COLD COMMISSIONING FOR HV CABLES

Project: IBRI II Solar PV Independent


Power Project

Document Title Cold Commissioning of HVAC Cables


Document NO. 1414-INT-FCC-ICL-HAC-001-1
Block NO. Date
Temperature Humidity

Have all relevant safety instructions been followed?


GENERAL DATA:
Cable No. :
Voltage Grade & Size :
From :
To :

1.(A) CABLE CONDUCTER CONTINUITITY TEST

PHASE RESISTANCE

A-B
B-C
C-A
TEST INSTRUMENT USED
MAKE / MODEL
RANGE AND ACCURACY
SERIAL NO.

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER HDEC- Engineer Witnessed By: OE Engineer

Signature: Signature: ________________ Signature: ________________


________________
Name : Name : ________________ Name : ________________
________________
COLD COMMISSIONING FOR HV CABLES

Project: IBRI II Solar PV Independent


Power Project
1. (B) CABLE PHASING TEST :

Test Number : ________ Test Location : __________ Test Date : ____________

VOLTAGE RESISTANCE
PHASE INJECTED MEASUREDBY CONDITION
BETWEEN MEGGER (M)
A-Ground Terminal A1 Grounded
A B-Ground Terminal A1 Grounded
C-Ground Terminal A1 Grounded
A-Ground Terminal B1 Grounded
B B-Ground Terminal B1 Grounded
C-Ground Terminal B1 Grounded
A-Ground Terminal C1 Grounded
C B-Ground Terminal C1 Grounded
C-Ground Terminal C1 Grounded
TEST INSTRUMENT USED
MAKE / MODEL
RANGE AND ACCURACY
SERIAL NO.

2. CABLE SHEATH DC HIGH VOLTAGE TEST :

Test Location : __________,


Maximum Test Voltage (kV): 10 KV , Duration to be maintained (min.): 1 .

LEAKAGE CURRENT (A)


A-PHASE
B-PHASE
C-PHASE
REMARKS
TEST INSTRUMENT
USED
MAKE/MODEL
RANGE & ACCURACY
SERIAL NO.

Acceptance criteria: Leakage current shall be in mA.

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER HDEC- Engineer Witnessed By: OE Engineer

Signature: Signature: ________________ Signature: ________________


________________
Name : Name : ________________ Name : ________________
________________
COLD COMMISSIONING FOR HV CABLES

Project: IBRI II Solar PV Independent


Power Project
3. CABLE INSULATION RESISTANCE TEST :
Test Location : __________,
Air Temperature (°C): __________, Relative Humidity (%) _________________
Megger Voltage (V): ______5000____, Time applied (min.): ________________

INSULATION RESISTANCE (M)


PHASE
BEFORE HV TEST AFTER HV TEST
A-B
B-C
C-A
A-Ground
B-Ground
C-Ground
TEST INSTRUMENT USED
MAKE / MODEL
RANGE AND ACCURACY

SERIAL NO.

Acceptance Criteria: minimum 1Mega Ohm per KW

3. .HIGH VOLTAGE AC TEST

Test Location : __________


Maximum Test Voltage(kV) : _______ Duration to be maintained (min.): _______

PHASE A B C
CABLE LENGTH(m)
TEST FREQUENCY
RANGE (HZ)
RESONANCE
FREQUENCY (HZ)
TEST CURRENT (A)
REMARKS
TEST INSTRUMENT USED
MAKE / MODEL
RANGE AND ACCURACY
SERIAL NO.
Acceptance Criteria: Cable should withstand the voltage

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER HDEC- Engineer Witnessed By: OE Engineer

Signature: Signature: ________________ Signature: ________________


________________
Name : Name : ________________ Name : ________________
________________
COLD COMMISSIONING FOR HV CABLES

Project: IBRI II Solar PV Independent


Power Project

4. PD Measurement:

Test Location : __________


Maximum Test Voltage(kV) : _______ Duration to be maintained (min.): _______

PHASE A B C
CABLE LENGTH(m)
TEST FREQUENCY
RANGE (HZ)
RESONANCE
FREQUENCY (HZ)
TEST CURRENT (A)
PD value
TEST INSTRUMENT USED
MAKE / MODEL
RANGE AND ACCURACY
SERIAL NO.

Acceptance criteria: Within 10pC

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER HDEC- Engineer Witnessed By: OE Engineer