R26.10.2(¢) Elongation measurements for prestressing should be in accordance with the proceduces outlined in the
Manual for Quality Control for Plants and Production of Structural Precast Concrete Products (PCLMNL L1G},
published by the Precast/Prestressed Conerete Institute
[R26.13.1.1 By inspection, this Code does not intend thatthe inspector should supervise the construction, Rather, it
means the inspector should visit the project as necessary to observe the various stages of Work and determine thatt
4s being performed in conformance with the construction documents. The frequency of inspections should follow
26
ACI311.4R describes the recommended procedure for organizing and conducting concrete inspection and serves
45 a guide to owners, architects, and engineers, ACI SE2MNL-2 describes methods of inspecting concrete
construction that are generally accepted as good practice and serves as a guide in matters not covered by construction
documents
26.13.15 The Intemational Building Code (JBC 2018 2021) requires inspection of all post-installed anchors. For
post-installed expansion (torque-controlled and displacement-controlled), serew, and undercut
[R26.13.3.1 Table 1705 in Chapter 17 of the 2433 2018 TBC was used to determine which items of Work require
continuous or periodic inspection
R27.3.1.3 Guidance on estimating equivalent f" from criginal cylinder data can be found in Bartlet (2012)
ACI Committee 214 has developed two methods for determining an equivalent f' from cores taken from an existing
structure. These methods re described in ACLPRC 214 4R and rely on statistical analysis techniques. The procedures,
described are only appropriate where the determination of an
13.