Fieldbus Foundation India Marketing Committee Fieldbus Foundation

Paradigm Change in Instrumentation Technology

Date Time Venue

: 26th of September, 2008 (Friday) : from 09:00 am to 06:00 pm. : Automation 2008 Conference Hall. : Conference Hall, Bombay Exhibition Centre (NSE), Goregaon (East), Mumbai INDIA

Fieldbus Engineering Methodology


Murali Krishnan T Emerson Process Management, Asia Pacific
2008 FFIMC - Automation 2008-Mumbai 1

2008 Fieldbus Foundation

Designing Fieldbus Segments


Segment Design Considerations Constraint Checks Communications Processing Components Selection

2008 FFIMC - Automation 2008-Mumbai 2

2008 Fieldbus Foundation

Segment Design Considerations


Instrument Functionality Instrument Location Process Control Requirements Availability Requirements

2008 FFIMC - Automation 2008-Mumbai 3

2008 Fieldbus Foundation

Instrument Functionality
Pick the right instrument for the application Find out which function blocks are available with an instrument Most common function blocks are AI, AO, PID, DI, DO

2008 FFIMC - Automation 2008-Mumbai 4

2008 Fieldbus Foundation

Transmitter
PID with Auto Tuning Output Splitter (OS) Control Selector (SEL) Arithmetic Integrator Signal Characterizer

2008 FFIMC - Automation 2008-Mumbai 5

2008 Fieldbus Foundation

Multi Input Temperature Transmitters

Classic & HART I/O

DeviceNet/Profibus

AS-i H1

8 RTD/ TC Inputs
2008 FFIMC - Automation 2008-Mumbai 6

2008 Fieldbus Foundation

Discrete I/Os Transmitter

Classic & HART I/O

DeviceNet/Profibus

AS-i H1

8 DI / 8 DO & logic
2008 FFIMC - Automation 2008-Mumbai 7

2008 Fieldbus Foundation

Process Control Requirements


How are the measurements being used? Monitor only or used in PID control? Required update time? Input processing, such as P-T compensation? Output processing, such as split-range?

2008 FFIMC - Automation 2008-Mumbai 8

2008 Fieldbus Foundation

Process Control Requirements


The measurement device and control element of a PID loop must be on the same segment for Control-in-field (CIF) The PID Function Block can be located in the transmitter (CIF), valve (CIF), or control can be in the controller (CIC) Where to locate the PID block(s) depends on the complexity of the control strategy

2008 FFIMC - Automation 2008-Mumbai 9

2008 Fieldbus Foundation

Availability Requirements
Redundancy requirements Equipment segregation Distribution of critical loops Component redundancy
-

Fieldbus Power supplies/Power Conditioners H1 card LAS (Back up LAS in a field device)

2008 FFIMC - Automation 2008-Mumbai 10

2008 Fieldbus Foundation

Designing For Process Modularity


D-38004

Segment 1
PT401 Fuel Gas Header

D-38003 TT101A D-36003 LT101

100% 100%

D-36004

Weir LT101

Hot Oil Return TT101B FT501

Condensate Stripper

Raw Methanol Stripper

AI
2008 FFIMC - Automation 2008-Mumbai 11

PID

AO

Segment 2Fieldbus Foundation 2008

Process Safety Levels (Client Driven)


Level 1 Valves Failure of this valve will result in a total system trip, causing a shutdown of the entire unit, or other unavoidable losses in excess of $100M. Level 1 valves and their associated measurement shall reside on H1 segments with no other devices. The ISD shall show the criticality rating and shall prominently display that no additional devices shall be loaded on this segment. Level 2 Valves Failure of a level 2 valve will result in an emergency situation, where prompt operator action would be required to "save" the unit from immanent total shutdown. The material and energy capacity of associated vessels, geographic location, and elevation/accessibility of such valves should be considered. Failure of a level 2 valve will result in a total system trip, causing a shutdown of the entire unit, or other unavoidable losses in excess of $100M. However, the level 2 valve's process dynamics allow time for quick recovery from the failure, either by quickly fixing a fault or by taking manual control. Level 2 valves and their associated measurement shall reside on H1 segments with no other level 1 or 2 valves. The ISD shall show the criticality rating. Level 3 Valves Failure of this valve will not result in any short-term risk of total unit shutdown. Level 3 valves can go to their fail position without requiring any immediate operator action. Level 3 valves can reside on cards or segments with other level 3 valves, or on a segment with a level 2 valve. Consideration should be given to the impact of common mode failures among level 3 and level 2 & 3 valves on the same segment.
EXAMPLE ONLY VARIES WITH CUSTOMER

2008 FFIMC - Automation 2008-Mumbai 12

2008 Fieldbus Foundation

Assigning Fieldbus Devices to a Segment


Maximum 16 devices per segment Recommended loading
-

Total of 12 devices per segment Total of 4 control loops per segment

Devices should be placed on segments based on location, control function, and reliability requirements

2008 FFIMC - Automation 2008-Mumbai 13

2008 Fieldbus Foundation

Constraint Checks
Distance Limits Spur Length Power Consumption Voltage Drop Communications Processing

2008 FFIMC - Automation 2008-Mumbai 14

2008 Fieldbus Foundation

Spur Length
Trunk
Terminator

Terminator

Spur

2008 FFIMC - Automation 2008-Mumbai 15

2008 Fieldbus Foundation

Topology
Most Common

Combination Topology
Trunk
To H1 Card JB Junction Box

Spur

2008 FFIMC - Automation 2008-Mumbai 16

2008 Fieldbus Foundation

Fieldbus Network Components (non-IS)


Segment / Trunk
The section of the fieldbus that is terminated. Max. 1900 m per segment Max. 32 devices per segment

Spur
Branch line from Segment Distribute devices along the Segment Final Circuit Max. length 120 m
PS PC T T1 S1 S2 Tree S23 S22
2008 FFIMC - Automation 2008-Mumbai 17

S3

Branch

Sn

S21

T1 +S1 +S2 + S21 +S22 +S23 .+ Sn<1900 m

2008 Fieldbus Foundation

Voltage Drop
26 ma
Fieldbus Power Supply 19 V

3000 feet #18 AWG, 6.4 /1000ft

17 ma 11 ma 15 ma Total = 69 ma

Voltage = 19 - [ (3000 x 6.4/1000 x 69/1000) x 2 ] Voltage = 19 - 2.65 Voltage = 16.35


2008 FFIMC - Automation 2008-Mumbai 18

2008 Fieldbus Foundation

Segment Power Considerations


Non-IS Application (Safe) Intrinsic Safety Models Entity (IS) FISCO (Zone 1) FNICO (Non incendive) Field Barriers

Fieldbus Power Supply

?
2008 FFIMC - Automation 2008-Mumbai

Junction Box

19

2008 Fieldbus Foundation

Power Conditioner (Examples)


Single

Redundant, Multi-segment FISCO, FNICO

Redundant, Multi-segment 2008 FFIMC - Automation 2008-Mumbai

Wiring Blocks (Examples)


Fieldbus Barriers Ex me [ia] Zone 1/0 Ex ia

Zone 2 Ex nL

Zone 1 Ex me 2008 FFIMC - Automation 2008-Mumbai

Fieldbus Design Tools (Examples)

2008 FFIMC - Automation 2008-Mumbai 22

2008 Fieldbus Foundation

Fieldbus Segment Design Tool Report

2008 FFIMC - Automation 2008-Mumbai 23

2008 Fieldbus Foundation

Link Active Scheduler runs segment


Link Active Scheduler (LAS) is the data Traffic Cop of the segment
-

Controls all access to the segment Keeps track of who is on the segment Runs Macro Cycle Time Clock for segment

LAS can be in any device on segment that has the capability


-

All host have LAS Many devices have LAS


2008 FFIMC - Automation 2008-Mumbai

24

2008 Fieldbus Foundation

Communications Processing
The LAS allocates both scheduled (for closed loop control) and unscheduled (Set point, monitoring loops, alarms) time on the bus Macrocycle time depends on block execution speed, number of blocks, communications between blocks, etc.

2008 FFIMC - Automation 2008-Mumbai 25

2008 Fieldbus Foundation

Scheduling
FUNCTION BLOCK SCHEDULING
Scheduled Function Block Execution Scheduled Cyclic Communication Unscheduled Communication

AI PID AO

LAS Schedule Macrocycle


Time

LAS Schedule Macrocycle

26

2008 Fieldbus Foundation

Function Blocks in FOUNDATION fieldbus Solutions

Valve Transmitter
BKCAL_IN OUT IN OUT BKCAL_OUT CAS_IN
FIELDVUE

AI

PID

AO

2008 FFIMC - Automation 2008-Mumbai 27

2008 Fieldbus Foundation

Control in the Field - An Example


AIN-PID-AOUT Loop PID
IN

AIN
OUT

OUT

BKCAL_IN

AOUT Flow Transmiter


CAS_IN BKCAL_OUT

Valve

28

2008 Fieldbus Foundation

Communications Processing
> 105 ms

AI
20 ms 30 ms

PID
30 ms

AO
25 ms

AI
20 ms 30 ms

PID
30 ms

AO
25 ms

This sample loop on a segment results in a minimum 105 ms macrocycle time.


2008 FFIMC - Automation 2008-Mumbai 29

2008 Fieldbus Foundation

Communications Processing
> 135 ms

AI AI
20 ms

PID PID
30 ms 30 ms

AO AO
25 ms

AI AI
20 ms

PID PID
30 ms 30 ms

AO AO
25 ms

Adding a second loop on the segment results in a longer macro-cycle time, but not twice as long (30ms compelled data time).
2008 FFIMC - Automation 2008-Mumbai 30

2008 Fieldbus Foundation

Advantages of Control in the Field


FOUNDATIONTM fieldbus allows for control in the field!
Deterministic Control Single loop integrity available Faster Speed of response Free up controller to handle advanced applications (embedded APC) Devices with more function blocks offer more flexibility for Control in the Field

31

2008 Fieldbus Foundation

Instrument data Sheets for Ff devices


Working voltage (9-32 volts) Maximum current draw from bus Function block requirements Block execution speeds Standard/Advanced Diagnostics requirements Interoperability tested (ITK4.0 FF base standard) Polarity sensitivity Capacity for instantiable function blocks LAS capability Device revision Channel number and description Any local indicator required
2008 FFIMC - Automation 2008-Mumbai 32

2008 Fieldbus Foundation

Fieldbus View Macrocycle


Graphs the macrocycle for a given segment

Quickly evaluate Fieldbus segment Quickly evaluate Fieldbus segment communications communications

2008 FFIMC - Automation 2008-Mumbai 33

2008 Fieldbus Foundation

Segment Design Drawing


May be used in place of loop drawings Will show general topology of segment Can be used for documentation of design constraints
Segment & spur length Voltage drop and current draw Loop execution requirements Process Criticality Level

2008 FFIMC - Automation 2008-Mumbai 34

2008 Fieldbus Foundation

Sample Segment Drawing


Field
JunctionBox
Note: XX M
B K

Located @ xxxx
DeltaV Cabinet: DV-01
H1Interf ace Fieldbus Module Controller: 01 Card: 03 Port: 01 H1Terminal Block

Fieldbus

W H

XX M
B K

This is a one piece block (Megablock) that has internal jumpering, (i.e. no hard-wired jumpers required). Hardwired jumpers are required when y ou tie two blocks together.
W H

Multipair cable or Single pair Cable # XXXX Meters

Cut& T ape (T yp.forall)

Fieldbus

This block can be ordered with internal spurguards which limits the spur current to 60 mA during a short circuit condition. The connectors are pluggable theref ore commissioning and maintenance are simplif ied.

XX M
B K

3+

5+

4-

XX M
B K

B K

B K W H W H B K

Fieldbus
W H

W H

B K W H

XX M
B K

B K W H

Fieldbus
W H

XX M
B K W H

B K W H

Fieldbus
B K W H

XX M
B K B K W H W H

Fieldbus

XX M
B K W H

B K

Fieldbus

W H

B K W H

B K W H

Relcom/MT LRedundant PowerConditioner

XX M
B K

B K W H

B K W H

Fieldbus

W H

B K

B K W H

XX M
B K

W H

Fieldbus
W H

T
XX M
B K

+ S -

W H

6-

Fieldbus

FJB-101

T oShieldBus Bar onDeltaV Carrier

FPS/01-0301 Port Card Controller

Fieldbus
W H

141-PV-101 Single Pair (Note: Ty pical wire tagging f or all f ield dev ices.) XX M

Reference Drawings
Cabinet WiringDetails P&ID

Emerson Process Management


Emerson Consider It Solved
Typical Instrument Segment Diagram MTL/REL Red. Power Cond.
DATE: DESIGN: CHECKED: DRAWN:

B K

Fieldbus
W H

March 23, 2004 0 A REV: DATE: ISSUED FOR CONSTRUCTION ISSUED FOR CUSTOMER APPROVAL
SCALE:

Sudhir Jain
CADFILE: REV:

None
BY: CHK: PROJ. ENG. CUST. APPR. JOB:

APPROVAL: DRAWING NO:

REVISIONS

2008 FFIMC - Automation 2008-Mumbai 35

2008 Fieldbus Foundation

Fieldbus Design Tools and Documents


The following is a summary of common tools/documents used in Fieldbus Design and Implementation: Fieldbus Design Methodology (FDS) : A document that spells out factors to take into consideration during the design process. Segment Design Tool : In the form of drag and drop to check segment design Vendor-specifc documents for Procedures, Application Notes and Design Review Foundation Fieldbus Installation Guide. Fieldbus Pre-commissioning Procedure. Fieldbus Troubleshooting Guide

DeltaV Foundation Fieldbus Installation Guide DeltaV Foundation Fieldbus Installation Guide

..

Fieldbus Troubleshooting Guide Fieldbus Troubleshooting Guide

2008 FFIMC - Automation 2008-Mumbai 36

2008 Fieldbus Foundation

Designing Fieldbus Segments - Summary


1. 2. 3. 4. 5. 6. 7. 8.
37

Select the proper instrumentation Group according to location & control function Lay out fieldbus segment Check segment length & spur length Check current draw & voltage drop Check communications loading Choose wiring methods Choose components
2008 FFIMC - Automation 2008-Mumbai

2008 Fieldbus Foundation