Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Certificate of

Certificate of Inspection
Inspection Date
Date ofofissue
Date
No.
issue

ofofissue
issue
2024-06-19
2024-06-00041

Wehereby
We hereby certify
certify that the following
that product has
the following duly passed
product the inspections
has duly passed the specified below. specified below.
inspections

Discription
Discription Vane Pump
Discription
Model No. PV2R1-10-F-LAA Fluid Temp.
Design No. 43
Discription M01

Test Condition
Test Condition
Operating conditions
Operating conditions Compliant with our company standards
Operating conditions
Hydraulic Fluid Equivalent to ISO VG32 Fluid Temp.
Fluid Temp. 45±5℃

Inspection Item
Inspection Item Detail of inspection and criterion Detail of criterion
There
There isisnono discrepancy in the model
there and
is no there is noinabnormality in the
11 Visual Inspection
Visual Inspection appearance.
difference in the model and abnormality the appearance.

22 Internal
WorkingLeakage
Condition Confirm that
Test Confirm thatthere is nois
there abnormality pump operation.
no abnormality pump operation.
Confirm thatOutput
Output
FlowFlow is within allowable range underspecified
conditions
in the specified
regulation. in
33 Inspection
OutputofFlow
Performance
Test Confirm that
the regulation.
is within allowable range under conditions

4 Drive Condition Confirm that Internal leakage at specified pressure is less than allowable range.

5 External Leakage Confirm that there is not found oil leaking outside under Specified condition.

Issuing company Issuing company Yuken Hydraulics (Zhangjiagang) Co., Ltd.

Powered by TCPDF (www.tcpdf.org)

You might also like