Instrument Functionality
Pick the right instrument for the application Find out which function blocks are available with an instrument Most common function blocks are AI, AO, PID, DI, DO
Transmitter
PID with Auto Tuning Output Splitter (OS) Control Selector (SEL) Arithmetic Integrator Signal Characterizer
DeviceNet/Profibus
AS-i H1
8 RTD/ TC Inputs
2008 FFIMC - Automation 2008-Mumbai 6
DeviceNet/Profibus
AS-i H1
8 DI / 8 DO & logic
2008 FFIMC - Automation 2008-Mumbai 7
Availability Requirements
Redundancy requirements Equipment segregation Distribution of critical loops Component redundancy
-
Fieldbus Power supplies/Power Conditioners H1 card LAS (Back up LAS in a field device)
Segment 1
PT401 Fuel Gas Header
100% 100%
D-36004
Weir LT101
Condensate Stripper
AI
2008 FFIMC - Automation 2008-Mumbai 11
PID
AO
Devices should be placed on segments based on location, control function, and reliability requirements
Constraint Checks
Distance Limits Spur Length Power Consumption Voltage Drop Communications Processing
Spur Length
Trunk
Terminator
Terminator
Spur
Topology
Most Common
Combination Topology
Trunk
To H1 Card JB Junction Box
Spur
Spur
Branch line from Segment Distribute devices along the Segment Final Circuit Max. length 120 m
PS PC T T1 S1 S2 Tree S23 S22
2008 FFIMC - Automation 2008-Mumbai 17
S3
Branch
Sn
S21
Voltage Drop
26 ma
Fieldbus Power Supply 19 V
17 ma 11 ma 15 ma Total = 69 ma
?
2008 FFIMC - Automation 2008-Mumbai
Junction Box
19
Zone 2 Ex nL
Controls all access to the segment Keeps track of who is on the segment Runs Macro Cycle Time Clock for segment
24
Communications Processing
The LAS allocates both scheduled (for closed loop control) and unscheduled (Set point, monitoring loops, alarms) time on the bus Macrocycle time depends on block execution speed, number of blocks, communications between blocks, etc.
Scheduling
FUNCTION BLOCK SCHEDULING
Scheduled Function Block Execution Scheduled Cyclic Communication Unscheduled Communication
AI PID AO
26
Valve Transmitter
BKCAL_IN OUT IN OUT BKCAL_OUT CAS_IN
FIELDVUE
AI
PID
AO
AIN
OUT
OUT
BKCAL_IN
Valve
28
Communications Processing
> 105 ms
AI
20 ms 30 ms
PID
30 ms
AO
25 ms
AI
20 ms 30 ms
PID
30 ms
AO
25 ms
Communications Processing
> 135 ms
AI AI
20 ms
PID PID
30 ms 30 ms
AO AO
25 ms
AI AI
20 ms
PID PID
30 ms 30 ms
AO AO
25 ms
Adding a second loop on the segment results in a longer macro-cycle time, but not twice as long (30ms compelled data time).
2008 FFIMC - Automation 2008-Mumbai 30
31
Quickly evaluate Fieldbus segment Quickly evaluate Fieldbus segment communications communications
Located @ xxxx
DeltaV Cabinet: DV-01
H1Interf ace Fieldbus Module Controller: 01 Card: 03 Port: 01 H1Terminal Block
Fieldbus
W H
XX M
B K
This is a one piece block (Megablock) that has internal jumpering, (i.e. no hard-wired jumpers required). Hardwired jumpers are required when y ou tie two blocks together.
W H
Fieldbus
This block can be ordered with internal spurguards which limits the spur current to 60 mA during a short circuit condition. The connectors are pluggable theref ore commissioning and maintenance are simplif ied.
XX M
B K
3+
5+
4-
XX M
B K
B K
B K W H W H B K
Fieldbus
W H
W H
B K W H
XX M
B K
B K W H
Fieldbus
W H
XX M
B K W H
B K W H
Fieldbus
B K W H
XX M
B K B K W H W H
Fieldbus
XX M
B K W H
B K
Fieldbus
W H
B K W H
B K W H
XX M
B K
B K W H
B K W H
Fieldbus
W H
B K
B K W H
XX M
B K
W H
Fieldbus
W H
T
XX M
B K
+ S -
W H
6-
Fieldbus
FJB-101
Fieldbus
W H
141-PV-101 Single Pair (Note: Ty pical wire tagging f or all f ield dev ices.) XX M
Reference Drawings
Cabinet WiringDetails P&ID
B K
Fieldbus
W H
March 23, 2004 0 A REV: DATE: ISSUED FOR CONSTRUCTION ISSUED FOR CUSTOMER APPROVAL
SCALE:
Sudhir Jain
CADFILE: REV:
None
BY: CHK: PROJ. ENG. CUST. APPR. JOB:
REVISIONS
DeltaV Foundation Fieldbus Installation Guide DeltaV Foundation Fieldbus Installation Guide
..
Select the proper instrumentation Group according to location & control function Lay out fieldbus segment Check segment length & spur length Check current draw & voltage drop Check communications loading Choose wiring methods Choose components
2008 FFIMC - Automation 2008-Mumbai