Professional Documents
Culture Documents
Proforma Cabpivns23 24124 Spanhaus Design and Construction PVT LTD DR Nilanjan Mallik
Proforma Cabpivns23 24124 Spanhaus Design and Construction PVT LTD DR Nilanjan Mallik
Invoice No # CAB/PI/VNS/23-24/124
Invoice Date Jun 09, 2024
Billed By Billed To
Spanhaus Design & Construction Pvt. Ltd. Dr. Nilanjan Mallik
3rd Floor 6/972, Sector 6, Gomti Nagar, Malesemau, Vill - Ramna ,
Lucknow, Varanasi,
Uttar Pradesh, India - 226010 Uttar Pradesh, India - 221011
GSTIN: 09ABBCS0295A1ZM
PAN: ABBCS0295A
Construction
Of Ground
1. 18% 1,295.00 Sqft ₹1,375 ₹17,80,625 ₹1,60,256.25 ₹1,60,256.25 ₹21,01,137.50
Floor (Existing
Slab Area))
Construction
Of Porch on
2. Ground Floor 18% 120.25 Sqft ₹1,375 ₹1,65,343.75 ₹14,880.94 ₹14,880.94 ₹1,95,105.63
(Existing Slab
Area))
Construction
Of 1st Floor
3. (Existing Slab 18% 832.00 Sqft ₹1,375 ₹11,44,000 ₹1,02,960 ₹1,02,960 ₹13,49,920
Area)) (HSN/SAC:
9954)
Mumty Area
2nd Floor
4. (Existing Slab 18% 334.75 Sqft ₹1,375 ₹4,60,281.25 ₹41,425.31 ₹41,425.31 ₹5,43,131.87
Area)) (HSN/SAC:
9954)
Parapet Wall
(Existing Wall
5. 18% 599.00 Sqft ₹90 ₹53,910 ₹4,851.90 ₹4,851.90 ₹63,613.80
Area)) (HSN/SAC:
9954)
Septic Tank
6. (Existing)) 18% 480.00 Sqft ₹140 ₹67,200 ₹6,048 ₹6,048 ₹79,296
(HSN/SAC: 9954)
Soak Pit
7. 18% 1.00 Nos. ₹20,000 ₹20,000 ₹1,800 ₹1,800 ₹23,600
(HSN/SAC: 9954)
West Side
Boundary Wall
8. Below Plinth 18% 178.00 Sqft ₹175 ₹31,150 ₹2,803.50 ₹2,803.50 ₹36,757
Beam (HSN/SAC:
9954)
West Side
Boundary Wall
9. Above Plinth 18% 153.00 Sqft ₹75 ₹11,475 ₹1,032.75 ₹1,032.75 ₹13,540.50
Beam (HSN/SAC:
9954)
North
Compunding
Boundary Wall
10. 18% 190.00 Sqft ₹175 ₹33,250 ₹2,992.50 ₹2,992.50 ₹39,235
Below Plinth
Beam (HSN/SAC:
9954)
East
Compunding
Boundary Wall
11. 18% 36.25 Sqft ₹175 ₹6,343.75 ₹570.94 ₹570.94 ₹7,485.63
Below Plinth
Beam (HSN/SAC:
9954)
Labour Charge
12. 18% 18.00 Nos ₹500 ₹9,000 ₹810 ₹810 ₹10,620
for Soil Filling
Generator
13. 18% 6.00 Days ₹1,500 ₹9,000 ₹810 ₹810 ₹10,620
Rental
Foundation @
West Side
14. 18% 2.00 Nos. ₹3,000 ₹6,000 ₹540 ₹540 ₹7,080
Compounding
Wall
Foundation @
North Side
15. 18% 4.00 Nos. ₹3,000 ₹12,000 ₹1,080 ₹1,080 ₹14,160
Compounding
Wall
Columns @
16. 18% 28.00 Rft ₹400 ₹11,200 ₹1,008 ₹1,008 ₹13,216
West Side
Columns @
17. North Side 18% 20.00 Rft ₹400 ₹8,000 ₹720 ₹720 ₹9,440
Completed
Columns @
18. North Side 18% 20.00 Rft ₹200 ₹4,000 ₹360 ₹360 ₹4,720
Incompleted
Plinth Beam @
19. 18% 43.00 RFt ₹400 ₹17,200 ₹1,548 ₹1,548 ₹20,296
West Wall
Plinth Beam @
20. North Wall 18% 23.00 RFt ₹400 ₹9,200 ₹828 ₹828 ₹10,856
Completed
Plinth Beam @
21. North Wall In 18% 15.00 RFt ₹200 ₹3,000 ₹270 ₹270 ₹3,540
Completed
Plinth Beam @
22. 18% 7.00 RFt ₹400 ₹2,800 ₹252 ₹252 ₹3,304
East Wall
Total (in words) : FORTY FIVE LAKH SIXTY THOUSAND SIX HUNDRED Amount ₹38,64,978.75
SEVENTY FOUR RUPEES AND NINETY THREE PAISE ONLY
CGST ₹3,47,848.09
SGST ₹3,47,848.09
Bank Details
Account Name Spanhaus Design & Total (INR) ₹45,60,674.93
Construction Pvt. Ltd.
Account Number 3713218010
IFSC CBIN0285122
Account Type Current
Bank Central Bank Of India