Transformer Dry Type


Checklist Page : 1 of 3

Customer: Project Name:


Plant Building: Contract No.:
Date:
Job No.:

Manufacturer: Rated Power:


Type: Rated Voltage, HV:
Serial No.: Rated Voltage, LV:
Year: Rated Current, HV:
Standard: Rated Current, LV:
% Impedence (75℃): No. of Phase:
Temperature Rise: Rated Frequency:
Oil in Transformer: Vector Group:
Total Mass: Tap Position:
Cooling Type:

No. CHECKING ITEMS Good No Good N/A


Condition Condition
1. Transformer Body/ Enclosure
2. Transformer Coil (HV & LV)
3. Name/ Rating Plate
4. Cooling Fans
5. Bushing for HV & LV
6. Cable Termination Bushing
7. Tap Changer
8. Transformer Earthing
9. LV control Box
10. Temperature Controller
11. PT100 sensor
12. Cleanliness

No. TESTING Good No Good N/A


Condition Condition
1. Winding Resistance Test
2. Transformer Turn Ratio Test
3. Insulation Ir, Test
4. Transformer Vector Group Check
5. Transformer Temperature Controller simulation check
6. Enclosure electrical functional check, limit switch, lighting, sensors

Internal