking Commodity (UTC) / Equipment Number Inspection Data Sheets and
their attachments) shall be conducted as appropriate in accordance with the relevant
ADNOC OFFSHORE DST-003 & PRO-103. Equipment Data Collection should be read in
conjunction with this document.

1.2 Purpose

To advise ADNOC OFFSHORE Job Officers, Vendors, Company’s PMT/PMC, EPC


Contractors and Third Party Inspection Agencies (TPA’s) of ADNOC OFFSHORE’s
document review, inspection, certification and surveillance requirements applicable to
purchase orders, contracts for new equipment and material in Projects as well as in
Operation.

1.3 Scope

This document applies to procurement of new materials and equipment where stipulated
by ADNOC OFFSHORE in new Projects or in Operation either procured directly by ADNOC
OFFSHORE or procured through Contractors / EPC (Contractors).

1.4 References

1.4.1 General

The latest edition (at the time of the contract) of the reference documentation as listed
in Appendix-C shall be read as an integral part of this Document.

The latest edition/revision of ADNOC OFFSHORE Technical Standards Documents as


indicated in Status List SL-001 shall be utilized.

November-2019 Page 9 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

1.4.2 Equivalent Standards

Standard Documents equivalent to those referred to herein shall not be substituted


without written approval from ADNOC OFFSHORE. Approval of equivalent Standard
Documents will not, in any way, remove responsibility from the Contractor/Supplier or
third parties to meet the best practices and/or requirements of the Technical Standard
Documents referred to herein, in the event of conflict.

Where differences and/or conflicting issues occur between the referenced documents
themselves or the requirements of this document, the requirements of this document
shall overrule unless otherwise advised by ADNOC OFFSHORE. However All conflicts shall
be reported in writing to the ADNOC OFFSHORE Standards Division (TSCAD) for
arbitration/resolution.

The following hierarchy of adherence to standards shall be followed:

a. Whenever ADNOC OFFSHORE Technical Standard Documents (TSD’s) relevant to the


system, service and/or equipment design are available, the same shall be utilized
first.
b. Shareholder’s TSD shall be utilized next in the hierarchy, if the relevant subject is
not covered by ADNOC OFFSHORE standards.
c. National or International standards (tailored to suit ADNOC OFFSHORE needs) shall
be utilized, if the required subject is not covered either by ADNOC OFFSHORE or
Shareholder’s TSD.

The Contractor/Supplier or Third Parties shall equip themselves with copies of all the
referenced Technical Standard Documents referred in Appendix-C of this document and
shall make them readily available to all ADNOC OFFSHORE, or nominated representative,
personnel involved in the work.

1.4.3 MOC for TSDs

Any changes shall be managed based on GDL-070 MOC forms & GDL-040 CR forms,
PRO-001 & PRO-002.

1.5 Abbreviations

The abbreviations used in this Document are listed in Appendix-A.

1.6 Terms & Definitions

The definitions used in this Document are listed in Appendix-B.

1.7 Use of Language

Throughout this document, the words ‘will’, ‘may/can’, ‘should’ and ‘shall/must’, when
used in the context of actions by ADNOC OFFSHORE or others, have specific meanings
as follows:

a. ‘Will’ is used normally in connection with an action by ADNOC OFFSHORE and/or


nominated representative, rather than by a supplier.
November-2019 Page 10 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

b. ‘May/Can’ is used where alternatives/action are equally acceptable.


c. ‘Should’ is used where provision is preferred.
d. ‘Shall/Must’ is used where a provision is mandatory/vital.

1.8 Units

Units shall be in accordance with ADNOC OFFSHORE STD-00 Part-1.

1.9 Lessons Learnt

Upon completion of works related to the scope of this document, a descriptive summary
of lessons learned shall be prepared and made available by the supplier/Consultants/Job
Officer and shall be forwarded to ADNOC OFFSHORE Lessons Learned System as
appropriate.

1.10 Site Conditions & Data

Site Conditions & Data of existing ADNOC OFFSHORE facilities (Umm Shaif, Zakum fields
and Das) shall be in accordance with ADNOC OFFSHORE STD-00 Part-2. For new Fields
development, project specific requirements should be followed or refer to ADNOC
OFFSHORE. All environmental data shall be referred to ADNOC OFFSHORE technical
authority for confirmation prior to usage in the analysis.

1.11 Roles & Responsibilities

The Authorities listed in Appendix-D are primarily responsible to the extent specified
herein for satisfying the requirements of this Document.

2. INSPECTION AND CERTIFICATION REQUIREMENTS

2.1 Pre-Manufacturing/Pre-Inspection Meeting

Company (when required), EPC, Sub-contractors, Vendors and nominated TPA will
attend the pre-manufacturing/Pre-inspection meetings. Such meetings are to be held
unless otherwise advised by ADNOC OFFSHORE. However, pre-manufacturing meetings
may also be held at the request of any concerned party. In this instance, reference
should be made to Integrity Assurance Authority, Quality Management Team of ADNOC
OFFSHORE and/or ADNOC OFFSHORE Project Management Team as applicable. EX-
ADMA GDL-058 gives guidance for conducting Pre-Inspection Meetings.

2.2 Access to Vendor’s Facilities

ADNOC OFFSHORE's representatives (including the Supervising Inspection Engineer


normally affiliated to Integrity Assurance Authority of ADNOC OFFSHORE and appointed
TPA inspectors / auditors) should have free access to all parts of the Vendors premises
and sub-Vendor's works at all times during the period of procuring, manufacturing,
testing and packing.

2.3 Approval of Technical Documents of Vendors and sub-Vendors

Prior to commencement of fabrication / manufacture of material and equipment:

November-2019 Page 11 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

2.3.1 All relevant technical documents including specifications, design calculations, data
sheets, drawings, materials, quality plans, inspection & test plan, FAT Procedures and
welding procedures shall be approved by ADNOC OFFSHORE.

2.3.2 Changes in the technical documents specified in Clause 2.3.1 above shall be highlighted
and addressed to ADNOC OFFSHORE for approval.

2.3.3 Vendor, Contractor and TPA Inspection personnel shall ensure that the inspection,
testing, FAT and/or certification activities are carried out in accordance with the latest
ADNOC OFFSHORE approved technical documents as mentioned in Clauses 2.3.1 & 2.3.2
above.

During inspection, Inspectors and TPA shall verify that Company comments on
documents have been incorporated in the work and shall reflect confirmatory statement
along with Company approval status of key vendor documents in their Inspection
reports.

2.3.4 Vendor, Contractor and TPA shall be responsible to ensure that Company comments on
key vendor documents are available at the place of inspection for verification by
Contractor/Company Inspection personnel/TPA.

Final inspection and FAT shall be carried out only by using final approved documents by
the Company; any noncompliance shall be immediately reported to the Company.

2.3.5 Only ADNOC OFFSHORE approved Vendors and Sub-Vendors shall be utilized. Contractor
and TPA shall check compliance with such requirements; any noncompliance shall be
immediately reported to the company for resolution.

2.4 Preliminary Work

2.4.1 Contractor, TPA inspection personnel and whenever is requested by The Company shall
review comments and endorse the applicable documents from stated below prior to
commencement of manufacture / fabrication of material/ equipment:

a. Vendor's fabrication/manufacturing schedule.


b. Vendor's ITP.
c. Status of sub-orders.
d. Certification of base-stock materials.
e. Welding procedures and qualifications.
f. Qualified welders list.
g. Calibration certificates for each device or instrument used in the test.
h. NDE Procedures.
i. NDE & Inspection Personnel Qualification & Competency.
j. Testing Procedures.
k. Painting/Coating Procedures.

2.4.2 Any queries that arise from the documents listed above should be reported to ADNOC
OFFSHORE Integrity Assurance Authority, Quality Management Team of ADNOC
OFFSHORE and/or ADNOC OFFSHORE Project Management Team as applicable in the
first instance.

November-2019 Page 12 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

2.5 PPM/PIM Agenda

Following items as a minimum shall be discussed during the PPM/PIM. Contractor/


Vendor shall prepare and submit the necessary records notes to Company.

a. HSE Awareness and Procedures to be followed during the PPM/PIM and subsequent
inspections.
b. Availability of P.O, Approved Purchase requisitions, Project specifications with
vendor.
c. Verifying the material traceability and certification requirements.
d. Exceptions and Deviations from PO, if any.
e. Communication and inspection notification channel between Company, Contractor,
Vendor and TPA.
f. Fabrication and inspection schedule (including Sub vendor).
g. Key vendor documents approval status review.
h. Sub vendor list, controls and Company approval status.
i. Review of implementation of Vendor’s Quality System, Organization, Control and
adequacy on sub vendors.
j. Review Qualification of vendor inspection personnel.
k. Shop tour covering fabrication facilities, testing facilities, material traceability,
handling and storage, and checking of Calibration status of test instruments.
l. Specific Inspection and testing requirements such as NDE/PMI/Ferrite/
Painting/Helium leak testing/FE testing/FAT requirements etc.
m. Preservation and packing.
n. Review of ITP and Inspection interventions of all parties involved (including any
observation from Shop tour to be implemented in ITP).
o. NCR handling process.
p. Punch listing process including those of the sub-vendor items.
q. Inspection notifications and release process including those of the Sub-vendor items.
r. Lesson learned to be implemented.
s. Final dossier (Vendor Data Book).

2.6 Production Checks

2.6.1 Contractor, TPA and, when required, the Company shall conduct inspection and
confirmatory checks on the product/product's parts during various stages of production
at vendor/Sub vendor premises to check implementation of production in line with
specification and procedure and to rectify/declare any deviation from the specifications.

These checks are specified for the various items of equipment in Section 6 Inspection &
Test Plan (ITP) and the table below.

APPLICABLE ADNOC
EQUIPMENT
OFFSHORE STANDARD
Ball Valves SP-1151, Part-2
Bolting STD-126
Butterfly Valves SP-1151, Part-4
Centrifugal Compressors STD-132
November-2019 Page 13 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

Centrifugal Pumps STD-131


Check Valves SP-1151, Part-3
Control & Instrumentation Cables STD-104
Steel Casing and Tubing STD-01
Down Hole Completion Equipment STD-03
Drill Pipe STD-122
Electrical Reactor STD-154
Flanges STD-108
Gas Turbines STD-134
Gaskets STD-127
Gate Valves SP-1151, Part-1
Pre and Post Weld Heat Treatment of Ferrous Materials SP-1035
Power Generators STD-165
Globe Valves SP-1151, Part-5
GRP Cable Trays & Ladders STD-107
High Nickel Alloy Casing Tubing & Coupling STD-124
High Voltage Electric Cables STD-141
High Voltage Induction Motors STD-149
High Voltage Switchgear and Control Gear STD-144
Instrument Tubing, Fittings & Valves STD-142
Line Pipe SAW / Seamless STD-02
Navigational Aids System for Offshore Facility SP-1084
Low Voltage Electrical Cables STD-140
Low Voltage Motors STD-148
Low Voltage Switchgear and Control Gear STD-143
Piping Fittings STD-128
Pressure Relief Valves STD-121
Drill Pipe STD-122
Solar Power Supply Systems STD-167
Special Purpose Gear Units STD-136
Static AC Uninterruptible Power Systems (AC-Ups) STD-156
Procurement of Loose Lifting Equipment GDL-033
Lifting Operations CP-113
Operation, Maintenance & Inspection of Loose Lifting
PRO-141
Equipment
Operation, Maintenance & Inspection of Fixed Lifting
PRO-142
Equipment
Packaged Equipment - General Requirements SP-1100 - Part 1
Packaged Equipment – Diesel Engine Driven Fire Water
SP-1100 - Part 2
Pumps Package
Packaged Equipment - Power Generator SP-1100 - Part 3
Packaged Equipment – Instrument Air Compressor and
SP-1100 PART-7
Dryer Package
Static DC Uninterruptible Power Systems (DC-Ups) STD-146
Steel Casing & Tubing STD-01
Transformers STD-155
Wellhead & Christmas Tree Equipment STD-05

November-2019 Page 14 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

2.6.2 During Inspection, any findings/outstanding works observed by Contractor, Company,


TPA shall be brought to the attention of Vendor/Sub-vendor for rectification. In this
regard, Joint inspection report/Minutes of Meetings for action shall be recorded and
signed off by all parties at the inspection location.

In addition, for Non-compliances observed Contractor/Company/TPA personnel shall


also issue Noncompliance report.

2.7 Examination of the Equipment for Dispatch

2.7.1 On completion of manufacture/fabrication, the TPA inspector will examine the integrity
and major parameters of the product.

2.7.2 Non-destructive examinations (NDE) conducted by the Vendor and/or an independent


inspection house should be witnessed and the relevant reports will be endorsed by
ADNOC OFFSHORE TPA. In some cases, ADNOC OFFSHORE Inspector will verify the
calibration of NDE instruments and check the qualifications of NDE inspectors.

2.7.3 It is Contractor/Vendor responsibility to ensure that final inspection shall be carried out
to Company final approved documents (approved with no comments status) approved
Key vendor documents and necessary approval references shall be provided by
Contractor/Vendor to Company/TPA inspectors.

2.8 Testing of the Equipment

2.8.1 Contractor and TPA Inspector shall witness functional, electrical, metallurgical and
Mechanical tests on the equipment / materials and endorse the testing report.

2.8.2 The Vendor should advise the nominated inspector, Contractor / TPA of the testing
procedures and schedule etc. at least 72 hrs. prior to conducting the tests.

2.8.3 Contractor and TPA Inspector may at his discretion examine the testing bed; instruments
etc. and verify the accuracy of the testing equipment.

2.9 Preparation of the Equipment for Dispatch

Prior to dispatch, the Contractor, vendor and TPA will also check the following aspects:

a. Identification: Marking, nameplates and color coding as applicable.


b. Preservation: Cleaning, sand blasting and painting.
c. Preparation for shipping and stocking: i.e. greasing, plugging of holes, packing, etc.
d. Where available, Vendor Data Books/WIN/UTC/Equipment Number/CMMS Data
Sheets have been appropriately completed and all necessary documents are
attached, (reference ADNOC OFFSHORE GDL-009 & Data Sheets DST-003 Part-1,
2&3 for Equipment Data Sheets/Collection as appropriate).

2.10 Reporting

2.10.1 For projects, Contractor shall issue their inspection report to Company within four
working days or as agreed with Company.

November-2019 Page 15 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

2.10.2 TPA inspector will issue Inspection Report to ADNOC OFFSHORE after each inspection
visit within four working days or as agreed with ADNOC OFFSHORE.

2.10.3 On completion of the inspection program, the TPA will issue a Final Release/Non
Acceptance Note/Non-Conformance Report as applicable to manufacturer immediately.

For Project procurement, Contractor inspection personnel shall issue Inspection release
notes duly endorsed by Company TPA. IRN submitted by Contractor without Company
TPA endorsement shall not be accepted.

Contractor and Company TPA shall ensure that at the time of issue of IRN All key vendor
documents are approved in Company final acceptance Code (approved with no
comments) and that all Category A Punch list items are closed and verified by Company
TPA for Any outstanding Engineering items Inspection personnel shall verify Company
acceptance of such items.

As part of Company TPA consultant scope in Projects, TPA shall also issue IRN to
Company provided all approval/inspection release conditions are met.

Contractor Inspection personnel shall also issue IRN for Sub-vendor items to be
delivered to main vendor works or directly dispatched to site and above inspection
release conditions are applicable. The Sub-vendor items requiring IRN shall be to the
extent required by Company and agreed at PIM.

2.10.4 In certain instances, the TPA inspector may issue a Final Inspection Report. Where this
is done, a clause indicating that an inspection report will be following should be included
in the Release Note.

2.10.5 The TPA shall produce daily/weekly/monthly inspection report as agreed with company
highlighting the critical inspection, work progress, and area of concern with evidence
that such issues were brought to the attention of Vendor/Sub-vendor for action.

2.10.6 All inspection documents issued by the Vendor(s) will be reviewed and endorsed by
ADNOC OFFSHORE TPA. These documents include: material certification, works test
certificates, FAT report, compliance certificates, NDT records, and heat treatment charts
etc.

2.10.7 All inspection documents issued by the Vendor(s) and sub-vendors and/or TPA shall be
in English and legible.

2.11 Inspection & Test Plan (ITP)

ADNOC OFFSHORE, Contractor and TPA Interventions, Documentation, Certification,


Inspection & Testing requirements are detailed hereinafter as indicated in Inspection &
Test Plan (ITP).

Wherever Random sampling witness inspection or percent basis witness inspection


interventions are marked up in the approved ITP, it is responsibility of Vendor /
Contractor to ensure that Sample items for random or percentage basis inspection are
offered to Company TPA for selection and such sampling lot are offered on progressive
basis based on the percent completion of items manufactured.

November-2019 Page 16 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

On random or percent witness inspections if there is any failure or rejection occurs, the
extent of inspection shall be doubled and in case of further failure or rejection extent
of Company/Company TPA witness shall be increased to 100%. Same control shall apply
to Contractor Inspection interventions.

In case of Non-Confirming items where NCR is issued further additional testing and
inspection as advised by company through NCR disposition approval shall be carried
out by Manufacturer/Vendor.

Company TPA shall ensure compliance to above during inspections.

The cost of all such additional inspections including TPA cost shall be borne by
Manufacturer/vendor.
3. DESCRIPTION OF CERTIFICATION & QUALIFICATION REQUIREMENTS

3.1 Description of Certificates in Accordance with BS EN 10204

For the purpose of this Code of Practice, ADNOC OFFSHORE requires equipment and
materials with certification in accordance with BS EN 10204 Types of Inspection
Documents as indicated below:

a. Declaration of Compliance with the order '2.1'

Document in which the Manufacturer declares that the products supplied are in
compliance with the requirements of the order, without inclusion of test results.

b. Inspection Certificate '3.1'

Document issued by the manufacturer in which he declares that the products


supplied are in compliance with the requirements of the order and in which he
supplies test results based on specific inspection and testing.

The document is validated by the manufacturer’s authorized inspection


representative, independent of the manufacturing department.

c. Material Test/Inspection Certificate '3.2'

Wherever the Equipment and packages are allocated 3.2 certification clause in this
document, stage wise inspection shall be carried out as per the approved ITP in line
with typical ITPs specified against each of the equipment and package in this
document.

For material certifications including those within equipment and packages with prior
approval from Company it is acceptable to procure items having BS EN 10204, 3.2
certification by Purchaser (Sub-vendors/Vendor/Contractor)’s TPA provided these
agencies are one of the Company approved TPA agencies. In this regard, Purchaser
shall ensure that all inspection and test results required by applicable Company
specification are clearly shown in the Material test certificates.

d. Inspection Report '2.2'

Document in which the manufacture declares that the products supplied are in
compliance with the requirements of the order and in which he supplies test results
based on non-specific inspection and testing.

November-2019 Page 17 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

3.2 Qualification & Competency of TPA Personnel

3.2.1 Welding, Fabrications, Coatings Applications & NDT

Qualifications & competency of Contractor and TPA personnel engaged in inspection,


testing & certification activities of ADNOC OFFSHORE materials and/or equipment shall
meet as a minimum the requirements of ADNOC OFFSHORE SP-1031.

3.2.2 Any other Aspects outside the Scope of ADNOC OFFSHORE SP-1031

Qualifications & competency of Vendor, Contractor and TPA Personnel engaged in


inspection, testing and/or certification activities for ADNOC OFFSHORE materials &
equipment shall meet as a minimum the following requirements:

a. Hold BSc in engineering or equivalent or hold senior level of certified qualification by


recognized certification authority.
b. Have 10 years’ experience in Oil & Gas industry.
c. Have at least 5 years’ experience in the same field of inspection & Certification works
for similar Material/Equipment.

3.2.3 Company Approval

CVs for Contractor and the TPA nominated personnel shall be submitted to ADNOC
OFFSHORE for approval, such CVs shall be attached with a valid copy of their
qualifications. It shall be contractor and TPA consultant responsibility to ensure that
minimum 2 CVs are proposed well in advance for Company assessment; so that
approved inspectors are timely mobilized for inspection without jeopardizing the
Inspection schedule.

Contractors and/or TPA shall provide competent inspection personnel’s CVs only who
having adequate qualification and experience in the same offered Material/Equipment
for the Company approval.

However, Contractor and/or TPA shall immediately facilitate the interview for the
selected inspectors (Telephonic or face to face interview) prior to their engagement in
the work. The approved inspector shall be allocated unique approval no. by ADNOC
OFFSHORE.

Company reserves the right to reject any CV without providing justification to Contractor
and/or TPA.

3.2.4 Competency Matrix

TPA shall maintain and submit Competency Matrix of approved inspectors to ADNOC
OFFSHORE.

3.3 Consistency of Inspectors

TPA shall maintain consistency in the deployment of the approved personnel on the job
and shall not change them. Any change in the deployment of approved personnel shall
require ADNOC OFFSHORE prior approval. Any inconsistency shall be subjected to a
penalty as per contractual obligations.

November-2019 Page 18 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

4. PACKAGE AND CRITICALITY ITEMS

4.1 Package Items

4.1.1 For packaged items and skids, while preparing ITP, Vendor/Contractor shall ensure that
all items covered in P.O; along with each Sub-vendors name and location covered are
included in the Master ITP along with Inspection interventions of all parties.

4.1.2 Main Package Vendor shall ensure that this master ITP is available at all Sub-vendor
locations at the time of inspection and shall be the basis for all inspection interventions
of Contractor and Company/TPA.

4.1.3 For items inspected at Sub-vendor locations, Contractor and TPA shall issue IRN for each
sub vendor items covered in the Master ITP along with associated Category B and C
punch lists.
Unless otherwise agreed with Company, all punch lists shall be closed at the sub-vendors
works prior to dispatch of items to main vendor location or Site.
4.1.4 Items to be excluded from Sub-vendor IRN shall be agreed with Company.

4.1.5 Unless otherwise agreed with Company, Inspection and certification level of items
covered within the Package shall be same as specified for individual items in CP-102.

4.1.6 Sub-vendor Items:

Main vendor shall ensure that all inspection requirements including extent of testing and
inspection interventions by Company/TPA pertaining to CP-102 are communicated to
each sub-vendor and are complied.

Main vendor shall ensure that Company approved inspection and testing documents
including the acceptance criteria are applied by each sub-vendor. Necessary project
documents and status of Company approval shall be available for Company/TPA
verification at sub-vendor location.

During inspections and verification of documents, Vendor QC personnel and


Contractor/TPA personnel shall ensure compliance to all the above.

4.2 Criticality

Whenever, criticality is specified for rotating equipment, Appendix-E will be referred.

5. EQUIPMENT/MATERIALS CERTIFICATION DESIGNATION

Certification Inspection & Test


Item Equipment / Material
Level Plan (ITP)
a. Unfired Pressure Vessels & Columns to ASME
3.2 ITP–101
VIII, BS 5500 and other recognized Codes
5.1 b. Pressure part Plates, Shell and Nozzle Pipes,
3.2 Note 1
forgings/tubes
c. Gaskets, Bolting, Vessel spare parts e.g.
3.1 ---
internals, demisters, etc.
a. Heat exchangers to TEMA Spec. "R" and shell
ITP–102 &
5.2 and tube type, replacement bundles. Air 3.2
ITP–103
cooled exchangers in hydrocarbon service
November-2019 Page 19 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

b. Pressure part Plates, Shell and Nozzle Pipes,


3.2 Note 1
forgings/Tubes
c. Gaskets, Bolting, spare parts. Baffle plates,
3.1 ---
Tie rods. internals, etc.
5.3 Storage Tanks 3.2 ITP-113
Shop prefabricated pipe work with respect to
5.4 3.2 ITP–104
fabrication activities, pipes, Fittings, Forgings
a. Centrifugal pumps to ADNOC OFFSHORE STD- App.-E ITP–111 CR
3.2
131 1,2,3&4
a.1 All Castings, Austenitic and Duplex SS
Impellers, Casing, Impeller, Shaft, Case
3.2 Note 1
wear ring, Impeller wear ring, Discharge
head/ suction head can, Column
a.2 Inner case parts, Bowls, Diffusers,
Diaphragms, Throat bushing, Interstage
5.5 3.1 ---
sleeves, Interstage bushing, Bowl shaft
bushing
a.3 Minor spare parts Fasteners, Baseplates,
2.1 ---
Case and gland studs, Case gasket
b. Positive displacement pumps to API 674 and App.-E ITP–111 CR
3.1
676. 1,2,3&4
b.1 Major spare parts e.g. seals 3.1 ---
b.2 Minor spares. 2.1 ---
a. Compressors (centrifugal to ADNOC OFFSHORE
App.-E ITP–112 CR
STD-132 and reciprocating to API 618) for 3.2
hydrocarbon gas plant applications only.
1,2,3&4
b. All Casings ( forging or casting ) 3.2 Note 1
c. Spares such as rotors, seals, etc. 3.1 ---
5.6
d. Minor spares. 2.1 ---
e. Ancillaries such as high pressure seal oil vessels,
intercoolers, pulsation dampers and other vessels
3.2 ITP–101
manufactured to ASME VIII or other pressure
vessel codes.
5.7 AC Power Generators 3.2 ITP–114
Instrumentation and Control Equipment
Note: Since this covers a wide range of different items, some caution is necessary and guidance
5.8
should be sought from Integrity Assurance Authority. For most orders, however, the following
requirements apply:
a. Control valves and choke valves
¾” and below all classes 3.1
ITP–109
Above ¾” all classes 3.2
2.2/3.2 if
b. Actuators (loose items) ITP–213/ITP224
requested.
c. Associated valve bonnets (if supplied loose) 3.1
5.8.1 2.2 Functional
tests only to be
d. Actuators, fitted to valves TPA ITP–223/ITP224
witnessed/3.2 if
requested.
Shall follow
e. ESD & MOV requirements of
5.9A

November-2019 Page 20 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

a. Instrumentation, small orders to replenish


3.1 ---
store stock
b. Major spares i.e. trim components
5.8.2 ¾” and below 2.1 ---
Above ¾” 3.1
c. Minor spares i.e. seals, gaskets 2.1 ---
5.9A Valves, Including Gate, Ball, Butterfly, Globe, Check, ESDV, MOV’S
Valves for hydrocarbon service including H2S
and / or chlorides:
a. Below 3", All classes 3.1 ---
b. 3" and above, class 150 3.1 ---
c. 3" and above, class 300 and above 3.2 ITP–107
5.9A.1
d. Internal spares: Below 4” 2.1 ---
e. Internal spares: 4” and above
Major:- seats, balls, gates, stems, springs
3.1 ---
etc.
Minor:- seals / gaskets 2.1 ---
Valves for General Service:
a. Below 14", class 150 3.1 ---
b. 14" and above, class 150 3.1 ---
5.9A.2
c. All sizes, class 300 and above 3.1 ---
d. Internal spares (all) 2.1 ---
5.9B Safety Relief Valves
Safety Relief Valves for hydrocarbon service
including H2S and / or chlorides
Below 2” All Classes 3.1
2” and above Class 150 3.1
5.9B.1
2” and above Class 300 and above 3.2 ITP-108
b. Internals, Spares
Majors Bellows, discs, nozzles, springs 3.1
Minor 2.1
Safety Relief Valves for General Purpose 3.1
a. 3/4” and below all classes 3.1
b. above ¾” all classes 3.1
Internals spares
5.9B2
¾” and below 2.1
Above ¾”
Bellow & Spring 3.1

Other spares 2.1


5.9C Any valve in Duplex, Inconel Body 3.2
5.10 Piping to API / ASTM / BS / EEMU and other relevant Standard:
ITP–301
(Refer to Addendum
7 & 8 of STD-02 Part-
5.10.1 Pipes for transmission pipeline projects 3.2 1 for SAW Pipe
(Refer to Addendum 9
& 10 of STD-02 Part-
2 for Seamless Pipe).
November-2019 Page 21 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

5.10.2 Weld Overlay Pipe with UNS no6625 3.2 ITP-302


5.10.3 Hot Induction Bend 3.2 ITP-303
5.10.4 Fittings, Forgings for pipeline 3.2 Note 1
Carbon steel pipes ex-stock UAE or procured from
5.10.5 reputable stockiest in Europe (for shop fabricated 3.1 ---
pipe work see item 5.4)

5.10.6 Corrosion Resistance Alloys (CRAs)


Stainless Steel 316 3.2 Note 1(whenever 3.2
Super Duplex Stainless Steel 3.2 is applicable, then ITP
should be prepared)
Inconel 3.2
Copper nickel 3.1 --
6Mo/904L 3.1 --
Monel 3.1 --
5.10.7 Cement lined pipes to BP GP 06-63 3.1 ---
5.10.8 Cupronickel, or other alloy piping 3.1 ---
3.1/3.2 If
5.10.9 Stainless steel pipes ITP-122 (if 3.2)
specified
ITP-119 (whenever 3.2
3.1/3.2 If
5.10.11 GRP, GRE, pipes & FITTINGS is applicable, then ITP
specified should be prepared)
3.1/3.2 If
5.10.12 GRV-RTR PIPES & FITTINGS ITP-120 (if 3.2)
specified
3.1/3.2 If
5.10.13 Machine Monitoring System ITP-123 (if 3.2)
specified
3.1/3.2 If
5.10.14 HVAC EQUIPMENT ITP-124 (if 3.2)
specified
5.11 Forging Flanges and Fittings (Carbon Steel, Alloy and Stainless Steel):
Carbon steel flanges, Forgings, Hub Connectors 3.1, 3.2 if
5.11.1 ITP–110 (if 3.2)
/ Compact Flanges specified
3.1
(‘3.2’ if
Cement lined flanges and fittings to
5.11.2 specified for ITP–110 (if ‘3.2’)
BP GP 06-63
a major
project)
5.11.3 Materials for low temperature applications 3.1 ---
5.11.4 All other Fittings 3.1 ---
5.11.5 Compression fittings 3.1, 2.1 ---
3.1, 3.2 (if
5.10.6 GRP, GRE, GRV pipes and fittings ---
specified)
3.1 (‘3.2’ for
special &
Primary ITP–105
5.12 Structural Steel, Plates and Sections etc.
material & (if ‘3.2’)
lifting pad
eyes etc.)

November-2019 Page 22 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

3.1, 3.2 (As ITP–106


5.12.1 Fabricated structural steel
per 4.11) (if ‘3.2’)
5.13 Fasteners / Stud Bolts:
5.13.1 High strength, low alloy steel and other alloys 3.1 --
5.13.2 Low strength carbon steel 3.1 ---
3.2 for Inconel
Ring
3.1 for other
5.14.1 Gaskets Note 1
Ring Joint &
Spiral Wound
Joints
3.1/3.2 (if
5.14.2 Insulating Gaskets ITP-121 if 3.2
specified)
5.15 Hoses:
5.15.1 Marine Hoses 3.2 ITP–501
2.1
For hoses
pressure test
certificates as
per relevant
Std. & for
5.15.2 Others Hoses ---
hoses
assemblies,
additional
pressure test
certificates for
assemblies.
5.16 Chains for Marine Service 3.2 ITP–504
5.17 Expansion Bellow 3.2 ITP-111
5.18 COLUMN INTERNALS 3.2 ITP-115
5.19 EMERGENCY DIESEL GENERATOR 3.1 ITP-116
5.20 FLARE PACKAGE 3.2 ITP-117
5.21 GLASS FLAKE LINING 3.2 ITP-118
5.22 Electrical and Control Items
a. 132kV & above Power Transformers and
3.2 ITP–201
Shunt Reactors
b. 33kV & Below Oil Filled Power Transformers
3.2 ITP–202
and Shunt Reactors
c. Dry Type Power Transformers 3.2 ITP–203
d. 132KV GIS 3.2 ITP–204
e. 11KV & 6.6KV AIS 3.2 ITP–205
f. 415V SWGR 3.2 ITP–206
g. ECMS/PMS/EAMS 3.2 ITP–207
h. Neutral earthing resistor 3.2 ITP–208
i. 132KV submarine cable 3.2 ITP–209
j. 11KV submarine cable 3.2 ITP–210
k. Electrical Cables 3.2 ITP–211
l. AC UPS 3.2 ITP–212
m. DC UPS 3.2 ITP–213
November-2019 Page 23 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

n. HV/MV Electric motors 3.2 ITP–214


o. LV Electric motors 3.2 ITP–215
p. Variable Speed Drives 3.2 ITP–216
q. Electrical Heat Tracing 3.2 ITP–217
r. Navigational Aids 3.2 ITP–218
s. Solar Power Systems 3.2 ITP–219
t. Cathodic Protection System 3.2 ITP–220
u. GRP Cable Trays & Ladders 3.2 ITP–221
w. Electric Traction Lift 3.2 ITP–222
x. Valves/Actuators Pneumatic & Hydraulic 3.2 ITP–223
y. Motorized Actuators 3.2 ITP–224
z. Analyzer System 3.2 ITP 225
a.a Distribution Panel Board 3.2 ITP-226
b.b Flow Meter 3.2 ITP-227
c.c Instrument Tubing 3.2 ITP-228
d.d Level Transmitter 3.2 ITP-229
e.e Telecom System (LAN/WAN System) 3.2 ITP-230
f.f Wellhead Control Panel 3.2 ITP-231
g.g LV Diesel Driven Alternator 3.2 ITP-232
h.h MAC DCS, ESD & F&G SYSTEMS 3.2 ITP-233
2.1– (Plus
operational test
certificate where
applicable)
BASEEFA
Certification or
5.23 a. Other Electrical Items Equivalent is
---
required on
certain items,
this will be
defined in the
P.O.
b. Sacrificial Anodes for CP 3.2 ITP-112
2.1 (Plus leak
test
Gas Cylinders – General ---
certificate for
5.24 Cylinder)
2.1 (Plus leak
Gas Cylinders – Chlorine test certificate ---
for Cylinder)
2.1 – Certain
products shall
require analysis
5.25 Chemicals certificate, this
---
will be defined in
the P.O.
5.26 Cranes (Lifting Equipment) 3.2 ITP–401
3.1Test
Certificate for
5.26.1 Spare Parts Load Bearing
---
Items

November-2019 Page 24 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

Load test
5.26.2 Ropes ---
certificates
As per
appropriate BS
5.26.3 Lifting Tackle Standard , GDL- ---
033, CP-113,
PRO-141&142
Assembly
5.26.4 Slings Load Test ---
Certificate
5.26.5 Nets Wire Mesh ‘2.1’ ---
App.-E ITP–113 CR
5.27 Gas Turbines (STD-134) 3.2
1,2,3&4
5.28 Mooring Buoys and PLEM 3.2 ITP–502
5.29 Mooring Hawsers 3.2 ITP–503
5.30 Casing & Tubing (STD-01) 3.2 ITP–601
5.31 Drill Pipe (STD-122). 3.2 ITP–602
Down hole Completion & Wire Line Equipment
5.32 3.2 ITP–603
(STD-03)
High Nickel Alloy Casing Tubing Coupling STD-
5.33 3.2 ITP–604
124
Wellhead & Christmas Tree equipment for
5.34 Standard wells (STD-05) & other wells (STD- 3.2 ITP–605
125)
5.35 Line Pipe SAW, Welded & Seamless (STD-02) 3.2 ITP–301
5.36 Rubstrips 3.2 ITP-505
5.37 Hydraulic Clamp 3.2 ITP-506
5.38 Connector 3.2 ITP-507
Note: - All certificates shall be original and in English.

Note-1: With Company’s prior approval, 3.2 certification by Purchaser (Sub-vendors/Vendor/


Contractor)’s TPA provided these agencies are one of the Company approved TPA agencies, In this
regard, TPA shall validate all inspection and test results required by applicable Company
specification. And these results shall be clearly shown in the Material test certificates.
General Notes on Section 5

a. The Equipment/Material listed in section 5 above shall be inspected on receipt by ADNOC


OFFSHORE.
b. When requested by the Job Officer, Integrity Assurance Authority will perform a confirmatory
inspection of equipment and materials other than listed in CP-102, upon arrival in UAE.
c. For Equipment/materials not listed in this Section, refer to Appendix–D.

6. INSPECTION & TEST PLAN (ITP)

6.1 Legend & Definition

A = Approve

November-2019 Page 25 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

A point at which relevant documents or test results shall be approved by ADNOC


OFFSHORE or TPA as per the approved Inspection & Test Plan (ITP) prior to proceeding
with further activities.

H = Hold point

A point at which ADNOC OFFSHORE or TPA shall inspect & clear the activity as per the
approved Inspection & Test Plan (ITP). Otherwise, no further activity shall proceed
without prior permission by ADNOC OFFSHORE.

Note: Random inspection is not applicable to HOLD Points (HOLD means covering all
items).

R = Review

A point at which ADNOC OFFSHORE or TPA shall review the relevant documents as per
the approved Inspection & Test Plan (ITP).

W = Witness, Checking, examination and/or inspection points as appropriate

A point at which ADNOC OFFSHORE or TPA shall attend or witness the activity as per the
approved Inspection & Test Plan (ITP).

The manufacturer shall:

1. Not proceed the activity until the notification time agreed between the manufacturer
& ADNOC OFFSHORE/TPA is lapsed.
2. Proceed with the activity if TPA is abstained without any information. In this case,
the manufacturer shall inform ADNOC OFFSHORE immediately via fax or e-mail.

Note: It is mandatory that Sub-vendors/Vendors/Contractor Inspection interventions


shall be higher than Company or Company TPA inspection interventions.

RW: Random witness

M: Monitoring

A point at which ADNOC OFFSHORE or TPA will visit any work to inspect the activity
during processing as per the approved Inspection & Test Plan (ITP).

6.2 For other items

6.2.1 Items which do not have an Inspection & Test Plan (ITP) given in CP-102, the
manufacturer shall devise an ITP (Inspection & Test Plan) in compliance with the relevant
ADNOC OFFSHORE Standard, International/National Standards referred in PO
description and shall be submitted for Company approval prior to the beginning of
manufacturing.

6.2.2 Outcome of all hold point inspections and critical checks will be reported periodically to
ADNOC OFFSHORE Integrity Assurance Authority or ADNOC OFFSHORE Project
management team as applicable.

November-2019 Page 26 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

6.3 Inspection & Test Plan (ITP) Series

6.3.1 ITP-100 Series

The series shall be for Mechanical Equipment & Material.

6.3.2 ITP-200 Series

The series shall be for Electrical & Control Items.

6.3.3 ITP-300 Series

The series shall be for Pipeline Items.

6.3.4 ITP-400 Series

The series shall be for Lifting Equipment.

6.3.5 ITP-500 Series

The series shall be for Marine Items.

6.3.6 ITP-600 Series

The series shall be for Drilling Items.

November-2019 Page 27 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

ITP–111-CR1 Pumps (Centrifugal & Reciprocating)

INTERVENTION LEVEL**

INTERVENTION LEVEL**
VENDOR/CONTRACTOR
INTERVENTION LEVEL

INTERVENTION LEVEL

TPA INTERVENTION
ADNOC OFFSHORE
EPC CONTRACTOR
MANUFACTURER
CERTIFICATION
REFERENCE
DOCUMENT

LEVEL

LEVEL
SL.
ACTIVITY
NO.

Scope Project Spec./P.O.


Description
1. This list covers test and inspection STD-131,
requirements for centrifugal, API 674
Reciprocating & rotary pumps. & API 676
2. Requirements with tender
2.1 Assessment of technical capability R RA
2.2 Appraisal of quality system R RA
3. Pre-production Meeting CP-102 Attend Attend Attend Attend Attend
4. General - Preliminary work
4.1 Design verification H R R RA
4.2 Design Validation H R R RA
4.3 Design Review H R R RA
Approval of Design Documentation /
4.4 H R R RA
drawings
4.5 Vendor fabrication schedule Prod. Plan H R R RA
4.6 Vendor Q.P QA Manual H R RA RA R
4.7 Status of sub orders Prod. Plan H R R R R
Codes, Std & *
4.8 Material test and certification H R R RA RA
CP-102 3.1/3.2
Design Codes, Std
4.9 Welding Procedure H R RA RA RA
& Drawings
4.10 List of qualified welders PQR H R R RA RA
4.11 Approval of HT procedures H R R RA RA
4.12 Approval of NDT procedure H R R RA RA
Approval of handling, preservation
4.13 H R R RA RA
and packaging procedure
5. Production
Examination and approval of
5.1 H RW RW RH RW
manufacturing facility
5.2 Material Traceability and Examination Vendor Data Book H R R RA RW
5.3 Production welding Codes & Std H RA RA RA RW
Casing including balance line, Seal
5.4 Gland, and (Pipe Columns & 3.2 H RA RA RA RW
Discharge Flange for Vertical pumps)
5.5 Rotating elements P.O Spec. & Std *3.1 H RW RW RW RW
Seals, Mechanical sealing system,
5.6 3.1 H RW RW RA RW
Couplings & Gear box
5.7 Driver (motor / diesel engine) *3.1 H RW RW RA RW
November-2019 Page 242 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

ITP–111-CR1 Pumps (Centrifugal & Reciprocating) (Cont’d)

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL
VENDOR/CONTRACTOR

TPA INTERVENTION
ADNOC OFFSHORE
EPC CONTRACTOR
MANUFACTURER
CERTIFICATION
REFERENCE
DOCUMENT

LEVEL
LEVEL
SL.

***

***
ACTIVITY
NO.

5. Production (Cont’d)
Approved spec.
5.8 Base plate 2.1 H RW RW RA RW
& Drawings
Approved spec.
5.9 Piping & piping components *3.1 H RW RW RA RW
& Drawings
Cylinders & liners, Distance pieces, Valves
Approved spec.
5.10 & Pulsation dampeners (for reciprocating 3.2/3.1 H RW RW RA RW
& Drawings
pumps)
Approved spec.
5.11 Lubrication & instrumentation H RW RW RA RW
& Drawings
5.12 Bolting and Gasket STD-126&127 3.1 / 2.1 H RW RW RA RW
6. Examination
P.O Spec. &
6.1 Visual Dimensional Check Approved H W W R W
Drawings
6.2 Lifting / Handling Proves CP-113 H RW RW RA RW
6.3 Non-Destructive Examination Codes & Std H RW RW RA RW
** MNL-01 /
6.4 Painting Examination H RW RW RA RW
Approved PRO
6.5 Welding surveillance H RW RW R RW
6.6 Visual examination of completed welds H RW RW R RW
6.7 Verifying pump clearances H RW RW W RW
Physical examination of Seals, shafts and
6.8 H RW RW W RW
bearings
Check oil system for contamination and
6.9 H RW RW W RW
foreign matter
6.10 Examine protective coatings H RW RW RA RW
Check rotational direction and rotational
6.11 H RW RW R RW
arrow
Heat treatment shall be checked. Reports
6.12 H RW RW RW RW
and charts need to be stamped approved
6.13 Witness equipment being weighed H RW RW W RW
7. Testing
7.1 PMI (Where applicable) Codes & Std H RA RA RA RA
Hydrostatic, Mechanical run, NPSH,
STD-131 API
7.2 vibration Performance & Noise control H H H HW H
674 & 676
tests
7.3 Witness Alignment checks H R R W W
Static / Dynamic balancing & NPSH tests
7.4 STD-131 H H WH WH H
(for centrifugal pumps)

November-2019 Page 243 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

ITP–111-CR1 Pumps (Centrifugal & Reciprocating) (Cont’d)

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL
VENDOR/CONTRACTOR

TPA INTERVENTION
ADNOC OFFSHORE
EPC CONTRACTOR
MANUFACTURER
CERTIFICATION
REFERENCE
DOCUMENT

LEVEL
LEVEL
SL.

**

**
ACTIVITY
NO.

7. Testing (Cont’d)
Approved PRO,
GDL-33, CP-
7.5 Load Test (Where applicable) H W W W W
113, PRO-
141&142
7.6 Verify coupling H W W W W
Witness measurement and record bearing
7.7 H W W W W
clearances
8. Preparation for Dispatch
P.O Spec.,
8.1 Marking & Tagging H W W RA W
Std.&SP-1002
P.O Spec.,
8.2 Protection for Shipment H W W RA W
Std.&SP-1002
9. Reports & Test Certification & vendor Data Books
9.1 NDT reports H RA RA RA RA
9.2 Vendor Data Report H RA RA RA RA
9.3 Raw Material Test Certificates CP-102 * 3.1/3.2 H RA RA RA RA
WIN / UTC / CMMS DATA Sheet (To Be SP-1017 &
9.4 Completed By Vendor Wherever DST-003 H RA RA RA RA
Applicable) Part 1
Vendor Data Books, issue of release note
9.5 GDL-009 H H RH RH RH
by TPA
Review and approval of
9.6 H R RA RA RA
maintenance/operation manual
Review and approval of performance
9.7 H R RA RA RA
/functional test data

(*) Selection of Certification Levels for individual parts of the assembly shall be agreed with the ADNOC
OFFSHORE Job Officer in liaison with ID.
(**) Applicable for projects only.
(***) Manufacturer to propose his standard paint system & Procedure for company approval.

A- Approve. R- Review and endorse W-Witness H- Hold point

Note

The sampling frequency/ lot size for witness point (as a minimum) shall be carried out as per the following
table (not applicable for hold points).

No. of items in group 2 to 4 5 to 8 9 to 12 12 to 40 Over 40

Min. number of item to be inspected 2 4 6 8 20%

November-2019 Page 244 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

ITP–111-CR2 Pumps (Centrifugal & Reciprocating)

INTERVENTION LEVEL**

INTERVENTION LEVEL**
VENDOR/CONTRACTOR
INTERVENTION LEVEL

INTERVENTION LEVEL

TPA INTERVENTION
ADNOC OFFSHORE
EPC CONTRACTOR
MANUFACTURER
CERTIFICATION
REFERENCE
DOCUMENT

LEVEL

LEVEL
SL.
ACTIVITY
NO.

Scope Project Spec./P.O.


Description
1. This list covers test and inspection STD-131,
requirements for centrifugal, API 674
Reciprocating & rotary pumps. & API 676
2. Requirements with tender
2.1 Assessment of technical capability R RA
2.2 Appraisal of quality system R RA
3. Pre-production Meeting CP-102 Attend Attend Attend Attend Attend
4. General - Preliminary work
4.1 Design verification H R R RA
4.2 Design Validation H R R RA
4.3 Design Review H R R RA
Approval of Design Documentation /
4.4 H R R RA
drawings
4.5 Vendor fabrication schedule Prod. Plan H R R RA RA
4.6 Vendor Q.P QA Manual H R RA RA RA
4.7 Status of sub orders Prod. Plan H R R RA RA
Codes, Std & *
4.8 Material test and certification H R R RA RA
CP-102 3.1/3.2
Design Codes, Std
4.9 Welding Procedure H R RA RA RA
& Drawings
4.10 List of qualified welders PQR H R R RA RA
4.11 Approval of HT procedures H R R RA RA
4.12 Approval of NDT procedure H R R RA RA
Approval of handling, preservation
4.13 H R R RA RA
and packaging procedure
5. Production
Examination and approval of
5.1 H RW RW H RW
manufacturing facility
5.2 Material Traceability and Examination Vendor Data Book H RW RW RA RW
5.3 Production welding Codes & Std H RW RW RA RW
Casing including balance line, Seal
5.4 Gland, and (Pipe Columns & 3.2 H RW RW RA RW
Discharge Flange for Vertical pumps)
5.5 Rotating elements P.O Spec. & Std *3.1 H RW RW RA RW
Seals, Mechanical sealing system,
5.6 3.1 H RW RW RA RW
Couplings & Gear box
5.7 Driver (motor / diesel engine) * 3.1 H RW RW RA RW

November-2019 Page 254 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

ITP–111-CR2 Pumps (Centrifugal & Reciprocating) (Cont’d)

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL
VENDOR/CONTRACTOR

TPA INTERVENTION
ADNOC OFFSHORE
EPC CONTRACTOR
MANUFACTURER
CERTIFICATION
REFERENCE
DOCUMENT

LEVEL
LEVEL
SL.

***

***
ACTIVITY
NO.

5. Production (Cont’d)
5.8 Base plate 2.1 H RW RW RA RW
5.9 Piping & piping components *3.1 H RW RW RA RW
Cylinders & liners, Distance pieces, Valves Approved spec. &
Drawings 3.2/
5.10 & Pulsation dampeners (for reciprocating H RW RW RA RW
3.1
pumps)
5.11 Lubrication & instrumentation H RW RW RA RW
3.1 /
5.12 Bolting and Gasket STD-126&127 H RW RW RA RW
2.1
6. Examination
P.O Spec. &
6.1 Visual Dimensional Check H W W R W
Approved Drawings
6.2 Lifting / Handling Proves CP-113 H RW RW RA W
6.3 Non-Destructive Examination Codes & Std H RW RW RA W
** MNL-01 /
6.4 Painting Examination H RW RW RA RW
Approved PRO
6.5 Welding surveillance H RW RW R RW
6.6 Visual examination of completed welds H RW RW R RW
6.7 Verifying pump clearances H RW RW W RW
Physical examination of Seals, shafts and
6.8 H RW RW W RW
bearings
Check oil system for contamination and
6.9 H RW RW W RW
foreign matter
6.10 Examine protective coatings H RW RW W RW
Check rotational direction and rotational
6.11 H RW RW R RW
arrow
Heat treatment shall be checked. Reports
6.12 H RW RW R RW
and charts need to be stamped approved
6.13 Witness equipment being weighed H RW RW W RW
7. Testing
7.1 PMI (Where applicable) Codes & Std H W W RA W
Hydrostatic, Mechanical, vibration STD-131 API 674 &
7.2 H H H HW H
Performance & Noise control tests 676
7.3 Witness Alignment checks W W W
Static / Dynamic balancing & NPSH tests
7.4 STD-131 HW HW HW
(for centrifugal pumps)
Approved PRO,
7.5 Load Test (Where applicable) GDL-33, CP-113, W W W
PRO-141&142
November-2019 Page 255 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

ITP–111-CR2 Pumps (Centrifugal & Reciprocating) (Cont’d)

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL
VENDOR/CONTRACTOR

TPA INTERVENTION
ADNOC OFFSHORE
EPC CONTRACTOR
MANUFACTURER
CERTIFICATION
REFERENCE
DOCUMENT

LEVEL
LEVEL
SL.

**

**
ACTIVITY
NO.

7. Testing (Cont’d)
7.6 Verify coupling H W W RA W
Witness measurement and record bearing
7.7 H W W RA W
clearances
8. Preparation for Dispatch
P.O Spec.,
8.1 Marking & Tagging H W W RA W
Std.&SP-1002
P.O Spec.,
8.2 Protection for Shipment H W W RA W
Std.&SP-1002
9. Reports & Test Certification & vendor Data Books
9.1 NDT reports H R RA RA RA
9.2 Vendor Data Report H R RA RA RA
*
9.3 Raw Material Test Certificates CP-102 H R RA RA RA
3.1/3.2
WIN / UTC / CMMS DATA Sheet (To Be SP-1017 &
9.4 Completed By Vendor Wherever DST-003 H R RA RA RA
Applicable) Part 1
Vendor Data Books, issue of release note
9.5 GDL-009 H H RH RH RH
by TPA
Review and approval of
9.6 H R RA RA RA
maintenance/operation manual
Review and approval of performance
9.7 H R RA RA RA
/functional test data

(*) Selection of Certification Levels for individual parts of the assembly shall be agreed with the ADNOC
OFFSHORE Job Officer in liaison with ID.
(**) Applicable for projects only.
(***) Manufacturer to propose his standard paint system & Procedure for company approval.

A- Approve. R- Review and endorse W-Witness H- Hold point

Note

The sampling frequency/ lot size for witness point (as a minimum) shall be carried out as per the following
table (not applicable for hold points).

No. of items in group 2 to 4 5 to 8 9 to 12 12 to 40 Over 40

Min. number of item to be inspected 2 4 6 8 20%

November-2019 Page 256 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

ITP–111-CR3 Pumps (Centrifugal & Reciprocating)

INTERVENTION LEVEL**

INTERVENTION LEVEL**
VENDOR/CONTRACTOR
INTERVENTION LEVEL

INTERVENTION LEVEL

TPA INTERVENTION
ADNOC OFFSHORE
EPC CONTRACTOR
MANUFACTURER
CERTIFICATION
REFERENCE
DOCUMENT

LEVEL

LEVEL
SL.
ACTIVITY
NO.

Scope Project Spec./P.O.


Description
1. This list covers test and inspection STD-131,
requirements for centrifugal, API 674
Reciprocating & rotary pumps. & API 676
2. Requirements with tender
2.1 Assessment of technical capability R RA
2.2 Appraisal of quality system R RA
3. Pre-production Meeting CP-102 Attend Attend Attend Attend Attend
4. General - Preliminary work
4.1 Design verification H R R R
4.2 Design Validation H R R R
4.3 Design Review H R R R
Approval of Design Documentation /
4.4 H R R RA
drawings
4.5 Vendor fabrication schedule Prod. Plan H R R RA RA
4.6 Vendor Q.P QA Manual H R RA RA RA
4.7 Status of sub orders Prod. Plan H R R R RA
Codes, Std & *
4.8 Material test and certification H R R RA RA
CP-102 3.1/3.2
Design Codes,
4.9 Welding Procedure H R RA RA RA
Std & Drawings
4.10 List of qualified welders PQR H R R RA RA
4.11 Approval of HT procedures H R R RA RA
4.12 Approval of NDT procedure H R R RA RA
Approval of handling, preservation and
4.13 H R R RA RA
packaging procedure
5. Production
Examination and approval of
5.1 H RW RW RA RW
manufacturing facility
5.2 Material Traceability and Examination Vendor Data Book H RW RW RA RW
5.3 Production welding Codes & Std H RW RW RA RW
Casing including balance line, Seal Gland,
5.4 and (Pipe Columns & Discharge Flange for 3.2 H RW RW RA RW
Vertical pumps)
5.5 Rotating elements P.O Spec. & Std *3.1 H RW RW RA RW
Seals, Mechanical sealing system,
5.6 3.1 H RW RW RA RW
Couplings & Gear box
5.7 Driver (motor / diesel engine) *3.1 H RW RW RA RW

November-2019 Page 266 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

ITP–111-CR3 Pumps (Centrifugal & Reciprocating) (Cont’d)

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL
VENDOR/CONTRACTOR

TPA INTERVENTION
ADNOC OFFSHORE
EPC CONTRACTOR
MANUFACTURER
CERTIFICATION
REFERENCE
DOCUMENT

LEVEL
LEVEL
SL.

***

***
ACTIVITY
NO.

5. Production (Cont’d)
5.8 Base plate 2.1 H RW RW RA RW
5.9 Piping & piping components *3.1 H RW RW RA RW
Cylinders & liners, Distance pieces, Valves Approved spec. &
5.10 & Pulsation dampeners (for reciprocating Drawings 3.2/3.1 H RW RW RA RW
pumps)
5.11 Lubrication & instrumentation H RW RW RA RW
3.1 /
5.12 Bolting and Gasket STD-126&127 H RW RW RA RW
2.1
6. Examination
P.O Spec. &
6.1 Visual Dimensional Check H W W R W
Approved Drawings
6.2 Lifting / Handling Proves CP-113 H RW RW RA W
6.3 Non-Destructive Examination Codes & Std H RW RW RA W
** MNL-01 /
6.4 Painting Examination H RW RW RA RW
Approved PRO
6.5 Welding surveillance H RW RW R RW
6.6 Visual examination of completed welds H RW RW R RW
6.7 Verifying pump clearances H RW RW R RW
Physical examination of Seals, shafts and
6.8 H RW RW R RW
bearings
Check oil system for contamination and
6.9 H RW RW R RW
foreign matter
6.10 Examine protective coatings H RW RW R RW
Check rotational direction and rotational
6.11 H RW RW R RW
arrow
Heat treatment shall be checked. Reports
6.12 H RW RW R RW
and charts need to be stamped approved
6.13 Witness equipment being weighed H RW RW R RW
7. Testing
7.1 PMI (Where applicable) Codes & Std H W W R W
Hydrostatic, Mechanical, vibration STD-131 API 674 &
7.2 H H HW H H
Performance & Noise control tests 676
7.3 Witness Alignment checks W R W
Static / Dynamic balancing & NPSH tests
7.4 STD-131 H H H HW H
(for centrifugal pumps)
Approved PRO,
7.5 Load Test (Where applicable) GDL-33, CP-113, H W W W W
PRO-141&142
November-2019 Page 267 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

ITP–111-CR3 Pumps (Centrifugal & Reciprocating) (Cont’d)

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL
VENDOR/CONTRACTOR

TPA INTERVENTION
ADNOC OFFSHORE
EPC CONTRACTOR
MANUFACTURER
CERTIFICATION
REFERENCE
DOCUMENT

LEVEL
LEVEL
SL.

**

**
ACTIVITY
NO.

7. Testing (Cont’d)
7.6 Verify coupling H W W R W
Witness measurement and record bearing
7.7 H W W R W
clearances
8. Preparation for Dispatch
P.O Spec.,
8.1 Marking & Tagging H W W RA W
Std.&SP-1002
P.O Spec.,
8.2 Protection for Shipment H W W RA W
Std.&SP-1002
9. Reports & Test Certification & vendor Data Books
9.1 NDT reports H R RA RA RA
9.2 Vendor Data Report H R RA RA RA
*
9.3 Raw Material Test Certificates CP-102 H R RA RA RA
3.1/3.2
WIN / UTC / CMMS DATA Sheet (To Be SP-1017 &
9.4 Completed By Vendor Wherever DST-003 H R RA RA RA
Applicable) Part 1
Vendor Data Books, issue of release note
9.5 GDL-009 H H RH RH RH
by TPA
Review and approval of
9.6 H R RA RA RA
maintenance/operation manual
Review and approval of performance
9.7 H R RA RA RA
/functional test data

(*) Selection of Certification Levels for individual parts of the assembly shall be agreed with the ADNOC
OFFSHORE Job Officer in liaison with ID.
(**) Applicable for projects only.
(***) Manufacturer to propose his standard paint system & Procedure for company approval.

A- Approve. R- Review and endorse W-Witness H- Hold point

Note

The sampling frequency/ lot size for witness point (as a minimum) shall be carried out as per the following
table (not applicable for hold points).

No. of items in group 2 to 4 5 to 8 9 to 12 12 to 40 Over 40

Min. number of item to be inspected 2 4 6 8 20%

November-2019 Page 268 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

ITP–111-CR4 Pumps (Centrifugal & Reciprocating)

INTERVENTION LEVEL**

INTERVENTION LEVEL**
VENDOR/CONTRACTOR
INTERVENTION LEVEL

INTERVENTION LEVEL

TPA INTERVENTION
ADNOC OFFSHORE
EPC CONTRACTOR
MANUFACTURER
CERTIFICATION
REFERENCE
DOCUMENT

LEVEL

LEVEL
SL.
ACTIVITY
NO.

Scope
STD-131,
1. This list covers test and inspection API 674
requirements for centrifugal, & API 676
Reciprocating & rotary pumps.
2. Requirements with tender
2.1 Assessment of technical capability RA RA
2.2 Appraisal of quality system RA RA
3. Pre-production Meeting CP-102 Attend Attend Attend Attend
4. General - Preliminary work
4.1 Design verification H RA RA
4.2 Design Validation H RA RA
4.3 Design Review H RA RA
Approval of Design Documentation /
4.4 H RA RA RA
drawings
4.5 Vendor fabrication schedule Prod. Plan H RA RA RA RA
4.6 Vendor Q.P QA Manual H RA RA RA RA
4.7 Status of sub orders Prod. Plan H RA RA RA
Codes, Std &
4.8 Material test and certification * 3.1/3.2 H RA RA RA RA
CP-102
Design Codes,
4.9 Welding Procedure H RA RA RA
Std & Drawings
4.10 List of qualified welders PQR H RA RA RA
4.11 Approval of HT procedures H RA RA RA
4.12 Approval of NDT procedure H RA RA RA
Approval of handling, preservation and
4.13 H RA RA RA RA
packaging procedure
5. Production
Examination and approval of
5.1 H RW RW R RW
manufacturing facility
Vendor Data
5.2 Material Traceability and Examination H RW RW R RW
Book
5.3 Production welding Codes & Std H RW RW R RW
Casing including balance line, Seal Gland,
5.4 and (Pipe Columns & Discharge Flange for 3.2 H RW RW R RW
Vertical pumps)
5.5 Rotating elements P.O Spec. & *3.1 H RW RW R RW
Std
Seals, Mechanical sealing system,
5.6 3.1 H RW RW R RW
Couplings & Gear box
5.7 Driver (motor / diesel engine) * 3.1 H RW RW R RW

November-2019 Page 278 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

ITP–111-CR4 Pumps (Centrifugal & Reciprocating) (Cont’d)

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL
VENDOR/CONTRACTOR

TPA INTERVENTION
ADNOC OFFSHORE
EPC CONTRACTOR
MANUFACTURER
CERTIFICATION
REFERENCE
DOCUMENT

LEVEL
LEVEL
SL.

***

***
ACTIVITY
NO.

5. Production (Cont’d)
5.8 Base plate 2.1 H RW RW R RW
5.9 Piping & piping components *3.1 H RW RW R RW
Approved
Cylinders & liners, Distance pieces, Valves spec. &
5.10 & Pulsation dampeners (for reciprocating Drawings 3.2/3.1 H RW RW R RW
pumps)
5.11 Lubrication & instrumentation H RW RW R RW
5.12 Bolting and Gasket STD-126&127 3.1 / 2.1 H RW RW R RW
6. Examination
P.O Spec. &
6.1 Visual Dimensional Check Approved H W W W
Drawings
6.2 Lifting / Handling Proves CP-113 H RW RW R W
6.3 Non-Destructive Examination Codes & Std H RW RW R W
** MNL-01 /
6.4 Painting Examination H RW RW R RW
Approved PRO
6.5 Welding surveillance H RW RW RW
6.6 Visual examination of completed welds H RW RW R RW
6.7 Verifying pump clearances H RW RW R RW
Physical examination of Seals, shafts and
6.8 H RW RW R RW
bearings
Check oil system for contamination and
6.9 H RW RW RW
foreign matter
6.10 Examine protective coatings H RW RW RW
Check rotational direction and rotational
6.11 H RW RW RW
arrow
Heat treatment shall be checked. Reports
6.12 H RW RW R RW
and charts need to be stamped approved
6.13 Witness equipment being weighed H RW RW R RW
7. Testing
7.1 PMI (Where applicable) Codes & Std H W W R W
Hydrostatic, Mechanical, vibration STD-131 API HR
7.2 H H HRA H
Performance & Noise control tests 674 & 676 A
7.3 Witness Alignment checks W RA W
Static / Dynamic balancing & NPSH tests HR
7.4 STD-131 H H H H
(for centrifugal pumps) A
Approved
PRO, GDL-33, HR
7.5 Load Test (Where applicable) H W W W
CP-113, PRO- A
141&142
ITP–111-CR4 Pumps (Centrifugal & Reciprocating) (Cont’d)
November-2019 Page 279 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL

INTERVENTION LEVEL
VENDOR/CONTRACTOR

TPA INTERVENTION
ADNOC OFFSHORE
EPC CONTRACTOR
MANUFACTURER
CERTIFICATION
REFERENCE
DOCUMENT

LEVEL
LEVEL
SL.

**

**
ACTIVITY
NO.

7. Testing (Cont’d)
7.6 Verify coupling H W W R W
Witness measurement and record bearing
7.7 H W W R W
clearances
8. Preparation for Dispatch
P.O Spec.,
8.1 Marking & Tagging H W W RA W
Std.&SP-1002
P.O Spec.,
8.2 Protection for Shipment H W W RA W
Std.&SP-1002
9. Reports & Test Certification & vendor Data Books
9.1 NDT reports H RA RA RA RA
9.2 Vendor Data Report H RA RA RA RA
*
9.3 Raw Material Test Certificates CP-102 H RA RA RA RA
3.1/3.2
WIN / UTC / CMMS DATA Sheet (To Be SP-1017 &
9.4 Completed By Vendor Wherever DST-003 H RA RA RA RA
Applicable) Part 1
Vendor Data Books, issue of release note
9.5 GDL-009 H H H RH RH
by TPA
Review and approval of
9.6 H RA RA RA RA
maintenance/operation manual
Review and approval of performance
9.7 H RA RA RA RA
/functional test data

(*) Selection of Certification Levels for individual parts of the assembly shall be agreed with the ADNOC
OFFSHORE Job Officer in liaison with ID.
(**) Applicable for projects only.
(***) Manufacturer to propose his standard paint system & Procedure for company approval.

A- Approve. R- Review and endorse W-Witness H- Hold point

Note

The sampling frequency/ lot size for witness point (as a minimum) shall be carried out as per the following
table (not applicable for hold points).

No. of items in group 2 to 4 5 to 8 9 to 12 12 to 40 Over 40

Min. number of item to be inspected 2 4 6 8 20%

November-2019 Page 280 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved
ADNOC Classification: Internal

A0-IG-J-CP-001 Code of Practice For Inspection & Testing Requirements


for New Equipment and Materials in Manufacture

APPENDIX-F: AUTHORITIES INVOLVED IN THIS COP

SITE DAS ASSET US ASSET ZK ASSET AL HYLEH


AUTHORITY
Facilities Facilities Facilities
INTEGRITY Facilities Integrity
Integrity Integrity Integrity
ASSURANCE Manager (ID)
Manager (ID) Manager (ID) Manager (ID)

STANDARDS MTS MTS MTS MTS

November-2019 Page 290 of 290

Copyright © 2019 Abu Dhabi Company for Offshore Petroleum Operations Ltd– ADNOC Offshore. All rights reserved