Situation of work:- 3/37 To 3/38, K.M.-4 of Bagi To Haleth Silari Motor Road
ESTIMATE No ………………………….. to ………………………...
Rs. P.
Net value of work to be paid for a Charge against contractor to be credit in Total value of work Rs. 433988.20
part payment. If the bill is on account 26039.00
Add 6% C.G.S.T. Rs.
Add 6% S.G.S.T. Rs. 26039.00
Total Bill Amount Rs. 486066.00
Deduction
1% C.G.S.T. Rs. 4340.00
1 3 3 4 5 6 7 8 9
Excavation in
foundation for retaining,
breast walls etc, in all
types of soils and rocks
including all lead, lift and
disposal of surplus
material as per direction
of engineer - in - charge,
42.90 0.00 42.90
as per drawing and 340.00 14586.00 0.00
cu.m. 1/1
technical specifications
Clause 305.1 of MORD
Specifiction.
Construction of
Random Rubble Stone
Masonry laid Dry, in
breast walls, retaining
walls, cross drainage
structure etc. including
supply of all material,
labour, T&P and
royaltiies etc.complete as
per drawing and
24.16 0.00 24.16 cu.m. 2/2 technical specifications 1885.00 45541.60 0.00
Clauses 702, 704, 1202
& 1203 of MORD
Specifiction.
Construction of
Random Rubble Stone
Masonry laid in 1:5
cement and sand mortar,
in breast walls &
retaining walls etc.
including supply of all
material, labour, T&P
103.53 0.00 103.53 cu.m. 3/3 and royaltiies etc. 3650.00 377884.50 0.00
complete as per drawing
and technical
specifications Clauses
702, 704, 1202 & 1203 of
MORD Specifiction.
Note - The contents of columns 3, 5 and 7 finally corrected and accepted in the bill should on account be posted in the columns 2, 5 and 8 of fresh Memo as the soon as the bill is paid space
for fresh details of work being left under each sub head. To new memo thus prepared is to be transmitted at once to the officer or subordinate incharge of the work.
unt
Since last
certificate
10
14586.00
45541.60
377884.50
438012.10
1 2 3 4 5 6 7 8 9 10
By Cash 67389.00
Rs. ---------------------------------------------------------------------
Clerk
1 R.R. Stone Masonry Laid Dry 24.16 cu.m 0.00 0.00 0.00 0.00 1.00 24.16
A.A.E. A.E.
P.M.G.S.Y.,I.D.-1 P.M.G.S.Y.,I.D.-1
FINAL VARIATION
Name of work -: Reconstruction of Breast wall ( For Protection of House) Damage due to Natural Disaster occurred in Rainy Season at X/S- 3/37 To
3/38, K.M.- 4 of Bagi To Haleth Silari Motor Road.
Contract Bond No. - 12/P.M.G.S.Y., I.D-1/A.E.-1/2019-20, Dated- 09.12.2019 Name of Contractor - M/s Bisht Associates
Total Rs. 777286.00 Total Rs. 394220.00 Toatl Rs. 392470.50 1749.50 0.00
Total cost of work as per Bond Rs. 394220.00 Total Saving Amount Rs. 1749.50
Total cost of work as per execution on Bond Rs. 392470.50 Total Excess Amount Rs. 0.00
Total Saving Against Bond). Rs. 1749.50 Net Saving Amount Rs. 1749.50
Certificate :-
1 -The lowest will remain lowest after variation.
2- The variation is not allowed in those items which have higher rate then estimate. CONTRACTOR A.A. E. ASSISTANT ENGINEER
3- Variation is not occur due to deletion of the any Item. Shri M/s Bisht Associates P.M.G.S.Y., I.D. - 1 P.M.G.S.Y., I.D. - 1
4- All the excess shell be meet out from the saving of the estimate. NEW TEHRI, (T.G.) NEW TEHRI, (T.G.)