Professional Documents
Culture Documents
Table Monitoring Ambs SG
Table Monitoring Ambs SG
management
classification countermeasures 对策
Ⅲ the normal construction正常施工
undertake comprehensive assessment on design and construction measures,enchance the
Ⅱ monitoring and measurement,take relevant engineening countermasures if necessity.对设计和
施工措施进行综合评价,进行监测和测量,必要时采取相应的工程措施
界值线 2U0/3(mm)
100
80 Ⅲ level threshold 级上限值
( mm)U0/3
60
Column H
40
20
0
12/6/2019
12/7/2019
12/8/2019
12/9/2019
12/10/2019
12/11/2019
12/12/2019
12/13/2019
10.0
8.0
Fill Thickness(m)
6.0
4.0
2.0
0.0
0 7 14 21 10
Time (Days)
60
110
10.0
8.0
Fill Thickness(m)
6.0
4.0
2.0
0.0
0 7 10
Time (Days)
60
110