AL WASL STREET
CONTRACTOR PROPOSE OPEN CUT DUE TO FOLLOWING SITE
JUMEIRAH ROAD
N
AL WASL ROAD
E
JUMEIRAH LIVING
-11)
MADINAT
AD (E
UMM SUQEIM ROAD
Proposed open cut for
D ST
O
ABDULAZIZ SAUBIN
crossing Water line
ED R
KING SALMAN
ZAY
Varies
0.25m To 0.60 3.00 4.00 2.50 2.50
Landscaping Service Road
A
IKH
Exi. Footpath
A Ex. Parallel parking
Exi. Road
SHE
Exi. AL SUFOUH
Footpath
NOTES
1. ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE
NOTED.
2. THE CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR ROADS
GRADING TO THE APPROVAL OF THE ENGINEER..
TO BE RELOCATED
EXISTING PAVEMENT
EX. SEWERAGE
Ø300 PW MAIN
EXISTING WATER LINE TO BE ABANDONED
SEWER (HC)
(200Ø uPVC)
PROPOSED WATER NETWORK
AL WASL ROAD
M
S LEGEND SEWER NETWORK
SECTION AA EXISTING
MANHOLE AND SEWER LINE
MANHOLE WITH BACKDROP
HOUSE CONNECTION CHAMBER
PRIVATE CHAMBER
SEPTIC TANK WITH SOAKAWAY
Varies
0.25m To 0.60
0.70
Varies
0.25m To 0.65 2.00 2.50 4.00 2.50 END CAP FUTURE CONNECTION
Tree Landscaping Ex. Parallel parking Service Road Exi. Footpath
Exi.
Exi. Road
Footpath
Exi.
no space
Footpath
Exit pit
SIGN
2145
3.004
ROAD
TO BE RELOCATED
EX. SEWERAGE
Ø300 PW MAIN
SEWER (HC)
(200Ø uPVC)
Proposed open cut for
crossing Water line
00 10-02-2024 CONSTRUCTION NOC MK MK MM
SECTION BB REV. DATE DESCRIPTION Drawn Checked Approved
Client:-
AL WASL ROAD
Supervision:-
Designer:-
Contractor:-
S
M
DX CONTRACTING L.L.C
P.O.Box 391516,Dubai , United Arab Emirates
Tel +971 4 451 2516 Fax +971 4 451 1381
Project / Contract:-