Cydna Offices-Hvac GF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

HW01

HW01
HW01 HW01
HW01

HW01 HW01 HW01

CC01

ODU

Terminal Schedule
Code Type CC (KW) Power input(V/Hz/Ph-Kw) Quantity
ODU VRV Outdoor Unit 104KW 380-415/50/3/6.94 1
HW01 High Wall Unit 3.6 220/50/1/1.1 8
CC01 Ceiling Cassette 10.4 220/50/1/3.1 1
THESE NOTES SERVE AS AN ADDENDUM TO THE Refer To Drawing No: Project:
Client:
SPECIFICATION IN THE BILL OF QUANTITIES (BOQ). IN THOSE
CASES WHERE THE BOQ SPECIFICATIONS DIFFER FROM
THESE NOTES, THESE NOTES SHALL TAKE PREFERENCE
LEGEND CO1519 - NEW BUILDING AT
ON ORIGINAL CYDNA OPTION 1
Ceiling Cassette Unit
15 25 Description:
5
0 10 20 30 40 50MM
HVAC - Ground Floor
Engineer:
High Wall indoor unit
L. Buwerimwe Pr.Eng Key Plan:
................................................................................................................................ Issued For:
Drawn By: Designed By: Checked By: INFORMATION
KEON CONSULTING K.K K.K L.B
Outdoor Unit Size: Scale: Sheet No: Original Date:
ENGINEERS
34 Dane Street Glen Austin 5th Avenue Office Park, JOHANNESBURG WATER A1 As Shown 1 OF 1 JUNE 2024
64b 5th avenue Newton Signture: Signture: Signture:
Turbine Hall,
TELEPHONE (011) 045 2532 Port Elizabeth 65 Ntemi Piliso Street,
CELL (072) 301 8811 TELEPHONE +27 413630189 Newtown, Johannesburg ...................... .......................... ...................... Refrigerant Piping Project No: Drawing No: Revision:
EMAIL engineer@technodesigns.co.za WEBSITE www.keon.co.za No Date Details Chd Appd
WEBSITE www.technodesigns.co.za
Date:
June 2024
Date:
June 2024
Date:
June 2024 Revisions C01519 ME-H02 0

You might also like