TRANSMITTAL

Date: Description:
April 5, 2024 Request for Information No.089, with response
To: Kevin Nolen, Project
Remarks:
Manager
☐ Sent per your request
Company: CRM Group
☒ For your use /Reference/Records
CC: Loic Thirant – RCA
Brandy Gray – CRM Group ☐ For review and comment
Linda Sturges - CRM Group

Contact: ☐ For approval


Roxanne Bruce
☒ For distribution
Project Name:
Weed ES Inc. 2
1
Sent Via:

Project Number: 1-100-01 Email/Procore

Comments:
CRM Group Project: WES Inc 2 - New Admin / Classroom Building
5736 Sumrall Way 575 White Ave
Reno, Nevada 89502 Weed, California 96094
P: +10000000001

RFI #RFI-89: Framing (Soffit Ledger)


Status Open

To Loic Thirant (Ruhnau Clarke) From Kevin Nolen (CRM Group)


Construction Department (Ruhnau Clarke)

Date Initiated Apr 3, 2024 Due Date Apr 8, 2024

Location Project Stage Course of Construction

Cost Impact TBD Schedule Impact TBD

Spec Section Cost Code

Drawing Number S6-1.1 Reference

Linked Drawings

Received From Steve Grela (Lakmann Construction)

Copies To Mohammed Maybed (Maybed Inspections), Kevin


Nolen (CRM Group)

Activity

Question Question from Kevin Nolen CRM Group on Wednesday, Apr 3, 2024 at 11:14 AM PDT
At the box overhangs on Gridlines P and part of M, the detail references 8/S6-1.1 and other details on that page.
These overhangs are only 7 1/4" on M and 9 3/8" on P.
With fascia and a 2x6 vertical there is no room for a 3x ledger.
Can these soffits have a 2x ledger and a 2x4 vertical?
Can the 2x ledger be attached with 16d commons?

Awaiting an Official Response

It is acceptable to use a 2x ledger and 2x4 studs for these locations. The ledger can
attach to the studs with (2) 16d in lieu of SDS screws.
Jason Smith, RTM
4/3/24

CRM Group Page 1 of 1 Printed On: Apr 3, 2024 11:14 AM PDT