Description Quantity Rate (INR)

Amount (INR)
Cement 1277 bags 350/bag 446,950
Sand 70.219 m³ 1500/m³ 105,328.50
Aggregate 140.442 m2000/m³ 280,884
Total 833,162.50
Description Quantity Rate (INR)
Amount (INR)
Bricks 69,300 unit7,000/100 485,100
Cement (Mo86 bags 350/bag 30,100
Sand (Mort17.82 m³ 1500/m³ 26,730
Total 541,930
Description Quantity Rate (INR)
Amount (INR)
Cement (Pl88 bags 350/bag 30,800
Sand (Plast15.444 m³ 1500/m³ 23,166
Total 53,966
Description Area Rate (INR/sqft)
Amount (INR)
4x2 Tiles ( 2692 sqft 80 215,360
1x1 Tiles ( 891 sqft 60 53,460
Anti-skid 1326 sqft 70 22,820
Waterproof891 sqft 100 89,100
Bathroom Wa 86.4 m² 80/sqft 55,296
Total 435,036
Description Quantity Rate (INR)
Amount (INR)
Putty 866.25 kg 50/kg 43,312.50
Primer 57.75 liters200/liter 11,550
Emulsion 231 liters 300/liter 69,300
Total 124,162.50
Description Quantity Rate (INR)
Amount (INR)
Reinforcem2150 kg 60/kg 129,000
Total 129,000
Description Quantity Rate (INR)
Amount (INR)
Electrical 1200 mete50/meter 60,000
Electrical FBasic Lump Sum100,000
Total 160,000
Description Quantity Rate (INR)
Amount (INR)
Plumbing PiBasic Lump Sum120,000
Total 120,000
Description Quantity Rate (INR)
Amount (INR)
Main Door 1 25,000 25,000
Internal Do18 10,000 eac180,000
Windows (40 8,000 each320,000
Balcony Par76.2 m 5,000/m 381,000
Parapet Wal76.2 m 1,500/m 114,300
Total 1,020,300