OP1 SWMS NO.

1 TREE REMOVAL
Ben’s Tree Service

Safe Work Method Statement No. 1


Organisation Details

Organisation Name: Ben’s Tree Service Pty. Ltd. Contact Name:: Ben Atkinson

ACN/ABN 21 131 346 659 Contact Position: Director

Address: 13 Mataram St., Winnellie NT 0820 Contract Phone No: 08 8947 1775

Project Details:

Project: Trim and Remove Trees SWMS #1 Area: Project Site

This JSEA has been developed in consultation


Prepare work area, cut and remove nominated trees. with:
Activity:
Reviewed by: ________________________
Position: ______________ Date: _ / __ /
Resources / Trades
Arborists
Involved:
Equipment Used: Chainsaws, Crane, Mulcher, Truck, Stump Grinder, Leader rope sling shot, ropes, chains, and slings

Maintenance checks: Visual Check during operations

Materials Used: Engine Coolant, Unleaded Petrol, Diesel, Hydraulic Fluid, Grease.
NT Code of Practice for Induction for Construction Work
NT Work Health and Safety Act (National Uniform Managing the Risk of Falls.
Legislation) Act and Regulations 2011 Safe Access in Tree Trimming and Arboriculture
Occupational Health Codes or Standards Managing Risks in Forestry Operations
Safety or Environmental applicable to the Traffic Management in Workplaces
Legislation: works: Working in the Vicinity of Overhead and Underground
Electrical Powerlines
Australian Standards for Chainsaw safety :
AS 2726.1;AS 2726.2;AS 2727
OP1 SWMS NO.1 TREE REMOVAL
Ben’s Tree Service

Likelihood / Probability
Level Description of Consequence or Impact Consequence L M U
Likely Moderate Unlikely

H (1) Potential death, permanent disability or major structural failure/damage. Off-site


H (1)
(High level of environmental discharge/release not contained and significant long-term 1 1 2
(High)
harm) environmental harm.

M (2) Potential temporary disability or minor structural failure/damage.


M (2)
(Medium level On-site environmental discharge/release contained, minor remediation required, short- 1 2 3
(Medium)
of harm) term environmental harm.

L (3) Incident that has the potential to cause persons to require first aid.
L (3)
(Low level of On-site environmental discharge/release immediately contained minor level clean up 2 3 3
(Low)
harm) with no short-term environmental harm.

Level Likelihood / Probability


Likely The event is likely to occur in most circumstances (has occurred at regular intervals in the past) once per day or once per week
Moderate The event might occur (has happened occasionally in the past) once per fortnight to once per month
Unlikely The event could occur (has rarely happened in the past) once per month to once per year

RISK MANAGEMENT CONTEXT

1 HIGH The activity MUST NOT proceed. Alternate work methods must be identified

The activity MUST NOT proceed until further risk control is identified.
2 MEDIUM
Monitor and supervise to ensure strict compliance with procedures and controls in place

3 LOW The activity may proceed with normal supervision after implementing the control measures
OP1 SWMS NO.1 TREE REMOVAL
Ben’s Tree Service
Current Control Measures- Actions to be taken New Name of
Risk Hierarchy of Controls: Elimination/Design modification, Risk persons
Item Job steps Hazards
Class Substitution, Isolation, Engineering, Administrative, Class responsible
Personal Protective Equipment for work
 Manual Handling  Barricade work area Low
Setup job site:  People in area Medium  Trained and inducted staff
 Assess area for  Other work in area  Pre-start meeting
 Slips/trips/falls  Checklists Site Supervisor
hazards. Arborists: Tree
 Minor Cuts and abrasions  Personal Protective Equipment
 Caution off area  SWMS sign on Fellers
 Remove obstructions  Qualified First Aiders
 ‘Start up’ checks on
machinery
1  Conduct work team
pre-start meeting
 Check safety
gear/equipment
 Staff to sign off on
procedure
OP1 SWMS NO.1 TREE REMOVAL
Ben’s Tree Service
Trim and Cut Trees Using  Falling from Height  Training and Competencies Med
Lifeline  Crushed by Branch High  Barricaded work area
High Risk Work Activity  Cut by Chain Saw  Power lines are isolated
 Place lifeline on  Manual Handling  Radio communications Site Supervisor
secure branch and  Eye injuries from branches  Pre-start talks Arborists: Tree
 Objects falling  Safety cut off switches on chain saws Climbers
attach to harness
 Equipment Failure  Equipment manuals
(both lifeline and  Overhead power lines  Equipment checklists and checking protocol
pole strap)  Noise  Personal Protective Equipment including:
 Position climber in  Slips Trips and Falls (Ground  Safety Harness
tree and set up Crew)  Safety Glasses and face shield
 Safety helmets
lowering ropes (if
 Safety boots
required or bull  High viz long sleeved shirts and trousers
ropes)  Ear protection
 Ensure people and  Safety chaps on legs
other obstructions  Gloves
 Aerial rescue plan and trained rescuers

2 
are not under or in
cordoned off area
Climber secures
 Qualified First Aiders

branch to be cut with


lowering ropes/bull
ropes
 Branch is cut safely
and lowered with
ropes into drop zone
 Ground crew remove
branch from drop
zone
 Bull ropes are
hoisted by climber
for new cut
OP1 SWMS NO.1 TREE REMOVAL
Ben’s Tree Service
 Falling from Height  Training and Competencies U2
Trim and Cut Trees Using Crane  Crushed by Branch L2  Barricaded work area
High Risk Work Activity  Cut by Chain Saw  Power lines are isolated
 Position crane in secure  Manual Handling  Checking of crane Site Supervisor
area  Eye injuries from branches  Positioning of Crane Arborists: Tree
 Ensure crane  Objects falling  Communication with crane driver Fellers
operator(s) have set  Crane movement  Equipment checks for chains
crane up properly and  Equipment Failure  Radio communications with climbers
 Overhead power lines  Pre-start talks
securely without rigger
 Noise  Safety cut-off switches on chain saws
post in place
 Slips Trips and Falls (Ground  Equipment manuals
 Ensure crane operator Crew)  Equipment checklists and checking protocol
complies with his safety  Personal Protective Equipment including:
procedures and SWMS  Safety Harness
 Crane positions climber  Safety Glasses and face shield
in tree  Safety helmets
 Climber attaches chains  High viz long sleeved shirts and trousers
 Safety chaps on legs

3 to branch to be cut
 Crane lowers climber to
enable safe access to


 Gloves
Aerial rescue plan and trained rescuers
Qualified first aiders
cut down branch
 Climber secures safely
to tree (see using
lifeline) whilst branch is
lowered
 Branch is lowered,
ground-crew remove
branch
 Crane is lifted back to
position to collect
climber
 Crane positions itself
and climber for new
cut.
OP1 SWMS NO.1 TREE REMOVAL
Ben’s Tree Service
 Falling from Height  Training and Competencies U2
Trim and Cut Trees Using  Crushed by Branch L2  Barricaded work area
Cherry Picker  Cut by Chain Saw  Power lines are isolated
High Risk Work Activity  Manual Handling  Checking of Cherry Picker
 Eye injuries from branches  Positioning of Cherry Picker Site Supervisor
 Position and set up  Objects falling  Communication with climber Arborists: Tree
 Cherry Picker Failure  Equipment checks for ropes and harness Fellers
cherry picker as per
start up procedure  Equipment Failure  Pre-start talks
 Climber positions  Overhead power lines  Safety cut-off switches on chain saws
 Noise  Equipment manuals
himself in bucket and
 Slips Trips and Falls (Ground  Equipment checklists and checking protocol
attaches harness
Crew)  Personal Protective Equipment including:
 Climber manoeuvres  Safety Harness
himself into a safe  Safety Glasses and face shield
working position to  Safety helmets
remove selected  High viz long sleeved shirts and trousers

4 
branch(s)
Branch(s) are secured

 Safety chaps on legs
 Gloves
Aerial rescue plan and trained rescuers
by bull ropes or
 Qualified First Aiders
lowering ropes
 Prior to cut ensure
drop zone is clear
 Selected branch is cut
and lowered in a safe
manner
 Ground crew remove
branch
 Bull ropes are lifted by
climber for new branch
OP1 SWMS NO.1 TREE REMOVAL
Ben’s Tree Service

Amendments or Additions

Risk Control Measures- Actions to be taken Name of persons


Hierarchy of Controls: Elimination/Design modification,
Item Job steps Hazards Class/ responsible for
Substitution, Isolation, Engineering, Administrative,
Ranking Personal Protective Equipment work

Qualifications and experience required to Personnel, Duties and Responsibilities


Training Required to Complete Work
complete the task (Supervisory staff and others)
Working at heights tickets (High Risk work Licence) Supervisor, tree climbers Nil

Truck Driver Drive in a safe manner Nil

Aerial Rescue Competency Supervisor and others Nil

Elevated Working Platform Ticket (Cherry Picker) EWP operator Nil

First Aid Supervisor and others Nil

Construction Industry Induction (White Card) All Nil

Engineering Details / Certificates / NT WorkSafe approvals:


OP1 SWMS NO.1 TREE REMOVAL
Ben’s Tree Service

This JSEA has been developed through consultation with our employees and has been read, understood and signed by all employees undertaking these
works:
Name: Please Print Signature: Date:

Ben Atkinson

Mark Mckenzie

Darryl Parrott

Daniel Goldini

Crane Driver AM Cranes and Rigging

Review
01 02 03 04 05 06 07 08 09
No

Initial:

Date: