GENERAL NOTES

1NTS
: 50
1. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN
ACCORDANCE WITH THESE PLANS AND INSPECTION APPLICABLE
PROVISIONS OF THE LATEST EDITION OF THE LOCAL ENFORCING
AUTHORITY AND REQUIREMENTS OF THE LOCAL POWER
COMPANY.

2. POWER SERVICE SHALL BE SINGLE PHASE TWO 60 Hz AC.

3 THE ELECTRICAL INSTALLATION SHALL BE DONE IN


POLYVINYL CONDUIT SCHEDULE, 40 THE MINIMUM SIZE OF WHICH
IS 15MMØ ELECTRICAL TRADE SIZE, NELTEX IN BRAND, FEEDERS
FROM THE KWHR TO SERVICE ENTRANCE SHALL BE STEEL
CONDUIT.

4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC


INSULATED TYPE THHN UNLESS OTHERWISE INDICATED IN PLANS
WHERE THE MINIMUM SHALL BE 3.5mm.

5. ALL SERVICE ENTRANCE EQUIPMENT PANEL BOARD AND ALL


NON CURRENT CARRYING METAL PARTS SHALL BE PROPERLY
GROUNDED IN ACCORDANCE WITH THE PHILIPPINE ELECTRICAL
CODE.

6. ANY DISCREPANCY IN LOCATION AND RATING OF


ELECTRICAL EQUIPMENT SHALL BE VERIFIED WITH THE OWNER
AND CHANGES SHALL BE MADE ACCORDGINLY.

7. MOUNTING HEIGHT SHALL BE AS FOLLOWS:


A.) LIGHT SWITCH 1.40M ABOVE FFL
B.) CONVENIENCE OUTLET 0.30M ABOVE FFL
C.) PANEL BOARD 1.40M ABOVE FFL
D.) SPECIAL PURPOSE OUTLET AT CONVENIENCE
UPON NEAR EQUIPMENT

8. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND


MUST BE APPROVED TYPE FOR THE LOCATION AND PURPOSED
INTENDED.

9. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE


IMMEDIATE SUPERVISION OF DULY LICENSED PROFESSIONAL
ELECTRICAL ENGINEER.

LEGENDS
1NTS
: 50

- TROFFER LIGHT

- FLUORESCENT W/ REFLECTORS
- PINLIGHT

- LED LAMP

S - ONE GANG SWITCH


Sab - TWO GANG SWITCH
Sabc - THREE GANG SWITCH
S3W - THREE WAY SWITCH
- PANELBOARD

- ELECTRICAL POST

- HOMERUN CIRCUIT

- SERVICE ENTRANCE

- DUPLEX CONVENIENCE OUTLET


- GFCI OUTLET

- WEATHER PROOF OUTLET


- WATER HEATER OUTLET

- AIRCON OUTLET
- EMERGENCY LIGHT

RA 9266 SECTION 33 IND. REVISION NOTES DATE DRAWN BY: PROJECT NO: PROJECT TITLE: % SQM BUILDING PROFESSIONAL: CLIENT: SHEET CONTENTS: SHEET NO:
DRAWINGS & SPECIFICATION AND OTHER CONTRACT JAA, CIJ 2418
TLA ELECTRICAL NOTES
DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS ICE PRODUCTION WAREHOUSE ENGR. JOVEN E. ANGELES
INSTRUMENTS OF SERVICE ARE THE INTELLECTUAL
CHECKED BY: DATE:
03-2024 AMBF/PSO E-01
PROPERTY & DOCUMENTS OF THE ARCHITECT. JMAB TOSL
APPROVED BY: DWG. REF. NO: ADDRESS: ISA IAPOA: VALIDITY:
THIS DRAWING IS COPYRIGHT TIBAG, TARLAC CITY ADDRESS:
MFB USA PRC. NO: VALIDITY: TIN NO:
CONTRACTORS SHALL WORK FROM THE FIGURED
DIMENSIONS ONLY. ELECTRONIC FILENAME: SCOPE OF WORK / CLASSIFICATION: OCCUPANCY TYPE: GFA
1
CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. \\Bildan-pc\BILDANETWORK\PROJECTS TIBAG, TARLAC CITY
DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO STOREY/S PTR. NO: DATE ISSUED: PLACE: 2
THE ARCHITECT.
2024\2417_Iceplant\2418_Iceplant revised.rvt FLAR
A B A B A B A B

N
3HP DEEP WELL
2.5HP ACU PUMP

S3Wa

WACU
a

Sab
a b

S
y z
a

w x
WACU
Scd

S3Wa
y z c d DN
w x S
PB PB
Swx Syz UP
5 5 5 2500W
WATER FILTER
5
S
SPO
(LIFTER)

h h

2500W
ICE BIN

Sgh
Sab
g g
Scd
TUBE ICE
Sef STORAGE 4HP

4 4 4 4

a a
10 TON ICE
TUBE MACHINE

b b

3 3 3 3

c c

10 TON ICE
OPEN TO BELOW TUBE MACHINE OPEN TO BELOW
(FUTURE)

d d

2 2 2 2

e e

f f

1 1 1 1

GROUND FLOOR LIGHTING LAYOUT SECOND FLOOR LIGHTING LAYOUT GROUND FLOOR POWER LAYOUT SECOND FLOOR POWER LAYOUT
1 1 : 100 2 1 : 100 3 1 : 100 4 1 : 100

RA 9266 SECTION 33 IND. REVISION NOTES DATE DRAWN BY: PROJECT NO: PROJECT TITLE: % SQM BUILDING PROFESSIONAL: CLIENT: SHEET CONTENTS: SHEET NO:
DRAWINGS & SPECIFICATION AND OTHER CONTRACT JAA, CIJ 2418
TLA ELECTRICAL PLANS
DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS ICE PRODUCTION WAREHOUSE ENGR. JOVEN E. ANGELES
INSTRUMENTS OF SERVICE ARE THE INTELLECTUAL
CHECKED BY: DATE:
03-2024 AMBF/PSO E-02
PROPERTY & DOCUMENTS OF THE ARCHITECT. JMAB TOSL
APPROVED BY: DWG. REF. NO: ADDRESS: ISA IAPOA: VALIDITY:
THIS DRAWING IS COPYRIGHT TIBAG, TARLAC CITY ADDRESS:
MFB USA PRC. NO: VALIDITY: TIN NO:
CONTRACTORS SHALL WORK FROM THE FIGURED
DIMENSIONS ONLY. ELECTRONIC FILENAME: SCOPE OF WORK / CLASSIFICATION: OCCUPANCY TYPE: GFA
2
CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. \\Bildan-pc\BILDANETWORK\PROJECTS TIBAG, TARLAC CITY
DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO STOREY/S PTR. NO: DATE ISSUED: PLACE: 2
THE ARCHITECT.
2024\2417_Iceplant\2418_Iceplant revised.rvt FLAR

You might also like