Project: TERRAZZO TILE WALKING WAY LOT-1

Location: AWWADAY
Client: AWWADAY CITY 6th payment
Contractor: GEYSAN LOVE KONISTRAKSHIN
Timizing Dimension Qty Item Descreption
1 Excavation and Earth Work
1 1 1 20.00 1.1 Site Clearing and Removing Top 200mm
7.00 140.00 m³
1 1 1 270.00
5.00 1350.00 m³
1490.00 m³ Total To Item 1.1
1 1 1 20.00 1.3 Bulk Excavation from
7.00
1.00 140.00 m³
1 1 1 17.00
5.00
0.80 68.00 m³
1 1 1 253.00
5.00
0.30 379.50 m³
587.50 m³ Total To Item 1.3
1 1 1 221.30 1.4 BACK Fill A
3.4
0.30 225.73 m³
1 1 1 20.00 1.50 Cart away
7.00
1.00 140.00 m³
1 1 1 17.00
5.00
0.80 68.00 m³
1 1 1 253.00
5.00
0.30 379.50 m³
587.50 m³ Total To Item 1.5
1.60 PAV5ING ROAD
1 1 1 220.00 colerd Terrazzo Tile walking way
3.4 748.00 m³
748.00 m² Total To Item 2.1
1 1 1 73.00 paving 10cm concrete
1.50
0.12 13.14 m³ Total To Item 2.2
2 1 1 280.00 precast concrete CURB
560 ML Total To Item 2.2
Sanitary Installation
1 1 1 57.00 precast concrete CURB
57 ML Total To Item 3.1
2 1 1 24.00 Size 40x40x3mm
48 ML Total To Item 3.2
SUPERVISOR:- CONTRACTOR:-
Name:_______________________ Name:_____________
Sign:________________________ Sign:_____________