Corrective Actions Sharing Form
ROOT CAUSES & CORRECTIVE ACTIONS
Ref. - Safety /CA/FY 24-25/01 Date of Issue – 04.04.2024
Date &
Time of
Location Type Category Brief Description Root Causes Corrective Action
occurre
nce
Brief Narrative of Events Responsibility
CA Target Date
Centre
On 25.01.2024 at approx.
17:00 Hrs. Lineman Chote
1. Linemen did not 1. After conducting HIRA, the LM ZM/ZRDMO Immediate
Lal (RN-126142) went for
conduct the proper must ensure the barricading inside
attending a meter resealing
HIRA as the building the premises if there is some
request at the address: D-
construction / renovation work
738 Saraswati Vihar, was under renovation
running at site.
Pitampura. There was some and floor was wet. He
renovation work in progress should have barricaded
inside the premises and
the working area to
private laborers were
engaged in the stacking of ensure safety.
D-738, bricks and marble slabs.
th 2. The lineman did not 2. After assessing the site ZM/ZRDMO Immediate
25 Jan. Saraswati Suddenly a marble slab
LWDC Non-Fatal slipped from the hands of a ask the owner of the conditions, the LM/Supervisor
2024 Vihar, must ensure to temporary stop
Pitampura laborer who was passing building to stop the
any external hazardous work
behind the lineman. Same renovation work while before execution of his work.
was hit to the L/M at back the resealing work was
side of his right leg (near
in progress.
the ankle). The lineman felt
some pain with a bit of
3. Lack of 3. Safety team to review the Safety Team 25-04-2024
swelling.
attentiveness and existing JSA of operational
However, he went back to
activities for such type of external
home after completing the casual approach while
hazardous conditions around
assigned work. He visited doing work at under- working area.
the doctor on next day and
renovation site.
his X-ray report confirmed a
minor fracture in his right
ankle.
Page 2 of 2 F09 (SHE-P-101)
TPDDL Eff. Date: 16.12.2022
Rev. - 01
_____________________________________________________________________________________________________________________________ ______________________________

Incident Site Photographs:

You might also like