Service Requisition MEPI Review 03.04.24
Service Requisition MEPI Review 03.04.24
722222-P-REQ-GEN-MTO-001
THIS VOLUME EMBODIES PROPRIETARY INFORMATION OF PT. PP PERSERO THIS VOLUME OF THE MATERIAL DESCRIBED
THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER
REVISION LOG
Page |2
Doc No. 722222-P-REQ-GEN-MTO-001
TABLE CONTENS
1. GENERAL ......................................................................................................................................... 4
2. SCOPE OF WORK AND SUPPLY ................................................................................................... 4
3. MANPOWER ..................................................................................................................................... 5
4. CONFLICT ......................................................................................................................................... 6
5. TESTING AND INSPECTION ........................................................................................................... 6
6. SCHEDULE ....................................................................................................................................... 6
7. SAFETY AND SECURITY PROGRAM ............................................................................................. 7
8. CONSTRUCTION EQUIPMENT & TOOLS ...................................................................................... 7
9. SURPLUS MATERIAL AND GARBAGE DISPOSAL ...................................................................... 8
10. SITE INSPECTION AND CONDITIONS ........................................................................................... 8
12. DEVIATION AND EXCEPTION ........................................................................................................ 8
13. SPECIAL NOTES .............................................................................................................................. 9
14. APPENDIX ........................................................................................................................................ 9
Page |3
Doc No. 722222-P-REQ-GEN-MTO-001
1. GENERAL
1.1 General
This requisition covers the minimum requirements for the erection, installation,
construction, site inspection, site testing and pre-commissioning & commissioning
test of MEPI Building Works (hereinafter called the work) to be performed and
completed by SUBCONTRACTOR for mining facilities located at Morowali, Central
Sulawesi. SUBCONTRACTOR shall perform and complete the Work in strict
accordance with the requirements contained in this Requisition.
1.2 Definitions
PURCHASER – means PT PP (Persero) Tbk and its designee who acts on its
behalf for Service Order.
OWNER – means PT VALE INDONESIA, the Owner for whom the Purchaser
performs work in which Services are to be incorporated.
SUBCONTRACTOR – means the firm or company whom Service Order is to be
placed.
1.3 Language
English shall be used in the documents, report and drawings to be prepared for this
project.
Page |4
Doc No. 722222-P-REQ-GEN-MTO-001
Detail of Scope of Direct & Indirect Work shall refer to APPENDIX-1: Scope of
Work and Supply and APPENDIX-3 : Bill of Quantity (BOQ). SUBCONTRACTOR
shall provide the Work at his own cost and expenses.
2.2 Material
Material loading and unloading (at site), handling, storage and protection shall be
SUBCONTRACTOR’s responsibility and shall be performed in the qualified manner.
2.3 Pre-commissioning and Commissioning
SUBCONTRACTOR shall provide his manpower on Pre-commissioning and
Commissioning stage to assist the experts. The number, qualification and
assistance duration of this stage shall be as PURCHASER’s request. The
manpower shall be completed with needed tools, apparatus, and other items
necessary to perform the Work.
3. MANPOWER
3.1 SUBCONTRACTOR shall provide all of direct manpower including unskilled and
skilled labor that are needed to perform and complete the work.
3.2 The manpower mobilized by SUBCONTRACTOR shall have sufficient skill &
certified in accordance with his specialization or job description. If any manpower is
deemed unacceptable or has no skill in accordance with his job description, in the
event the personeel of SUBCONTRACTOR is or are unable to pass the medical
check up, SUBCONTRACTOR shall replace the person with acceptable and
capable manpower immediately.
3.3 SUBCONTRACTOR shall gurantee that the manpower has good medical check up
history also capable to perform the work and shall provide to the PURCHASER the
list of Manpower within 1 months before the manpower loading schedule.
3.4 SUBCONTRACTOR shall provide its healthy personeel for each position of
Manpower in order to ensure that manpower will pass the medical check up
requirement and procedure from the Owner.
3.5 SUBCONTRACTOR shall provide medical check up for manpower until the
manpower has decided to be FIT to work by the Owner. if the result of manpower
UNFIT to work SUBCONTRACTOR shall be replace their manpower with
acceptable manpower immediately as per above period.
3.6 SUBCONTRACTOR shall provide all of safety accessories, necessities, insurance
and others for his manpower.
3.7 SUBCONTRACTOR shall complete his manpower with necessary certificate related
Page |5
Doc No. 722222-P-REQ-GEN-MTO-001
4. CONFLICT
In the event of conflict amongst contract documents, SUBCONTRACTOR shall notify
the PURCHASER and obtain written clarification of the points in question.
SUBCONTRACTOR shall not commence Work before receiving approval from
PURCHASER.
6. SCHEDULE
Page |6
Doc No. 722222-P-REQ-GEN-MTO-001
6.1 SUBCONTRACTOR shall perform and complete the work in accordance with
APPENDIX- 6“Construction Master Schedule”
6.2 Based on the Construction Master Schedule and construction milestone required,
SUBCONTRACTOR shall prepare and submit a Construction Detail Schedule.
6.3 If SUBCONTRACTOR’s work performance does not meet the schedule,
SUBCONTRACTOR shall make necessary efforts to recover the progress schedule
at SUBCONTRACTOR’s cost.
Page |7
Doc No. 722222-P-REQ-GEN-MTO-001
14. APPENDIX
APPENDIX- 1 : List Scope of Work and Supply
APPENDIX- 2 : Preservation Requirements
APPENDIX- 3 : Bill of Quantity (BOQ)
APPENDIX- 4 : Subcontractor Data Requirement Sheets
APPENDIX- 5 : Technical Deviation Form
APPENDIX- 6 : Construction Master Schedule
Page |9
Doc No. 722222-P-REQ-GEN-MTO-001
APPENDIX 1
List Scope of Work and Supply
RESPONSIBILITIES
NO DESCRIPTION REMARKS
PP SUBCONT
1 Engineering
Basic Engineering v
Detailed Design & Shop Drawing v
As Built Drawing v v
MTO v v
2 Material Supply
Power Distribution Panel for Building v
Cable System v
Lighting & Receptacle System include v
accessories
Fire Detection & Alarm System include v
accessories
Bulk Material for support system lighting & v
security system building
3 Delivery Material v v *( only for PP scope)
4 Loading Material from Laydown v
5 Delivery Material from Laydown to Construction v
Area
6 Unloading material at Construction Area v
7 Installation for lighting system & power, fire alarm V
system
8 Pre-Commissioning v
9 Commissioning v
10 Manpower & Equipment Mob-demob v
11 Tools & Equipment v
12 Heavy Equipment and operator v
13 Laydown Area v
14 Subcontractor Site Office Facilities v
15 Subcontractor Lodging v
16 Subcontractor Meals v
17 Medical Check up v
P a g e | 10
Doc No. 722222-P-REQ-GEN-MTO-001
RESPONSIBILITIES
NO DESCRIPTION REMARKS
PP SUBCONT
18 Working Permit v
19 Report (Daily, Weekly, Monthly) v
20 QC Reporting and test result report. v
21 Work Method Statement for performed work. v
22 Removal of it own office, fabrication area and v
restoring of area used upon project completion.
23 Provide all related tools, consumable material v
and heavy equipment to perform the work within
it scope of work.
24 Provide resources planning, including manpower v
planning, heavy equipment planning and other
tools required for work
25 Ensure to follow all regulation and procedure from v
Owner, PP and local authorities regarding health
protocol in prevention of Covid-19
26 Ensure all work methods and sequences are v
discussed and compatible with other party
working within the same area
27 Mediating between two parties if there are any v
interfaces during the work's process
28 Monitoring of each lifted equipment and ensuring v v
the lifting procedure are followed to maintain the
warranty and preventing defect caused by lifting
P a g e | 11
Doc No. 722222-P-REQ-GEN-MTO-001
APPENDIX 2
Preservation Requirements
P a g e | 12
Doc No. 722222-P-REQ-GEN-MTO-001
APPENDIX 3
Bill of Quantity (BOQ)
P a g e | 13
Doc No. 722222-P-REQ-GEN-MTO-001
APPENDIX 4
Subcontractor Data Requirements Sheets
P a g e | 14
Doc No. 722222-P-REQ-GEN-MTO-001
APPENDIX 5
Technical Deviation Form
P a g e | 15
Doc No. 722222-P-REQ-GEN-MTO-001
APPENDIX 6
Construction Master Schedule
P a g e | 16