PROJECT 1st Agri Hub PART OF STRUCTURE Production line shed A8IF01 TRIAL MIX
POURING DATE 6/16/2023 ORIGIN OF CONCRETE Zerock Batching plant Loudima INFORMATION ✘
COMPRESSIVE
SPECIMEN AGE WEIGHT DENSITY LOAD
CRUSHING DATE STRENGHT FAILURE
REFERENCE
(J) (Kg) (T/m3) (KN) MPa AVERAGE
AH043 28 7/14/2023 16.12 2.51 621.07 30.89 Correct
AH044 28 7/14/2023 16.00 2.49 617.53 30.71 29.69 Correct
AH045 28 7/14/2023 16.16 2.51 552.22 27.47 Correct
Remarks :
Correct
Incorrect
Pervibration