X1 X2 X3 X4 X5

19 20 21 22 23 24 25 26 27 28 29 30 31 32
A (not inverted)

Packages C/D/E
Packages B/C/D/E
Relay 8
(B/C/D/E: Synch-check,
not configurable) B (inverted)
Interface
Uni-directional GND
[RS-485/Modbus RTU Slave]
Relay 7 A (not inverted)

B (inverted)

Relay 6

Relay 5

Relay 4
3/4

Packages A/B/C/D/E
supervised system (variable)

Packages D/E

9 10 11 12 13 14 15 16 50 51 52 53 54 55
-20/0/4 to 20 mA
Analog output 3
GND
4

(Measuring voltage N)
3/4

-20/0/4 to 20 mA
3

Measuring voltage Measuring voltage L3


three-wire or Analog output 2
four-wire system GND
2

Measuring voltage L2

-20/0/4 to 20 mA
40 41 42 43 44 45 1

Measuring voltage L1
Analog output 1
s2 (l) GND
Measuring current L3
Packages A/B/C/D/E

s1 (k)

s2 (l) Relay 3
Measuring current L2
s1 (k)

s2 (l)
Measuring current L1
s1 (k) Relay 2
MFR 13 (Multi Function Relay)

The synchronizing voltage must be connected three-


Packages B/C/D/E

phase if the measuring voltage is connected three-


phase (N not connected). If the measuring voltage is
CB

connected four-phase (L1-L2-L3-N), the synchronizing Relay 1


voltage may be connected two-phase (L1-L2). L3 is (Ready for operation)
connected only for compensation and is not measured.
70 71 72

(Synchronizing voltage L3) The socket for the PC configuration is situated


Synchronizing voltage
2/3

on the side of the unit. This is where the


three-wire or Synchronizing voltage L2 DPC must be plugged in.
two-wire system
synchronizing system (fixed)

(refer to note above) Packages:


Synchronizing voltage L1
A = Package GP
B = Package GPX
C = Package GPX-I, K08
A/B/C/D: 24 Vdc D = Package GPY-I
8

E: 90 to 265 Vac/dc E = Package GPY-I-N


0 Vdc
7

D/E

60 61

C (kWh impulse)
6

Blocking of watchdog functions/


remote acknowledgement
E (open collector)
5

Subject to technical modifications. 2005-09-14 | MFR 13 Wiring Diagram r13ww-3705-ap.skf