wre,
fiers Freer,
wee ape f(r),
Bee WeeT |
ar ¥,
were Se Gereererst arferer’,
Be Wee |
wales /q3) /2022-8/35 /2022 maT Sree Sa 2022
Pwr es ane Pet rim) de-2 doreria fee dae g wR oS
tise songs, get a wee B GT A)
per sara wert * fH feaiw 20 7 21.08.2022 wt aie Hosa GT WT
som ert grr sidteecent a arene ¥ fen rar) fori opr wrt & aret at
gafa at when at rg, wel are ver ua afer & arat a ag, ener eh dar vO
A fear rear
ape} ake Sor aT Varn, oe 4H Rice dayfreee dea Bt os
ag verte vod of, ge wede A od A tot ag gig & afte va ahee
feorgs, gga a welde dar Roar qar 81 HR orrgey grr ara Garady A wre
HH wucrarn, aiferm Refs vd w/ wre Sot HM saesan o ope weno
FT TT Wea eI
ae: URI fice dae vd freer a o tsa fonds, get T
weie va } wei dom ae Saat Rea o) de O Piffayaeeit ow @ gree
B Vaal ITA TT WET BI
Wer SRP
i
eres HRT Pry ), SOHO |
wean @ feria
ufafert:— Prafekaa of yaarf ya sae orfardt og afta!
4. aOR yea ues, Gerenikret feart, Goro wr
2. wreT fSrenferere, ovo |
3. Bre eT fore afore, Toyo |
4, SRT Hosea Sa Preste (0), Boo | oA
fret Pree,
wees ae frem(arie) sow |oye,
frert freer,
wee anc Peruri),
Ue weet |
a,
ered fore Garrcerst aftrert,
SR Tee |
Walh:—§ /q?|\ /2022-5 / / 2... TITS fem erred, 2022
fevers at fers (rim) dor-2 atone ree day a freee dex S
disel Bon, gia a yecte S were 7]
ern sara arn & fi frie 20 4 21.08.2022 at Hie HUSA wT wT
sem area
@ syceT Hear GT wT zB]
warts
waa,
Giga ga gn)
err fare,
wes aa frera(arite) sou |
Year a aie ada
sfofert:— Prafefta ot erat ya oraere arf 8g Meer
1. SOR yey afer, Carriero fart, Goo wer |
2. wrt ferenfrer’, gow |
3. WRT yea flora siffrert, woo |
4. RG Teche sq Peer (do), youo |
WIS ANT 1),30¥O |iy ———
==
pica \
i= ~~ _SDRAINAGE
; = ~~ CHANNEL
=
|
- CLEAN
WATER T
——— ss |
[Parco ipa
INCLINED il
SCREENING t
BAR =e
or
“nd
cs units
iv
aor
nd
aDetail of measurement
Work Name :-Construction of Silt Chamber
ew
[7 excavation in foundation o/sollin drain Veall the
ete work
[Tank chamber
[CCin S642 coment, sand & 20mm s7balast mortori/cal
i
rank Chamber
INIS0 class b/w 1-4 comment & Ceand mortar Veal the
omplete work Foundation
2mm thick Plaster In 4 cement & e/sand mortor eal the
complete work,
[eduction
{ccin 1:24 coment, e/sand and 20mm S/balast mortor Veal
1ecompl
iS ron Plane Work Veal the complete work
fo Sereen
vison Tor Photo araDhy
LY yr
Crd 0 ABH nek BOTTA:
Tony dng.Consumption of material
Work Name :-Construction of Silt Chamber
—) S| ae SR RNY a Her aa
on |
am ror ee tele
a = a
Tao [easz0 [oe | oan | a8
toe [easto [oso [oan [oo
at es tes tent oe
wee
1
ve ut
wy ie
Bw
rat SoooBill of quantity
Work Name :-Construction of Silt Chamber,
(Material cost)
So. Name of tem ‘any [une [fate [Amount
1 [Sfecement 11.00 | bag | 364.80 [4012.80
2 |5/0.¢/sana 130 | eum | 2049.90 [266887
3. [5/0150 dass Bick 1435 | 1000 [7.21 | 10343.48
4 [5/e-4omm 6/balest 0.30 | eum | 1219.00 [365.70
6 |5/0.20mm s/Ballast ‘0.40 | cum | 275390 | 1101.56
7 [5/0 M/siron Bar a2 | ad | 7434.00 [3122.28
8_|s/oF/sand (0.20 | cum | 179690 | 35938
97 [s/o Screening Sor 1.00 | Job | ts | 500.00
17 [Provision for photowraphy 1 [sob | 300.00 | ~ 300.00
Totat= | 2270.07,
(Wabour cost)
Sine Nene offen Guy [Unit [Rate | Amount
ia excavation foundation In o/soll/eto the complete wor
1 |e/w excavation foundation in ofsolie pete work Fane faall aes
(Boxxing).
7 |cCin 16:12 cement, 7a 7
[ccin 16:12 cement, sand & aOmm B/balast mortorvealtme | 95, | cm | asoo00 | 40860
Jcompiete work
J ]M150 class b/w LG coment Bc/sand motorveatthecomolet | 3.) | cm | sooo | 260320
work (Foundation)
12mm thick Plaster in 14 cement & ¢/sand mortor /eallthe cele aa eee
complete work (drain)
5 JRecin 1:24 coment, c/sand and 20mm Sfballast mortorvealthe | oa | cum | axeo.00| 97200
complete work
[WIS iron Plane Work all the complete work oa2_| qi | 185000 [777.00
Total= | 7477.48SUMMARY OF COST
Work Name :-Construction of Silt Chamber
S.No. | Item Amount
1 [Labour Cost 7477.48
2__|Material Cost 2270.07
Total 30247.55
Say (0.30 Lakh
J renones 2m),
orS) ae a ; =
| A e
| cee 4 Uy,
| | VMN
(cook — yy i J > he
| ry YIEIEL
| | ,
, _dém__} y_0.6m__,
| see ew
| SIRE ae siti GL
| me |
oe > RE me pee =Detail of measurement
Work Name :-Construction of Fillter Chamber
Hi
Te
|E/w excavation in foundation o/sollin drain Veallthe
complete work
[Tonk chamber
(eC im SID coment, Jeand & Omm e/oalant mortor Ve aT
the complete work
Hank Chamber
[CCin t:24 cement, c/sand and 20mm S/balast mortor Veal
the complete werk
|MiS0 cass b/w iva carnent & cand mortor Veal the
lcomplete work Foundation
decoction]
5 [Rime thick Plaster in 14 cement & c/sand mortar Veal
omplate work
{ein 124 coment, [sand and 20mm S[ballast mortor Ve al
the complete work
Son Plane Work call the complete work
Je Hessian doth
70.50 to Torn Brick Bats
Jo 25 0 AO mm Brick Balas
focisand
rovsion for Photo graphy
eSWork Name :-Construction of Fillter Chamber
Consumption of material
a 7 SF | S| OT PRI NSLP le
eye | s/o ee
tree ham
rode aes | a7 | ose | tesco
z co 5 1437] 158 0.22
4 lat 45 | 101 045 0.22
nee
hs oss | a3 | 029 088
tr i | 030 oat
cataesanioiee aa
+ feces oa
Tee [ammo | oar | ore [oa | ont
1500] 200 [168000 090-| 00 | 020 | 060
fat oe) oe pe ot oe Te
ah.
, *P
Sy
ee
a
ee)
Qe
@
oo 9Bill of quantity
(material cost)
SNe. ‘Name of lem ity Rate_[ Amount
1 _|Sfocement 15.00 | Bag | 364.80 | 5472.00
2 |s/oc/sand 2.00 | cum | 2049.90 | 4099.80
3 |S/oMis0 class Brick a6s0_[ 1000 [7.21 | _12109.44
‘4_|s/o-4omm B/Ballast 0.90_| cum | 1919.00 | 1097.10
5_|s/opric Bats 0.60__| cum | 1166.00 | 699.60
6_|5/0 20mm s/Balast (0.80 [cum | 2753.90 | 2203.12
7_|s/e M/s iron Bar o61 | au | 7434.00 | 4534.74
8 |s/oF/sand 0.20 | cum | 1796.90 | 359.8,
S/o Messian doth 287 _| sam | 37.76 | 70.69
17_|Provision for photography 1 | Job [300.00 | 300.00
Total= | 30945.87
(Labour cost)
S.No, Name of item Qtty [Unit | Rate_[ Amount
1 |E/w excavation foundation in o/s0ili/e to the complete work
833 | cum | 155.00 | 1291.15
Boxing).
7 ae Seen tne sanWamaoeriedte | oy | Tae) ae
3 [MISO class b/w 16 cement @ chsandmonorVeatthe complete | 5. To | geaao | aiazeo
|work (Foundation)
“4 [12mm thick Plaster in 1:4 coment & e/sand mortori/e all the sap ee eee eee
|complete work (drain)
5 Jfecin 22s coment, sand and 20mm-fealast mororVeatine | 565 |< | asen00 | aaoaoo
|complete work
6 _ [MIS iron Plane Work call the complete work ‘o«i | qti_| 185000 [112850
8 [Ein 2:8 cement, c/sand and 20mm S/balast morierVealthe | 5 > | cum | ass0.00 | aseso
Jcomplete work
Total= | 921803SUMMARY OF COST
Work Name :-Construction of Fillter Chamber
S.No. [item [Amount]
1 _|Labour Cost _ 9214.03
2 Material Cost 30945.87
[(-T_ rorar =| 40159.90 |
Say = 0.40 Lakh