Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A JASA PEKERJAAN SATUAN UNIT PRICE Remarks

Site Acquesition Include kompensasi (RT/RW/Paguyuban, ORMAS)


1 RW Rp 20,000,000
dokeument Acquisis dan BAK PKS
Implementasi (incl, Jasa Survey, Dokument:Survey
2 FDT/RW Rp 4,500,000 Survey-Doc-ATP-Funnel :Design plan
Pekerjaan,TestComm, ATP, BAST)
a.Penarikan Kabel Mtr Rp 5,000 Matrial-Transport ke site
b.Pemasangan Tiang 7 & 9 (Inc Pondasi, Acc Tiang : Dead End Klem Btg Rp 265,000 Matrial-Transport ke site
c.Pemasangan Sleck Support Unit Rp 28,000
d.Pemasangan FAT Tiang (Cap.16 port) Unit Rp 180,000
e.Pemasangan FDT Tiang (24,48 port) Unit Rp 253,000 Labeling Core
f.Pemasangan Joint Closure Unit Rp 148,000
g.Jasa Penyambungan/Splicing Unit Rp 38,500 OTDR-OPM-Labeling

B MATERIAL SATUAN UNIT PRICE


1 Kabel ADSS 12 Core Mtr Rp 10,200 WareHouse, Logistic, Labeling dan Sisa Kabel
2 Kabel ADSS 24 Core Mtr Rp 11,950 WareHouse, Logistic, Labeling dan Sisa Kabel
3 Tiang 7 m (tebal 3mm) 2 Susun Rp 1,500,950 WareHouse, Logistic-Labeling
3.1 Tiang 7m (tebal 3mm) 1 Stage Btg Rp 1,250,000 WareHouse, Logistic-Labeling
4 Tiang 9m (tebal 3mm) 1 Stage Btg Rp 1,713,791 WareHouse, Logistic-Labeling
5 Slack Support Uk 70x70 Unit Rp 135,000 WareHouse, Logistic
6 FAT Type Solid, Capacity 16 port Type UPC Adapter (lengkap) Unit Rp 977,000 WareHouse, Logistic-Labeling
7 FDT Capacity 24 Port Type UPC Adapter (lengkap) Unit Rp 710,000 WareHouse, Logistic-Labeling
8 FDT Capacity 48 Port Type UPC Adapter (lengkap) Unit Rp 1,200,000 WareHouse, Logistic-Labeling
9 Dead End Unit Rp 29,000 WareHouse, Logistic-Labeling
10 Klemp Tiang Unit Rp 36,500 WareHouse, Logistic-Labeling
11 Closure 48 Unit Rp 580,000 WareHouse, Logistic-Labeling
12 Closure 96 Unit Rp 760,000 WareHouse, Logistic-Labeling

You might also like