Professional Documents
Culture Documents
Perhitungan Dinding Penahan Tanah Ps Batu..air Ikan
Perhitungan Dinding Penahan Tanah Ps Batu..air Ikan
Perhitungan Dinding Penahan Tanah Ps Batu..air Ikan
( COULOMB METHODE )
A. Data - data teknik :
1. Data Tanah Urugan : 3. Material :
o
F = 30 ( data asumsi ) gbatu kali = 2.2 t/m3 = 2200 kg/cm3
g = 1.8 t/m3 gair = 1.0 t/m3 = 1000 kg/cm3
Mutu beton = 0 kg/cm2 = 0 Mpa
2. Data Tanah asli
o
: Mutu baja = 0 kg/cm2 = 0 Mpa
f = 30 ( data asumsi ) Cos d = 0.866 f = sudut geser dalam tanah
g = 1.8 t/m3 Sin d = 0.500 g = berat isi tanah
C = 0.4 kg/cm2 Cos f = 0.866 C = kohesi
d = 30o Sin f = 0.500
( f + d ) =1 60
ta = 0.3
4
H3
A1
H1 = 2
A2 H2 = 2.1 H= 3
A3
d = 1 1
Pa
B = 1.5
B. Dimensi Talud :
H H1 H2 H3 ta B d
m m m m m m m
3 2.4 2.1 0.3 0.3 1.5 0.6
Fardi/desain/Sengkang
R = 7706.88 kg tg f = 0.577
Fr = 22971.35 kg
Fr
Faktor keamanan thd geser = = 13.60 > 2 Ok…!
Ph
B ΣMr - ΣMo
e = - = -0.042 m < 1/6*B = 0.25 m
2 ΣV
Fgd = 1
qult
Faktor keamanan = = 13.08 ≥ 2.5 Ok..!
qtumit
Fardi/desain/Sengkang
PLAT DECKER LEBAR 2 M, PANJANG 8 M
0.25 0.25
0.50
0.25 Ø 16 - 20
Ø 16 - 20
1.25
0.50
Perhitungan Volume
1 Beton 0.25 * 2.40 * 8.00 = 4.80 m3
0.25 * 0.50 * 8.00 = 1.00 m3
0.25 * 0.25 * 8.00 = 0.50 m3
6.30 m3
1 Beton 6.30 m3
2 Pas Batu 31.00 m3
3 Besi Tulangan 1034.0 Kg
0.25 0.25
0.25
0.50
0.25
1.25
0.50
PERANCANGAN PEMBANGUNAN
DINDING PENAHAN TANAH PASANGAN BATU KALI
BENDUNG AIR IKAN