Lifting Equipment princip jungkatjungkit

momen besar

↓ dan katrol
I
X


W Cusaha)
lebihkecil

adalah
Yang divartask an

panjang tall baja

Teleskopik

Mobile crane

SI-4151 Construction Equipment & Methods


SI-4151 Construction Equipment & Method
LIFT, DERRICK, HOIST, CRANE - 1
Function & Characteristics
• To help moving (vertical & horizontal) loads from one
location to another by means of mechanical mechanism

• Operating Characteristics
– Various configuration, capacity, method of operation & utilization
• Working/site condition (area, crane’s base bearing capacity)
Bisa membatasi alat bantu angkat
• Height of lift Klo luas busa pakai mobile carane, dan
• Load radius SeberapaRadius
berat beban
kerja
tergantung jenis pembnagunannya

• Dynamic loads
– Wind Mengayun, krn kena angin

– Swing movement
– Hoisting speed Kecepatan tarik atau ulurnya Hentakan
– Stopping the hoist

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 2
Mammoth size and capacity
Kemampuan mobilitas mobile crane
lebih tinggi,

capacity up to 800 tons!

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 3
Heavy lifting Bisa bekerja di struktur yang sedang dilakukan

Naik deck girder

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 4
Heavy lifting Bisa dilakukan di darat dan perairan

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 5
Crane Types
CRANE

MOBILE TOWER CRANE

Roda baja Lokasi di satu titik


Fixed-Base
Crawler- Movable Tergantung pada lokasi Memanjat ke atas
(Climbing &
mounted (Limited) untuk menginbangi
Bisa pindah pada Non-Climbing)
Bisa truck juga bawahnya lintasan tertentu di rell objek
Mobile Crane
Telescopic
Rigged with Traveling Hammer Head Flat-Top Luff crane
boom
Vertical Tower Lengannya bisa
Area menonjol
Bisa memanjang dan memendk naik turun
Mobile crane
tapi dipasang Bottom
Lattice boom Top slew Top slew Top slew
dengan towe slew
crnae Lebih effort banyak
Rangka batang Berputar titik2 lokasinya,
cuamn berputar di atas
Rough terrain Top slew
Lebih effort kecil, karena towernyantidak perlu berputar

Heavy lift

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 6
crawler-mounted crane

Hoist cable

Lattice-boom

Tali yang di tarik

Tali baja

Counterweight
Beban melawan
Beton dan
dari baja
seperti slab

Dipasang di atas crawler


Crawler-mounted
SI-4151 Construction Equipment & Method
LIFT, DERRICK, HOIST, CRANE - 7
mobile-mounted telescopic crane
Truck mounted

Makin kecil diameternya

Teleskopik, baja longgar, rectangular


telescopic boom

Untuk menambah keseimbangan


Agar stabik

Tanahnya stabil atau tidak menobang beban, makanya diberi


pelat baja atau kayu
SI-4151 Construction Equipment & Method
LIFT, DERRICK, HOIST, CRANE - 8
Tower Crane Mirip palu(hammer head)

A frame, guna narik kabel, kabel menahan beban dari lengan

Kapasitas dihitung berdasarkan beban yang Working jib


bisa diangkut jika dekat dengan poros
Counter jib(counter weight) Troli yang medekati poros putar

Klo flat head tanpa a frmae Semakin jauh lengan


dengan maka momen
semakin besar, bebannya
semakin kecil
Slim

Moving mechanism
1. Install / hook load @ end of hook block
2. Raise hoist rope
3. Turning / swing boom/jib
4. Moving trolley
5. Lower hoist rope
6. Unhook load
7. Raise hoist rope
• etc.
SI-4151 Construction Equipment & Method Hoist harus diangakat agar tidak bertabrakan dengan trolly
LIFT, DERRICK, HOIST, CRANE - 9
Tower crane

Pendant

Top-slew

Trolley

Operator naik tangga

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 10
Tower crane
Luffing

Dimanipulasi sudutnya Bisa dipasang cctv


Memanipulasi ketinggian Ciicin yang bisa berputar

cabin

Bottom slew tapi


ketinggiannya
terbatar

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 11
Tower crane bracing

Diikat ke struktur

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 12
Tower Crane installation
Installation of jib / boom

Bisa meninggiakan towernya

Installation / extension of tower


Flat top

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 13
Tower Crane’s Self Raising Mechanism

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 14
Design of Tower Crane’s Static Based
M0
Design code (UBC - USA)
P0 Footing block must be able to withstand 1.33 ~ 1.5 times of
applied turning moment

When horizontal shear force V is considered

d
W = wb2d
b w = concrete density

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 15
Top-slew luff crane

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 16
Other types of derrick & hoists

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 17
Hoist mechanism
Overhead
Crane

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 18
Gantry Cranes

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 19
Crane’s Elements

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 20
balancing mechanism

Ada beam tambahan untuk


membuat stabil

Radius samoaing kanan kiri sama


Radius depan belakang beda

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 21
stability of mobile crane

Outriggers add to stability by increasing tipping lines and spreading loads

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 22
Crane’s Quadrant - Balancing Load

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 23
Crane’s Quadrant - Balancing Load

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 24
Crane’s Attachments Lifting poin sudah ada

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 25
Crane’s Hooks, Grabs & Bucket

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 26
SI-4151 Construction Equipment & Method
LIFT, DERRICK, HOIST, CRANE - 27
Procedure for determining mobile crane capacity
Makin banyak kabel maka makin berat yang dianggkat

When the load is being lifted from the main boom tip:

1. Determine the weight of load being lifted


2. Determine the weight of slings and rigging hardware
Gaboleh interpolasi
3. Determine parts of line required and hook block weight dan ekstrapolaso
I,
4. Determine load radius, boom length and angle as required
5. Select the correct main boom load chart for actual crane
configuration, base configuration and quadrant of operation
6. For correct boom length and load radius (or boom angle), read the
gross capacity from the main boom load chart. Whenever possible,
use load rather than boom angle as it will provide better accuracy
7. Determine capacity deduction Kabel 4 dibawah 90 ft maka akan membantu tapi jika sudah
lebih maka akan jadi beban
8. Calculate Net capacity = Gross Capacity – Capacity Deduction
9. Compare the Net Capacity to the Load Weight. If the net capacity is
equal or greater than the load, the crane can be used.
SI-4151 Construction Equipment & Method
LIFT, DERRICK, HOIST, CRANE - 28
Capacity Design
• Gross capacity
– The capacity listed in the load chart are NOT the load that can be
suspended from crane hook
• Determining Range of Boom
– Determine weight of load or object to be lifted
– Determine height of lift
– Calculate total height of attachment (block, sling, hook)
– Determine distance of object from the center (radius)
• Capacity Deduction
– Weight of hook block
– Weight of slings and rigging hardware
– Effective weight of boom or jib extension
– Weight of auxiliary hook and headache ball
– Weight of auxiliary hoist line hanging below boom extension tip
– Stowed weight of jib

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 29
Capacity Design
• Maximum allowable loads / rated load
– Rated loads are based on ideal condition (level machine, calm
air / no wind, no dynamic effect)
– For safety reason, PCSA suggests load of lifting crane should not
exceed rated tipping loads (SWL/safety weight lift)
• Crawler-mounted machine = 75% of rated load
• Rubber-tire-mounted machine = 75% of rated load
• Machines on outriggers = 85% of rated load

• Load Quadrants
– Over side
– Over rear (of the carrier)
– Over front (of the carrier) 
(some truck-mounted machine prohibit loading on this side)

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 30
Capacity Design
• Load Radius
– Is the horizontal distance measured from the center rotation of
the crane (center pin) to the load hook (center of gravity of the
load)
– Load radius is more critical than boom length or boom angle
when establishing crane capacity
– DO NOT interpolate (extrapolate) values in load chart. Use the
gross capacity for the next longer radius listed in the chart

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 31
exercise
• Calculate maximum allowable load (safety weight lift/SWL) for a 50-
ton crawler-mounted crane equipped with 15 meter 2.5-ton boom, if
the distance from crane’s c.g. and boom’s c.g. to the crane’s tipping
point are 3.25m and 6.5m, respectively. Assumed, lifting distance is
75% of boom length.
• 75% of boom length = 0,75 * 15m = 11.25 m
• Balanced moment 
50-ton * 3.25 m = 2.5-ton *6.5m + X-ton * 11.25m
X = 13,72-ton
• SWL = 75% * 13,72-ton = 10,29-ton
Udah termasuk beban slim dan load

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 32
Safe lifting capacity of crawler cranes (in lbs)

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 33
Working range of 200-tons crawler-crane

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 34
Lifting capacity of 200 tons crawler-crane

Jika dalam suatu kasus, diperoleh radius yang tidak tercantum dalam tabel, jangan lakukan interpolasi ataupun
extrapolasi, contoh di sini..radius yang diperoleh adalah 37/ 38/ 39 maka lakukan radius yang lebih besar
terdekat.. yaitu 40, dengan konsekuensi nilai kapasitas angkat yang lebih rendah, sebagai keamanan karena
tabel didasarkan pada kondisi ideal, belum meperhitungkan faktor2 beban yang dinamis ataupun lainnya
SI-4151 Construction Equipment & Method
LIFT, DERRICK, HOIST, CRANE - 35
elements of tower cranes

Counter weights

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 36
Lifting capacity of tower crane (in lbs)

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 37
Lifting capacity of tower crane (in lbs)

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 38
Perencanaan Tower Crane

B B

A A

• Keuntungan • Keuntungan
– Tidak ada saling ganggu – Redundan
– Biaya rendah – Cocok dgn keterbatasan lokasi
– Beban maks besar – Fleksible dlm jadwal
– Jangkauan luas – Cocok untuk persegi panjang
– Koordinasi minimal • Kerugian
– Cocok untuk bujur sangkat – Transfer dibutuhkan
• Kerugian – Beban maks kecil
– Radius besar – Upah tinggi
– Crane rusak kerjaan tertunda
– Kurang fleksible dlm jadwal

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 39
mobile crane (68,000 lbs - )

MODEL 6430 TRUCK MOUNT LOAD CHART - PCSA CLASS 15-133


SI-4151 Construction Equipment & Method
LIFT, DERRICK, HOIST, CRANE - 40
Crawler crane (25 tons – 13,000 lbs)

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 41
3D Simulation modeling for crane-lifting design

area

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 42
3D Simulation modeling for crane-lifting design

dual-cranes lift

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 43
3D Simulation modeling for crane-lifting design

rigging configuration

Crane Critical Lift Checklist base configuration


ground pressure
SI-4151 Construction Equipment & Method
LIFT, DERRICK, HOIST, CRANE - 44
Other lifting mechanism

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 45
Jakarta, Senin, 4 Maret 2004
• Sebuah crane jatuh dari bangunan Sudirman Center Business District (SCBD),
di kawasan Jalan Jenderal Sudirman, Jakarta Pusat, Senin (3/4). Akibatnya, tiga
pekerja PT Prasarana dilaporkan tewas dan lima orang lainnya terluka. Korban
yang meninggal adalah pekerja yang berada di dalam crane. Ketiga pekerja
nahas itu adalah Tahok (27 tahun) operator crane, Daniel (30 tahun), dan Salim
(30 tahun). Seluruh jenazah korban langsung dibawa ke Rumah Sakit
Mangunkusumo, Jakarta Pusat.
Berdasar informasi yang dihimpun Liputan6.com, kecelakaan itu terjadi di
bagian depan gedung, sekitar pukul 10.30 WIB. Bangunan apartemen ini masih
dalam bentuk rangka beton dan baru terdiri dari 11 lantai. Crane tadi jatuh dari
ketinggian 72 meter karena penyangga alat tersebut patah. Saat roboh, alat
berat bangunan ini menyabet enam pekerja yang berada di lantai 10, sehingga
lima di antaranya terluka. Saat jatuh, salah seorang di dalam crane berusaha
menyelamatkan diri dengan cara melompat. Sayangnya usahanya sia-sia
karena tertancap besi tajam.

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 46
Jakarta, Jumat, 25 Mei 2007
• Menara Crane setinggi sekitar 30 meter lebih, Kamis (25/5) pukul
14.00, roboh, di depan gedung Mall Ritz Carlton yang sedang
dibangun di Kawasan Sudirman Centre Business District (SCBD),
Jakarta Selatan.
Peristiwa ini mengakibatkan kemacetan lalu lintas luar biasa di
jalan-jalan kawasan tersebut.
Seorang pekerja Security Group Artha (SGA), Harno (40), tewas
seketika tertimpa menara, sementara dua mobil warna hitam,
Mercedes S280, B 2180 EH, dan Avanza D 1066 AL rusak.
Sejumlah saksi mata mengatakan, ketika menara crane mau
dipindahkan, tali baja menara crane tersangkut tali baja
kendaraan berat crane KATO. Diduga operator crane KATO tidak
menyadari hal itu. Tali baja crane KATO tetap ditarik. Akibatnya,
menara crane ikut tertarik, roboh.

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 47
Lifting safety

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 48
Lifting safety

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 49
Lifting safety

improper
footing

inadequate
ground
support

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 50
Lifting safety
too close to power lines

moving with unbalanced object


SI-4151 Construction Equipment & Method
LIFT, DERRICK, HOIST, CRANE - 51
Lifting safety
Most frequent lifting violations
• Failure to guard swing radius
• Operating near power lines
• No load chart
• Unnecessary use of personnel basket

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 52
Homework
In a construction project, the construction engineer is trying to figure out the design capacity
for a mobile crane. He is considering to utilize a 200-tons crawler crane to lift objects as
high as 130 ft above the ground.
The logistic department informed him that the tallest object to be lifted is a 25 ft vessel.
The total length of attachments (hook, sling, block, etc.) is 9 ft, and they weigh approximately
150 lbs.
If the crane is to be used within the distance of 35 ft and turning 1350, determine the safety
weight lift (SWL) of the crawler crane.

SI-4151 Construction Equipment & Method


LIFT, DERRICK, HOIST, CRANE - 53
End of handout on lifting / erection equipment