1 TREE REMOVAL
Ben’s Tree Service
Organisation Name: Ben’s Tree Service Pty. Ltd. Contact Name:: Ben Atkinson
Address: 13 Mataram St., Winnellie NT 0820 Contract Phone No: 08 8947 1775
Project Details:
Materials Used: Engine Coolant, Unleaded Petrol, Diesel, Hydraulic Fluid, Grease.
NT Code of Practice for Induction for Construction Work
NT Work Health and Safety Act (National Uniform Managing the Risk of Falls.
Legislation) Act and Regulations 2011 Safe Access in Tree Trimming and Arboriculture
Occupational Health Codes or Standards Managing Risks in Forestry Operations
Safety or Environmental applicable to the Traffic Management in Workplaces
Legislation: works: Working in the Vicinity of Overhead and Underground
Electrical Powerlines
Australian Standards for Chainsaw safety :
AS 2726.1;AS 2726.2;AS 2727
OP1 SWMS NO.1 TREE REMOVAL
Ben’s Tree Service
Likelihood / Probability
Level Description of Consequence or Impact Consequence L M U
Likely Moderate Unlikely
L (3) Incident that has the potential to cause persons to require first aid.
L (3)
(Low level of On-site environmental discharge/release immediately contained minor level clean up 2 3 3
(Low)
harm) with no short-term environmental harm.
1 HIGH The activity MUST NOT proceed. Alternate work methods must be identified
The activity MUST NOT proceed until further risk control is identified.
2 MEDIUM
Monitor and supervise to ensure strict compliance with procedures and controls in place
3 LOW The activity may proceed with normal supervision after implementing the control measures
OP1 SWMS NO.1 TREE REMOVAL
Ben’s Tree Service
Current Control Measures- Actions to be taken New Name of
Risk Hierarchy of Controls: Elimination/Design modification, Risk persons
Item Job steps Hazards
Class Substitution, Isolation, Engineering, Administrative, Class responsible
Personal Protective Equipment for work
Manual Handling Barricade work area Low
Setup job site: People in area Medium Trained and inducted staff
Assess area for Other work in area Pre-start meeting
Slips/trips/falls Checklists Site Supervisor
hazards. Arborists: Tree
Minor Cuts and abrasions Personal Protective Equipment
Caution off area SWMS sign on Fellers
Remove obstructions Qualified First Aiders
‘Start up’ checks on
machinery
1 Conduct work team
pre-start meeting
Check safety
gear/equipment
Staff to sign off on
procedure
OP1 SWMS NO.1 TREE REMOVAL
Ben’s Tree Service
Trim and Cut Trees Using Falling from Height Training and Competencies Med
Lifeline Crushed by Branch High Barricaded work area
High Risk Work Activity Cut by Chain Saw Power lines are isolated
Place lifeline on Manual Handling Radio communications Site Supervisor
secure branch and Eye injuries from branches Pre-start talks Arborists: Tree
Objects falling Safety cut off switches on chain saws Climbers
attach to harness
Equipment Failure Equipment manuals
(both lifeline and Overhead power lines Equipment checklists and checking protocol
pole strap) Noise Personal Protective Equipment including:
Position climber in Slips Trips and Falls (Ground Safety Harness
tree and set up Crew) Safety Glasses and face shield
Safety helmets
lowering ropes (if
Safety boots
required or bull High viz long sleeved shirts and trousers
ropes) Ear protection
Ensure people and Safety chaps on legs
other obstructions Gloves
Aerial rescue plan and trained rescuers
2
are not under or in
cordoned off area
Climber secures
Qualified First Aiders
3 to branch to be cut
Crane lowers climber to
enable safe access to
Gloves
Aerial rescue plan and trained rescuers
Qualified first aiders
cut down branch
Climber secures safely
to tree (see using
lifeline) whilst branch is
lowered
Branch is lowered,
ground-crew remove
branch
Crane is lifted back to
position to collect
climber
Crane positions itself
and climber for new
cut.
OP1 SWMS NO.1 TREE REMOVAL
Ben’s Tree Service
Falling from Height Training and Competencies U2
Trim and Cut Trees Using Crushed by Branch L2 Barricaded work area
Cherry Picker Cut by Chain Saw Power lines are isolated
High Risk Work Activity Manual Handling Checking of Cherry Picker
Eye injuries from branches Positioning of Cherry Picker Site Supervisor
Position and set up Objects falling Communication with climber Arborists: Tree
Cherry Picker Failure Equipment checks for ropes and harness Fellers
cherry picker as per
start up procedure Equipment Failure Pre-start talks
Climber positions Overhead power lines Safety cut-off switches on chain saws
Noise Equipment manuals
himself in bucket and
Slips Trips and Falls (Ground Equipment checklists and checking protocol
attaches harness
Crew) Personal Protective Equipment including:
Climber manoeuvres Safety Harness
himself into a safe Safety Glasses and face shield
working position to Safety helmets
remove selected High viz long sleeved shirts and trousers
4
branch(s)
Branch(s) are secured
Safety chaps on legs
Gloves
Aerial rescue plan and trained rescuers
by bull ropes or
Qualified First Aiders
lowering ropes
Prior to cut ensure
drop zone is clear
Selected branch is cut
and lowered in a safe
manner
Ground crew remove
branch
Bull ropes are lifted by
climber for new branch
OP1 SWMS NO.1 TREE REMOVAL
Ben’s Tree Service
Amendments or Additions
This JSEA has been developed through consultation with our employees and has been read, understood and signed by all employees undertaking these
works:
Name: Please Print Signature: Date:
Ben Atkinson
Mark Mckenzie
Darryl Parrott
Daniel Goldini
Review
01 02 03 04 05 06 07 08 09
No
Initial:
Date: