PROGRESS REPORT DESILTING AND PATCHING WORKS ALONG PAVED ROADS FROM 18.06.2024-23.06.2024.
Station : Arua
To : Station Manager
Thru : Maintenance Engineer
From : Maintenance Technician
Date : 23.06.2024
7.2 Maintenance Engineer 1 0 4 20,000 200,000 800,000 Kakooza Charles 20,000 200,000 0 0 - -
7.3 Mechanical Supervisor 1 0 2 20,000 200,000 400,000 Matovu John Rogers 20,000 200,000 0 0 - -
7.4 Accountant 1 0 1 20,000 200,000 200,000 Muguma Simpson 15,000 100,000 0 0 - -
7.5 Supplies Officer 1 0 1 20,000 200,000 200,000 Mukiibi Ismail 20,000 200,000 0 - -
7.6 Maintenance Technician 1 0 15 15,000 100,000 1,500,000 Agoi Christopher 15,000 100,000 0 0 - -
7.7 Mechanics 2 0 4 15,000 100,000 800,000 Akode Michael 15,000 100,000 0 0 - -
7.8 Plant Attendants 1 0 2 15,000 100,000 200,000 Kusasira David 15,000 100,000 0 0 - -
7.9 Roller Operator 1 0 0 15,000 100,000 - Eling Benard 15,000 100,000 0 0 - -
8.0 Excavator Operator 1 0 0 15,000 100,000 - - -
8.1 Lowbed Operator 1 0 0 15,000 100,000 - - -
Cargo Truck fleet
8.2 1 0 24 15,000 100,000 2,400,000 - -
Assistants
8.3 Pickup Fleet Assistants 1 0 15 15,000 100,000 1,500,000 - -
8.4 Water Bowser Operator 1 0 0 15,000 100,000 - - -
8.5 Fuel Bowser Operator 1 0 3 15,000 100,000 300,000 - -
Sub Total 1 8,700,000 0 - -
Casual labourers
8.6 Skilled 2 30 0 25,000 0 1,500,000 Skilled 25,000 0 0 0 - -
8.7 Unskilled 8 30 0 20,000 0 4,800,000 Unskilled 20,000 0 0 - -
8.8 Security for machines 1 0 0 15,000 0 - Security for machines 15,000 0 0 0 - -
Sub Total 2 6,300,000 - -
Grand Total 15,000,000 - -
11.0 Recommendations
a There is need to weld another pan to boost on the daily output during asphalt works.
b There is need to procure Overralls for casuals as PPE