RING

ARRANGEMENTS
Second Floor Third Floor

- 4 -16Ø - 10 -12Ø
Steel - 6 -12Ø
- 4 -16Ø
- 6 -12Ø
- 4 -16Ø
- 6 -12Ø Lap=48Ø
Grade / Size M20 / (10" x 15") M20 / (10" x 15") M20 / (10" x 18") M20 / (10" x 18") (typical detail of
Lap in column)

12a
Ring- 8mm @ (5"+7"+5") 8mm @ (5"+7"+5") 8mm @ (5"+7"+5") 8mm @ (5"+7"+5")
- 4 -16Ø - 10 -12Ø
Steel - 6 -12Ø
- 4 -16Ø
- 6 -12Ø
- 4 -16Ø
- 6 -12Ø
Grade / Size M20 / (10" x 15") M20 / (10" x 15") M20 / (10" x 18") M20 / (10" x 18") ROOF
BEAM
Ring- 8mm @ (5"+7"+5") 8mm @ (5"+7"+5") 8mm @ (5"+7"+5") 8mm @ (5"+7"+5")

8Ø @ 5" c/c
a
Ground Floor First Floor

LAPPING ZONE
8Ø @ 7" c/c
- 8 -16Ø - 6 -16Ø - 10 -16Ø
Steel - 2 -12Ø - 4 -12Ø
- 6 -16Ø
- 4 -12Ø
Grade / Size M20 / (10" x 15") M20 / (10" x 15") M20 / (10" x 18") M20 / (10" x 18")

8Ø @ 5" c/c
Ring- 8mm @ (5"+7"+5") 8mm @ (5"+7"+5") 8mm @ (5"+7"+5") 8mm @ (5"+7"+5")
ROOF
BEAM
- 8 -16Ø - 6 -16Ø - 10 -16Ø
Steel - 2 -12Ø - 4 -12Ø
- 6 -16Ø
- 4 -12Ø
Grade / Size M20 / (10" x 15") M20 / (10" x 15") M20 / (10" x 18") M20 / (10" x 18") COLUMN LONGI. SEC
Ring- 8mm @ (5"+7"+5") 8mm @ (5"+7"+5") 8mm @ (5"+7"+5") 8mm @ (5"+7"+5")
B4, C4, D1, A2, A3, A4, B2, B3,
E1, E3, D3,
GRID D4, D5, E4, A5, B5, C5 C2, C3
E5