Continuous Beam Design - B1-1-9 - Hilmy
Continuous Beam Design - B1-1-9 - Hilmy
Continuous Beam Design - B1-1-9 - Hilmy
:
ENGINEERING 6 STOREY BUDGET HOTEL
UNIVERSITI TEKNOLOGI
MARA KAMPUS SHAH
ALAM Jalan Ilmu 1/1 STRUCTURAL MEMBER:
40450, CONTINUOUS BEAM DESIGN (B1/1-9)
Shah Alam, Selangor
DESIGNED BY: CHECK BY: DATE:
Tel: 03-554200
Specifications
i. Design life = 50 years
ii. Fire Resistance = 60 minutes
iii. Exposure class = XC3
iv. Characteristic strength of concrete, fck = 30 N/mm2
v. Characteristic strength of steel, fyk = 500 N/mm2
vi. Unit weight of RC concrete = 25 kN/m3
vii. Nominal Cover, Cnom = 30 mm
BS EN viii. Slab thickness, h = 125 mm
1992-1-1 ix. Bar diameter, Фbar = 20 mm
x. Span, L = 3600 mm
xi. Width, b = 1800 mm
xii. Beam size =150x400 mm
Characteristic actions:
Permanent, Gk:
i. Screeding (20mm thk) = 0.5 kN/m2
Table ii. Clay tiles = 0.3 kN/m2
A.2B: EN iii. Slab selfweight = 0.125 x 25 = 3.1 kN/m2
1990 Gk = 3.9 kN/m2
Variable, Qk:
Bathroom = 2.0 kN/m2
Qk = 2.0 kN/m2
Characteristic actions:
Permanent, Gk:
SCHOOL OF CIVIL PROJECT: SHEET NO.:
ENGINEERING 6 STOREY BUDGET HOTEL
UNIVERSITI TEKNOLOGI
MARA KAMPUS SHAH
ALAM Jalan Ilmu 1/1 STRUCTURAL MEMBER:
40450, CONTINUOUS BEAM DESIGN (B1/1-9)
Shah Alam, Selangor
DESIGNED BY: CHECK BY: DATE:
Tel: 03-554200
Variable, Qk:
Bathroom = 3.0 kN/m2
Qk = 3.0 kN/m2
Table
A.2B: EN Design action, nd = 1.35Gk + 1.5Qk = 9.8 kN/m2
1990
bw = 150 mm
hf = 125 mm
h = 150 mm
b1 = [1800 – 150] / 2 = 825 mm
b2 = [1400 – 150] / 2 = 625 mm
Actual flange width, b = b1 + b2 + bw = 1600 mm
Span 8-9
lo = 0.85l = 0.85 x 2500 = 2125 mm
beff,1 = 0.2(825) + 0.1(2125) = 378 mm ≤ 425 mm
beff,1 = 0.2(625) + 0.1(2125) = 338 mm ≤ 425 mm
Table beff = 378 + 338 + 150 = 866 mm < 1600 mm
A.2B: EN
1990 Action on beam:
Bending Moments,
Main Reinforcement,
At midspan 7-8
Effective depth,
dx = h - Cnom – 0.5Фbar = 400 - 30 - (20/2) = 360 mm
M = 132 kNm
K = M / bd2fck
= 132 x 106 / (866 x 3602 x 30)
= 0.04 < Kbal = 0.167
Compression reinforcement is not required
z = d [ 0.5 + (0.25 – K/1.134)1/2 = 0.96d < 0.95d use 0.95d
As = M / 0.87fykz
= 132 x 106 / (0.87 x 500 x 0.95 x 360)
= 887 mm2 4H20
Shear Reinforcement:
Deflection
Percentage of required tension reinforcement,
ρ = Asreq/bd
= 943 / (150 x 360) = 0.018
ρ’ = A’sreq/bd = 0
Allowable span,
l/dallowable = 17.7 x 0.80 x 1.06 = 15.0
Cracking
Limiting crack width, Wmax = 0.3
Steel stress,
𝑓𝑦𝑘 (𝐺𝑘 + 0.3𝑄𝑘)
𝑓𝑠 =
1.15(1.35𝐺𝑘 + 1.5𝑄𝑘)
500 (24+0.3(9))
𝑓𝑠 = = 253 N/mm2
1.15(1.35(24)+1.5(9))
Detailing
SCHOOL OF CIVIL PROJECT: SHEET NO.:
ENGINEERING 6 STOREY BUDGET HOTEL
UNIVERSITI TEKNOLOGI
MARA KAMPUS SHAH
ALAM Jalan Ilmu 1/1 STRUCTURAL MEMBER:
40450, CONTINUOUS BEAM DESIGN (B1/1-9)
Shah Alam, Selangor
DESIGNED BY: CHECK BY: DATE:
Tel: 03-554200
2) Distribution factor, DF
DF12 = DF98 = 0
4EI/3.6
DF21 = 4EI 4𝐸𝐼 = 0.5
+
3.6 3.6
4EI/3.6
DF23 = 4EI 4𝐸𝐼 = 0.5
+
3.6 3.6
4EI/2.5
DF89 = 4EI 4𝐸𝐼 = 0.6
+
2.5 3.6
1) Distribution table
Joint 1 2 3 4 5 6 7 8 9
Member 12 21 23 32 34 43 45 54 56 65 67 76 78 87 89 98
DF 0 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0
FEM -50 50 -50 50 -50 50 -50 50 -50 50 -50 50 -50 50 -24 24