BEHAVIOURAL SAFETY AUDIT (BSA)

Date: 14-02-2023 Ref #:

A OBSERVATION

Project: Sir Baniyas Marine Project (10178)


Time: 10:00 hrs Unit:
C POTENTIAL HAZARDS
Location: Capping beam
HAZARDS Safe Unsafe
Task being carried out:
The worker wearing appropriate PPEs during PPE
working over the water.
Head
No. of personnel observed: 1 Hearing

Feet

Fall Protection
B COMMENTS / ACTION TAKEN
Eye/Face
Safe Acts Observed
Hands
The worker wearing appropriate PPEs during
Respirator
working over the water.
Body

Work site conditions and House keeping

Facility/area condition (Slip/Trip/Falls)

Environmental condition
Actions Taken to Encourage Continued Safe Performance
Adequate lighting

Appreciated him keep it following safe Obstruction of safety equip.

practice Body position

Pinch point

Line of fire

Work at height
Unsafe Acts Observed

Bending / Lifting / Pulling / Pushing

Hot surface

Electrical connections
Immediate Corrective Action
Inhaling/Absorbing/Swallowing substance

Tools and equipment

Proper selection and use

Equipment De-energized

Tool / Equipment condition


Comments
Location of tool
Ensure it always continuing..,
Procedures / Orderliness

Procedures Inadequate
BEHAVIOURAL SAFETY AUDIT (BSA)

Date: 14-02-2023 Ref #:

Procedures Not Known/Understood Abuse / Misuse

Procedures Not Followed Condition and maintenance

Orderliness Standards Inadequate Fasten Seat belt

Orderliness Standards Not Known Others (specify)

Orderliness Standards Not Followed


……………………………

Mobile Equipment

Exceeding Speed limit

Improper parking

Observer # 1: Name: Position:


Mahmoud Matar HSE Officer

Observer # 2: Name: Position:


BEHAVIOURAL SAFETY AUDIT (BSA)

Date: 14-02-2023 Ref #: