Commissionig PTW (Permit To Work) LOG SHEET 2020

PROJECT NAME : JIJEL CCPP PROJECT

No. PTW Number Issued Date Expired Date Type of PTW Day/ Night Area DESCRIPTION Requested by

4880 GE-HEC-1050 02.01.2020 08.01.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE ACTIVITY MECHANIC TEAM

4881 GE-HEC-1051 02.01.2020 08.01.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE ACTIVITY MECHANIC TEAM

4882 GE-HEC-1052 04.01.2020 08.01.2020 COLD WORK DAY GTB-12 FIR ALARM, CABLE TAG INSTALLATION & PUNCH CLEAR ELECTRIC TEAM

4883 GE-HEC-1053 04.01.2020 08.01.2020 COLD WORK DAY GTB-11 FIR ALARM, CABLE TAG INSTALLATION & PUNCH CLEAR ELECTRIC TEAM

4884 GE-HEC-1054 02.01.2020 08.01.2020 COLD WORK DAY GT-12 PUNCH CLEARING ELECTRIC TEAM

4885 GE-HEC-1055 02.01.2020 08.01.2020 HOT WORK DAY GT-11 BOLT TIGHTENING OF STEEL STRUCTURES ARCHITECTURE

4886 GE-HEC-1056 02.01.2020 08.01.2020 HOT WORK DAY GT-12 BOLT TIGHTENING OF STEEL STRUCTURES ARCHITECTURE

4887 GE-HEC-1057 02.01.2020 08.01.2020 HOT WORK DAY GT-12 INSTRUMENT INSTALLATION INSTRUMENT TEAM

4888 7173 02.01.2020 08.01.2020 COLD WORK DAY LEB,HRSG LINE CHECK COMMISSIONING

4889 6700 02.01.2020 08.01.2020 COLD WORK DAY GT-21 FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

4890 1033 04.01.2020 10.01.2020 COLD WORK DAY BSDG ASSISTING OF SU-CONTRACTOR TO RESOLVE ENGINE PROBLEMS MECHANIC TEAM

4891 7186 04.01.2020 10.01.2020 HOT WORK DAY NGSS TEST OF PANEL ELECTRICAL

4892 7188 04.01.2020 10.01.2020 HOT WORK DAY CCB(SWGR) TEST OF PANEL ELECTRICAL

4893 7189 04.01.2020 10.01.2020 HOT WORK DAY GT-22 PEECC TEST OF PANEL ELECTRICAL
4894 7190 04.01.2020 10.01.2020 HOT WORK DAY GT-21 PEECC TEST OF PANEL ELECTRICAL

4895 7191 04.01.2020 10.01.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

4896 7192 04.01.2020 10.01.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

4897 7193 04.01.2020 10.01.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

4898 7194 04.01.2020 10.01.2020 HOT WORK DAY BSDG TEST OF PANEL ELECTRICAL

4899 17530 04.01.2020 10.01.2020 HOT WORK DAY GTB-21 GROUNDING INSTALLATION ELECTRICAL

4900 17531 04.01.2020 10.01.2020 HOT WORK DAY GTB-22 GROUNDING INSTALLATION ELECTRICAL

4901 17777 04.01.2020 10.01.2020 HOT WORK DAY GTG-21 CONDUIT LIGHTING FIRE ALARM & COVER CABLE TRAY ELECTRICAL

4902 17778 04.01.2020 10.01.2020 HOT WORK DAY W/T CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

4903 17779 04.01.2020 10.01.2020 HOT WORK DAY CCB(1st FLOOR) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

4904 17580 04.01.2020 10.01.2020 HOT WORK DAY GTG-22 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

4905 17581 04.01.2020 10.01.2020 HOT WORK DAY BSDG CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

4906 17780 04.01.2020 10.01.2020 HOT WORK DAY CCB(G.F AND BASEMENT) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

4907 8520 04.01.2020 10.01.2020 HOT WORK DAY FWPB CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

4908 8521 04.01.2020 10.01.2020 HOT WORK DAY W/T CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

4909 15358 04.01.2020 10.01.2020 HOT WORK DAY GT-12 ISOLATION T/F FIRE ALARM CONDUIT & SUPPORT INSTALALTION SCAFFOLDING INSTALLATION ELECTRIC TEAM

4910 15431 04.01.2020 10.01.2020 HOT WORK DAY GTB-22 WELDING, CUTTING, GRINDING & INSTALLATION OF UNISTRUIT CHANNEL FOR ELECTRIC TEAM
CONDUIT SUPPORT
WELDING, CUTTING, GRINDING & INSTALLATION OF UNISTRUIT CHANNEL FOR
4911 15432 04.01.2020 10.01.2020 HOT WORK DAY GTB-21 CONDUIT SUPPORT ELECTRIC TEAM

4912 15500 04.01.2020 10.01.2020 HOT WORK DAY CCB CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

4913 6532 04.01.2020 10.01.2020 COLD WORK DAY CCB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

4914 6535 04.01.2020 10.01.2020 COLD WORK DAY FWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

4915 6536 04.01.2020 10.01.2020 COLD WORK DAY W/T INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

4916 6676 04.01.2020 10.01.2020 COLD WORK DAY GT-21 LCI MV CABLE HIPOT TEST TERMINATION, LINE CHECKIN ELECTRIC TEAM

4917 6587 04.01.2020 10.01.2020 COLD WORK DAY CCB(G.F) PANEL MONITORING, LINE CHECK, INTER WIRING ELECTRIC TEAM

4918 6588 04.01.2020 10.01.2020 COLD WORK DAY BSDG PANEL TEST, RELAY TEST, FUNCTIONAL TEST ELECTRIC TEAM

4919 6590 04.01.2020 10.01.2020 COLD WORK DAY UEB-1 PANEL TEST, INTER WIRING, IR TEST ELECTRIC TEAM

4920 14933 04.01.2020 10.01.2020 HOT WORK DAY GT-22 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM

4921 14934 04.01.2020 10.01.2020 HOT WORK DAY G-21 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM

THREADING, CUTTING INSTALLATION) OF PIPE & SUPPORT, BOLTING, FIXING OF PIPING TEAM
4922 9461 04.01.2020 08.01.2020 HOT WORK DAY GT-22
FITTINGS & VISUAL INSPECTION

REINSTATEMENT WORKS, GASKET REPLACEMENT, BOLTING, GROTING


4923 9492 04.01.2020 08.01.2020 HOT WORK DAY GT-21 REPAIR/MODIFICATION OF PIPE SUPPORT AIR BLOWING PIPING TEAM

REINSTATEMENT WORKS, GASKET REPLACEMENT, BOLTING, GROTING


4924 9491 04.01.2020 08.01.2020 HOT WORK DAY GT-22 REPAIR/MODIFICATION OF PIPE SUPPORT AIR BLOWING PIPING TEAM

4925 7949 04.01.2020 09.01.2020 COLD WORK DAY CCB(BASEMENT) CABLE PULLING ELECTRICAL

4926 6628 02.01.2020 08.01.2020 COLD WORK DAY GT-22 PEECC MODIFY DC-OIL MOTOR STARTER CIRCUIT, INTERWIRING, PANEL TEST ELECTRIC TEAM

4927 6629 02.01.2020 08.01.2020 COLD WORK DAY GT-21 PEECC MODIFY DC-OIL MOTOR STARTER CIRCUIT, INTERWIRING, PANEL TEST ELECTRIC TEAM
4928 8812 04.01.2020 10.01.2020 COLD WORK DAY BSDG ENGINE CHECKING PROBLEM MECHANIC TEAM

CLIENT LINE WALKDOWN INCLUDING CELING / FLOOR OPENNING, TOUCH-UP


4929 9422 04.01.2020 10.01.2020 COLD WORK DAY CCB PAINTING & LINE MODIFICATION IF REQUIIRED PIPING TEAM(FF)

4930 14075 04.01.2020 10.01.2020 HOT WORK DAY GT-21 STEEL STRUCTURES, METAL CLADDING, GRATING INSTALLATION ARCHITECTURE

4931 14087 04.01.2020 10.01.2020 HOT WORK DAY W/T HVAC(DUCT, EQUIPMENT INSTALLATION, PIPE CONTROL, CABLE PULLING HVAC

4932 14091 04.01.2020 10.01.2020 HOT WORK DAY GT-22 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPE CONTROL, CABLE PULLING HVAC

4933 14095 04.01.2020 10.01.2020 HOT WORK DAY GT-21 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPE CONTROL, CABLE PULLING HVAC

4934 14107 04.01.2020 10.01.2020 HOT WORK DAY GT-22 STEEL STRUCTURES, METAL CLADDING, GRATING INSTALLATION ARCHITECTURE

4935 8899 05.01.2020 10.01.2020 COLD WORK DAY GT-21 NGFS PAINTING AND PIPE INSULATION WORK PIPING

4936 8910 05.01.2020 10.01.2020 COLD WORK DAY GT-22 NGFS PAINTING AND PIPE INSULATION WORK PIPING

4937 8912 05.01.2020 10.01.2020 COLD WORK DAY GT-22 PAINTING AND PIPE INSULATION WORK PIPING

4938 8913 05.01.2020 10.01.2020 COLD WORK DAY GT-21 PAINTING AND PIPE INSULATION WORK PIPING

4939 17853 04.01.2020 09.01.2020 HOT WORK DAY GT-21/22 IPB WELDING ELEMENT IPB MECHANICAL

4940 17853 04.01.2020 09.01.2020 HOT WORK DAY GT-21/22 IPB WELDING ELEMENT IPB MECHANICAL

4941 8909 05.01.2020 10.01.2020 COLD WORK DAY NGSS PAINTING, TOUCH UP, CLEANING PIPING

4942 4613 04.01.2020 10.01.2020 COLD WORK DAY PIPE RACK TO CCB PULLINING CABLE AND TERMINATION WORK INSTRUMENT TEAM

4943 GE-HEC-1058 05.01.2020 11.01.2020 COLD WORK DAY GTB-1(PEECC-12 BASEMENT) CABLE PULLING ELECTRIC TEAM

LINE CHECKING. INSULATION RESISTANCE, HIPOT TEST CABLES DISCONNECT &


4944 GE-HEC-1059 04.01.2020 10.01.2020 COLD WORK DAY GT-12 LCI COMPARTMENT RECONNECT CABLES ELECTRIC TEAM

4945 GE-HEC-1060 04.01.2020 10.01.2020 HOT WORK DAY GT-12 PEECC TEST OF PANEL ELECTRICAL
4946 GE-HEC-1061 05.01.2020 10.01.2020 HOT WORK DAY GT-11 HVAC(DCT, FIXATION, ISOLATIO) HVAC

4947 GE-HEC-1062 05.01.2020 10.01.2020 HOT WORK DAY GT-12 HVAC(DCT, FIXATION, ISOLATIO) HVAC

4948 GE-HEC-1063 05.01.2020 10.01.2020 HOT WORK DAY GT-11 NGFS PAINTING AND PIPE INSULATION WORK PIPING

4949 GE-HEC-1064 05.01.2020 10.01.2020 HOT WORK DAY GT-11 NGFS PAINTING AND PIPE INSULATION WORK PIPING

GTB-1(NORMAL LIGHTING
4950 GE-HEC-1065 04.01.2020 08.01.2020 COLD WORK DAY PANEL 111) CABLE TERMINATION INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

4951 GE-HEC-1066 04.01.2020 09.01.2020 COLD WORK DAY GT-11 PERFORMING COMMISSIONINGWORK COMMISSIONING

4952 GE-HEC-1067 04.01.2020 09.01.2020 COLD WORK DAY GT-12 PERFORMING COMMISSIONINGWORK COMMISSIONING

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


4953 GE-HEC-1068 04.01.2020 09.01.2020 COLD WORK DAY GT-11 PEECC COMMISSIONING
VALVE AND DEVISE START MOTOR

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


4954 GE-HEC-1069 04.01.2020 09.01.2020 COLD WORK DAY GT-12 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

4955 19210 04.01.2020 10.01.2020 HOT WORK DAY CCB CHIPPING AND PLASTER AND WOOD PANEL REPAIR ARCHITECTURE TEAM

4956 19211 04.01.2020 10.01.2020 HOT WORK DAY GTB-2 HOUSE KEEPING TRANCH COVER REPAIR WORK ARCHITECTURE TEAM

4957 19214 04.01.2020 10.01.2020 HOT WORK DAY W/T GYPSUM BOARD WORK9WELDIING) ARCHITECTURE TEAM

4958 19219 04.01.2020 10.01.2020 HOT WORK DAY ACB ROOF FOUNDATION INSTALLATION ARCHITECTURE TEAM

4959 6101 04.01.2020 10.01.2020 COLD WORK DAY FWPB PLASTER WORK ARCHITECTURE TEAM

4960 15524 06.01.2020 12.01.2020 HOT WORK DAY GT-GTG-21 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM

4961 15525 06.01.2020 12.01.2020 HOT WORK DAY GT-GTG-22 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM

PUNCH CLEAR, CO2 FIRE SUPPRESSION SYSTEM WIRING CHEECKING, CABLE


4962 6707 05.01.2020 11.01.2020 COLD WORK DAY BSDG ELECTRIC TEAM
CONNECTION & INSPECTION
4963 6708 05.01.2020 11.01.2020 COLD WORK DAY CCB(SWGR & UPS) PUNCH CLEAR, CABLE LINE CHECK, CABLE ARRANGEMENT, CABLE CONNECTION &ELECTRIC TEAM

4964 6709 05.01.2020 11.01.2020 COLD WORK DAY CCB(DCS G.F ) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

4965 6710 05.01.2020 11.01.2020 COLD WORK DAY CCB(DCS 1st .F) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

4966 6711 05.01.2020 11.01.2020 COLD WORK DAY GT-21 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

4967 6714 05.01.2020 11.01.2020 COLD WORK DAY GT-22 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

4968 7933 04.01.2020 09.01.2020 COLD WORK DAY GT-21 CABLE TERMINATION WORK ELECTRICAL

4969 7934 04.01.2020 09.01.2020 COLD WORK DAY GT-22 CABLE TERMINATION WORK ELECTRICAL

4970 6713 04.01.2020 10.01.2020 COLD WORK DAY GT-22 CABLE TERMINATION ELECTRIC TEAM

4971 17817 04.01.2020 09.01.2020 HOT WORK DAY GTB-22 PIPING AND SUPPORT INSTALLATION PIPING

4972 6631 04.01.2020 10.01.2020 COLD WORK DAY W/T NEW MODULE INSTALLATION FOR MCC PANEL ELECTRIC TEAM

4973 GE-HEC-1070 04.01.2020 10.01.2020 HOT WORK DAY GT-GTG-11 VENTILATION DUCT DAMPER MODIFICATION ACTIVITY MECHANIC TEAM

4974 GE-HEC-1071 04.01.2020 10.01.2020 HOT WORK DAY GT-GTG-12 VENTILATION DUCT DAMPER MODIFICATION ACTIVITY MECHANIC TEAM

4975 7196 04.01.2020 10.01.2020 COLD WORK DAY GT-21/22 COMPARTMENT DEMI WATER FLUSHING FOR CCW GT-21/22 COMMISSIONING

4976 7197 04.01.2020 10.01.2020 COLD WORK DAY GT-22 COMPARTMENT LUBE OIL FLUSHING PASE 1/2/3 COMMISSIONING

4977 7942 04.01.2020 09.01.2020 COLD WORK DAY CCB(DCS) PUNCH LIST, CONNECTED EARTHING ELECTRICAL

4978 6702 05.01.2020 11.01.2020 COLD WORK DAY UEB-1 TO CHEMICAL DOSING CABLE PULLING ELECTRIC TEAM

4979 7950 04.01.2020 09.01.2020 COLD WORK DAY GT-21 PEECC TESTING CABLE ELECTRICAL
4980 7951 04.01.2020 09.01.2020 COLD WORK DAY GT-21/22 GCB TESTING CABLE ELECTRICAL

4981 7952 04.01.2020 09.01.2020 COLD WORK DAY BSDG TESTING CABLE ELECTRICAL

4982 6715 05.01.2020 11.01.2020 COLD WORK DAY GT-21 VISUAL INSPECTION FOR PUNCH WITH GE AND CEEG ELECTRIC TEAM

4983 7953 04.01.2020 09.01.2020 COLD WORK DAY CCB TESTING CABLE ELECTRIC TEAM

4984 7956 04.01.2020 09.01.2020 COLD WORK DAY GTB-2 CCW CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

4985 GE-HEC-1072 06.01.2020 12.01.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE ACTIVITY MECHANIC TEAM

4986 GE-HEC-1073 05.01.2020 11.01.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE ACTIVITY MECHANIC TEAM

4987 GE-HEC-1074 06.01.2020 12.01.2020 COLD WORK DAY GT-GTG-12 GAS TURBINE FINAL ALIGNMENT ACTIVITY MECHANIC TEAM

4988 GE-HEC-1075 05.01.2020 11.01.2020 COLD WORK DAY GT-12 CLEANING OF ELECTRICAL JUNCTION BOX ENCLOSURE AND INSPECTION WITH GE ELECTRIC TEAM

4989 GE-HEC-1076 06.01.2020 12.01.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

4990 6100 04.01.2020 10.01.2020 COLD WORK DAY CHEMICAL STORAGE REMOVING SCAFFOLDING ARCHITECTURE TEAM

4991 3751 05.01.2020 10.01.2020 COLD WORK DAY GTB-2 PUNCH CLEAR INSPECTION QC

4992 9799 05.01.2020 11.01.2020 COLD WORK DAY GTB-2 AIR BLOWING FOR BLOCK-2 GTG I.A DISTRIBUTION COMMISSIONING

4993 GE-HEC-1077 05.01.2020 11.01.2020 COLD WORK DAY CCB(1st FLOOR) FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

CCB TO ST BLDG TO AUX


4994 6712 05.01.2020 10.01.2020 COLD WORK DAY BOILER TO FFAC STG-10 CABLE PULLING ELECTRIC TEAM

4995 14093 04.01.2020 10.01.2020 HOT WORK DAY UEB-1 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPE CONTROL, CABLE PULLING HVAC

4996 6719 05.01.2020 11.01.2020 COLD WORK DAY GT-21 FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM
4997 6721 06.01.2020 12.01.2020 COLD WORK DAY GT-21 CABLE TERMINATION ELECTRIC TEAM

4998 6722 05.01.2020 11.01.2020 COLD WORK DAY CCB CABLE TERMINATION ELECTRIC TEAM

4999 7954 05.01.2020 09.01.2020 COLD WORK DAY W/T TESTING CABLE ELECTRICAL

5000 6720 05.01.2020 08.01.2020 COLD WORK DAY UEB-2 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5001 6724 06.01.2020 12.01.2020 COLD WORK DAY PEECC-22 TO GTB-2 CABLE TERMINATION AND INSPECTION WITH GE, QC AND CEEG ELECTRIC TEAM

5002 6725 06.01.2020 12.01.2020 COLD WORK DAY PEECC-21 TO GTB-1 CABLE TERMINATION AND INSPECTION WITH GE, QC AND CEEG ELECTRIC TEAM

5003 GE-HEC-1078 06.01.2020 12.01.2020 COLD WORK DAY GT-11 CABLE CONTINUITY TEST & CABLE TERMINATION ELECTRIC TEAM

5004 GE-HEC-1079 06.01.2020 12.01.2020 COLD WORK DAY GT-12 CABLE CONTINUITY TEST & CABLE TERMINATION ELECTRIC TEAM

5005 GE-HEC-1080 06.01.2020 11.01.2020 COLD WORK DAY GT-12 INVESTIGAE AND FIX THE LEAKAGE OF LIFTING BEARING NO.1 COMMISSIONING

THREADING, CUTTING INSTALLATION OF PIPE & SUPPORT, BOLTING, FIXING OF


5006 15757 06.01.2020 12.01.2020 HOT WORK DAY GT-21 FITTINGS & VISUAL INSPECTION PIPING TEAM

5007 6729 07.01.2020 13.01.2020 COLD WORK DAY GT-22 CABLE PULLING & CABLE TERMINATION ELECTRIC TEAM

5008 6727 06.01.2020 12.01.2020 COLD WORK DAY GT-21 PUNCH CLEARING AD INSPECTION WITH GE AND CEEG(EARTHING CABLE) ELECTRIC TEAM

5009 6728 06.01.2020 12.01.2020 COLD WORK DAY GT-21 FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

5010 GE-HEC-1081 05.01.2020 11.01.2020 COLD WORK DAY GT-12 INSTRUMENT INSTALLATION INSTRUMENT TEAM

5011 GE-HEC-1082 05.01.2020 11.01.2020 COLD WORK DAY GTG-12 MODIFICATION OF TUBING INSTRUMENT TEAM

5012 6726 07.01.2020 13.01.2020 COLD WORK DAY UEB-1 TO FUEL OIL PUMP CABLE PULLING ELECTRIC TEAM
5013 8816 05.01.2020 09.01.2020 COLD WORK DAY W/T TOU-UP PAINTING & HOUSKEEPING, PUNCH CLEARING MECHANIC TEAM

5014 8906 06.01.2020 12.01.2020 COLD WORK DAY CCB(1st FLOOR) ACCESS, CEELING FLOOR INSTALLATION(WALL) ARCHITECTURE

REMOVING OF STOPPER LOCK OF THE COUPLING DRESSER, RE-WILD AFTER


5015 GE-HEC-1083 07.01.2020 13.01.2020 HOT WORK DAY GT-12 PREPARING THE ACTIVITIES COMMISSIONING

5016 7955 06.01.2020 11.01.2020 COLD WORK DAY GT-11 PEECC TESTING CABLE ELECTRIC TEAM

5017 GE-HEC-1084 07.01.2020 13.01.2020 COLD WORK DAY GT-11 PEECC CABLE PULLING & CABLE TERMINATION ELECTRIC TEAM

5018 GE-HEC-1085 07.01.2020 13.01.2020 COLD WORK DAY GT-12 PUNCH CLEARING AS PER ATTACHED PUNCH LIST AND INSPECTION WITH GE AND ELECTRIC TEAM

5019 GE-HEC-1086 07.01.2020 13.01.2020 COLD WORK DAY GT-12 VISUAL INSPECTION FOR PUNCH WITH GE AND CEEG ELECTRIC TEAM

5020 17857 07.01.2020 10.01.2020 HOT WORK DAY ACB CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5021 3513 07.01.2020 09.01.2020 COLD WORK DAY GT-22 CLEANING OF PIPE SURFACE AND PAINTING, WELDING JOINT AND OTHER MATERIA
PIPING TEAM

5022 17875 11.01.2020 16.01.2020 HOT WORK DAY GTB-22 GROUNDING INSTALLATION ELECTRICAL

5023 17875 11.01.2020 16.01.2020 HOT WORK DAY GTB-21 GROUNDING INSTALLATION ELECTRICAL

5024 17793 11.01.2020 17.01.2020 HOT WORK DAY BSDG CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5025 17794 11.01.2020 17.01.2020 HOT WORK DAY W/T CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5026 17795 11.01.2020 17.01.2020 HOT WORK DAY CCB(1st FLOOR) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5027 17796 11.01.2020 17.01.2020 HOT WORK DAY CCB(G.F) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5028 17797 11.01.2020 17.01.2020 HOT WORK DAY GTG-21 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5029 17798 11.01.2020 17.01.2020 HOT WORK DAY GTG-22 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5030 17858 11.01.2020 17.01.2020 HOT WORK DAY SWPB CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL
5031 17859 11.01.2020 17.01.2020 HOT WORK DAY FWPB CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5032 17860 11.01.2020 17.01.2020 HOT WORK DAY DWPB CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5033 GE-HEC-1087 08.01.2020 14.01.2020 HOT WORK DAY GTB-12 TEMPORARY DOOR REPAIR WORK ARCHITECTURE TEAM

5034 GE-HEC-1088 08.01.2020 14.01.2020 COLD WORK DAY GT-12 LCI COMPARTMENT-21 CABLE PULLING & MEGGER TEST ELECTRIC TEAM

5035 GE-HEC-1089 08.01.2020 14.01.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5036 7938 07.01.2020 09.01.2020 COLD WORK DAY CCB(G.F) CABLE TERMINATION & PUNCH CLEAR LIST ELECTRICAL

REQUEST TO EXCHANGE OF TEMPERATURE TRANSMITTER BETWEEN


5037 GE-HEC-1090 08.01.2020 10.01.2020 COLD WORK DAY GTG-12 12PGG44CT101 AND 12PGG82CT101 INSTRUMENT TEAM

REQUEST TO EXCHANGE OF TEMPERATURE TRANSMITTER BETWEEN


5038 GE-HEC-1091 08.01.2020 10.01.2020 COLD WORK DAY GTG-11 11PGG44CT101 AND 11PGG82CT102 INSTRUMENT TEAM

5039 8660 08.01.2020 14.01.2020 HOT WORK DAY CCB GLANDING AND TERMINATION ELECTRIC TEAM

5040 7978 07.01.2020 13.01.2020 COLD WORK DAY W/T CLEANING AND PAINTING OF THE EQUIPMENT MECHANICAL

5041 8524 11.01.2020 17.01.2020 HOT WORK DAY FWPB CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

5042 8525 11.01.2020 17.01.2020 HOT WORK DAY W/T CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

5043 8526 11.01.2020 17.01.2020 HOT WORK DAY CCB CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

CUTTING, GRINDING, DRILLING & WELDING OF UNISTRUIT CHANEL FOR CONDUIT ELECTRIC TEAM
5044 8557 11.01.2020 17.01.2020 HOT WORK DAY GTB-22 SUPPORT & INSTALLATION

5045 8558 11.01.2020 17.01.2020 HOT WORK DAY GTB-21 CUTTING, GRINDING, DRILLING & WELDING OF UNISTRUIT CHANEL FOR CONDUIT ELECTRIC TEAM
SUPPORT & INSTALLATION

5046 15373 11.01.2020 17.01.2020 HOT WORK DAY GT-12 ISOLATION T/F CONDUIT & SUPPORT- INSTALLATION SCAFFOLDING INSTALLATION/DISMANTLE ELECTRIC TEAM

5047 6539 11.01.2020 17.01.2020 COLD WORK DAY FWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM
5048 6540 11.01.2020 17.01.2020 COLD WORK DAY W/T INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5049 6542 11.01.2020 17.01.2020 COLD WORK DAY CCB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5050 6632 11.01.2020 17.01.2020 COLD WORK DAY UEB-1 PANEL TEST, HIPOT TEST, IR TEST ELECTRIC TEAM

5051 6634 11.01.2020 17.01.2020 COLD WORK DAY BSDG PANEL TEST, RELAY TEST, IR TEST ELECTRIC TEAM

5052 6633 11.01.2020 17.01.2020 COLD WORK DAY CCB(G.F) LINE CHECKING, PANEL MONITORING ELECTRIC TEAM

5053 6635 11.01.2020 17.01.2020 COLD WORK DAY GT-21 PEECC MCC INTER WIRING, MODIFICATION WORKS, PANEL TESTING ELECTRIC TEAM

5054 6636 11.01.2020 17.01.2020 COLD WORK DAY GT-22 PEECC MCC INTER WIRING, MODIFICATION WORKS, PANEL TESTING ELECTRIC TEAM

5055 4617 07.01.2020 10.01.2020 COLD WORK DAY BYPASS, EXHAUST, LEB CABLE PULLING AND TERMINATION INSTRUMENT TEAM

5056 7792 11.01.2020 16.01.2020 COLD WORK DAY CCB(BASEMENT) PULLING CABLE ELECTRICAL

5057 19228 11.01.2020 17.01.2020 HOT WORK DAY GTB-2 CLEANING WORK, COVERS TRANCH, REPAIR WORK ARCHITECTURE TEAM

5058 19231 11.01.2020 17.01.2020 HOT WORK DAY CCB GYPSUM BOARD WORK & SCAFFOLDING ARCHITECTURE TEAM

5059 19232 11.01.2020 17.01.2020 HOT WORK DAY UEB-1 DOORS INSTALLATION ARCHITECTURE TEAM

5060 19233 11.01.2020 17.01.2020 HOT WORK DAY W/T GYPSUM BOARD & SAFFOLDING & METAL CLADDING ARCHITECTURE TEAM

5061 19239 11.01.2020 17.01.2020 HOT WORK DAY ACB ROOF FONDATION INSTALLATION ARCHITECTURE TEAM

5062 8818 11.01.2020 17.01.2020 COLD WORK DAY BSDG ENGINE CHECKING PROBLEM 7 MECHANICAL INSTALLATION FOR BSDG2,3 MECHANIC TEAM

5063 6705 08.01.2020 14.01.2020 COLD WORK DAY GT-21 MOTOR I/R TEST ELECTRIC TEAM
5064 GE-HEC-1092 11.01.2020 17.01.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5065 GE-HEC-1093 11.01.2020 17.01.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5066 GE-HEC-1094 11.01.2020 17.01.2020 HOT WORK DAY GT-GTG-12 GAS TURBINE FINAL ALIGNMENT ACTIVITY MECHANIC TEAM

5067 GE-HEC-1095 09.01.2020 15.01.2020 COLD WORK DAY GT-11 PEECC MCC MODULES VERIFYING EOCR SETTING VALUES ELECTRIC TEAM

5068 GE-HEC-1096 09.01.2020 15.01.2020 COLD WORK DAY GT-12 PEECC MCC MODULES VERIFYING EOCR SETTING VALUES ELECTRIC TEAM

RIENSTATMENT WORK GASKET REPLACEMENT, BOLTING GROUTING,


5069 15775 11.01.2020 17.01.2020 HOT WORK DAY GT-21 REPAIR/MODIFICATION OF PIPE & SUPPORT, AIR BLOWING PIPING TEAM

RIENSTATMENT WORK GASKET REPLACEMENT, BOLTING GROUTING,


5070 15776 11.01.2020 17.01.2020 HOT WORK DAY GT-22 REPAIR/MODIFICATION OF PIPE & SUPPORT, AIR BLOWING PIPING TEAM

THREADING, CUTTING, INSTALLATION OF FIRE FIGHTING PIPE & SUPPORT,


5071 15785 09.01.2020 15.01.2020 HOT WORK DAY GT-22 BOLTING & FIXING OF FITTINGS & VISUAL INSPECTION & SCAFFOLDING PIPING TEAM

CLEANING OF PIPE SURFACE AND PAINTING, WELDING JOINT AND OTHER


5072 3517 11.01.2020 17.01.2020 COLD WORK DAY GT-22 MATERIALS REQUIRED ON SITE PIPING TEAM

5073 GE-HCC-1097 09.01.2020 15.01.2020 COLD WORK DAY GT-12 LCI CABLE TERMINATION INSPECTION WITH QC, GE, CEEG & COUNTNUITY TEST, CONTELECTRIC TEAM

5074 6544 11.01.2020 17.01.2020 COLD WORK DAY SWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5075 6545 11.01.2020 17.01.2020 COLD WORK DAY BSDG INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5076 6547 11.01.2020 17.01.2020 COLD WORK DAY ACB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5077 6548 11.01.2020 17.01.2020 COLD WORK DAY DWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5078 14935 11.01.2020 17.01.2020 HOT WORK DAY GT-21 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM

5079 14970 11.01.2020 17.01.2020 HOT WORK DAY GT-22 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM
5080 7200 11.01.2020 17.01.2020 HOT WORK DAY NGSS TEST OF PANEL ELECTRICAL

5081 7202 11.01.2020 17.01.2020 HOT WORK DAY GT-22 PEECC TEST OF PANEL ELECTRICAL

5082 7203 11.01.2020 17.01.2020 HOT WORK DAY GT-21 PEECC TEST OF PANEL ELECTRICAL

5083 7204 11.01.2020 17.01.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

5084 7205 11.01.2020 17.01.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

5085 7206 11.01.2020 17.01.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

5086 17893 11.01.2020 17.01.2020 HOT WORK DAY GT-21/22 IPB WELDING ELEMENT IPB & CLEANING MECHANICAL

5087 17894 11.01.2020 17.01.2020 HOT WORK DAY GT-21/22 CLEANING, PAINTING, FINISH WORK MECHANICAL

5088 7982 11.01.2020 16.01.2020 COLD WORK DAY GT-22 HYDROTEST QA/QC

5089 9923 10.01.2020 16.01.2020 COLD WORK DAY GT-11/12 CCW SUCTION STRAINER CLEANING COMMISSIONING

5090 9924 09.01.2020 15.01.2020 COLD WORK DAY BSDG WATER FILLING & OIL FILING COMMISSIONING

5091 GE-HEC-1098 11.01.2020 16.01.2020 COLD WORK DAY GT-12 PERFORMING COMMISSIONINGWORK COMMISSIONING

5092 GE-HEC-1099 11.01.2020 16.01.2020 COLD WORK DAY GT-11 PERFORMING COMMISSIONINGWORK COMMISSIONING

5093 GE-HEC-1100 11.01.2020 16.01.2020 COLD WORK DAY GT-12 PEECC COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING COMMISSIONING
VALVE AND DEVISE START MOTOR
COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING
5094 GE-HEC-1101 11.01.2020 16.01.2020 COLD WORK DAY GT-11 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

5095 6737 09.01.2020 15.01.2020 COLD WORK DAY GT-21 LCI FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM
5096 6738 09.01.2020 15.01.2020 COLD WORK DAY GT-21 FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

5097 6740 10.01.2020 16.01.2020 COLD WORK DAY GT-21 PUNCH CLEARING INSPECTION ELECTRIC TEAM

5098 14117 11.01.2020 17.01.2020 HOT WORK DAY W/T HVAC(DUCT, EQUIPMENT INSTALLATION, PIPE CONTROL, CABLE PULLING HVAC

5099 14121 11.01.2020 17.01.2020 HOT WORK DAY GT-22 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPE CONTROL, CABLE PULLING HVAC

5100 14122 11.01.2020 17.01.2020 HOT WORK DAY GT-21 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPE CONTROL, CABLE PULLING HVAC

5101 8907 11.01.2020 17.01.2020 COLD WORK DAY CCB(1st FLOOR) HVAC(DUCT, EQUIPMENT INSTALLATION, PIPE CONTROL, CABLE PULLING ARCHITECTURE

5102 8914 11.01.2020 17.01.2020 COLD WORK DAY GT-21 PAINTING AND PIPE INSULATION WORK PIPING

5103 8915 11.01.2020 17.01.2020 COLD WORK DAY GT-22 PAINTING AND PIPE INSULATION WORK PIPING

5104 8916 11.01.2020 17.01.2020 COLD WORK DAY GT-22 NGFS PAINTING AND PIPE INSULATION WORK PIPING

5105 8917 11.01.2020 17.01.2020 COLD WORK DAY GT-21 NGFS PAINTING AND PIPE INSULATION WORK PIPING

5106 6739 09.01.2020 15.01.2020 COLD WORK DAY CCB(G.F TO 1st F) INSULLATION RESISTANCE TEST FOR POWE CABLE WITH QC, CEEG ELECTRIC TEAM/QC

PUNCH CLEAR : CO2 FIRE SUPRESSION SYSTEM WIRING CHECKING, CABLE


5107 6731 11.01.2020 17.01.2020 COLD WORK DAY BSDG ELECTRIC TEAM
CONNECTION AND INSPECTION

5108 6732 11.01.2020 17.01.2020 COLD WORK DAY DCS(1st FLOOR-CCB) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5109 6733 11.01.2020 17.01.2020 COLD WORK DAY CCB-SWGR & UPS PUNCH CLEAR, CABLE LINE CHEECK, CABLE ARRANGEMENT, CABLE CONNECTION &ELECTRIC TEAM

5110 6734 11.01.2020 17.01.2020 COLD WORK DAY CCB-DCS(G.F) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5111 6735 11.01.2020 17.01.2020 COLD WORK DAY GT-21 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5112 6736 11.01.2020 17.01.2020 COLD WORK DAY GT-22 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5113 GE-HEC-1102 11.01.2020 16.01.2020 COLD WORK DAY GT-12 NGFS PAINTING AND PIPE INSULATION WORK PIPING
5114 GE-HEC-1103 11.01.2020 16.01.2020 COLD WORK DAY GT-11 NGFS PAINTING AND PIPE INSULATION WORK PIPING

5115 GE-HEC-1104 11.01.2020 16.01.2020 HOT WORK DAY GT-12 HVAC(DUCT WORK, FIXATION, ISOLATION HVAC

5116 GE-HEC-1105 11.01.2020 17.01.2020 HOT WORK DAY GT-11 HVAC(DUCT WORK, FIXATION, ISOLATION HVAC

5117 4618 11.01.2020 17.01.2020 COLD WORK DAY BYPASS, EXHAUST TO LEB-1 CABLE PULLING AND TERMINATION WORK INSTRUMENT TEAM

5118 4619 11.01.2020 17.01.2020 COLD WORK DAY PIPE RACK TO CCB CABLE PULLING AND TERMINATION WORK INSTRUMENT TEAM

5119 7959 11.01.2020 16.01.2020 COLD WORK DAY GT-21 CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

5120 7966 11.01.2020 16.01.2020 COLD WORK DAY CCB(G.F) CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

5121 7967 11.01.2020 16.01.2020 COLD WORK DAY GT-22 CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

5122 7972 11.01.2020 16.01.2020 COLD WORK DAY CCB(DCS) PUNCH CLEAR LIST & CONNECTED EARTHING ELECTRICAL

5123 7973 11.01.2020 16.01.2020 COLD WORK DAY BSDG CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

5124 15527 13.01.2020 19.01.2020 HOT WORK DAY GT-GTG-21 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM

5125 15528 13.01.2020 19.01.2020 HOT WORK DAY GT-GTG-22 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM

5126 15529 11.01.2020 17.01.2020 HOT WORK DAY GT-11 EGBS WELDING, CLEANING, TOUCH-UP INSPECTION ACTIVITY MECHANIC TEAM

5127 15530 11.01.2020 17.01.2020 HOT WORK DAY GT-12 EGBS WELDING, CLEANING, TOUCH-UP INSPECTION ACTIVITY MECHANIC TEAM

5128 6751 11.01.2020 17.01.2020 COLD WORK DAY GT-22 CABLE TERMINATION ELECTRIC TEAM

5129 9925 11.01.2020 17.01.2020 COLD WORK DAY GT-22 COMPARTMENT LUBE OIL FLUSHING PASE 1/2/3 COMMISSIONING

5130 9926 11.01.2020 17.01.2020 COLD WORK DAY GT-21/22 COMPARTMENT DEMI WATER FLUSHING FOR CCW GT-21/22 COMMISSIONING
5131 7997 11.01.2020 17.01.2020 COLD WORK DAY BSDG TESTING CABLE ELECTRICAL

5132 7994 11.01.2020 17.01.2020 COLD WORK DAY ACB INSPECTION VISUAL LIGHTING ELECTRICAL

5133 7991 11.01.2020 17.01.2020 COLD WORK DAY GT-21 PEECC TESTING CABLE ELECTRICAL

5134 7993 11.01.2020 17.01.2020 COLD WORK DAY FWPB INSPECTION VISUAL ( FIRE +LIGHTING) ELECTRICAL

5135 9927 11.01.2020 17.01.2020 COLD WORK DAY GT-21 FLUSHING OF WATER WASHING LINE COMMISSIONING

5136 4623 11.01.2020 17.01.2020 COLD WORK DAY GT-22 PUNCH CLEAR AND TUBING WORK INSTRUMENT TEAM

5137 4624 11.01.2020 17.01.2020 COLD WORK DAY GT-21 PUNCH CLEAR AND TUBING WORK INSTRUMENT TEAM

5138 7996 11.01.2020 17.01.2020 COLD WORK DAY CCB TESTING CABLE ELECTRICAL

5139 7992 11.01.2020 17.01.2020 COLD WORK DAY NGSS TESTING CABLE ELECTRICAL

5140 GE-HEC-1106 13.01.2020 19.01.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE ACTIVITY MECHANIC TEAM

5141 GE-HEC-1107 12.01.2020 17.01.2020 COLD WORK DAY GTB-12 LIGHTING FIXTURES TROUBLESHOOTING ELECTRIC TEAM

5142 GE-HEC-1108 13.01.2020 17.01.2020 COLD WORK DAY GT-12 PUNCH CLEAR INSTRUMENT TEAM

5143 6763 13.01.2020 19.01.2020 COLD WORK DAY GT 21 CABLE TERMINATION & INSPECTION ELECTRIC TEAM

5144 9928 12.01.2020 18.01.2020 COLD WORK DAY GT 21/22 AIR BLOWING FOR BLOCK-2 GTG I.A DISTRIBUTION COMMISSIONING

5145 GE-HEC-1109 13.01.2020 19.01.2020 COLD WORK DAY GT-11 CORRECTION THE PRESSURE REGULATOR VPR74-1 AT THE CORRECT DIRECTION COMMISSIONING

5146 GE-HEC-1110 13.01.2020 19.01.2020 COLD WORK DAY GT-12 CORRECTION THE PRESSURE REGULATOR VPR74-1 AT THE CORRECT DIRECTION COMMISSIONING
THREDING, CUTTING, INSTALL OF PIPE SPOOL & SUPPORT, BOLTING & FIXING OF
5147 15786 13.01.2020 19.01.2020 HOT WORK DAY GT-21 FITTINGS & VISUAL INSPECTION PIPING

5148 6764 13.01.2020 19.01.2020 COLD WORK DAY GT-21 LCI-21 TO-12 CABLE PULLING ELECTRIC TEAM

5149 6684 13.01.2020 19.01.2020 COLD WORK DAY CCB BUSBAR INSTALLATION MODIFICATION ELECTRIC TEAM

5150 GE-HEC-1111 16.01.2020 21.01.2020 COLD WORK DAY GTB-1 LCI #12 COMPERTMENT CABLE PULING AND TERMINATION ELECTRIC TEAM

5151 GE-HEC-1112 13.01.2020 19.01.2020 COLD WORK DAY GT-12 REPAIR AIR LEAKS AIER INLET PIPING

5152 6753 13.01.2020 19.01.2020 COLD WORK DAY UEB-1 CABLE TERMINATION ELECTRIC TEAM

CCB TO ST BLDG TO AUX


5153 6752 13.01.2020 17.01.2020 COLD WORK DAY BOILER TO FFAC STG-10 CABLE PULLING ELECTRIC TEAM

5154 6766 14.01.2020 20.01.2020 COLD WORK DAY GT-22 CABLE PULLING & CABLE TERMINATION ELECTRIC TEAM

5155 6765 13.01.2020 19.01.2020 COLD WORK DAY PEECC-22 TO GTB-2 CABLE TERMINATION INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

5156 6742 13.01.2020 19.01.2020 COLD WORK DAY CCB CABLE ARANGEMENT ELECTRIC TEAM

5157 3769 13.01.2020 16.01.2020 COLD WORK DAY GT-22 PEECC CABLE TESTING ELECTRICAL

5158 7999 13.01.2020 16.01.2020 COLD WORK DAY GT-21/22 FFAC CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

5159 GE-HEC-1113 13.01.2020 19.01.2020 COLD WORK DAY GT-GTG-12 GAS TURBINE FINAL ALIGNMENT ACTIVITY MECHANIC TEAM

5160 6769 13.01.2020 19.01.2020 COLD WORK DAY GT-21 PULSE COMP VISUAL INSPECTION FOR PUNCH WITH GE AND CEEG ELECTRIC TEAM

5161 6557 13.01.2020 17.01.2020 COLD WORK DAY NGSS INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM
5162 6767 13.01.2020 19.01.2020 COLD WORK DAY PEECC-21 TO GTB-2 CABLE TERMINATION AND INSPECTION WITH GE, QC AND CEEG ELECTRIC TEAM

5163 2215 13.01.2020 17.01.2020 COLD WORK DAY GT-21 THERMOCUPLE INSTALLATION JOB INSTRUMENT TEAM

5164 GE-HEC-1114 14.01.2020 20.01.2020 COLD WORK DAY GT-12 VISUAL INSPECTION FOR PUNCH WITH GE AND CEEG ELECTRIC TEAM

CABLE TERMINATION INSPECTION AND INSULATION RESISTANCE TEST OF POWER


5165 GE-HEC-1115 16.01.2020 22.01.2020 COLD WORK DAY GTB-1 CABLE WITH QC, GE, CEEG ELECTRIC TEAM

5166 GE-HEC-1116 14.01.2020 20.01.2020 COLD WORK DAY GT-11 COMPARTMENT HEATER, FAN NOISE & DUST INSPECTION(23HT-1A) COMMISSIONING

5167 GE-HEC-1117 14.01.2020 20.01.2020 HOT WORK DAY GT-12 WELDING OF EQUAL POTENTIEL LINK COMMISSIONING

5168 6771 14.01.2020 20.01.2020 COLD WORK DAY GT-21 FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

5169 6772 14.01.2020 20.01.2020 COLD WORK DAY GT-21 FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

5170 19245 14.01.2020 16.01.2020 COLD WORK DAY SWPB TEMPORARY WINDOWS ARCHITECTURE TEAM

5171 GE-HEC-1118 15.01.2020 21.01.2020 COLD WORK DAY GT-12 COMPARTMENT INSPECTION & LUBRIFICATION OF ALL MOTORS IN GTG-12 AS PER ATTACHED LIST COMMISSIONING

5172 GE-HEC-1119 16.01.2020 23.01.2020 COLD WORK DAY GT-12 INSTALLATION OF FLEXIBLE BRAID FOR GENERATOR ELECTRIC TEAM

5173 7794 18.01.2020 23.01.2020 COLD WORK DAY CCB(BASEMENT) CABLE PULLING & CLEANING ELECTRICAL

5174 17906 18.01.2020 24.01.2020 HOT WORK DAY CCB(G.F & BASEMNET) CONDUIT FIR ALARM AND LIGHTING ELECTRICAL

5175 17907 18.01.2020 24.01.2020 HOT WORK DAY CCB(1st FLOOR) CONDUIT FIR ALARM AND LIGHTING ELECTRICAL

5176 17908 18.01.2020 24.01.2020 HOT WORK DAY BSDG CONDUIT FIR ALARM AND LIGHTING ELECTRICAL
5177 17909 18.01.2020 24.01.2020 HOT WORK DAY W/T CONDUIT FIR ALARM AND LIGHTING ELECTRICAL

5178 17910 18.01.2020 24.01.2020 HOT WORK DAY GTG-21 CONDUIT FIR ALARM AND LIGHTING ELECTRICAL

5179 17911 18.01.2020 24.01.2020 HOT WORK DAY GTG-22 CONDUIT FIR ALARM AND LIGHTING ELECTRICAL

5180 17924 18.01.2020 24.01.2020 HOT WORK DAY CHIMICAL STORAGE CONDUIT FIR ALARM AND LIGHTING ELECTRICAL

5181 18250 18.01.2020 24.01.2020 COLD WORK DAY DWPB CONDUIT FIR ALARM AND LIGHTING ELECTRICAL

5182 8532 18.01.2020 24.01.2020 HOT WORK DAY W/T CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

5183 8536 18.01.2020 24.01.2020 HOT WORK DAY CCB CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

5184 8669 18.01.2020 24.01.2020 HOT WORK DAY GT-12 ISOLATION T/F FIRE ALARM CONDUIT & SUPPORT INSTALALTION SCAFFOLDING INSTALLATION & ELECTRIC TEAM

CUTTING, GRINDING, DRILLING & WELDING OF UNISTRUIT CHANEL FOR CONDUIT ELECTRIC TEAM
5185 15395 18.01.2020 24.01.2020 HOT WORK DAY GTB-21 SUPPORT & INSTALLATION

CUTTING, GRINDING, DRILLING & WELDING OF UNISTRUIT CHANEL FOR CONDUIT ELECTRIC TEAM
5186 15433 18.01.2020 24.01.2020 HOT WORK DAY GTB-22
SUPPORT & INSTALLATION

5187 8531 18.01.2020 24.01.2020 HOT WORK DAY FWPB CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

5188 6549 18.01.2020 24.01.2020 COLD WORK DAY DWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5189 6550 18.01.2020 24.01.2020 COLD WORK DAY SWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5190 6551 18.01.2020 24.01.2020 COLD WORK DAY FWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5191 6552 18.01.2020 24.01.2020 COLD WORK DAY ACB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM
5192 6553 18.01.2020 24.01.2020 COLD WORK DAY BSDG INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5193 6554 18.01.2020 24.01.2020 COLD WORK DAY W/T INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5194 6556 18.01.2020 24.01.2020 COLD WORK DAY CCB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5195 6558 18.01.2020 24.01.2020 COLD WORK DAY NGSS INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5196 6602 18.01.2020 24.01.2020 COLD WORK DAY CCB PANEL MONITORING, LINE CHECK, CABLES TERMINATION ELECTRIC TEAM

5197 6642 18.01.2020 24.01.2020 COLD WORK DAY UEB-1 PANEL TEST, IR TEST, PANEL MONITORING ELECTRIC TEAM

5198 6643 18.01.2020 24.01.2020 COLD WORK DAY BSDG PANEL FUNCTIONAL TEST, IR TEST ELECTRIC TEAM

5199 8664 18.01.2020 24.01.2020 COLD WORK DAY UEB-1 FIRE ALARM SYSTEM, TAG INSTALALTION(CABLE0 ELECTRIC TEAM

5200 7209 18.01.2020 24.01.2020 HOT WORK DAY GT-22 PEECC TEST OF PANEL ELECTRICAL

5201 7210 18.01.2020 24.01.2020 HOT WORK DAY GT-21 PEECC TEST OF PANEL ELECTRICAL

5202 7211 18.01.2020 24.01.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

5203 7212 18.01.2020 24.01.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

5204 7213 18.01.2020 24.01.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

5205 6773 16.01.2020 22.01.2020 COLD WORK DAY GT-21 AC MOTOR IR TEST ELECTRIC TEAM

5206 6774 16.01.2020 22.01.2020 COLD WORK DAY GT-21 FDM INSPECTION WITH GE, QC, CEEG ELECTRIC TEAM
5207 9929 15.01.2020 21.01.2020 COLD WORK DAY BSDG WATER & OIL FILLING COMMISSIONING

5208 14972 18.01.2020 24.01.2020 HOT WORK DAY GT-21 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM

5209 2216 18.01.2020 24.01.2020 COLD WORK DAY GT-22 FILTER HOUSE INSTRUMENT CALIBRATION INSTRUMENT TEAM

5210 6775 16.01.2020 22.01.2020 COLD WORK DAY GT-21 CABLE DISCONNECT FOR PUNCH CLEARING ELECTRIC TEAM

5211 17960 18.01.2020 23.01.2020 HOT WORK DAY GT-21/22 IPB WELDING ELEMENT IPB MECHANICAL

5212 17961 18.01.2020 23.01.2020 HOT WORK DAY GT-21/22 CLEANING, PAINTING, FINISH WORK MECHANICAL

5213 17760 18.01.2020 23.01.2020 HOT WORK DAY GTB-21 GROUNDING INSTALLATION ELECTRICAL

5214 17767 18.01.2020 23.01.2020 HOT WORK DAY GTB-2 GROUNDING INSTALLATION ELECTRICAL

5215 GE-HEC-1120 18.01.2020 24.01.2020 COLD WORK DAY GT-12 FIRE ALARM CABLE TAG INSTALLATION ELECTRIC TEAM

5216 GE-HEC-1121 18.01.2020 24.01.2020 COLD WORK DAY GT-11 FIRE ALARM CABLE TAG INSTALLATION ELECTRIC TEAM

5217 9933 15.01.2020 21.01.2020 COLD WORK DAY BSDG ENERGIZATION OF THE ENGINE-02 COMMISSIONING

THREADING, CUTTING, INSTALL OF PIPE SPOOL & SUPPORT, BOLTING, FIXING OF


5218 15814 16.01.2020 22.01.2020 HOT WORK DAY GT-22 FITTINGS & VISUAL INSPECTION PIPING TEAM

5219 3569 16.01.2020 22.01.2020 COLD WORK DAY NGSS DISMANTLE OF SCAFFOLD PIPING TEAM

REINSTATEMENT WORKS, GASKET REPLACEMENT, BOLTING, GROTING


5220 15815 18.01.2020 24.01.2020 HOT WORK DAY GT-22 REPAIR/MODIFICATION OF PIPE SUPPORT AIR BLOWING PIPING TEAM

REINSTATEMENT WORKS, GASKET REPLACEMENT, BOLTING, GROTING


5221 15815 18.01.2020 24.01.2020 HOT WORK DAY GT-21 REPAIR/MODIFICATION OF PIPE SUPPORT AIR BLOWING PIPING TEAM
5222 GE-HEC-1122 16.01.2020 22.01.2020 COLD WORK DAY RETURN TANK LINE TO GT-11 HYDROSTATIC TEST, PIPE RESTORATION, PIPE CLEANING PIPING TEAM

5223 GE-HEC-1123 16.01.2020 22.01.2020 COLD WORK DAY RETURN TANK LINE TO GT-12 HYDROSTATIC TEST, PIPE RESTORATION, PIPE CLEANING PIPING TEAM

5224 GE-HEC-1124 16.01.2020 22.01.2020 COLD WORK DAY GT-12 PUNCH CLEARING INSPECTION WITH CEEG/GE IN MLI-0965, 9019, H2 MANIFOLD PIPING TEAM

5225 6685 16.01.2020 22.01.2020 COLD WORK DAY CCB(MCC ROOM) MCC MODULES TRANSFER & MODIFICATION WORKS ELECTRIC TEAM

5226 GE-HEC-1125 16.01.2020 22.01.2020 COLD WORK DAY GT-21 GAS TBN COMPARTMENTTOP W/D FOR GT-21 WASHING & CLEANING COMMISSIONING

5227 8684 18.01.2020 24.01.2020 HOT WORK DAY W/T SCAFFOLDING, GYPSUM BOARD ARCHITECTURE TEAM

5228 19247 18.01.2020 24.01.2020 HOT WORK DAY GTB-2 ROOF FINISHING WORK ARCHITECTURE TEAM

5229 19250 18.01.2020 24.01.2020 HOT WORK DAY CCB GYPSUM BOARD WORK (WINDOWS, PAINTING) ARCHITECTURE TEAM

5230 6778 18.01.2020 24.01.2020 COLD WORK DAY BSDG PUNCH CLEAR, CABLE CONNECTION AND INSPECTION ELECTRIC TEAM

5231 6779 18.01.2020 24.01.2020 COLD WORK DAY CCB-DCS(1st FLOOR) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5232 6780 18.01.2020 24.01.2020 COLD WORK DAY CCB-DCS(G.F) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5233 6781 18.01.2020 24.01.2020 COLD WORK DAY CCB-SWGR & UPS PUNCH CLEAR, CABLE LINE CHEECK, CABLE ARRANGEMENT, CABLE CONNECTION &ELECTRIC TEAM

5234 6782 18.01.2020 24.01.2020 COLD WORK DAY GT-21 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5235 6783 18.01.2020 24.01.2020 COLD WORK DAY GT-22 NGFS PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5236 1055 18.01.2020 24.01.2020 COLD WORK DAY GT-21 NGFS CLEANING, PAINTING, SCAFFOLDING ACTIVITY MECHANIC TEAM

5237 15532 20.01.2020 26.01.2020 HOT WORK DAY GT-GTG-22 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM
5238 15533 20.01.2020 26.01.2020 HOT WORK DAY GT-GTG-21 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM

5239 14132 18.01.2020 24.01.2020 HOT WORK DAY W/T HVAC(DUCT, EQUIPMENT INSTALLATION, PIPE CONTROL, CABLE PULLING) HVAC

5240 14139 18.01.2020 24.01.2020 HOT WORK DAY GT-21 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPE CONTROL, CABLE PULLING) HVAC

5241 14140 18.01.2020 24.01.2020 HOT WORK DAY GT-22 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPE CONTROL, CABLE PULLING) HVAC

5242 8927 18.01.2020 24.01.2020 HOT WORK DAY GT-21 PAINTING AND PIPE INSULATION WORK PIPING

5243 8928 18.01.2020 24.01.2020 COLD WORK DAY GT-22 PAINTING AND PIPE INSULATION WORK PIPING

5244 8929 18.01.2020 24.01.2020 COLD WORK DAY GT-21 NGFS PAINTING AND PIPE INSULATION WORK PIPING

5245 8930 18.01.2020 24.01.2020 COLD WORK DAY GT-22 NGFS PAINTING AND PIPE INSULATION WORK PIPING

5246 8932 18.01.2020 24.01.2020 COLD WORK DAY CCB(1st FLOOR) CEELING FLOOR ERECTION ARCHITECTURE TEAM

5247 14971 18.01.2020 24.01.2020 HOT WORK DAY GT-22 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM

5248 6776 17.01.2020 23.01.2020 COLD WORK DAY UEB-1 TO FUEL OIL PUMP CABLE PULLING ELECTRIC TEAM

5249 7215 18.01.2020 24.01.2020 HOT WORK DAY NGSS TEST OF PANEL ELECTRICAL

5250 8685 18.01.2020 24.01.2020 HOT WORK DAY CHIMICAL STORAGE SCAFFOLDIN ERECTION ARCHITECTURE TEAM

5251 6744 17.01.2020 23.01.2020 COLD WORK DAY CCB LINE CHECKING AND CABLE DRESSING ELECTRIC TEAM

5252 GE-HEC-1126 18.01.2020 23.01.2020 COLD WORK DAY GT-12 PERFORMING COMMISSIONINGWORK COMMISSIONING

5253 GE-HEC-1127 18.01.2020 23.01.2020 COLD WORK DAY GT-11 PERFORMING COMMISSIONINGWORK COMMISSIONING

5254 GE-HEC-1128 18.01.2020 23.01.2020 COLD WORK DAY GT-12 PEECC COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING COMMISSIONING
VALVE AND DEVISE START MOTOR
5255 GE-HEC-1129 18.01.2020 23.01.2020 COLD WORK DAY GT-11 PEECC COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING COMMISSIONING
VALVE AND DEVISE START MOTOR

5256 GE-HEC-1130 18.01.2020 23.01.2020 HOT WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5257 GE-HEC-1131 18.01.2020 24.01.2020 HOT WORK DAY GT-GTG-12 GAS TURBINE FIX AND POINT ADJUSTMENT MECHANIC TEAM

5258 GE-HEC-1132 18.01.2020 24.01.2020 HOT WORK DAY GTB-1 METAL CLADDING FINISHING WORK ARCHITECTURE TEAM

5259 GE-HEC-1133 18.01.2020 24.01.2020 COLD WORK DAY GT-12 LCI CONTINUITY TEST OF CONTROL CABLE WITH QC, GE, CEEG ELECTRIC TEAM

5260 GE-HEC-1134 18.01.2020 24.01.2020 COLD WORK DAY GT-11 NGFS PAINTING AND PIPE INSULATION WORK PIPING

5261 GE-HEC-1135 18.01.2020 24.01.2020 COLD WORK DAY GT-11 REPAIR OF FOUNDATION, TOUCH-UP OF EQUIPMENT9PAINTING MECHANICAL

5262 6686 18.01.2020 24.01.2020 COLD WORK DAY W/T MCC MODULES INSTALLATION & MODIFICATION WORKS ELECTRIC TEAM

5263 6687 18.01.2020 24.01.2020 COLD WORK DAY FWPB HIPOT TEST OF MOTOR, CONTROL PANELS, DISCONNECT/RE-CONNECT MV CABLE ELECTRIC TEAM

5264 GE-HEC-1136 18.01.2020 24.01.2020 COLD WORK DAY GT-11 WALK DOWN INSPECTION WITH CLIENT CEEG HVAC

5265 GE-HEC-1137 18.01.2020 24.01.2020 HOT WORK DAY GT-12 HVAC(DUCT FIXATION, ISOLATION) HVAC

5266 GE-HEC-1138 18.01.2020 24.01.2020 COLD WORK DAY GT-21 TOP W/D FOR GT-21 GENERATOR PROTECTION AND MEASUREMENT SYSTEM COMMISSIONING

5267 GE-HEC-1139 18.01.2020 24.01.2020 COLD WORK DAY GT-21 TOP W/D FOR GT-21 ELECTRICAL AND CONTROL SYSTEM(MARK Vie+VLeS) COMMISSIONING

5268 9934 18.01.2020 24.01.2020 COLD WORK DAY GT-22 COMPARTMENT LUBE OIL FLUSHING PASE 1/2/3 COMMISSIONING

5269 9935 18.01.2020 24.01.2020 COLD WORK DAY GT-21/22 COMPARTMENT DEMI WATER FLUSHING FOR CCW GT-21/22 COMMISSIONING

5270 7371 18.01.2020 23.01.2020 COLD WORK DAY CCB(G.F) CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL
5271 3775 18.01.2020 23.01.2020 COLD WORK DAY BSDG FIBER OPTIC CABLE TERMINATION ELECTRICAL

5272 3777 18.01.2020 23.01.2020 COLD WORK DAY GT-21/22 FFAC CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

5273 6788 18.01.2020 24.01.2020 COLD WORK DAY CCB CABLE TERMINATION & CONTINUITY TEST ELECTRIC TEAM

5274 6789 18.01.2020 24.01.2020 COLD WORK DAY NGSS CABLE TERMINATION & CONTINUITY TEST ELECTRIC TEAM

5275 6790 18.01.2020 24.01.2020 COLD WORK DAY BSDG CABLE TERMINATION & CONTINUITY TEST ELECTRIC TEAM

5276 8829 18.01.2020 24.01.2020 COLD WORK DAY BSDG MECHANICAL PART INSTALLATION & ERROR CHECK PROBLEM (NO-1) MECHANIC TEAM

5277 3794 18.01.2020 24.01.2020 COLD WORK DAY GT-22 HYDROTEST QA/QC

5278 7974 18.01.2020 23.01.2020 COLD WORK DAY G-21 CABLE TERMINATON WORK ELECTRICAL

5279 7975 18.01.2020 23.01.2020 COLD WORK DAY GT-22 CABLE TERMINATON WORK ELECTRICAL

5280 3778 18.01.2020 23.01.2020 COLD WORK DAY CCB(DCS) CABLE TERMINATON AND PUNCH LIST CLEARING ELECTRICAL

5281 14162 18.01.2020 24.01.2020 HOT WORK DAY GT-21 INSTALLATION OF THE WINDOWS ARCHITECTURE

5282 14163 18.01.2020 24.01.2020 HOT WORK DAY GT-22 INSTALLATION OF THE WINDOWS ARCHITECTURE

5283 6826 18.01.2020 24.01.2020 COLD WORK DAY NGSS PUNCH CLEAR,M CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5284 GE-HEC-1140 20.01.2020 26.01.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5285 GE-HEC-1141 18.01.2020 24.01.2020 HOT WORK DAY GTB-12 DOORS REPAIR WORK AND INSTALLATION ARCHITECTURE TEAM
CCB TO ST BLDG TO AUX
5286 6867 19.01.2020 24.01.2020 COLD WORK DAY BOILER TO FFAC STG-10 CABLE PULLING ELECTRIC TEAM

5287 6868 20.01.2020 26.01.2020 COLD WORK DAY GT-21 CABLE TERMINATION INSPECTION ELECTRIC TEAM

5288 GE-HEC-1142 19.01.2020 25.01.2020 COLD WORK DAY GT-11 88QA-1 COUPLING COMMISSIONING

5289 9936 19.01.2020 25.01.2020 COLD WORK DAY UEB-2,CCB(DCS), PEECC-21/22 LINE CHECK COMMISSIONING

5290 19272 19.01.2020 24.01.2020 HOT WORK DAY CCB PULLING CABLE AND CABLE TERMINATION INSTRUMENT TEAM

5291 19273 19.01.2020 24.01.2020 HOT WORK DAY GT-21 NGFS INSTRUMENT AIR TUBE SUPPORT INSTRUMENT TEAM

5292 6688 19.01.2020 25.01.2020 COLD WORK DAY W/T MCC ROOM MCC MODULES INSTALLATION /MODIFICATION ELECTRIC TEAM

5293 GE-HEC-1143 19.01.2020 24.01.2020 COLD WORK DAY GT-12 PUNCH CLEAR INSTRUMENT TEAM

THREADING, CUTTING INSTALL OF FF SPOOL & SUPPORT, BOLTING & FIXING OF


5294 15818 20.01.2020 26.01.2020 HOT WORK DAY GT-21 FITTINGS, VISUAL INSPECTION PIPING TEAM

5295 GE-HEC-1144 20.01.2020 26.01.2020 COLD WORK DAY GT-GTG-12 GAS TURBINE FINAL ALIGNMENT ACTIVITY MECHANIC TEAM

5296 GE-HEC-1145 21.01.2020 27.01.2020 COLD WORK DAY GT-12 TORQUING/TIGHTENING FOR THERMOCOUPLE AND INSPECTION WITH GE, AND ELECTRIC TEAM

5297 GE-HEC-1146 21.01.2020 27.01.2020 COLD WORK DAY GT-12 FIXATION OF BREAK GLASS FOR CO2 DISHARGE IN FIRE ALARM CONTROL PANEL ELECTRIC TEAM

5298 GE-HEC-1147 22.01.2020 28.01.2020 COLD WORK DAY GT-12 GEN CABLE CONTINUITY TEST ELECTRIC TEAM

5299 GE-HEC-1148 22.01.2020 28.01.2020 COLD WORK DAY GT-11 GEN CABLE CONTINUITY TEST ELECTRIC TEAM

CORROSION CLEANING FOR THE INDICATOR 12MBV41AX001 INSIDE SKID AND


5300 GE-HEC-1149 20.01.2020 26.01.2020 COLD WORK DAY GT-12 INSTALLATION OF SHIMS PLATE FOR STAINLESS STEEL PIPES IN CARBON PIPING TEAM
SUPPORTS

5301 GE-HEC-1150 20.01.2020 26.01.2020 COLD WORK DAY GT-12 GENERAL CLANING, PICKLING AND PASSIVATION FOR STAINLESS STEEL LINES PIPING TEAM
5302 GE-HEC-1151 20.01.2020 24.01.2020 HOT WORK DAY GT-12 NGFS TERMINATION WORK INSTRUMENT TEAM

5303 6873 21.01.2020 27.01.2020 COLD WORK DAY GT-22 CABLE PULLING & CABLE TERMINATION ELECTRIC TEAM

5304 GE-HEC-1152 20.01.2020 26.01.2020 HOT WORK DAY GT-GTG-12 PULSE AIR LINE LEAKAGE REPAIR ACTIVITY MECHANIC TEAM

5305 3796 20.01.2020 23.01.2020 COLD WORK DAY GT-22 ATOMIZING SKID HIPOT TEST FOR MV CABL ELECTRICAL

5306 3797 20.01.2020 23.01.2020 COLD WORK DAY GT-21ATOMIZING SKID HIPOT TEST FOR MV CABL ELECTRICAL

5307 3798 20.01.2020 23.01.2020 COLD WORK DAY NGSS TEST CABLE AND TERMINATION ELECTRICAL

5308 3824 20.01.2020 23.01.2020 COLD WORK DAY CCB TESTING CABLE ELECTRICAL

5309 8831 20.01.2020 24.01.2020 COLD WORK DAY GTB-2 CCW CHANGE MOTOR'S COVER ORIENTATION MECHANIC TEAM

5310 6875 21.01.2020 27.01.2020 COLD WORK DAY GT-21 LCI CABLE TERMINATON AND INSPECTION ELECTRIC TEAM

5311 6876 21.01.2020 27.01.2020 COLD WORK DAY PEECC-21 TO GTB-2 CABLE TERMINATION AND INSPECTION WITH GE, QC AND CEEG ELECTRIC TEAM

5312 6756 21.01.2020 27.01.2020 COLD WORK DAY CCB CABLE TERMINATION ELECTRIC TEAM

5313 GE-HEC-1153 21.01.2020 27.01.2020 COLD WORK DAY GT-21 TOP W/D OF EXCITATION SYSTEM AND TRANSFORMER COMMISSIONING

5314 6879 21.01.2020 27.01.2020 COLD WORK DAY PEECC-22 TO GTB-2 CABLE TERMINATION AND INSPECTION WITH GE, QC AND CEEG ELECTRIC TEAM

5315 6880 21.01.2020 27.01.2020 COLD WORK DAY UEB-1 INSULATION RESISTANCE TEST WITH CEEG ELECTRIC TEAM

5316 7976 21.01.2020 23.01.2020 COLD WORK DAY CCB(1st FLOOR) CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

5317 3800 20.01.2020 23.01.2020 COLD WORK DAY GT-21/22 GCB TESTING CABLE ELECTRICAL
5318 GE-HEC-1154 22.01.2020 28.01.2020 COLD WORK DAY UEB-1 TO BFP-11 CABLE PULLING ELECTRIC TEAM

FIRE ALRM CONDUIT, NAC PANEL INSTALLATION & CABLE LAYING,


5319 GE-HEC-1155 25.01.2020 31.01.2020 HOT WORK DAY GTB-11 TERMINATION- CABLE TAG INSTALLATION ELECTRIC TEAM

5320 GE-HEC-1156 25.01.2020 31.01.2020 HOT WORK DAY GT-12 ISOLATION T/F FIRE ALARM CONDUIT - INSTALLATION & CABLE LAYING TERMINATION SCAFFLDI ELECTRIC TEAM

5321 GE-HEC-1157 25.01.2020 31.01.2020 COLD WORK DAY GT-11 SCAFFOLDING INSTALLATION ELECTRIC TEAM

5322 GE-HEC-1158 25.01.2020 31.01.2020 COLD WORK DAY GT-12 SCAFFOLDING INSTALLATION ELECTRIC TEAM

HYDROSTATIC TEST( BOLTING, WATER FILLING, INITIAL TESTING) PIPE


5323 GE-HEC-1159 22.01.2020 28.01.2020 COLD WORK DAY FUEL OIL BLDG TO GT-11 RESTORATION, PIPE CLEANING PIPING TEAM

HYDROSTATIC TEST( BOLTING, WATER FILLING, INITIAL TESTING) PIPE


5324 GE-HEC-1160 22.01.2020 28.01.2020 COLD WORK DAY FUEL OIL BLDG TO GT-12 RESTORATION, PIPE CLEANING PIPING TEAM

5325 GE-HEC-1161 22.01.2020 28.01.2020 HOT WORK DAY GTB-1 DOORS INSTALLATION WORK ARCHITECTURE TEAM

5326 GE-HEC-1162 22.01.2020 28.01.2020 HOT WORK DAY GT-12 PEECC COMMISSIONING OF PANEL SPEED ADJUSTEMENT OF DC LUBE & SEAL OIL PUMP ELECTRICAL

5327 9938 22.01.2020 28.01.2020 COLD WORK DAY W/T WATER FLUSHING OF DEM WATER LINE FOR CHEMICAL DOSING TANK COMMISSIONING

5328 6946 22.01.2020 28.01.2020 COLD WORK DAY GT-21 NGFS PUNCH CLEARING AND INSPECTION WITH GE AND CEEG ELECTRIC TEAM

5329 9939 22.01.2020 28.01.2020 COLD WORK DAY BSDG WATER AND OIL FILLING COMMISSIONING

5330 6947 22.01.2020 28.01.2020 COLD WORK DAY GT-22 NGFS FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM/QC

5331 6948 22.01.2020 28.01.2020 COLD WORK DAY GT-21 NGFS FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM/QC

5332 6949 22.01.2020 28.01.2020 COLD WORK DAY GT-21 FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM/QC

5333 6689 23.01.2020 29.01.2020 COLD WORK DAY UEB-1/AUX MCC-1/2 MODULE TRANFORMER / MODIFICATION WORKS ELECTRIC TEAM/QC
5334 6690 23.01.2020 29.01.2020 COLD WORK DAY UEB-2/AUX MCC-3 MODULE TRANFORMER / MODIFICATION WORKS ELECTRIC TEAM/QC

5335 17976 25.01.2020 31.01.2020 HOT WORK DAY W/T CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5336 17977 25.01.2020 31.01.2020 HOT WORK DAY BSDG CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5337 17978 25.01.2020 31.01.2020 HOT WORK DAY CCB(1st FLOOR) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5338 17979 25.01.2020 31.01.2020 HOT WORK DAY CCB(G.F) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5339 17980 25.01.2020 31.01.2020 HOT WORK DAY GT-21 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5340 17982 25.01.2020 31.01.2020 HOT WORK DAY GT-22 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5341 17983 25.01.2020 31.01.2020 HOT WORK DAY GT-21 NGFS CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5342 7198 22.01.2020 28.01.2020 COLD WORK DAY W/T PIPE MODIFICATION AND PUTTING TAG MECHANIC TEAM/C

5343 8835 25.01.2020 30.01.2020 COLD WORK DAY W/T TOUCH-UP PAINTING & PUNCH CLEARING MECHANIC TEAM

CUTTING, GRINDING, DRILLING & WELDING OF UNISTRUIT CHANNEL FOR


5344 8563 25.01.2020 31.01.2020 HOT WORK DAY GTB-22 ELECTRIC TEAM
CONDUIT SUPPORT & INSTALLATION

CUTTING, GRINDING, DRILLING & WELDING OF UNISTRUIT CHANNEL FOR


5345 8564 25.01.2020 31.01.2020 HOT WORK DAY GTB-21 CONDUIT SUPPORT & INSTALLATION ELECTRIC TEAM

5346 15457 25.01.2020 31.01.2020 HOT WORK DAY FWPB CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

5347 15458 25.01.2020 31.01.2020 HOT WORK DAY W/T CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

5348 15461 25.01.2020 31.01.2020 HOT WORK DAY CCB CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

INSTALLATION OF CONDUIT SUPPORT NAC PANEL & SCAFFOLDING INSTALLATION ELECTRIC TEAM
5349 16569 25.01.2020 31.01.2020 HOT WORK DAY UEB-1
/ CABLE TAG INSTALLATION
5350 6791 25.01.2020 31.01.2020 COLD WORK DAY DWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5351 6792 25.01.2020 31.01.2020 COLD WORK DAY SWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5352 6793 25.01.2020 31.01.2020 COLD WORK DAY FWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5353 6794 25.01.2020 31.01.2020 COLD WORK DAY ACB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5354 6795 25.01.2020 31.01.2020 COLD WORK DAY BSDG INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5355 6796 25.01.2020 31.01.2020 COLD WORK DAY W/T INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5356 6799 25.01.2020 31.01.2020 COLD WORK DAY CCB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5357 6800 25.01.2020 31.01.2020 COLD WORK DAY NGSS INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5358 6828 25.01.2020 31.01.2020 COLD WORK DAY UEB-1 PANEL IR TEST, HIPOT TEST, INTERWIRING, CONNECTION ELECTRIC TEAM

5359 6829 25.01.2020 31.01.2020 COLD WORK DAY BSDG PANEL TEST, TORQUING CABLES ELECTRIC TEAM

5360 6830 25.01.2020 31.01.2020 COLD WORK DAY CCB PANEL MONITORING, LINE CHECK ELECTRIC TEAM

5361 14973 25.01.2020 31.01.2020 HOT WORK DAY GT-22 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM

5362 14974 25.01.2020 31.01.2020 COLD WORK DAY GT-21 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM

5363 17769 25.01.2020 30.01.2020 HOT WORK DAY GT-21 GROUNDING INSTALLATION ELECTRICAL

5364 17770 25.01.2020 30.01.2020 HOT WORK DAY GT-22 GROUNDING INSTALLATION ELECTRICAL

5365 7217 25.01.2020 31.01.2020 HOT WORK DAY GT-22 PEECC TEST OF PANEL ELECTRICAL
5366 7218 25.01.2020 31.01.2020 HOT WORK DAY GT-21 PEECC TEST OF PANEL ELECTRICAL

5367 7219 25.01.2020 31.01.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

5368 7220 25.01.2020 31.01.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

5369 15840 25.01.2020 31.01.2020 HOT WORK DAY GT-21 REINSTATEMENT WORKS, GASKET REPLACEMENT, BOLTING, GROTING PIPING TEAM
REPAIR/MODIFICATION OF PIPE SUPPORT AIR BLOWING

5370 15841 25.01.2020 31.01.2020 HOT WORK DAY GT-22 REINSTATEMENT WORKS, GASKET REPLACEMENT, BOLTING, GROTING PIPING TEAM
REPAIR/MODIFICATION OF PIPE SUPPORT AIR BLOWING

5371 17999 25.01.2020 30.01.2020 HOT WORK DAY GT-21/22 IPB WELDING ELEMENT IPB(CLEANING) MECHANICAL

5372 17998 25.01.2020 30.01.2020 HOT WORK DAY GT-21/22 CLEANING AND PAINTING & WELDING PIPE SKID CO2 MECHANICAL

5373 GE-HEC-1163 20.01.2020 24.01.2020 COLD WORK DAY GTB-12 FIRE FITHING ACTIVITIES : CO2 BOTTLE INSTALLATION PIPING TEAM

FIRE ALARM- CONDUIT NAC PANEL INSTALLATION & CABLE LAYING


5374 GE-HEC-1164 25.01.2020 31.01.2020 HOT WORK DAY GT-12 ELECTRIC TEAM
TERMINATION, CABLE TAG INSTALLATION

5375 GE-HEC-1165 22.01.2020 28.01.2020 COLD WORK DAY GT-12 TESTING CABLE ELECTRICAL

5376 GE-HEC-1166 22.01.2020 28.01.2020 COLD WORK DAY GT-11 TESTING CABLE ELECTRICAL

5377 8921 25.01.2020 31.01.2020 COLD WORK DAY GT-22 PAINTING AND PIPE INSULATION WORK PIPING

5378 8922 25.01.2020 31.01.2020 COLD WORK DAY GT-21 PAINTING AND PIPE INSULATION WORK PIPING

5379 8923 25.01.2020 31.01.2020 COLD WORK DAY GT-21 NGFS PAINTING AND PIPE INSULATION WORK PIPING

5380 8924 25.01.2020 31.01.2020 COLD WORK DAY GT-22 NGFS PAINTING AND PIPE INSULATION WORK PIPING

5381 3579 22.01.2020 28.01.2020 COLD WORK DAY FUTB TO FWPB TO BSDG TANK HYDROSTATIC TEST, PIPE RESTORATION, PIPE CLEANING PIPING TEAM

5382 GE-HEC-1167 23.01.2020 29.01.2020 COLD WORK DAY GT-12 NGFS CLEANING, LUBRICATION, GREASING OF VALVES AND VALAVES AND BOLT REPLACPIPING TEAM
5383 GE-HEC-1168 25.01.2020 30.01.2020 COLD WORK DAY GT-12 PERFORMING COMMISSIONINGWORK COMMISSIONING

5384 GE-HEC-1169 25.01.2020 30.01.2020 COLD WORK DAY GT-11 PERFORMING COMMISSIONINGWORK COMMISSIONING

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


5385 GE-HEC-1170 25.01.2020 30.01.2020 COLD WORK DAY GT-12 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

5386 GE-HEC-1171 25.01.2020 30.01.2020 COLD WORK DAY GT-11 PEECC PREPARATION FOR THE FIRS FIRE COMMISSIONING

5387 GE-HEC-1172 23.01.2020 29.01.2020 COLD WORK DAY GT-12 HOUSEKEEPING ELECTRIC TEAM

THREADING, CUTTING INSTALL OF FF SPOOL & SUPPORT, BOLTING & FIXING OF


5388 15756 23.01.2020 29.01.2020 HOT WORK DAY GT-22 FITTINGS, VISUAL INSPECTION PIPING TEAM

5389 GE-HEC-1173 23.01.2020 29.01.2020 COLD WORK DAY GT-21 TOP W/D OF GENERATOR PROTECTION AND MEASUREMENT SYSTEM COMMISSIONING

5390 7806 25.01.2020 31.01.2020 COLD WORK DAY W/T CLEANING AND PAINTING OF THE EQUIPMENT MECHANICAL

5391 1035 25.01.2020 31.01.2020 COLD WORK DAY GT-21 NGFS CLEANING, PAINTING, SCAFFOLDING ACTIVITY MECHANIC TEAM

5392 8634 25.01.2020 31.01.2020 HOT WORK DAY SWPB PUNCH CLEAR, CUTTING, GRINDING MECHANIC TEAM

5393 8839 25.01.2020 31.01.2020 COLD WORK DAY GTB-2 CCW PUNCH CLEAR, BOLT RE-INSTALL, CLEANING MECHANIC TEAM

5394 8840 25.01.2020 31.01.2020 COLD WORK DAY BSDG ENGINS CHECKING BEFOR RUNNING MECHANIC TEAM

5395 6958 24.01.2020 30.01.2020 COLD WORK DAY GT-21 PUNCH CLEARING AND INSPECTION WITH GE AND CEEG ELECTRIC TEAM

5396 7987 25.01.2020 31.01.2020 COLD WORK DAY CCB(BASEMENT) PULLING CABLE ELECTRICAL

5397 4628 23.01.2020 27.01.2020 COLD WORK DAY G-21 FIBER OPTIC CABLE, LINE CHECK INSTRUMENT TEAM

5398 6957 26.01.2020 01.02.2020 COLD WORK DAY CCB CABLE TERMINATION & CONTINUITY TEST ELECTRIC TEAM
5399 19283 25.01.2020 31.01.2020 HOT WORK DAY CCB(1st FLOOR) PULLING CABLE, TERMINATION WORK INSTRUMENT TEAM

5400 3811 25.01.2020 30.01.2020 COLD WORK DAY CCB(1st FLOOR) CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

5401 3812 25.01.2020 30.01.2020 COLD WORK DAY GT-21/22 FIN FAN CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

5402 3822 25.01.2020 30.01.2020 COLD WORK DAY GT-21 CABLE TERMINATION ELECTRICAL

5403 GE-HEC-1174 25.01.2020 31.01.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANICAL

5404 GE-HEC-1175 25.01.2020 31.01.2020 HOT WORK DAY GT-GTG-12 GAS TURBINE FIX AND POINT ADJUSTMENT MECHANICAL

5405 GE-HEC-1176 23.01.2020 30.01.2020 COLD WORK DAY GT-11 TESTING HEATER(23HT-1A&23HT-1B) COMMISSIONING

5406 8690 24.01.2020 30.01.2020 HOT WORK DAY BSDG CEILLING WORK ARCHITECTURE TEAM

5407 8691 24.01.2020 30.01.2020 HOT WORK DAY CCB WOOD PANEL REPAIR WORK AND CLEANING WORK AND PLASTER ARCHITECTURE TEAM

5408 8692 24.01.2020 30.01.2020 HOT WORK DAY GTB-2 BATTERY ROOM, CEILLING WORK ARCHITECTURE TEAM

5409 19292 24.01.2020 30.01.2020 HOT WORK DAY ACB FOUNDATION INSTALLATION ARCHITECTURE TEAM

5410 GE-HEC-1177 25.01.2020 31.01.2020 COLD WORK DAY GT-11 NGFS PAINTING AND PIPE INSULATION WORK PIPING

5411 GE-HEC-1178 25.01.2020 31.01.2020 COLD WORK DAY GT-11 WALK DOWN INSPECTION WITH CLIENT CEEG HVAC

5412 GE-HEC-1179 25.01.2020 31.01.2020 COLD WORK DAY GT-12 NGFS PAINTING AND PIPE INSULATION WORK PIPING

5413 GE-HEC-1180 25.01.2020 31.01.2020 HOT WORK DAY GT-12 HVAC(DUCT FIXATION, ISOLATION) HVAC

5414 GE-HEC-1181 26.01.2020 30.01.2020 COLD WORK DAY GT-12 CLEANING AND INSPECTION WITH GE AND CEEG ELECTRIC TEAM
5415 8926 25.01.2020 31.01.2020 COLD WORK DAY CCB(1st FLOOR) CEELING FLOOR ERECTION ARCHITECTURE

5416 14144 25.01.2020 31.01.2020 HOT WORK DAY GT-22 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

5417 14145 25.01.2020 31.01.2020 HOT WORK DAY GT-21 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

5418 6952 25.01.2020 31.01.2020 COLD WORK DAY CCB-DCS (1st FLOOR) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5419 6953 25.01.2020 31.01.2020 COLD WORK DAY NGSS PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5420 6954 25.01.2020 31.01.2020 COLD WORK DAY GT-21 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5421 6955 25.01.2020 31.01.2020 COLD WORK DAY CCB-SWGR & UPS PUNCH CLEAR, CABLE LINE CHEECK, CABLE ARRANGEMENT, CABLE CONNECTION &ELECTRIC TEAM

5422 6956 25.01.2020 31.01.2020 COLD WORK DAY CCB-DCS(G.F) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5423 GE-HEC-1182 26.01.2020 31.01.2020 COLD WORK DAY GT-21 FDM INSPECTION WITH QC, GE, CEEG(LCI) QC

5424 3820 25.01.2020 30.01.2020 COLD WORK DAY CCB(G.F) CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

5425 3821 25.01.2020 30.01.2020 COLD WORK DAY GT-22 CABLE TERMINATION ELECTRICAL

5426 3879 25.01.2020 30.01.2020 COLD WORK DAY NGSS TESTING CABLE ELECTRICAL

5427 3880 25.01.2020 30.01.2020 COLD WORK DAY GT-21/22 GCB TESTING CABLE ELECTRICAL

5428 3882 25.01.2020 30.01.2020 COLD WORK DAY GTB-21 TESTING CABLE ELECTRICAL

5429 3883 25.01.2020 30.01.2020 COLD WORK DAY GTB-22 TESTING CABLE ELECTRICAL

5430 6964 25.01.2020 31.01.2020 COLD WORK DAY GT-22 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRICAL
5431 9944 26.01.2020 01.02.2020 COLD WORK DAY UEB-1 UEB-2, CCB(DCS), PEECC- LINE CHECK COMMISSIONING

5432 6959 26.01.2020 31.01.2020 COLD WORK DAY BSDG CABLE TERMINATION & CONDUIT INSTALLATION ELECTRIC TEAM

5433 6962 26.01.2020 31.01.2020 COLD WORK DAY CCB TO ST BLDG TO AUX CABLE PULLING ELECTRIC TEAM
BOILER TO FFAC STG-10

5434 3819 25.01.2020 30.01.2020 COLD WORK DAY CCB(DCS) CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

5435 9946 26.01.2020 01.02.2020 COLD WORK DAY GT-21 TRB COMPARTMENT & LPLP CO2 & FIRE PRTECTION, AIR BLOWING FOR GT-21 COMMISSIONING

5436 9945 26.01.2020 01.02.2020 COLD WORK DAY GT-22 DEMI WATER FLUSHING FOR CCW GT-21/22 COMMISSIONING

5437 9943 26.01.2020 01.02.2020 COLD WORK DAY GT-22 COMPARTMENT LUBE OIL FLUSHING PASE 1/2/3 COMMISSIONING

5438 9942 27.01.2020 02.02.2020 COLD WORK DAY GT-21 MOTOR GREASE INJECTION COMMISSIONING

5439 3886 25.01.2020 30.01.2020 COLD WORK DAY CCB(1st FLOOR) OPTICAL FIBER TEST ELECTRICAL

5440 1034 25.01.2020 31.01.2020 COLD WORK DAY GT-22 NGFS CLEANING, PAINTING, SCAFFOLDING ACTIVITY MECHANIC TEAM

5441 15535 27.01.2020 02.02.2020 HOT WORK DAY GT-GTG-21 SCAFFOLDING , PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTIONMECHANIC TEAM

5442 15536 27.01.2020 02.02.2020 HOT WORK DAY GT-GTG-22 SCAFFOLDING , PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTIONMECHANIC TEAM

5443 GE-HEC-1183 27.01.2020 02.02.2020 COLD WORK DAY GT-GTG-12 GAS TURBINE FINAL ALIGNMENT ACTIVITY(TURNING GEAR) MECHANIC TEAM

5444 GE-HEC-1184 27.01.2020 02.02.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5445 GE-HEC-1185 27.01.2020 02.02.2020 COLD WORK DAY GT-11 NGFS JB & PULL BOX SCREW FIXATION ELECTRIC TEAM
5446 GE-HEC-1186 27.01.2020 02.02.2020 COLD WORK DAY GT-12 NGFS JB & PULL BOX SCREW FIXATION ELECTRIC TEAM

5447 GE-HEC-1187 27.01.2020 31.01.2020 HOT WORK DAY GT-11 BOLT TIGHTENING OF STEEL STRUCTURES ARCHITECTURE

5448 GE-HEC-1188 27.01.2020 31.01.2020 HOT WORK DAY GT-12 BOLT TIGHTENING OF STEEL STRUCTURES ARCHITECTURE

5449 3801 25.01.2020 30.01.2020 COLD WORK DAY GT-22 PEECC OPTICAL FIBER TEST ELECTRICAL

5450 GE-HEC-1189 27.01.2020 02.02.2020 COLD WORK DAY GT-11 TESTING CABLE ELECTRICAL

5451 GE-HEC-1190 27.01.2020 02.02.2020 COLD WORK DAY GT-12 TESTING CABLE ELECTRICAL

5452 3888 26.01.2020 31.01.2020 COLD WORK DAY CCB TESTING CABLE ELECTRICAL

5453 9941 26.01.2020 01.02.2020 COLD WORK DAY GT-21 CHEMICAL CLEANING COMMISSIONING

5454 GE-HEC-1191 27.01.2020 02.02.2020 COLD WORK DAY GT-11 MOTOR GREASE INJECTION OF THE MOTORS 88QE-1 & 88ES-1 COMMISSIONING

5455 1933 27.01.2020 02.02.2020 COLD WORK DAY GT-22 HYDROTEST QA/QC

5456 6965 27.01.2020 02.02.2020 COLD WORK DAY UEB-2 PUNCH CLEARING AND INSPECTION WITH GE AND CEEG ELECTRIC TEAM

5457 6967 28.01.2020 03.02.2020 COLD WORK DAY GT-21 CABLE TERMINATION & INSPECTION ELECTRIC TEAM

THREADING, CUTTING INSTALL OF FF SPOOL & SUPPORT, BOLTING & FIXING OF


5458 15755 27.01.2020 02.02.2020 HOT WORK DAY GT-21 FITTINGS, VISUAL INSPECTION PIPING TEAM

5459 3782 27.01.2020 30.01.2020 COLD WORK DAY CCB(UPS ROOM) CABLE TERMINATION ELECTRICAL

5460 GE-HEC-1192 27.01.2020 30.01.2020 COLD WORK DAY GT-11 NGFS WOBBE METER SYSTEM COMMISSIONING COMMISSIONING
5461 6966 28.01.2020 03.02.2020 COLD WORK DAY GT-22 CABLE PULLING & CABLE TERMINATION ELECTRIC TEAM

5462 6691 28.01.2020 03.02.2020 COLD WORK DAY GT-21 PEECC PUNCH LIST CLEARING, PANEL CLEANING ELECTRIC TEAM

5463 9947 27.01.2020 02.02.2020 COLD WORK DAY BSDG COOLING WATER STRAINER INSPECTION WATER FILLING COMMISSIONING

5464 GE-HEC-1193 27.01.2020 30.01.2020 COLD WORK DAY GT-11 NGFS INSTALLATION O ELECTRICAL CAP ELECTRICAL

5465 GE-HEC-1194 29.01.2020 04.02.2020 COLD WORK DAY UEB-1 TO BFP-11 CABLE PULLING ELECTRIC TEAM

5466 4629 28.01.2020 31.01.2020 COLD WORK DAY CCB(1st FLOOR) FIBER OPTIC CABLE & PUNCH CLEAARING WORK INSTRUMENT TEAM

5467 4630 28.01.2020 31.01.2020 COLD WORK DAY GT-21 FIBER OPTIC CABLE & PUNCH CLEAARING WORK INSTRUMENT TEAM

5468 4631 28.01.2020 31.01.2020 COLD WORK DAY GT-22 FIBER OPTIC CABLE & PUNCH CLEAARING WORK INSTRUMENT TEAM

5469 6665 28.01.2020 03.02.2020 COLD WORK DAY UEB-1 CABLE TERMINATION ELECTRIC TEAM

5470 3889 27.01.2020 02.02.2020 COLD WORK DAY W/T TESTING CABLE ELECTRICAL

5471 6968 28.01.2020 04.02.2020 COLD WORK DAY PEECC-22 TO GTB-2 CABLE TERMINATION AND INSPECTION WITH GE, QC AND CEEG ELECTRIC TEAM

5472 6969 28.01.2020 04.02.2020 COLD WORK DAY PEECC-21 TO GTB-3 CABLE TERMINATION AND INSPECTION WITH GE, QC AND CEEG ELECTRIC TEAM

5473 7913 27.01.2020 02.02.2020 COLD WORK DAY CCB TESTING CABLE ELECTRICAL

5474 8936 29.01.2020 04.02.2020 COLD WORK DAY NGSS PAINTING TOUCH-UP AND WALK DOWN INSPECTION WITH CLIENT (CEEG) PIPING

5475 6692 29.01.2020 04.02.2020 HOT WORK DAY GT-21 LCI IR TEST, HIPOT TEST OF MV CABLE RECONNECTION CABLES ELECTRIC TEAM

5476 6970 28.01.2020 04.02.2020 COLD WORK DAY GT-22 PUNCH LIST CLEARING AND INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM
5477 GE-HEC-1195 29.01.2020 04.02.2020 COLD WORK DAY GT-11 FIXATION OF MISSING BOLTS OF HEATER ELECTRIC TEAM

5478 GE-HEC-1196 29.01.2020 04.02.2020 COLD WORK DAY GT-12 LCI COMPARTMENT LINE CHECKING, INSULATION RESISTANCE, HIPOT TEST CABLES, DISCONNECT & ELECTRIC TEAM
RECONNECT CABLES

5479 GE-HEC-1197 29.01.2020 04.02.2020 COLD WORK DAY GT-21 TOP W/D OF TURBINE CONTROL INSTRUMENTATION COMBUTION DYNAMIC MO COMMISSIONING
NITORING & PERFORMANCE MONITORING SYSTEM

PRESSURE PORTS TIGHTENING/INSPECTION AT INLET SLOP DUCT(INCLUDING


5480 GE-HEC-1198 29.01.2020 04.02.2020 COLD WORK DAY GT-GTG-11 SCAFFOLDING) COOLING AIR PIPE FLANGE REMOVAL (INCLUDING SCAFFOLDING) MECHANIC TEAM

PRESSURE PORTS TIGHTENING/INSPECTION AT INLET SLOP DUCT(INCLUDING


5481 GE-HEC-1199 29.01.2020 04.02.2020 COLD WORK DAY GT-GTG-12 MECHANIC TEAM
SCAFFOLDING) COOLING AIR PIPE FLANGE REMOVAL (INCLUDING SCAFFOLDING)
FIXING OF LOCK NUTS, REMOVE TRAVELS STOPS AND ADJUST THE 2 SPRING
CANS FOR 9TH STAGE BLEED PIPE LHS AND RHS UNDER COMP, ROTATE 180 DEG.
5482 GE-HEC-1200 29.01.2020 04.02.2020 COLD WORK DAY GT-12 ON ACUATED VALVE VA7 -2, BOLT TIGHTENING OF SUPPORT GT BASE LHS, PIPING TEAM
COMP, DRAIN VALVE TIGHT TO OPEN / CLOSE RHS STAGE 9 BLEED. AND FINAL
INSPECTION WITH GE/CEEG

5483 GE-HEC-1201 29.01.2020 04.02.2020 HOT WORK DAY GTB-1 SCAFFOLDING AND DEGRID METAL CLADDING INSTALLATION WORK ARCHITECTURE TEAM

5484 9950 29.01.2020 04.02.2020 COLD WORK DAY BSDG WATER AND OIL FILLING COMMISSIONING

5485 17864 01.02.2020 07.02.2020 HOT WORK DAY W/T CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5486 17865 01.02.2020 07.02.2020 HOT WORK DAY BSDG CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5487 17866 01.02.2020 07.02.2020 HOT WORK DAY CCB CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5488 17867 01.02.2020 07.02.2020 HOT WORK DAY G-21 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5489 17868 01.02.2020 07.02.2020 HOT WORK DAY GT-22 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5490 17869 01.02.2020 07.02.2020 HOT WORK DAY CCB(G.F BASEMENT0 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5491 3802 29.01.2020 04.02.2020 COLD WORK DAY CCB(UPS ROOM) TESTING CABLE ELECTRICAL

5492 17621 01.02.2020 06.02.2020 HOT WORK DAY GTB-21 GROUNDING INSTALLATION ELECTRICAL
5493 17622 01.02.2020 06.02.2020 HOT WORK DAY GTB-22 GROUNDING INSTALLATION ELECTRICAL

5494 19311 01.02.2020 07.02.2020 HOT WORK DAY GT-21 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM

5495 19313 01.02.2020 07.02.2020 HOT WORK DAY GT-22 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM

REINSTATEMENT WORKS, GASKET REPLACEMENT, BOLTING, GROUTING


5496 15876 01.02.2020 07.02.2020 HOT WORK DAY GT-22 REPAIR/MODIFICATION OF PIPE SUPPORT PIPING TEAM

REINSTATEMENT WORKS, GASKET REPLACEMENT, BOLTING, GROUTING


5497 15877 01.02.2020 07.02.2020 HOT WORK DAY GT-21 REPAIR/MODIFICATION OF PIPE SUPPORT PIPING TEAM

5498 7222 01.02.2020 07.02.2020 HOT WORK DAY NGSS TEST OF PANEL ELECTRICAL

5499 7223 01.02.2020 07.02.2020 HOT WORK DAY GT-22 PEECC TEST OF PANEL ELECTRICAL

5500 7224 01.02.2020 07.02.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

5501 7225 01.02.2020 07.02.2020 HOT WORK DAY UEB-2 TEST OF PANEL ELECTRICAL

CUTTING, DRILLING, GRINDING, WELDING OF CHANNEL FOR CONDUIT SUPPORT


5502 8570 01.02.2020 07.02.2020 HOT WORK DAY GTB-21 & INSTALLATION OF CONDUIT ELECTRIC TEAM

CUTTING, DRILLING, GRINDING, WELDING OF CHANNEL FOR CONDUIT SUPPORT


5503 8571 01.02.2020 07.02.2020 HOT WORK DAY GTB-22 & INSTALLATION OF CONDUIT ELECTRIC TEAM

5504 8785 01.02.2020 07.02.2020 HOT WORK DAY UEB-1 FIRE ALARM - CONDUIT & NAC-PANEL INSTALLATION CABLE TAG INSTALLATION &ELECTRIC TEAM

5505 15463 01.02.2020 07.02.2020 HOT WORK DAY CCB CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

5506 15464 01.02.2020 07.02.2020 HOT WORK DAY W/T CUTTING, DRILLING, GRINDING, CHIPPING WORKS & INSTALLATION OF CONDUIT ELECTRIC TEAM

5507 6801 01.02.2020 07.02.2020 COLD WORK DAY CCB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5508 6802 01.02.2020 07.02.2020 COLD WORK DAY W/T INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

THREDING, CUTTING, INSTALL OF PIPE SPOOL & SUPPORT, BOLTING & FIXING OF PIPING TEAM
5509 15878 30.01.2020 06.02.2020 HOT WORK DAY GT-22
FITTINGS & VISUAL INSPECTION
INSTALLATION OF INERGEN MANIFOLD & CLIENT INSPECTION (INCLUDING
5510 9423 30.01.2020 05.02.2020 COLD WORK DAY CCB CEILING, FLOOR OPENNING & TOUCH-UP) PIPING TEAM

FIRE ALARM CONDUIT NAC PANEL INSTALLATION, CABLE LAYING


5511 GE-HEC-1202 01.02.2020 07.02.2020 HOT WORK DAY GT-12 TERMINATION/LIGHTING FIX TROUBLESHOOT ELECTRIC TEAM

FIRE ALARM CONDUIT NAC PANEL INSTALLATION, CABLE LAYING


5512 GE-HEC-1203 01.02.2020 07.02.2020 HOT WORK DAY GT-11 ELECTRIC TEAM
TERMINATION/LIGHTING FIX TROUBLESHOOT

5513 GE-HEC-1204 01.02.2020 07.02.2020 HOT WORK DAY GT-12 FLEXIBLE CONDUIT & VALVE POSITION ADJUSTMENT ELECTRIC TEAM

5514 GE-HEC-1205 30.01.2020 05.02.2020 COLD WORK DAY GT-12 TESTING CABLE ELECTRICAL

5515 GE-HEC-1206 30.01.2020 05.02.2020 COLD WORK DAY GT-11 TESTING CABLE ELECTRICAL

5516 GE-HEC-1207 01.02.2020 06.02.2020 COLD WORK DAY GT-11 PERFORMING COMMISSIONINGWORK COMMISSIONING

5517 GE-HEC-1208 01.02.2020 06.02.2020 COLD WORK DAY GT-12 PERFORMING COMMISSIONINGWORK COMMISSIONING

5518 GE-HEC-1209 01.02.2020 06.02.2020 COLD WORK DAY GT-11 PEECC COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING COMMISSIONING
VALVE AND DEVISE START MOTOR

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


5519 GE-HEC-1210 01.02.2020 06.02.2020 COLD WORK DAY GT-12 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

5520 GE-HEC-1211 30.01.2020 05.02.2020 COLD WORK DAY GT-12 RPAIR OF AIR LEAKAGE IN THE FITTINGS PIPING TEAM

5521 GE-HEC-1212 01.02.2020 07.02.2020 COLD WORK DAY FUEL OIL BLDG TO GT-12 HYDROSTATIC TEST, PIPE RESTORATION, PIPE CLEANING PIPING TEAM

5522 GE-HEC-1213 01.02.2020 07.02.2020 COLD WORK DAY FUEL OIL BLDG TO GT-11 HYDROSTATIC TEST, PIPE RESTORATION, PIPE CLEANING PIPING TEAM

5523 GE-HEC-1214 01.02.2020 07.02.2020 COLD WORK DAY GT-21 TOP W/D OF EXCITATION SYSTEM AND TRANSFORMER COMMISSIONING

5524 3599 01.02.2020 07.02.2020 COLD WORK DAY F.U BLDG TO FWPB TO BSDG HYDROSTATIC TEST, PIPE REPARATION, PIPE CLEANING PIPING TEAM

5525 6975 01.02.2020 07.02.2020 COLD WORK DAY BSDG INSTALLATION OF CONDUIT, CABLE TERMINATION AND DISMENTALL OF SCAFFOL ELECTRIC TEAM

5526 19293 01.02.2020 07.02.2020 HOT WORK DAY GTB-2 CGRID OPENING HALL CLOSED ARCHITECTURE TEAM
5527 19296 01.02.2020 07.02.2020 COLD WORK DAY UEB-1 SCAFFOLDING DISMANTLING AND REPARATION ARCHITECTURE TEAM

5528 3841 01.02.2020 06.02.2020 COLD WORK DAY CCB(BASEMENT) CABLE PULLING ELECTRICAL

5529 3849 01.02.2020 06.02.2020 COLD WORK DAY GT-21 PEECC CABLE PULLING ELECTRICAL

5530 9948 30.01.2020 04.02.2020 COLD WORK DAY GT-21 AIR BLOWING & LEAK TEST FOR SELF CLEAN FILTER I.A SUPPLY LINE COMMISSIONING

5531 9952 30.01.2020 05.02.2020 COLD WORK DAY GT-21 AIR BLOWING FOR SEAL OIL SENSING LINE SPANNER COMMISSIONING

5532 GE-HEC-1215 30.01.2020 05.02.2020 COLD WORK DAY GT-GTG-12 COOLING FAN ENCLOSURE CHECKING AND MODIFICATION AS PER REQUIREMENT MECHANIC TEAM

5533 GE-HEC-1216 30.01.2020 05.02.2020 COLD WORK DAY GT-GTG-12 LOAD COUPLING INSTALLATION ACTIVITY INCLUDING COUPLING GUARD AND MECHANIC TEAM
INSULATION INSTALLATION ACTIVITY

GT-21/22 CCWP & FIN FAN &


5534 7174 30.01.2020 05.02.2020 COLD WORK DAY DCS, UEB-2 HOT LOOP TEST COMMISSIONING

5535 7174 30.01.2020 05.02.2020 COLD WORK DAY 10 CCWP, DCS, CCB LINE CHECK COMMISSIONING

5536 8938 01.02.2020 08.02.2020 COLD WORK DAY GT-22 NGFS PAINTING AND PIPE INSULATION WORK PIPING

5537 8939 01.02.2020 08.02.2020 COLD WORK DAY GT-21 NGFS PAINTING AND PIPE INSULATION WORK PIPING

5538 8940 01.02.2020 08.02.2020 COLD WORK DAY GT-21 PAINTING AND PIPE INSULATION WORK PIPING

5539 8941 01.02.2020 08.02.2020 COLD WORK DAY GT-22 PAINTING AND PIPE INSULATION WORK PIPING

5540 14170 01.02.2020 08.02.2020 HOT WORK DAY GT-21 HVAC(DUCT, EQUIPMENT, INSTALLATION, PIPING, CONTROL CABLE PULLING) HVAC

5541 14181 01.02.2020 08.02.2020 HOT WORK DAY UEB-1 HVAC(DUCT, EQUIPMENT, INSTALLATION, PIPING, CONTROL CABLE PULLING) HVAC

5542 14182 01.02.2020 08.02.2020 HOT WORK DAY GT-22 HVAC(DUCT, EQUIPMENT, INSTALLATION, PIPING, CONTROL CABLE PULLING) HVAC

5543 1069 01.02.2020 07.02.2020 COLD WORK DAY GT-22 NGFS CLEANING, PAINTING, SCAFFOLDING ACTIVITY MECHANIC TEAM
5544 1070 01.02.2020 07.02.2020 COLD WORK DAY GT-21 NGFS CLEANING, PAINTING, SCAFFOLDING ACTIVITY MECHANIC TEAM

5545 6836 01.02.2020 07.02.2020 COLD WORK DAY UEB-1 PANEL TEST, IR/ HIPOT TEST ELECTRIC TEAM

5546 6837 01.02.2020 07.02.2020 COLD WORK DAY CCB PANEL CHECK, LINE CHECK TEMPORARY TESTING CABLE ELECTRIC TEAM

5547 17896 01.02.2020 06.02.2020 HOT WORK DAY GT-21/22 IPB WELDING AND CLEANING ELEMENT IPB MECHANICAL

5548 17895 01.02.2020 06.02.2020 HOT WORK DAY GT-21/22 CLEANING AND PAINTING & FINISH WORK MECHANICAL

5549 6976 30.01.2020 31.01.2020 COLD WORK DAY UEB-1, EGBS#12 DE- ISOLATION U/G CATHODIC, PIPE LINE & TEST O.A ELECTRIC TEAM

5550 14189 01.02.2020 07.02.2020 HOT WORK DAY GT-21 SANDWICH PANNEL, FLUSHING, ALLUMINIUM WINDOWS ERRECTION ARCHITECTURE

5551 14190 01.02.2020 07.02.2020 HOT WORK DAY GT-22 SANDWICH PANNEL, FLUSHING, ALLUMINIUM WINDOWS ERRECTION ARCHITECTURE

5552 8943 01.02.2020 07.02.2020 COLD WORK DAY CCB(1st FLOOR) CEELING ERECTION ARCHITECTURE

5553 GE-HEC-1217 01.02.2020 07.02.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5554 GE-HEC-1218 01.02.2020 07.02.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5555 GE-HEC-1219 01.02.2020 07.02.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5556 GE-HEC-1220 01.02.2020 07.02.2020 HOT WORK DAY GT-GTG-12 GAS TURBINE FIX AND POINT ADJUSTMENT MECHANIC TEAM

5557 GE-HEC-1221 01.02.2020 07.02.2020 HOT WORK DAY GT-12 PEECC COMMISIONING OF PANEL SPEED ADJUSTEMENT O DC LUBE & SEAL OIL PUMP ELECTRICAL

5558 GE-HEC-1222 01.02.2020 07.02.2020 HOT WORK DAY GT-12 LCI INSULATION RESISTANCE, HIPOT TEST CABLES, DISCONNECT & RECONNECT ELECTRIC TEAM
5559 GE-HEC-1223 01.02.2020 07.02.2020 COLD WORK DAY GT-12 NGFS GREASE AND PLUG THE MAIN ISOLATION VALVE KKS: 0KG10AA001/0KG10AA002. PIPING TEAM
FINAL INSPECTION WITH CEEG / GE

5560 GE-HEC-1224 01.02.2020 07.02.2020 COLD WORK DAY GT-11 WALK DOWN INSPECTION WITH CLIENT CEEG HVAC

5561 GE-HEC-1225 01.02.2020 07.02.2020 HOT WORK DAY GT-12 HVAC(DUCT, FIXATION, ISOLATION HVAC

5562 139 01.02.2020 07.02.2020 HOT WORK DAY GT-21 LCI INSULATION RESISTANCE & HIPOT TEST OF CABL, RECONNECT CABLE ELECTRIC TEAM

5563 GE-HEC-1226 01.02.2020 06.02.2020 COLD WORK DAY GT-12 TO CARRY OUT CO2 FILING IN MAIN & RESERVE TANKS & DISCHARGE TEST IN COMMISSIONING
TURBINE & DLN-BEARING 2-A160-A162

5564 GE-HEC-1227 01.02.2020 07.02.2020 COLD WORK DAY GTB-11 SCAFFOLDING INSTALLATION / DISMANTLE ELECTRIC TEAM

5565 GE-HEC-1228 01.02.2020 07.02.2020 COLD WORK DAY GTB-12 SCAFFOLDING INSTALLATION / DISMANTLE ELECTRIC TEAM

5566 GE-HEC-1229 01.02.2020 07.02.2020 COLD WORK DAY GTB-12 ISOLATION TRANSFORMFIRE ALARM CONDUIT INSPECTION & SCAFFOLDING DISMANTLE ELECTRIC TEAM

5567 12006 01.02.2020 07.02.2020 HOT WORK DAY GT-11 BYPASS STACK CONDUIT WORK INSTRUMENT TEAM

5568 12007 01.02.2020 07.02.2020 HOT WORK DAY GT-11 BYPASS STACK CONDUIT WORK INSTRUMENT TEAM

5569 19287 01.02.2020 07.02.2020 HOT WORK DAY CCB(1st FLOOR) CABLE PULLING & TERMINATION INSTRUMENT TEAM

5570 4632 01.02.2020 07.02.2020 COLD WORK DAY BSDG BSDG'S ROOFS RE-INSTALLATION NUMBER 2 MECHANIC TEAM

5571 4633 01.02.2020 07.02.2020 COLD WORK DAY NGSS INSULATION WORK MECHANIC TEAM

5572 4634 01.02.2020 07.02.2020 COLD WORK DAY GTB-2 CCW BELT'S TENSION CHECKING FOR ALL FAN RINGS MECHANIC TEAM

21BMA01 GT MCC-3E-230V DISTRIBUTION PANEL ENERGIZATION & TEMPORARY ELECTRIC TEAM


5573 6984 01.02.2020 07.02.2020 COLD WORK DAY GT-21 PEECC
AC ENERGIZATION
5574 6977 01.02.2020 07.02.2020 COLD WORK DAY NGSS PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5575 6978 01.02.2020 07.02.2020 COLD WORK DAY CCB-DCS(1st FLOOR) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5576 6979 01.02.2020 07.02.2020 COLD WORK DAY CCB-DCS(G.F) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5577 6980 01.02.2020 07.02.2020 COLD WORK DAY CCB-SWGR & UPS PUNCH CLEAR, CABLE LINE CHECK, CABLE ARRANGEMENT, CABLE CONNECTION & ELECTRIC TEAM

5578 6982 01.02.2020 07.02.2020 COLD WORK DAY GT-22 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5579 6983 01.02.2020 07.02.2020 COLD WORK DAY GT-21 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5580 3898 01.02.2020 06.02.2020 COLD WORK DAY GT-21 CABLE TERMINATION ELECTRICAL

5581 3899 01.02.2020 06.02.2020 COLD WORK DAY GT-22 CABLE TERMINATION ELECTRICAL

5582 3901 01.02.2020 06.02.2020 COLD WORK DAY CCB(DCS ROOM) CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

5583 3902 01.02.2020 06.02.2020 COLD WORK DAY GTB-2 CCW CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

5584 15537 03.02.2020 09.02.2020 HOT WORK DAY GT-GTG-21 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM

5585 15539 03.02.2020 09.02.2020 HOT WORK DAY GT-GTG-22 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM

5586 3900 01.02.2020 06.02.2020 COLD WORK DAY CCB(G.F) CABLE TERMINATION AND PUNCH LIST CLEARING ELECTRICAL

5587 3854 02.02.2020 06.02.2020 COLD WORK DAY CCB(1st FLOOR) TESTING CABLE ELECTRICAL

5588 3855 02.02.2020 06.02.2020 COLD WORK DAY GT-22 PEECC TESTING CABLE ELECTRICAL

5589 3857 02.02.2020 06.02.2020 COLD WORK DAY GT-22 TESTING CABLE ELECTRICAL
5590 3858 02.02.2020 06.02.2020 COLD WORK DAY GT-21/22 GCB TESTING CABLE ELECTRICAL

5591 3859 02.02.2020 06.02.2020 COLD WORK DAY GT-21 TESTING CABLE ELECTRICAL

5592 9953 02.02.2020 08.02.2020 COLD WORK DAY GT-21 CHEMICAL CLEANING COMMISSIONING

5593 9954 02.02.2020 08.02.2020 COLD WORK DAY GT-22 COMPARTMENT LUBE OIL FLUSHING PASE 1/2/3 COMMISSIONING

5594 9955 02.02.2020 08.02.2020 COLD WORK DAY GT-21 TRB COMPARTMENT & LPLP CO2 & FIRE PRTECTION, AIR BLOWING FOR GT-21 COMMISSIONING

5595 9956 02.02.2020 08.02.2020 COLD WORK DAY GT-22 DEMI WATER FLUSHING FOR CCW GT-21/22 COMMISSIONING

5596 19429 02.02.2020 07.02.2020 HOT WORK DAY GT-21 NGFS CONDUIT, TUBING & JB INSTALLATION INSTRUMENT TEAM

5597 19430 02.02.2020 07.02.2020 HOT WORK DAY GT-22 NGFS CONDUIT, TUBING & JB INSTALLATION INSTRUMENT TEAM

5598 4635 02.02.2020 07.02.2020 COLD WORK DAY GT-22 FIBER OPTIC CABLE INSTRUMENT TEAM

5599 4636 02.02.2020 07.02.2020 COLD WORK DAY CCB(1st FLOOR) PUNCH POINT CLEANING INSTRUMENT TEAM

5600 4637 02.02.2020 07.02.2020 COLD WORK DAY GT-21 PUNCH POINT INSTRUMENT TEAM

5601 6985 02.02.2020 07.02.2020 COLD WORK DAY CCB TO ST BLDG TO AUX CABLE PULLING ELECTRIC TEAM
BOILER TO FFAC STG-10

5602 8693 02.02.2020 09.02.2020 HOT WORK DAY CCB SCAFFOLDING AND REPARATION ARCHITECTURE TEAM

5603 6989 03.02.2020 09.02.2020 COLD WORK DAY GT-21 CABLE TERMINATION & INSPECTION ELECTRIC TEAM

5604 6844 02.02.2020 08.02.2020 COLD WORK DAY GT-21 BATTRY ROOM WALK DOWN INSPECTION & HOUSEKEEPING WORK ELECTRIC TEAM

5605 6986 02.02.2020 08.02.2020 COLD WORK DAY GT-21 LCI FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM
5606 7925 02.02.2020 06.02.2020 COLD WORK DAY FWPB INSTALLATION OF THE PUMP MECHANICAL

5607 7926 02.02.2020 06.02.2020 COLD WORK DAY GT-22 NGFS INSPECTON OF THE HOIST MECHANICAL

5608 7927 02.02.2020 06.02.2020 COLD WORK DAY W/T CLEANING AND PAINTING OF THE EQUIPMENT MECHANICAL

5609 6992 03.02.2020 09.02.2020 COLD WORK DAY GT-22 NGFS PUNCH CLEARING AS PER ATTACHED LIST ELECTRIC TEAM

5610 GE-HEC-1230 03.02.2020 09.02.2020 COLD WORK DAY GT-12 NGFS CABLE PULLING ELECTRIC TEAM

5611 GE-HEC-1231 03.02.2020 09.02.2020 COLD WORK DAY UEB-1 TO BFP-12 CABLE PULLING ELECTRIC TEAM

5612 GE-HEC-1232 03.02.2020 09.02.2020 COLD WORK DAY GT-12 FIXING JUNCTION BOX DOOR SEAL AND INSPECTION WITH GE AND CEEG ELECTRIC TEAM

5613 GE-HEC-1233 03.02.2020 09.02.2020 COLD WORK DAY GT-GTG-11 COOLING FAN ENCLOSURE CHECKING AND MODIFICATION AS PER REQUIREMENT MECHANIC TEAM

THREDING, CUTTING, INSTALL OF F/F SPOOL & SUPPORT, BOLTING & FIXING OF
5614 15881 03.02.2020 09.02.2020 HOT WORK DAY GT-21 PIPING TEAM
FITTINGS & VISUAL INSPECTION

5615 GE-HEC-1234 03.02.2020 09.02.2020 HOT WORK DAY GT-11 PEECC-11 GPP-GCB-11 LOOP CHECKING, ENERGIZING PANEL / FUNCTIONAL TEST, ELECTRIC TEAM

5616 GE-HEC-1235 03.02.2020 09.02.2020 HOT WORK DAY GT-12 PEECC-12 GPP-GCB-12 LOOP CHECKING, ENERGIZING PANEL / FUNCTIONAL TEST, ELECTRIC TEAM

5617 1936 03.02.2020 08.02.2020 COLD WORK DAY GT-22 HYDROTEST QA/QC

5618 9957 03.02.2020 09.02.2020 COLD WORK DAY BSDG COOLING WATER STRAINER INSPECTION WATER FILLING COMMISSIONING

5619 6993 03.02.2020 09.02.2020 COLD WORK DAY CCB CABLE TERMINATION AND INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

5620 6994 04.02.2020 10.02.2020 COLD WORK DAY GT-22 CABLE PULLING & CABLE TERMINATION ELECTRIC TEAM

5621 9421 03.02.2020 09.02.2020 COLD WORK DAY FWPB(RING MAIN) LINE PRESSUREZING & COMMISSIONING INCLUDING REPAIR OF LEAKAGE IF REQUPIPING TEAM
CUTTING, GRINDING, DRILLING & WELDING OF UNISTRUIT CHANEL FOR CONDUIT
5622 8576 03.02.2020 07.02.2020 HOT WORK DAY W/T SUPPORT & INSTALLATION ELECTRIC TEAM

5623 5003 04.02.2020 10.02.2020 COLD WORK DAY UEB-2 PUNCH CLEAR, CHANGE THE CABLE INSIDE PANEL, CABLE ARRANGEMENT, CABLE ELECTRIC TEAM
TERMINATION & INSPECTION

CHANGE THE CABLE INSIDE PANEL, CABLE ARRANGEMENT, CABLE TERMINATION,


5624 5004 04.02.2020 10.02.2020 COLD WORK DAY UEB-1 CONNECTION & INSPECTION ELECTRIC TEAM

5625 GE-HEC-1236 04.02.2020 10.02.2020 HOT WORK DAY GT-GTG-12 GENERATOR LAGGING SUPPORT INSTALLAION MECHANIC TEAM

5626 GE-HEC-1237 04.02.2020 10.02.2020 COLD WORK DAY GT-11 NGFS REPLACEMENT OF STAINLESS STEEL WASHER OF TWO FLOW METERS AND FINAL I PIPING TEAM

5627 GE-HEC-1238 03.02.2020 09.02.2020 COLD WORK DAY GT-11 PUNCH CLEARING ELECTRIC TEAM

5628 5006 04.02.2020 07.02.2020 COLD WORK DAY W/T & FWPB ENERGIZING HOIST & INSPECTION ELECTRIC TEAM

5629 GE-HEC-1239 04.02.2020 07.02.2020 COLD WORK DAY GT-12 NGFS GAS LEAK DETECTOR TEST INSTRUMENT TEAM

5630 GE-HEC-1240 05.02.2020 11.02.2020 COLD WORK DAY GT-11 NGFS CABLE PULLING ELECTRIC TEAM

5631 GE-HEC-1241 05.02.2020 11.02.2020 HOT WORK DAY GT-12 NGFS CALIBRATE AND PROVIDE ADEQUATE DRAIN LINE, INSTALLATION OF PIPE SPOOLS PIPING TEAM
AND PIPE SUPPORTS(CUTTING, GRINDING, FIT-UP, TACKING, WELDING)

SPRING HANGER SUPPORT-DRILL FOR NEW HOLE AND BUILD-UP EXISTING HOLE, PIPING TEAM
5632 GE-HEC-1242 05.02.2020 11.02.2020 HOT WORK DAY GT-12
COMPRESSOR DRAIN VALVE INSPECTION AND REINSTALLATION

INSULATION RESISTANCE, HIPOT TEST CABLES, DISCONNECT & RECONNECT


5633 GE-HEC-1243 05.02.2020 11.02.2020 HOT WORK DAY GT-12 LCI ELECTRIC TEAM
CABLES

5634 GE-HEC-1244 05.02.2020 11.02.2020 COLD WORK DAY GT-21 TOP W/D GENERATOR COMMISSIONING

5635 GE-HEC-1245 05.02.2020 11.02.2020 HOT WORK DAY GT-12 NGFS INSTALLATION FOR JB INSTRUMENT TEAM

5636 GE-HEC-1246 05.02.2020 11.02.2020 HOT WORK DAY GT-11 NGFS UNINSTAL FOR JB INSTRUMENT TEAM
5637 GE-HEC-1247 05.02.2020 11.02.2020 HOT WORK DAY GTB-1 SCAFFOLDING, METAL CLADDING INSTALLATION ARCHITECTURE TEAM

5638 5005 04.02.2020 10.02.2020 COLD WORK DAY CCB CLANDING, TERMINATION AND INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

5639 9959 05.02.2020 11.02.2020 COLD WORK DAY FUEL OIL TRANSFER PUMP BLDGGREASING OF FUEL FORWARDING SKID PUMP COMMISSIONING

5640 9960 05.02.2020 11.02.2020 COLD WORK DAY BSDG WATER AND OIL FILLING COMMISSIONING

5641 5007 05.02.2020 11.02.2020 COLD WORK DAY ACB PUNCH CLEAR, CABLE ENTRY HOLE SEALING AND INNSPECTION ELECTRIC TEAM

5642 5008 06.02.2020 12.02.2020 COLD WORK DAY PEECC-22 TO GTB-2 CABLE TERMINATION AND INSPECTION WITH GE, QC, CEEG ELECTRIC TEAM

5643 5009 06.02.2020 12.02.2020 COLD WORK DAY PEECC-21 TO GTB-2 CABLE TERMINATION AND INSPECTION WITH GE, QC, CEEG ELECTRIC TEAM

5644 3903 05.02.2020 06.02.2020 COLD WORK DAY W/T CABLE TERMINATION AND PUNCH LIST ELECTRICAL

5645 8517 05.02.2020 11.02.2020 HOT WORK DAY GT-21 LCI HIPOT TESTING MV CABLE DISCONNECT, R-CONNECT ELECTRIC TEAM

5646 8948 05.02.2020 11.02.2020 COLD WORK DAY NGSS PAINTING(TOUCH-UP) AD WALK DOWN INSPECTION WITH CLIENT CEEG PIPING

5647 3908 08.02.2020 13.02.2020 COLD WORK DAY CCB(1st FLOOR & BASEMENT) CABLE PULLING ELECTRICAL

5648 3909 08.02.2020 13.02.2020 COLD WORK DAY GT-21 PEECC CABLE PULLING ELECTRICAL

5649 8539 08.02.2020 14.02.2020 HOT WORK DAY W/T CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

5650 8538 08.02.2020 14.02.2020 HOT WORK DAY CCB CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF CONDUIT ELECTRIC TEAM

CUTTING, GRINDING, WELDING OF UNISTRUIT CHANNEL FOR CONDUIT SUPPORT


5651 8572 08.02.2020 14.02.2020 HOT WORK DAY GT-21 & INSTALLATION ELECTRIC TEAM

CUTTING, GRINDING, WELDING OF UNISTRUIT CHANNEL FOR CONDUIT SUPPORT


5652 8573 08.02.2020 14.02.2020 HOT WORK DAY GT-22 & INSTALLATION ELECTRIC TEAM
FIRE ALARM & CONDUIT MODIFICATION CABLE LAYING TERMINATION FIRE
5653 8790 08.02.2020 14.02.2020 HOT WORK DAY UEB-1 ALARM SYSTEM & TESTING ELECTRIC TEAM

CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF DEVICE


5654 15465 08.02.2020 14.02.2020 HOT WORK DAY DWPB CONDUIT AND SUPPORTS ELECTRIC TEAM

CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF DEVICE


5655 15466 08.02.2020 14.02.2020 HOT WORK DAY ACB CONDUIT AND SUPPORTS ELECTRIC TEAM

CUTTING, DRILLING, GRINDING, CHIPPING WORKS& INSTALLATION OF DEVICE


5656 15467 08.02.2020 14.02.2020 HOT WORK DAY SWPB CONDUIT AND SUPPORTS ELECTRIC TEAM

5657 6803 08.02.2020 14.02.2020 HOT WORK DAY W/T INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5658 6804 08.02.2020 14.02.2020 COLD WORK DAY CCB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5659 6845 08.02.2020 14.02.2020 COLD WORK DAY UEB-1 PANEL TEST, IR TEST, HIPOT TEST FOR MV PANEL ELECTRIC TEAM

5660 6846 08.02.2020 14.02.2020 COLD WORK DAY CCB PANEL CHECK, LINE CHECK CABLES ELECTRIC TEAM

5661 6851 08.02.2020 14.02.2020 COLD WORK DAY GT-21 PEECC PANEL CLEANING, BOLT TORQUING, INSPECTION ELECTRIC TEAM

5662 17773 08.02.2020 13.02.2020 HOT WORK DAY GT-21 GROUNDING INSTALLATION ELECTRICAL

5663 17774 08.02.2020 13.02.2020 HOT WORK DAY GT-22 GROUNDING INSTALLATION ELECTRICAL

5664 19316 08.02.2020 14.02.2020 HOT WORK DAY GT-22 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM

5665 19317 08.02.2020 14.02.2020 HOT WORK DAY GT-21 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM

5666 12026 08.02.2020 14.02.2020 HOT WORK DAY GT-11 BYPASS GAS EXHAUST PULLING CABLE & TERMINATIO WORK, CONDUIT INSTRUMENT TEAM

5667 12027 08.02.2020 14.02.2020 HOT WORK DAY GT-12 BYPASS GAS EXHAUST PULLING CABLE & TERMINATIO WORK, CONDUIT INSTRUMENT TEAM

5668 3919 05.02.2020 10.02.2020 COLD WORK DAY CCB(1st FLOOR) TESTING CABLE ELECTRICAL
5669 7914 05.02.2020 10.02.2020 COLD WORK DAY CCB(G.F) TESTING CABLE ELECTRICAL

5670 17662 08.02.2020 13.02.2020 HOT WORK DAY CCB(1st FLOOR) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5671 17689 08.02.2020 13.02.2020 HOT WORK DAY GT-22 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5672 17690 08.02.2020 13.02.2020 HOT WORK DAY GT-21 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5673 17692 08.02.2020 13.02.2020 HOT WORK DAY BSDG CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5674 17697 08.02.2020 13.02.2020 HOT WORK DAY CCB(G.F BASEMENT) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5675 17698 08.02.2020 13.02.2020 HOT WORK DAY W/T CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5676 17700 08.02.2020 13.02.2020 HOT WORK DAY ACB CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

LOAD COUPLING INSTALLATION ACTIVITY INCLUDING COUPLING GUARD AND


5677 GE-HEC-1248 06.02.2020 12.02.2020 COLD WORK DAY GT-GTG-12 INSULATION INSTALLATION ACTIVITY MECHANIC TEAM

5678 3818 05.02.2020 10.02.2020 COLD WORK DAY BSDG TESTING CABLE ELECTRICAL

5679 3918 05.02.2020 10.02.2020 COLD WORK DAY CCB(UPS ROOM) TESTING CABLE ELECTRICAL

5680 GE-HEC-1249 08.02.2020 13.02.2020 COLD WORK DAY GT-12 PERFORMING COMMISSIONINGWORK COMMISSIONING

5681 GE-HEC-1250 08.02.2020 13.02.2020 COLD WORK DAY GT-11 PERFORMING COMMISSIONINGWORK COMMISSIONING

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


5682 GE-HEC-1251 08.02.2020 13.02.2020 COLD WORK DAY GT-12 PEECC COMMISSIONING
VALVE AND DEVISE START MOTOR

5683 GE-HEC-1252 08.02.2020 13.02.2020 COLD WORK DAY GT-11 PEECC COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING COMMISSIONING
VALVE AND DEVISE START MOTOR

FIRE ALARM NAC PANEL CONDUIT INSTALLATION, CABLE LAYING, TERMINATION, ELECTRIC TEAM
5684 GE-HEC-1253 08.02.2020 14.02.2020 HOT WORK DAY GT-12
BANDING, JUMPER INSTALLATION
FIRE ALARM NAC PANEL CONDUIT INSTALLATION, CABLE LAYING, TERMINATION,
5685 GE-HEC-1254 08.02.2020 14.02.2020 HOT WORK DAY GT-11 BANDING, JUMPER INSTALLATION ELECTRIC TEAM

5686 GE-HEC-1255 08.02.2020 14.02.2020 HOT WORK DAY GT-12 FIRE FIGHTING ADDITIONAL CONDUIT INSTALLATION CABLE LAYING & TERMINATI ELECTRIC TEAM

5687 GE-HEC-1256 08.02.2020 14.02.2020 HOT WORK DAY GT-11 FIRE FIGHTING ADDITIONAL CONDUIT INSTALLATION CABLE LAYING & TERMINATI ELECTRIC TEAM

5688 15345 08.02.2020 14.02.2020 HOT WORK DAY CCB(LV SWGR.1A/1B) ENERRGIZING FEEDERS FOR HYDROGEN BLDG MCC ELECTRIC TEAM

5689 GE-HEC-1257 08.02.2020 13.02.2020 HOT WORK DAY GT-12 PEECC COMMISSIONING OF PANEL SPEED ADJUSTEMENT OF DC LUBE & SEAL OIL PUMP ELECTRICAL

5690 GE-HEC-1258 06.02.2020 07.02.2020 COLD WORK DAY GTG-12 RECTIFICATION OF PUNCH AND INSPECTION INSTRUMENT TEAM

5691 7176 06.02.2020 12.02.2020 COLD WORK DAY UEB-2, G-21/22, CCB, UEB-1, ACLINE CHECK COMMISSIONING

5692 9958 06.02.2020 12.02.2020 COLD WORK DAY GT-21 AIR BLOWING & LEAK TEST FOR SELF CLEAN FILTER I.A SUPPLY LINE COMMISSIONING

5693 5020 06.02.2020 12.02.2020 COLD WORK DAY CCB CABLE TERMINATION INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

5694 1061 08.02.2020 14.02.2020 COLD WORK DAY GT-22 NGFS CLEANING, PAINTING, SCAFFOLDING ACTIVITY MECHANIC TEAM

5695 1062 08.02.2020 14.02.2020 COLD WORK DAY GT-21 NGFS CLEANING, PAINTING, SCAFFOLDING ACTIVITY MECHANIC TEAM

5696 15915 06.02.2020 12.02.2020 HOT WORK DAY GT-22 INSTALLATION OF PIPE & SUPPORT AND PANEL, PAINTING & ASSEMBLY OF CO2 PIPING TEAM
RACK, CYLINDER, ACCESSORIES, SAFETY VALVE

INSTALLATION OF PIPE & SUPPORT AND PANEL, PAINTING & ASSEMBLY OF CO2
5697 15916 06.02.2020 12.02.2020 HOT WORK DAY GT-21 RACK, CYLINDER, ACCESSORIES, SAFETY VALVE PIPING TEAM

5698 5010 08.02.2020 14.02.2020 COLD WORK DAY BSDG CABLE TERMINATION & LOP CHECK INCLUDING SCAFFOLDING ERECTION & REMO ELECTRIC TEAM

5699 15542 10.02.2020 16.02.2020 HOT WORK DAY GT-GTG-22 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM

5700 15540 10.02.2020 16.02.2020 HOT WORK DAY GT-GTG-21 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM
5701 8945 08.02.2020 14.02.2020 COLD WORK DAY NGSS PAINTING TOUCH-UP AND WALK DOWN INSPECTION WITH CLIENT (CEEG) PIPING

5702 8946 08.02.2020 14.02.2020 COLD WORK DAY GT-22 PAINTING AND PIPE INSULATION WORK PIPING

5703 14200 08.02.2020 14.02.2020 HOT WORK DAY UEB-1 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

5704 14202 08.02.2020 14.02.2020 HOT WORK DAY GT-22 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

5705 GE-HEC-1259 06.02.2020 12.02.2020 COLD WORK DAY GT-11 MOTOR TEST(LUBE OIL SKID) COMMISSIONING

5706 GE-HEC-1260 06.02.2020 12.02.2020 COLD WORK DAY GT-12 CO2 LEAK IN PIPE RECTIFICATION ASSEMBLY AND ARRANGEMENT, PAINTING PIPING TEAM

5707 8702 06.02.2020 11.02.2020 HOT WORK DAY FWPB SCAFFOLDING , REPARATION WORK ARCHITECTURE TEAM

5708 8695 08.02.2020 13.02.2020 HOT WORK DAY GTB-2 HOIST CRANE SUPPORT INSTALLATION INSTRUMENT TEAM

5709 14209 08.02.2020 14.02.2020 HOT WORK DAY GT-22 METAL CLADDING FINISHING WORK ARCHITECTURE

5710 12030 08.02.2020 14.02.2020 HOT WORK DAY W/T TERMINATION WORK AND PULLING CABLE INSTRUMENT TEAM

5711 14212 08.02.2020 14.02.2020 HOT WORK DAY CCB(1st FLOOR) HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

5712 14213 08.02.2020 14.02.2020 HOT WORK DAY GT-21 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

5713 GE-HEC-1261 08.02.2020 14.02.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5714 GE-HEC-1262 08.02.2020 14.02.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5715 GE-HEC-1263 08.02.2020 14.02.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5716 GE-HEC-1264 08.02.2020 14.02.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5717 GE-HEC-1265 08.02.2020 14.02.2020 COLD WORK DAY GT-GTG-12 GAS TURBINE FIX AND POINT ADJUSTMENT MECHANIC TEAM
5718 GE-HEC-1266 08.02.2020 14.02.2020 COLD WORK DAY GT-11 NGFS PAINTING AND PIPE INSULATION WORK PIPING

5719 GE-HEC-1267 08.02.2020 14.02.2020 HOT WORK DAY GT-12 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

5720 GE-HEC-1268 08.02.2020 14.02.2020 COLD WORK DAY GT-12 SCAFFOLDING INSTALLATION/DISMANTLE ELECTRIC TEAM

REINSTATEMENT WORKS, GASKET REPLACEMENT, BOLTING, GROUTING


5721 15917 08.02.2020 14.02.2020 HOT WORK DAY GT-22 REPAIR/MODIFICATION OF PIPE SUPPORT PIPING TEAM

REINSTATEMENT WORKS, GASKET REPLACEMENT, BOLTING, GROUTING


5722 15918 08.02.2020 14.02.2020 HOT WORK DAY GT-21 REPAIR/MODIFICATION OF PIPE SUPPORT PIPING TEAM

5723 8735 08.02.2020 14.02.2020 HOT WORK DAY CCB COTE DRILLING ON CONCRETE FLOORING, INSTALLL CONDUIT & SUPPORT ELECTRIC TEAM

5724 GE-HEC-1269 06.02.2020 12.02.2020 COLD WORK DAY GT-21 TOP W/D OF GENERATOR SEAL OIL COMMISSIONING

PUNCH CLEAR, CONDUIT, BALLAST FCL LIGHTING INSTALLATION, CABLE


5725 5021 08.02.2020 14.02.2020 COLD WORK DAY BSDG CONNECTION & INSPECTION ELECTRIC TEAM

5726 5022 08.02.2020 14.02.2020 COLD WORK DAY CCB-DCS(1st FLOOR) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5727 5023 08.02.2020 14.02.2020 COLD WORK DAY CCB-DCS(G.F) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

PUNCH CLEAR, CABLE LINE CHECK CABLE ARRANGEMENT, CABLE CONNECTION &
5728 5024 08.02.2020 14.02.2020 COLD WORK DAY CCB-SWGR & UPS INSPECTION ELECTRIC TEAM

5729 5025 08.02.2020 14.02.2020 COLD WORK DAY GT-21 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5730 5026 08.02.2020 14.02.2020 COLD WORK DAY GT-22 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5731 5028 08.02.2020 14.02.2020 COLD WORK DAY NGSS PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

5732 5030 08.02.2020 14.02.2020 COLD WORK DAY W/T FDF BOX INSTALLATION IN THE MCC SWITCHGEAR PANEL(00BJE01 & 00BJD01) ELECTRIC TEAM

5733 17708 08.02.2020 13.02.2020 HOT WORK DAY GT-21/22 GCB CLEANING, PAINTING AND FINISH WORK MECHANICAL
5734 17709 08.02.2020 13.02.2020 HOT WORK DAY GT-21/22 IPB CLEANING AND WELDING ELEMENT IPB MECHANICAL

5735 3867 08.02.2020 13.02.2020 COLD WORK DAY GT-22 CABLE TERMINATION ELECTRICAL

5736 3869 08.02.2020 13.02.2020 COLD WORK DAY CCB(DCS ROOM) CABLE TERMINATION AND PUNCH LIST ELECTRICAL

5737 3870 08.02.2020 13.02.2020 COLD WORK DAY CCB(G.F) CABLE TERMINATION AND PUNCH LIST ELECTRICAL

5738 3871 08.02.2020 13.02.2020 COLD WORK DAY CCB(1st FLOOR) CABLE TERMINATION AND PUNCH LIST ELECTRICAL

5739 3923 08.02.2020 13.02.2020 COLD WORK DAY FWPB INSTALLATION OF THE PUMP MECHANICAL

5740 3924 08.02.2020 13.02.2020 COLD WORK DAY GT-22 NGFS CLEAN OF THE HOIST MECHANICAL

5741 3925 08.02.2020 13.02.2020 COLD WORK DAY GT-21 INSTALLATION OF THE HOIST MECHANICAL

5742 3927 08.02.2020 13.02.2020 COLD WORK DAY W/T CLEANING AND PAINTING MECHANICAL

5743 5029 09.02.2020 14.02.2020 COLD WORK DAY CCB TO ST BLDG TO AUX CABLE PULLING ELECTRIC TEAM
BOILER TO FFAC STG-10

5744 5031 08.02.2020 14.02.2020 COLD WORK DAY UEB-1 TO TR-11/12 CABLE PULLING AND TERMINATION AS PER NEW CABLE SCHEDULE ELECTRIC TEAM

5745 GE-HEC-1270 08.02.2020 13.02.2020 COLD WORK DAY GT-12 TO CARRY OUT CO2 FILING IN MAIN & RESERVE TANKS COMMISSIONING

5746 3928 08.02.2020 13.02.2020 COLD WORK DAY GT-21/22 GCB TESTING CABLE ELECTRICAL

5747 3929 08.02.2020 13.02.2020 COLD WORK DAY GT-21 TESTING CABLE ELECTRICAL

5748 3930 08.02.2020 14.02.2020 COLD WORK DAY GT-22 PEECC TESTING CABLE ELECTRICAL
5749 GE-HEC-1271 08.02.2020 14.02.2020 COLD WORK DAY GT-12 CABLE PULLING & TERMINATION(SHAFT MONITORING BRUSH TO JB164) ELECTRIC TEAM

5750 6097 08.02.2020 14.02.2020 COLD WORK DAY NGSS INSULATION AND CLADDING WORK MECHANIC TEAM

5751 6098 08.02.2020 14.02.2020 COLD WORK DAY BSDG CLEANING WORK INSIDE THE BUILDING MECHANIC TEAM

5752 12012 08.02.2020 14.02.2020 HOT WORK DAY GTB-1 CCW BENDED AND ADJUST THE HAND RAIL TOP SIDE MECHANIC TEAM

5753 12013 08.02.2020 14.02.2020 HOT WORK DAY GTB-2 CCW BENDED AND ADJUST THE HAND RAIL TOP SIDE MECHANIC TEAM

5754 5027 09.02.2020 15.02.2020 COLD WORK DAY CHEMICAL STORAGE CABLE TERMINATION & LOOP CHECK ELECTRIC TEAM

5755 3868 08.02.2020 13.02.2020 COLD WORK DAY GT-21 CABLE TERMINATION ELECTRICAL

5756 GE-HEC-1272 09.02.2020 15.02.2020 COLD WORK DAY GT-11 CO2 HP CYLINDER ARRANGEMENT AND INSTALLATION OF ACCESSORIES, PIPE PIPING TEAM
PAINTING

CO2 HP CYLINDER ARRANGEMENT AND INSTALLATION OF ACCESSORIES, PIPE


5757 GE-HEC-1273 09.02.2020 15.02.2020 COLD WORK DAY GT-12 PAINTING PIPING TEAM

5758 9961 09.02.2020 15.02.2020 COLD WORK DAY GT-22 LUBE OIL FLUSHING PASE 1/2/3 COMMISSIONING

5759 9962 09.02.2020 15.02.2020 COLD WORK DAY GT-22 DEMI WATER FLUSHING FOR CCW COMMISSIONING

5760 9963 09.02.2020 15.02.2020 COLD WORK DAY GT-21 CHEMICAL CLEANING COMMISSIONING

5761 9964 09.02.2020 15.02.2020 COLD WORK DAY GT-21 TRB COMPARTMENT & LPLP CO2 & FIRE PRTECTION, AIR BLOWING FOR GT-21 COMMISSIONING

5762 5033 10.02.2020 16.02.2020 COLD WORK DAY GT-21 CABLE TERMINATION & INSPECTION ELECTRIC TEAM

5763 1904 09.02.2020 14.02.2020 COLD WORK DAY GT-22 HYDROTEST QA/QC
5764 3624 09.02.2020 14.02.2020 COLD WORK DAY GT-21 NGFS REMOVAL RELIEF VALE PIPING TEAM

5765 3625 09.02.2020 14.02.2020 COLD WORK DAY GT-22 NGFS REMOVAL RELIEF VALE PIPING TEAM

5766 12014 09.02.2020 14.02.2020 HOT WORK DAY DWPB PUNCH ITEM CLEANING' GRINDING, CUTTING, WELDING' MECHANIC TEAM

5767 GE-HEC-1274 09.02.2020 15.02.2020 COLD WORK DAY GT-12 LCI TO LCI-21 FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

5768 3626 10.02.2020 16.02.2020 COLD WORK DAY W/T ERECTION & DISMANTLE OF SCAFFOLD PIPING TEAM

5769 GE-HEC-1275 11.02.2020 17.02.2020 HOT WORK DAY GT-GTG-12 GENERATOR LAGGING SUPPORT INSTALLAION MECHANIC TEAM

5770 GE-HEC-1276 10.02.2020 16.02.2020 COLD WORK DAY GT-GTG-11 COOLING FAN ENCLOSURE CHECKING AND MODIFICATION AS PER REQUIREMENT MECHANIC TEAM

5771 GE-HEC-1277 10.02.2020 16.02.2020 COLD WORK DAY GT-11 APPLYING SEALING COMPOUND TO ATEX SEALER AND INSPECTION WITH GE AND ELECTRIC TEAM

5772 GE-HEC-1278 10.02.2020 16.02.2020 COLD WORK DAY GT-11 APPLYING SEALING COMPOUND TO ATEX SEALER AND INSPECTION WITH GE AND ELECTRIC TEAM

5773 GE-HEC-1279 10.02.2020 16.02.2020 COLD WORK DAY GT-11 APPLYING SEALING COMPOUND TO ATEX SEALER AND INSPECTION WITH GE AND ELECTRIC TEAM

5774 GE-HEC-1280 10.02.2020 16.02.2020 COLD WORK DAY GT-11 APPLYING SEALING COMPOUND TO ATEX SEALER AND INSPECTION WITH GE AND ELECTRIC TEAM

5775 GE-HEC-1281 10.02.2020 16.02.2020 COLD WORK DAY GT-11 APPLYING SEALING COMPOUND TO ATEX SEALER AND INSPECTION WITH GE AND ELECTRIC TEAM

5776 GE-HEC-1282 10.02.2020 16.02.2020 COLD WORK DAY GT-12 APPLYING SEALING COMPOUND TO ATEX SEALER AND INSPECTION WITH GE AND ELECTRIC TEAM

5777 GE-HEC-1283 10.02.2020 16.02.2020 COLD WORK DAY GT-12 APPLYING SEALING COMPOUND TO ATEX SEALER AND INSPECTION WITH GE AND ELECTRIC TEAM

5778 GE-HEC-1284 10.02.2020 16.02.2020 COLD WORK DAY GT-12 APPLYING SEALING COMPOUND TO ATEX SEALER AND INSPECTION WITH GE AND ELECTRIC TEAM
5779 GE-HEC-1285 10.02.2020 16.02.2020 COLD WORK DAY GT-12 APPLYING SEALING COMPOUND TO ATEX SEALER AND INSPECTION WITH GE AND ELECTRIC TEAM

5780 GE-HEC-1286 10.02.2020 16.02.2020 COLD WORK DAY GT-12 APPLYING SEALING COMPOUND TO ATEX SEALER AND INSPECTION WITH GE AND ELECTRIC TEAM

5781 GE-HEC-1287 10.02.2020 16.02.2020 COLD WORK DAY GT-12 APPLYING SEALING COMPOUND TO ATEX SEALER AND INSPECTION WITH GE AND ELECTRIC TEAM

5782 GE-HEC-1288 10.02.2020 16.02.2020 COLD WORK DAY GT-12 APPLYING SEALING COMPOUND TO ATEX SEALER AND INSPECTION WITH GE AND ELECTRIC TEAM

5783 GE-HEC-1289 10.02.2020 16.02.2020 COLD WORK DAY GT-12 APPLYING SEALING COMPOUND TO ATEX SEALER AND INSPECTION WITH GE AND ELECTRIC TEAM

5784 GE-HEC-1290 10.02.2020 16.02.2020 COLD WORK DAY GT-12 FINAL INSPECTION WITH CEEG PIPING TEAM

5785 GE-HEC-1291 10.02.2020 16.02.2020 COLD WORK DAY GT-21 TOP W/D OF EXCITATION SYSTEM AND TRANSFORMER COMMISSIONING

5786 GE-HEC-1292 10.02.2020 16.02.2020 COLD WORK DAY UEB-1 TO BFP-12 CABLE PULLING ELECTRIC TEAM

5787 GE-HEC-1293 11.02.2020 17.02.2020 COLD WORK DAY GT-11 LCI TO ISOLATION TR-11 CABLE PULLING ELECTRIC TEAM

5788 5035 11.02.2020 17.02.2020 COLD WORK DAY CCB GLANDING AND TERMINATION ELECTRIC TEAM

5789 5034 10.02.2020 17.02.2020 COLD WORK DAY GT-21 LCI PUNCH CLEARING AND INSPECTION WITH GE AND CEEG ELECTRIC TEAM

5790 5037 10.02.2020 16.02.2020 COLD WORK DAY CCB CABLE TERMINATION & LOOP CHECK ELECTRIC TEAM

5791 5038 10.02.2020 16.02.2020 COLD WORK DAY ACB CABLE TERMINATION & LOOP CHECK ELECTRIC TEAM

5792 5002 10.02.2020 16.02.2020 COLD WORK DAY GT-21 PUNCH CLEARING AND INSPECTION WITH GE AND CEEG ELECTRIC TEAM

5793 9965 10.02.2020 16.02.2020 COLD WORK DAY BSDG COOLING WATER STRAINER INSPECTION WATER FILLING COMMISSIONING

5794 1063 10.02.2020 14.02.2020 COLD WORK DAY SWPB PUNCH CLEARING ITEMS: PAINTING OF PUMP, INSTALL COVER OF PUMP, CLEANI MECHANIC TEAM
5795 5036 10.02.2020 11.02.2020 COLD WORK DAY CCB HOIST PANEL POWER ENERGIZATION FROM CCB GENERAL SERVICE MCC TO BSDGELECTRIC TEAM

5796 17701 10.02.2020 13.02.2020 HOT WORK DAY FWPB CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5797 9425 11.02.2020 17.02.2020 COLD WORK DAY CCB CLIENT WALKDOWN INCLUDING MODIFICATION CEILING OPENING & TOUCH-UP PIPING TEAM

5798 9966 11.02.2020 17.02.2020 COLD WORK DAY H2 PLANT (YARD) WATER LINE FLUSHING COMMISSIONING

5799 1036 10.02.2020 13.02.2020 COLD WORK DAY SERVICE GAS SHEELTER PUNCH LIST ITEMS CLEARING, PAINTING, GREASING, INSTALLING NAMEPLAT MECHANIC TEAM

5800 1037 10.02.2020 13.02.2020 COLD WORK DAY SWPB PUNCH CLEAR" CLEARING, PAINTING, GREASING MECHANIC TEAM

5801 G-HEC-1294 09.02.2020 14.02.2020 COLD WORK DAY GT-11 PUNCH LIST INSTRUMENT TEAM

5802 G-HEC-1295 09.02.2020 14.02.2020 COLD WORK DAY GT-12 PUNCH LIST INSTRUMENT TEAM

5803 G-HEC-1296 11.02.2020 17.02.2020 COLD WORK DAY GT-12 PEECC GPP/12BAY50GH0 DISCONNECTING AND REMOVAL OF DELETED CABLES ELECTRIC TEAM

5804 5040 11.02.2020 17.02.2020 COLD WORK DAY GT-21 FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

5805 GE-HEC-1297 11.02.2020 17.02.2020 HOT WORK DAY GTB-1 REMOVING SCAFFOLDING FROM THE ROOF ARCHITECTURE TEAM

5806 5042 12.02.2020 18.02.2020 COLD WORK DAY GT-21 PUNCH CLEARING AS PER ATTACHED & HIGHLITED POINT ELECTRIC TEAM

5807 5043 12.02.2020 18.02.2020 COLD WORK DAY GT-22 CABLE PULLING & CABLE TERMINATION ELECTRIC TEAM

5808 GE-HEC-1298 10.02.2020 14.02.2020 COLD WORK DAY GT-12 PUNCH CLEARING AND INSPECTION(ONLY TIGHTENING) INSTRUMENT TEAM

5809 3936 11.02.2020 17.02.2020 COLD WORK DAY CCB(G.F) TESTING CABLE ELECTRICAL

5810 3937 11.02.2020 17.02.2020 COLD WORK DAY BSDG TESTING CABLE ELECTRICAL
5811 3938 11.02.2020 17.02.2020 COLD WORK DAY CCB(1st FLOOR) TESTING CABLE ELECTRICAL

5812 3939 11.02.2020 17.02.2020 COLD WORK DAY CCB(UPS ROOM) TESTING CABLE ELECTRICAL

5813 12047 11.02.2020 17.02.2020 HOT WORK DAY CCB SCAFFOLDING WORK & DOORS INSTALLATION ARCHITECTURE TEAM

5814 4641 11.02.2020 14.02.2020 COLD WORK DAY GT-21 LINE CABLE INSTALLATION INSTRUMENT TEAM

5815 4640 11.02.2020 17.02.2020 COLD WORK DAY NGSS PUNCH LIST INSTRUMENT TEAM

5816 3932 10.02.2020 16.02.2020 COLD WORK DAY W/T TESTING CABLE ELECTRICAL

5817 5068 12.02.2020 18.02.2020 COLD WORK DAY GT-21/22 GENERATOR MODIFICATION FOR THE INSTALLATION OF JB-163, 164 AND509 ELECTRIC TEAM

5818 7230 11.02.2020 17.02.2020 HOT WORK DAY GT-21 TEST OF PANEL ELECTRICAL

5819 GE-HEC-1299 12.02.2020 18.02.2020 COLD WORK DAY GT-12 TOP W/D OF TURNING GEAR COMMISSIONING

5820 GE-HEC-1300 12.02.2020 18.02.2020 COLD WORK DAY GT-21 TOP W/D OF OIL SYSTEMS AND STARTING MEANS COMMISSIONING

SCAFFOLDING DISMANTLING ACTIVITY AND FINAL CLEANING AFTER REMOVAL


5821 GE-HEC-1301 12.02.2020 18.02.2020 COLD WORK DAY GT-GTG-11 MECHANIC TEAM
SCAFFOLDING MATERIAL

5822 8472 15.02.2020 20.02.2020 COLD WORK DAY CCB(1st floor, G.F) PULLING CABLE ELECTRICAL

5823 GE-HEC-1302 12.02.2020 18.02.2020 HOT WORK DAY GTB-1 METAL CLADDING WORK AND DOORS INSTALLATION, SCAFFOLDING REMOVING ARCHITECTURE TEAM

5824 9967 12.02.2020 18.02.2020 COLD WORK DAY BSDG WATER AND OIL FILLING COMMISSIONING

5825 GE-HEC-1303 12.02.2020 18.02.2020 HOT WORK DAY GT-11 REPAIR DOOR COMMISSIONING

5826 1038 11.02.2020 14.02.2020 COLD WORK DAY W/T PUNCH CLEARING, TOUCH-UP PAINTING, HOUSSEKEEPING MECHANIC TEAM
5827 19319 15.02.2020 21.02.2020 HOT WORK DAY GT-21 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM

5828 19320 15.02.2020 21.02.2020 HOT WORK DAY GT-22 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM

5829 12252 15.02.2020 20.02.2020 HOT WORK DAY GT-21 GROUNDING INSTALLATION ELECTRICAL

5830 12253 15.02.2020 20.02.2020 HOT WORK DAY GT-22 GROUNDING INSTALLATION ELECTRICAL

5831 17710 15.02.2020 20.02.2020 HOT WORK DAY GT-22 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5832 17711 15.02.2020 20.02.2020 HOT WORK DAY GT-21 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5833 17712 15.02.2020 20.02.2020 HOT WORK DAY W/T CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5834 17714 15.02.2020 20.02.2020 HOT WORK DAY CCB(1ST FLOOR) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5835 17715 15.02.2020 20.02.2020 HOT WORK DAY BSDG CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5836 17716 15.02.2020 20.02.2020 HOT WORK DAY CCB(BASEMENT & G.F)) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5837 17720 15.02.2020 20.02.2020 HOT WORK DAY FWPB CONDUIT AND CABLE TRAY INSTALLATIO ELECTRICAL

5838 17724 15.02.2020 20.02.2020 HOT WORK DAY SWPB LIGHTING INSTALLATION ELECTRICAL

5839 17732 15.02.2020 21.02.2020 HOT WORK DAY GT-21/33 IPB CLEANIND AND WELDING ELEMENT MECHANIQUE

5840 17733 15.02.2020 21.02.2020 HOT WORK DAY GT-21/22 CLEANING, PAINTING AND FINISH WORK & PUNCH CLEAR WORKS MECHANIQUE

5841 6805 15.02.2020 21.02.2020 COLD WORK DAY DWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5842 6806 15.02.2020 21.02.2020 COLD WORK DAY SWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM
5843 6807 15.02.2020 21.02.2020 COLD WORK DAY ACB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5844 6808 15.02.2020 21.02.2020 COLD WORK DAY W/T INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5845 6809 15.02.2020 21.02.2020 COLD WORK DAY CCB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

5846 6852 15.02.2020 21.02.2020 COLD WORK DAY UEB-1 PANEL TESTING, INTERWIRING WORKS, BOLTING TERMINATION ELECTRIC TEAM

5847 6856 15.02.2020 21.02.2020 COLD WORK DAY CCB(G.F) PANEL CHECK, LINR CHECK CABLES ELECTRIC TEAM

5848 6859 15.02.2020 21.02.2020 COLD WORK DAY GT-21 PEECC PANEL TEST, INTER WIRING, WORKS, PUNCH LIST CLEANING ELECTRIC TEAM

5849 8541 15.02.2020 21.02.2020 HOT WORK DAY W/T CUTTING, DRILLING, GRINDING, CHIPPING WORKS INSTALLATION OF CONDUIT A ELECTRIC TEAM

5850 8542 15.02.2020 21.02.2020 HOT WORK DAY CCB CUTTING, DRILLING, GRINDING, CHIPPING WORKS INSTALLATION OF CONDUIT A ELECTRIC TEAM

5851 8583 15.02.2020 21.02.2020 HOT WORK DAY CCB SUPPORT AND CABLE TRAY INSTALLATION ELECTRIC TEAM

CUTTING, WELDING, DRILLING & GRINDING OF UNISTRUIT CHANNEL FOR


5852 8719 15.02.2020 21.02.2020 HOT WORK DAY GT-22 CONDUITS SUPPORT & INSTALLATION ELECTRIC TEAM

CUTTING, WELDING, DRILLING & GRINDING OF UNISTRUIT CHANNEL FOR


5853 8720 15.02.2020 21.02.2020 HOT WORK DAY GT-21 CONDUITS SUPPORT & INSTALLATION ELECTRIC TEAM

5854 12050 12.02.2020 18.02.2020 HOT WORK DAY UEB-1 STEEL ANGLE INSTALLATION WORK & WATER ROOF INSTALLATION ARCHITECTURE TEAM

5855 1039 15.02.2020 21.02.2020 COLD WORK DAY GT-21 NGFS CLEANING, PAINTING, SCAFFOLDING ACTIVITY MECHANIC TEAM

5856 1040 15.02.2020 21.02.2020 COLD WORK DAY GT-22 NGFS CLEANING, PAINTING, SCAFFOLDING ACTIVITY MECHANIC TEAM

5857 15543 17.02.2020 23.02.2020 HOT WORK DAY GT-GTG-22 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM

5858 15544 17.02.2020 23.02.2020 HOT WORK DAY GT-GTG-21 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM
5859 7251 11.02.2020 17.02.2020 COLD WORK DAY NGSS TEST OF PANEL ELECTRICAL

5860 3947 12.02.2020 14.02.2020 COLD WORK DAY CCB(UPS ROOM) CABLE TERMINATION WORK ELECTRICAL

5861 GE-HEC-1304 15.02.2020 21.02.2020 COLD WORK DAY GT-12 SCAFFOLDING INSTALLATION / DISMANTLE ELECTRIC TEAM

5862 GE-HEC-1305 15.02.2020 21.02.2020 COLD WORK DAY GT-11 SCAFFOLDING INSTALLATION / DISMANTLE ELECTRIC TEAM

FIRE FIGHTING SYSTEM - CO2 CONDUIT INSTALLATION , NAC CABLE LAYING


5863 GE-HEC-1306 15.02.2020 21.02.2020 HOT WORK DAY GT-12 TERMINATION, BENDING, JUMPER INSTALLATION ELECTRIC TEAM

FIRE FIGHTING SYSTEM - CO2 CONDUIT INSTALLATION , NAC CABLE LAYING


5864 GE-HEC-1307 15.02.2020 21.02.2020 HOT WORK DAY GT-11 TERMINATION, BENDING, JUMPER INSTALLATION ELECTRIC TEAM

REINSTATEMENT WORKS, GASKET REPLACEMENT, BOLTING, GROUTING


5865 15940 15.02.2020 21.02.2020 COLD WORK DAY GT-21 REPAIR/MODIFICATION OF PIPE SUPPORT PIPING TEAM

REINSTATEMENT WORKS, GASKET REPLACEMENT, BOLTING, GROUTING


5866 15941 15.02.2020 21.02.2020 COLD WORK DAY GT-22 REPAIR/MODIFICATION OF PIPE SUPPORT PIPING TEAM

INSTALLATION OF SUPPORTS, SAFETY VALVE & PNEUMATIC LINES, INSPECTION,


5867 15951 13.02.2020 19.02.2020 HOT WORK DAY GT-21 ACCESSORIES PAINTING, SCFFOLDING PIPING TEAM

INSTALLATION OF SUPPORTS, SAFETY VALVE & PNEUMATIC LINES, INSPECTION,


5868 15952 13.02.2020 19.02.2020 HOT WORK DAY GT-22 ACCESSORIES PAINTING, SCFFOLDING PIPING TEAM

5869 5072 15.02.2020 21.02.2020 COLD WORK DAY CCB CABLE TERMINATION & LOOP CHECK ELECTRIC TEAM

5870 5074 13.02.2020 19.02.2020 COLD WORK DAY CCB-UPS 230V UPS POWER ENERGIZATION FROM CCB TO GT-21 (TEMPORARY POWER SUPPELECTRIC TEAM

5871 7177 13.02.2020 19.02.2020 COLD WORK DAY UEB-2, BSDG, GCB21&22, PEEC LINE CHECK COMMISSIONING

5872 8580 13.02.2020 19.02.2020 COLD WORK DAY GTB-1 CCW DISMANTAL OF SCAFFOLDING ELECTRIC TEAM

5873 GE-HEC-1308 15.02.2020 20.02.2020 COLD WORK DAY GT-11 PERFORMING COMMISSIONINGWORK COMMISSIONING

5874 GE-HEC-1309 15.02.2020 20.02.2020 COLD WORK DAY GT-12 PERFORMING COMMISSIONINGWORK COMMISSIONING
5875 GE-HEC-1310 15.02.2020 20.02.2020 COLD WORK DAY GT-11 PEECC COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING COMMISSIONING
VALVE AND DEVISE START MOTOR

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


5876 GE-HEC-1311 15.02.2020 20.02.2020 COLD WORK DAY GT-12 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

5877 8818 15.02.2020 21.02.2020 HOT WORK DAY CCB CONDUIT & PANEL INSTALLATION ELECTRIC TEAM

5878 12036 15.02.2020 21.02.2020 HOT WORK DAY CCB(G.F) CABLE PULING & CABLE TERMINATION , CONDUIT INSTALLATION INSTRUMENT TEAM

5879 8882 15.02.2020 21.02.2020 COLD WORK DAY NGSS PAINTING & TOUCH-UP PIPING

5880 8949 15.02.2020 21.02.2020 COLD WORK DAY GT-22 PAINTING AND PIPE INSULATION WORK PIPING

5881 8953 15.02.2020 21.02.2020 COLD WORK DAY NGFS-21 PAINTING AND PIPE INSULATION WORK PIPING

5882 8952 15.02.2020 21.02.2020 COLD WORK DAY NGFS-22 PAINTING AND PIPE INSULATION WORK PIPING

5883 8954 15.02.2020 21.02.2020 COLD WORK DAY GT-21 PAINTING AND PIPE INSULATION WORK PIPING

5884 14214 15.02.2020 21.02.2020 HOT WORK DAY GT-22 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

5885 14232 15.02.2020 21.02.2020 HOT WORK DAY UEB-1 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

5886 14233 15.02.2020 21.02.2020 HOT WORK DAY CCB(1st FLOOR) HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

5887 14236 15.02.2020 21.02.2020 HOT WORK DAY GT-21 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

5888 5045 15.02.2020 21.02.2020 COLD WORK DAY W/T PUNCH CLEANING & TOUCH-UP PAINTING & HOUSEKEEPING MECHANIC TEAM

5889 GE-HEC-1312 15.02.2020 21.02.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE ACTIVITY MECHANIC TEAM

5890 GE-HEC-1313 15.02.2020 21.02.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE ACTIVITY MECHANIC TEAM

5891 GE-HEC-1314 15.02.2020 21.02.2020 COLD WORK DAY GT-12 FLANGE BOLTS RETIGHTENING COMMISSIONING
5892 3834 15.02.2020 20.02.2020 COLD WORK DAY CCB(1st FLOOR) CABLE TERMINATION AND PUNCH LIST ELECTRICAL

5893 3835 15.02.2020 20.02.2020 COLD WORK DAY GT-21 CABLE TERMINATION WORK AND PUNCH LIST CLARING ELECTRICAL

5894 3833 15.02.2020 20.02.2020 COLD WORK DAY CCB(DCS) CABLE TERMINATION AND PUNCH LIST ELECTRICAL

5895 GE-HEC-1315 15.02.2020 15.02.2020 COLD WORK DAY GT-12 CABLE LINE CHECK INSTRUMENT TEAM

5896 GE-HEC-1316 15.02.2020 15.02.2020 COLD WORK DAY GT-11 CABLE LINE CHECK INSTRUMENT TEAM

5897 5084 15.02.2020 21.02.2020 COLD WORK DAY BSDG CABLE TERMINATION & LOOP CHECK ELECTRIC TEAM

5898 9969 15.02.2020 21.02.2020 COLD WORK DAY GT-22 LUBE OIL FLUSHING PASE 1/2/3 COMMISSIONING

5899 9970 15.02.2020 21.02.2020 COLD WORK DAY GT-22 DEMI WATER FLUSHING FOR CCW COMMISSIONING

5900 9971 15.02.2020 21.02.2020 COLD WORK DAY GT-21 CHEMICAL CLEANING COMMISSIONING

5901 3832 15.02.2020 20.02.2020 COLD WORK DAY CCB(G.F) CABLE TERMINATION AND PUNCH LIST ELECTRICAL

5902 3836 15.02.2020 20.02.2020 COLD WORK DAY GT-22 PUNCH LIST CLEARING ELECTRICAL

5903 5076 15.02.2020 21.02.2020 COLD WORK DAY CCB-DCS(1st FLOOR) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRICAL

5904 5077 15.02.2020 21.02.2020 COLD WORK DAY CCB-DCS(G.F) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRICAL

5905 5078 15.02.2020 21.02.2020 COLD WORK DAY CCB-SWGR & UPS PUNCH CLEAR, CABLE LINE CHECK, CABLE ARRANGEMENT, CABLE CONNECTION & ELECTRICAL

5906 5079 15.02.2020 21.02.2020 COLD WORK DAY GT-21 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRICAL
5907 5080 15.02.2020 21.02.2020 COLD WORK DAY GT-22 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRICAL

5908 5081 15.02.2020 21.02.2020 COLD WORK DAY NGSS PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRICAL

5909 5082 15.02.2020 21.02.2020 COLD WORK DAY BSDG PUNCH, CONDUIT, BALLAST FCL LIGHTING INSTALALTION, CABLE CONNECTION & IELECTRICAL

5910 5478 15.02.2020 21.02.2020 HOT WORK DAY FWPB PIPING INSTALLATION & SUPPORT INSTALLATION INCLUDING CUTTING, GRINDINGPIPING TEAM

5911 1041 15.02.2020 21.02.2020 COLD WORK DAY DWPB PUNCH CLEAR ITEMS INSIDE THE BUILDING MECHANIC TEAM

5912 1042 15.02.2020 21.02.2020 COLD WORK DAY GTB-1 CCW PUNCH CLEAR ITEMS' BELT TENSIOING CHECKING MECHANIC TEAM

5913 1043 15.02.2020 21.02.2020 COLD WORK DAY GTB-2 CCW PUNCH CLEAR ITEMS ' GREED FIXING, PAINTING MECHANIC TEAM

5914 1044 15.02.2020 21.02.2020 COLD WORK DAY NGSS INSULATION WORK OF VALVES AND RIPS MECHANIC TEAM

5915 6099 15.02.2020 21.02.2020 COLD WORK DAY SWPB PUNCH CLEAR ITEMS INSIDE THE BUILDING MECHANIC TEAM

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


5916 GE-HEC-1317 15.02.2020 21.02.2020 COLD WORK DAY GT-21 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

5917 5083 16.02.2020 21.02.2020 COLD WORK DAY CCB(DCS 1st .F G.F TO STB 10, CABLE PULLING ELECTRIC TEAM
AUX BOILER, FFAC10)

5918 6666 16.02.2020 22.02.2020 COLD WORK DAY UEB-1 TO CCB CABLE TERMINATION AND CONTINUITY TEST ELECTRIC TEAM

5919 GE-HEC-1318 16.02.2020 22.02.2020 COLD WORK DAY GT-21 CHEMICAL CLEANING COMMISSIONING

5920 GE-HEC-1319 16.02.2020 21.02.2020 HOT WORK DAY GT-11 METAL CLADING ACCESSORY, FLUSHING WORK ARCHITECTURE

5921 GE-HEC-1320 16.02.2020 21.02.2020 HOT WORK DAY GT-12 METAL CLADING ACCESSORY, FLUSHING WORK ARCHITECTURE
5922 GE-HEC-1321 16.02.2020 21.02.2020 HOT WORK DAY GT-21 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

5923 16885 16.02.2020 22.02.2020 HOT WORK DAY UEB #2 Energizing Feeders for PECC21 MCC groups ELECTRIC TEAM

5924 GE-HEC-1322 15.02.2020 21.02.2020 HOT WORK DAY GT-12 NGFS SCAFFOLDING, GUTTERS INSTALLATION ARCHITECTURE TEAM

5925 GE-HEC-1323 16.02.2020 21.02.2020 COLD WORK DAY UEB-1 CABLE LINE CHECK INSTRUMENT TEAM

5926 5109 17.02.2020 23.02.2020 COLD WORK DAY ACB CABLE TERMINATION & LOOP CHECK ELECTRIC TEAM

5927 5148 16.02.2020 22.02.2020 COLD WORK DAY PEECC-22 TO GTB-2 CABLE TERMINATION AND INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

5928 GE-HEC-1324 16.02.2020 22.02.2020 COLD WORK DAY GT-11 NGFS & GAS FUEL MODULLEAK TEST WITH NATURAL GAS FOR GT-11 NGFS & GAS FUEL MODULE COMMISSIONING

5929 3974 16.02.2020 20.02.2020 COLD WORK DAY W/T PULLING CABLE AND CABLE TERMINATION ELECTRICAL

5930 GE-HE-1325 16.02.2020 22.02.2020 HOT WORK DAY GT-21 PEECC INSTALLATION OF DOOR (LOCK SUPPORT) COMMISSIONING

5931 3979 16.02.2020 22.02.2020 COLD WORK DAY CCB TESTING CABLE(HIPOT TEST) ELECTRICAL

5932 3975 16.02.2020 22.02.2020 COLD WORK DAY W/T TESTING CABLE ELECTRICAL

5933 3976 16.02.2020 22.02.2020 COLD WORK DAY GT-22 PEECC TESTING CABLE ELECTRICAL

5934 3941 16.02.2020 22.02.2020 COLD WORK DAY CCB(1st FLOOR) TESTING CABLE ELECTRICAL

5935 GE-HEC-1326 18.02.2020 24.02.2020 COLD WORK DAY GT-11 LCI TO ISOLATION TR-11 CABLE PULLING ELECTRIC TEAM

5936 GE-HEC-1327 17.02.2020 23.02.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM
5937 GE-HEC-1328 17.02.2020 23.02.2020 COLD WORK DAY GT-12 NGFS INSULATION WORK PIPING

5938 GE-HEC-1329 17.02.2020 23.02.2020 COLD WORK DAY GT-21 TOP W/D OF HEATING AND VENTILATION SYSTEM COMMISSIONING

5939 5154 17.02.2020 23.02.2020 COLD WORK DAY GT-22 FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

5940 GE-HEC-1330 17.02.2020 23.02.2020 COLD WORK DAY GT-GTG-11 COOLING FAN ENCLOSURE CHECKING AND MODIFICATION AS PER REQUIREMENT MECHANIC TEAM

5941 3972 16.02.2020 20.02.2020 COLD WORK DAY UEB-2 CABLE TERMINATION WORK ELECTRICAL

5942 5155 17.02.2020 23.02.2020 COLD WORK DAY GT-22 BOTTOM PLATE INSTALLATION & INSPECTION ELECTRIC TEAM

5943 GE-HEC-1331 17.02.2020 23.02.2020 COLD WORK DAY GT-GTG-11 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5944 8582 17.02.2020 23.02.2020 HOT WORK DAY UEB-1 CABLE TRAY INSTALLATION ELECTRIC TEAM

5945 8851 17.02.2020 23.02.2020 HOT WORK DAY UEB-1 (SWGR-MV LOOP CHECKING, FUNCTIONAL TEST ELECTRIC TEAM

5946 5112 17.02.2020 23.02.2020 COLD WORK DAY GT-22 PEECC PANEL CLEANING, INSTALLA GROUNDING, FIXING BOLTS INSPECTION ELECTRIC TEAM

5947 3977 16.02.2020 22.02.2020 COLD WORK DAY BSDG TESTING CABLE ELECTRICAL

5948 9973 18.02.2020 24.02.2020 COLD WORK DAY GT-22 MOTOR DC RESTORATION COMMISSIONING

5949 GE-HEC-1332 18.02.2020 24.02.2020 COLD WORK DAY GT-21 PUNCH CLEARING AS PER HIGHLITED LIST ELECTRIC TEAM

5950 GE-HEC-1333 18.02.2020 24.02.2020 COLD WORK DAY GT-21 PEECC TESTING RESISTANCE GROUNDING ELECTRICAL

5951 GE-HEC-1334 18.02.2020 24.02.2020 COLD WORK DAY GT-21 PEECC TESTING RESISTANCE GROUNDING ELECTRICAL
5952 GE-HEC-1335 18.02.2020 24.02.2020 COLD WORK DAY GT-GTG-12 GENERATOR LAGGING SUPPORT INSTALLAION MECHANIC TEAM

5953 GE-HEC-1336 18.02.2020 24.02.2020 HOT WORK DAY GT-12 PEECC GPP-GCB-12 LOOP CHECKING, ENERGIZING PANEL / FUNCTIONAL TEST ELECTRIC TEAM

5954 GE-HEC-1337 18.02.2020 24.02.2020 HOT WORK DAY GT-11 PEECC GPP-GCB-11 LOOP CHECKING, ENERGIZING PANEL / FUNCTIONAL TEST ELECTRIC TEAM

5955 GE-HEC-1338 18.02.2020 21.02.2020 HOT WORK DAY GT-21 ADDITIONAL CABLE SUPPORT INSTALLATION ELECTRIC TEAM

5956 GE-HEC-1339 18.02.2020 24.02.2020 COLD WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

5957 GE-HEC-1340 18.02.2020 24.02.2020 COLD WORK DAY GT-11, 12, 21 88IC-1 TESTING COMMISSIONING

5958 GE-HEC-1341 18.02.2020 24.02.2020 COLD WORK DAY GT-21 TOP W/D OF GT FIRE PROTECTION SYSTEM COMMISSIONING

5959 GE-HEC-1342 18.02.2020 24.02.2020 COLD WORK DAY GT-21 PEECC TEST THE EARTH RESISTANCE OF UPS AND DC PANEL ELECTRIC TEAM

5960 GE-HEC-1343 18.02.2020 24.02.2020 COLD WORK DAY GT-11 NGFS PAINTING PIPE INSULATION PIPING

5961 GE-HEC-1344 18.02.2020 20.02.2020 COLD WORK DAY GT-21 PEECC PUNCH CLEARING ELECTRICAL

5962 GE-HEC-1345 18.02.2020 20.02.2020 COLD WORK DAY GT-21 EXCITATION ROOM PUNCH CLEARING ELECTRICAL

5963 GE-HEC-1346 18.02.2020 20.02.2020 COLD WORK DAY GT-21 PUNCH CLEARING ELECTRICAL

5964 9974 18.02.2020 24.02.2020 COLD WORK DAY GT-22(CCW) REPLACE THE CHECK VALVE FOR GT-22 CCW COMMISSIONING

5965 5157 18.02.2020 24.02.2020 COLD WORK DAY GT-22 CABLE CONTINUITY TEST ELECTRIC TEAM

5966 GE-HEC-1347 18.02.2020 24.02.2020 COLD WORK DAY GT-12 SIGN BOARD INSTALLATION ACTIVITY MECHANIC TEAM
5967 GE-HEC-1348 18.02.2020 24.02.2020 COLD WORK DAY GT-11 SIGN BOARD INSTALLATION ACTIVITY MECHANIC TEAM

5968 9976 18.02.2020 24.02.2020 COLD WORK DAY GT-22 88-IC1 TESTING COMMISSIONING

5969 8641 18.02.2020 24.02.2020 HOT WORK DAY GT-22 PEECC DOORS INSTALLATION & METAL CLADING ARCHITECTURE TEAM

5970 12280 18.02.2020 20.02.2020 HOT WORK DAY ACB CONDUIT FAIRE ALARM AND LIGHTING ELECTRICAL

5971 GE-HEC-1349 19.02.2020 25.02.2020 COLD WORK DAY GT-11 CABLE CONTINUITY TEST ELECTRIC TEAM

5972 GE-HEC-1350 19.02.2020 25.02.2020 COLD WORK DAY GT-12 CABLE CONTINUITY TEST ELECTRIC TEAM

5973 GE-HEC-1351 19.02.2020 25.02.2020 COLD WORK DAY GT-21 CABLE CONTINUITY TEST ELECTRIC TEAM

5974 GE-HEC-1352 19.02.2020 25.02.2020 COLD WORK DAY GT-12 VISUAL INSPECTION FOR PUNCH WITH GE AND CEEG ELECTRIC TEAM

5975 GE-HEC-1353 19.02.2020 25.02.2020 COLD WORK DAY GT-21 BATTERY ROOM PANEL PUNCHLIST CLEARING WORKS AS PER ATTACHED ELECTRIC TEAM

5976 GE-HEC-1354 19.02.2020 25.02.2020 COLD WORK DAY GT-21 PEECC/EXCI PANEL PUNCHLIST CLEARING WORKS AS PER ATTACHED ELECTRIC TEAM

5977 GE-HEC-1355 19.02.2020 25.02.2020 COLD WORK DAY GT-21 PUNCH CLEARING AS PER ATTACHED HIGHLIGHTED LIST ELECTRIC TEAM

5978 GE-HEC-1356 19.02.2020 25.02.2020 COLD WORK DAY GT-21 PUNCH CLEARING AS PER ATTACHED HIGHLIGHTED LIST ELECTRIC TEAM

5979 GE-HEC-1357 19.02.2020 25.02.2020 COLD WORK DAY GT-21 PUNCH CLEARING AS PER ATTACHED HIGHLIGHTED LIST ELECTRIC TEAM

5980 GE-HEC-1358 19.02.2020 25.02.2020 COLD WORK DAY GT-21 GCB PUNCH CLEAR WORK ATTACHED WITH HIGHLIGHTED LIST AND INSPECTION ELECTRIC TEAM

5981 GE-HEC-1359 19.02.2020 25.02.2020 HOT WORK DAY GT-12 SURFACE GRINDING COMMISSIONING

5982 3945 18.02.2020 20.02.2020 COLD WORK DAY W/T CLEANING AND PAINTING MECHANICAL

5983 GE-HEC-1360 19.02.2020 25.02.2020 HOT WORK DAY GT-GTG-12 SHAFT MACHINING ACTIVITY MECHANIC TEAM
5984 GE-HEC-1361 19.02.2020 24.02.2020 HOT WORK DAY GT-21 TEMPORORY DOOR REPAIR WORK AND GRINDER OF FLOOR ARCHITECTURE TEAM

5985 GE-HEC-1362 19.02.2020 25.02.2020 COLD WORK DAY GT-11 PEECC CABLE LINE CHECK INSTRUMENT TEAM

5986 GE-HEC-1363 22.02.2020 28.02.2020 COLD WORK DAY GT-21 INSTRUMENT INSTALLATION & CALIBRATION INSTRUMENT TEAM

5987 7366 18.02.2020 20.02.2020 COLD WORK DAY CCB(UPS ROOM) CABLE TERMINATION WORK ELECTRICAL

5988 8642 19.02.2020 24.02.2020 HOT WORK DAY UEB-1 ACCESS FLOOR INSTALLATION ARCHITECTURE TEAM

5989 7178 19.02.2020 25.02.2020 COLD WORK DAY BSDG WATER AND OIL FILLING COMMISSIONING

5990 3981 22.02.2020 27.02.2020 COLD WORK DAY CCB(G.F/1ST F) CABLE PULLING ELECTRICAL

5991 3986 22.02.2020 27.02.2020 COLD WORK DAY CHEMICAL DOSAGE CABLE PULLING ELECTRICAL

5992 12270 22.02.2020 27.02.2020 HOT WORK DAY FWPB CONDUIT AND CABLE TRAY INSTALLATION ELECTRICAL

5993 12271 22.02.2020 27.02.2020 HOT WORK DAY CCB(1st floror) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5994 12275 22.02.2020 27.02.2020 HOT WORK DAY CCB(G.F/BAS) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5995 17728 22.02.2020 27.02.2020 HOT WORK DAY W/T CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5996 17727 22.02.2020 27.02.2020 HOT WORK DAY GT-22 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5997 12272 22.02.2020 27.02.2020 HOT WORK DAY BSDG CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5998 12273 22.02.2020 27.02.2020 HOT WORK DAY SWPB CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

5999 19323 22.02.2020 28.02.2020 HOT WORK DAY GT-22 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM
6000 8804 22.02.2020 28.02.2020 HOT WORK DAY UEB-1 FIRE ALARM DEVIES , TESTING, CABLE TRAY INSTALLATION & CONDUIT MODIFICA ELECTRIC TEAM

CUTTING, DRILLING, GRINDING OF UNISTRUIT CHANNEL FOR CONDUIT SUPPORT


6001 8721 22.02.2020 28.02.2020 HOT WORK DAY GT-22 ELECTRIC TEAM
& INSTALLATION

6002 8644 19.02.2020 25.02.2020 HOT WORK DAY CCB(1st floor) GYPSM BOARD WORK ARCHITECTURE TEAM

6003 6860 22.02.2020 28.02.2020 COLD WORK DAY UEB-1 PANEL CHECK INTERWIRING CONNECTION, FIBER OPTIC BOX INSTALL ELECTRIC TEAM

6004 6861 22.02.2020 28.02.2020 COLD WORK DAY CCB PANEL CHECK, LINE CHECK, INTERWIRING WORKS ELECTRIC TEAM

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


6005 GE-HEC-1364 22.02.2020 27.02.2020 COLD WORK DAY GT-11 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


6006 GE-HEC-1365 22.02.2020 27.02.2020 COLD WORK DAY GT-12 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

6007 GE-HEC-1366 22.02.2020 27.02.2020 COLD WORK DAY GT-12 PERFORMING COMMISSIONING WORK COMMISSIONING

6008 GE-HEC-1367 22.02.2020 27.02.2020 COLD WORK DAY GT-11 PERFORMING COMMISSIONING WORK COMMISSIONING

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


6009 GE-HEC-1368 22.02.2020 27.02.2020 COLD WORK DAY GT-21 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

6010 GE-HEC-1369 22.02.2020 27.02.2020 HOT WORK DAY GT-21 INSTALLATION CONDUIT AND PULLING CABLE TERMINATION OF PANEL PLUG ELECTRICAL

6011 GE-HEC-1370 22.02.2020 27.02.2020 HOT WORK DAY GT-21 INSTALLATION CONDUIT AND PULLING CABLE , TERMINATION OF FIRE ALARM ELECTRICAL

6012 GE-HEC-1371 22.02.2020 27.02.2020 HOT WORK DAY GT-21 INSTALLATIO OF PANEL ELECTRICAL

FIRE FIGHTING SYSTEM-CONDUIT INSTALLATION CABLE LAYING TEERMINATION


6013 GE-HEC-1372 22.02.2020 28.02.2020 HOT WORK DAY GT-11 BENDING JUMBER INSTALLATION ELECTRIC TEAM
FIRE FIGHTING SYSTEM-CONDUIT INSTALLATION CABLE LAYING TEERMINATION
6014 GE-HEC-1373 22.02.2020 28.02.2020 HOT WORK DAY GT-12 BENDING JUMBER INSTALLATION ELECTRIC TEAM

6015 GE-HEC-1374 20.02.2020 26.02.2020 HOT WORK DAY GT-21 PEECC MAKING HOLE FOR INTERNAL CABLE TERMINATION ELECTRIC TEAM

6016 GE-HEC-1375 20.02.2020 26.02.2020 HOT WORK DAY GT-21 PEECC MAKING HOLE FOR INTERNAL CABLE TERMINATION ELECTRIC TEAM

6017 GE-HEC-1376 20.02.2020 26.02.2020 HOT WORK DAY GT-GTG-12 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

6018 GE-HEC-1377 20.02.2020 26.02.2020 COLD WORK DAY GT-11/12 MOTOR TEST(LUBE OIL SKID) COMMISSIONING

6019 GE-HEC-1378 20.02.2020 26.02.2020 HOT WORK DAY GT-21 GROUNDING INSTALLATION ELECTRICAL

F/F REINSTATMENT, PIPE SUPPORT INSTALLATION, PUNCH CLEARING, PAINTING,


6020 15983 20.02.2020 26.02.2020 HOT WORK DAY GT-21 SCAFFOLDING WORK PIPING TEAM

F/F REINSTATMENT, PIPE SUPPORT INSTALLATION, PUNCH CLEARING, PAINTING,


6021 15984 20.02.2020 26.02.2020 HOT WORK DAY GT-22 SCAFFOLDING WORK PIPING TEAM

REINSTATEMENT WORKS, GASKET REPLACEMENT, BOLTING, GROUTING


6022 15981 22.02.2020 28.02.2020 HOT WORK DAY GT-21 REPAIR/MODIFICATION OF PIPE SUPPORT PIPING TEAM

REINSTATEMENT WORKS, GASKET REPLACEMENT, BOLTING, GROUTING


6023 15982 22.02.2020 28.02.2020 HOT WORK DAY GT-22 REPAIR/MODIFICATION OF PIPE SUPPORT PIPING TEAM

6024 8549 22.02.2020 28.02.2020 HOT WORK DAY CCB CABLE TRAY INSTALLATION ELECTRIC TEAM

6025 12302 22.02.2020 27.02.2020 HOT WORK DAY GT-22 GROUNDING INSTALLATION ELECTRICAL

6026 5053 22.02.2020 28.02.2020 COLD WORK DAY W/T PUNCH CLEARING è TOUCH-UP PAINTING HOUSEKEEPING MECHANIC TEAM

6027 GE-HEC-1379 22.02.2020 27.02.2020 COLD WORK DAY GT-21 PUNCH CLEARING ELECTRICAL
6028 GE-HEC-1380 22.02.2020 27.02.2020 COLD WORK DAY GT-21 PUNCH CLEARING ELECTRICAL

6029 GE-HEC-1381 22.02.2020 27.02.2020 COLD WORK DAY GT-21 PUNCH CLEARING ELECTRICAL

6030 GE-HEC-1382 22.02.2020 28.02.2020 COLD WORK DAY GT-12 RECTIFICATION OF PUNCH AND INSPECTION INSTRUMENT TEAM

6031 GE-HEC-1383 22.02.2020 28.02.2020 COLD WORK DAY GT-12 RECTIFICATION OF PUNCH AND INSPECTION INSTRUMENT TEAM

6032 14238 22.02.2020 28.02.2020 HOT WORK DAY CCB(1st FLOOR) HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

6033 14247 22.02.2020 28.02.2020 HOT WORK DAY UEB-1 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

6034 19751 22.02.2020 28.02.2020 HOT WORK DAY GT-22 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

6035 8955 22.02.2020 28.02.2020 COLD WORK DAY GT-22 NGFS PAINTING AND PIPE INSULATION WORK PIPING

6036 8957 22.02.2020 28.02.2020 COLD WORK DAY NGSS PAINTING TOUCH-UP PIPING

6037 8747 22.02.2020 28.02.2020 HOT WORK DAY CCB CABLE PULLING & TERMINATION INSTRUMENT TEAM

6038 1047 22.02.2020 28.02.2020 COLD WORK DAY GT-22 NGFS CLEANING, PAINTING, SCAFFOLDING ACTIVITY MECHANIC TEAM

6039 8853 21.02.2020 27.02.2020 HOT WORK DAY UEB-1 MCC MODULE MODIFICATION WORKS OF MCC/RE-ENEGIZING AFTER COMPLETION ELECTRIC TEAM

6040 17897 22.02.2020 27.02.2020 HOT WORK DAY GT-22 IPB WELDING AND CLEANING ELEMENT IPB MECHANICAL

6041 17898 22.02.2020 27.02.2020 HOT WORK DAY GT-22 CLEANINIG AND PAINTING MECHANICAL
6042 5181 20.02.2020 26.02.2020 COLD WORK DAY GT-22 NGFS CABLE TERMINATION ELECTRIC TEAM

6043 GE-HEC-1384 22.02.2020 28.02.2020 COLD WORK DAY GT-12 CLEANING (INSPECTION WITH GE AND CEEG) GENU-12-02 ELECTRIC TEAM

6044 GE-HEC-1385 22.02.2020 28.02.2020 COLD WORK DAY GT-12 CLEANING (INSPECTION WITH GE AND CEEG) GTU-12-11 ELECTRIC TEAM

6045 GE-HEC-1386 22.02.2020 28.02.2020 COLD WORK DAY GT-12 CLEANING AND TORQUING OF CABLE (INSPECTION WITH GE AND CEEG) GENU-12-ELECTRIC TEAM

6046 GE-HEC-1387 22.02.2020 28.02.2020 COLD WORK DAY GT-12 PUNCH CLEARING(INSPECTION WITH GE AND CEEG) GTU-12-01 ELECTRIC TEAM

6047 GE-HEC-1388 22.02.2020 28.02.2020 COLD WORK DAY GT-12 CLEANING( INSPCTION WITH GE AND CEEG) ELECTRIC TEAM

6048 GE-HEC-1389 22.02.2020 27.02.2020 HOT WORK DAY GT-21 GROUNDING INSTALLATION ELECTRICAL

6049 GE-HEC-1390 20.02.2020 26.02.2020 COLD WORK DAY GTB-1 REMOVING SCAFFOLDING ARCHITECTURE TEAM

6050 GE-HEC-1391 21.02.2020 26.02.2020 COLD WORK DAY GT-21 NGFS CABLE TERMINATION AS PER ATTACHED CABLE TEST ELECTRIC TEAM

6051 GE-HEC-1392 22.02.2020 26.02.2020 HOT WORK DAY GT-21 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING HVAC

6052 GE-HEC-1393 22.02.2020 26.02.2020 COLD WORK DAY GT-12 HVAC(DUCT WORK, FIXATION, ISOLATION HVAC

6053 GE-HEC-1394 22.02.2020 26.02.2020 COLD WORK DAY GT-11 HVAC(DUCT WORK, FIXATION, ISOLATION HVAC

6054 GE-HEC-1395 22.02.2020 26.02.2020 COLD WORK DAY GT-12 REMOVE THE BLIND FLANGE & LEAK TEST WITH NATURAL GAS COMMISSIONING

6055 GE-HEC-1396 22.02.2020 26.02.2020 COLD WORK DAY GT-12 MOTOR GREASE INJECTION COMMISSIONING

6056 8819 22.02.2020 28.02.2020 HOT WORK DAY CCB INSTALLATION OF CONDUIT & PANEL ELECTRIC TEAM
6057 5073 22.02.2020 28.02.2020 COLD WORK DAY BSDG CABLE TERMINATION & LOOP CHECK ELECTRIC TEAM

6058 5183 22.02.2020 28.02.2020 COLD WORK DAY CCB CABLE TERMINATION & LOOP CHECK & INSTALLATION OF SCAFFOLDING ELECTRIC TEAM

6059 8547 22.02.2020 28.02.2020 HOT WORK DAY CCB CUTTING, DRILLING, GRINDING, CHIPPING WORKS INSTALLATION OF CONDUIT A ELECTRIC TEAM

6060 5548 22.02.2020 28.02.2020 HOT WORK W/T CUTTING, DRILLING, GRINDING, CHIPPING WORKS INSTALLATION OF CONDUIT A ELECTRIC TEAM

6061 6810 22.02.2020 28.02.2020 COLD WORK W/T INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

6062 6811 22.02.2020 28.02.2020 COLD WORK CCB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

6063 GE-HEC-1397 22.02.2020 22.02.2020 COLD WORK DAY GT-11 TRANSFORMER FIRE ALARM DEVIES TESTING ELECTRIC TEAM

6064 GE-HEC-1398 22.02.2020 28.02.2020 COLD WORK DAY GT-11 ENERGIZATION OF PD PANEL AUTO TRANSFOR SWITCH(LFAP)/ FIRE ALARM DEVIESELECTRIC TEAM

6065 7179 22.02.2020 28.02.2020 COLD WORK DAY UEB-1, UEB-2, CCB LINE CHECK COMMISSIONING

6066 7158 22.02.2020 28.02.2020 COLD WORK DAY GT-22 DEMI WATER FLUSHING FOR CCW COMMISSIONING

6067 7159 22.02.2020 28.02.2020 COLD WORK DAY GT-22 LUBE OIL FLUSHING PASE 1/2/3 COMMISSIONING

6068 GE-HEC-1399 22.02.2020 28.02.2020 COLD WORK DAY GT-11 OPEN THE MOTOR COVER & INSPECTION COMMISSIONING

6069 5186 22.02.2020 28.02.2020 COLD WORK DAY GT-22 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6070 5187 22.02.2020 28.02.2020 COLD WORK DAY NGSS PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6071 5188 22.02.2020 28.02.2020 COLD WORK DAY CCB-SWGR & UPS PUNCH CLEAR, CABLE LINE CHECK CABLE ARRANGEMENT, CABLE CONNECTION & ELECTRIC TEAM
6072 5189 22.02.2020 28.02.2020 COLD WORK DAY CCB-DCS(G.F) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6073 5190 22.02.2020 28.02.2020 COLD WORK DAY CCB-DCS(1st FLOOR) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6074 5191 22.02.2020 28.02.2020 COLD WORK DAY BSDG PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6075 7231 22.02.2020 28.02.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

6076 5180 23.02.2020 29.02.2020 COLD WORK DAY CCB TO HRSG-11 CABLE PULLING ELECTRIC TEAM

6077 1048 22.02.2020 28.02.2020 COLD WORK DAY NGSS INSULATION WORK MECHANIC TEAM

6078 1049 22.02.2020 28.02.2020 COLD WORK DAY SWPB PUNCH CLEAR ITEMS OF PUMPS, TANK MECHANIC TEAM

6079 5054 22.02.2020 28.02.2020 COLD WORK DAY SERVICE GAS SHEELTER LAPPING OF THE VALVES MECHANIC TEAM

6080 5192 23.02.2020 29.02.2020 COLD WORK DAY PEECC-22 TO GTB-2 CABLE TERMINAATION AND INSPECTION WITH QC, CEEG ELECTRIC TEAM

6081 5055 22.02.2020 28.02.2020 COLD WORK DAY GTB-1 CCW PUNCH CLEAR ITEMS 'CLEANING, PAINTING, REDRECING' MECHANIC TEAM

6082 7390 23.02.2020 29.02.2020 COLD WORK DAY BSDG TESTING CABLE ELECTRICAL

6083 7392 23.02.2020 29.02.2020 COLD WORK DAY CCB(1st Floor) TESTING CABLE ELECTRICAL

6084 7393 23.02.2020 29.02.2020 COLD WORK DAY W/T TESTING CABLE ELECTRICAL

6085 7394 23.02.2020 29.02.2020 COLD WORK DAY CCB(G.F) TESTING CABLE ELECTRICAL
6086 5056 22.02.2020 28.02.2020 COLD WORK DAY ACB KKS CODE INSTALLATION FOR EQUIPMENTS MECHANIC TEAM

6087 8122 22.02.2020 28.02.2020 COLD WORK DAY W/T CLEANING AND PAINTING MECHANICAL

6088 7370 22.02.2020 27.02.2020 COLD WORK DAY CCB-DCS CABLE TERMINATION WORK ELECTRICAL

6089 5194 22.02.2020 27.02.2020 COLD WORK DAY GT-22 GENERATOR GENERATOR MONTBLY INSULATION RESISTANCE TESTING ELECTRIC TEAM

6090 GE-HEC-1400 23.02.2020 29.02.2020 COLD WORK DAY GT-21 PEECC VISUAL INSPECTION FOR PUNCH WITH GE AND CEEG ELECTRIC TEAM

6091 GE-HEC-1401 23.02.2020 29.02.2020 COLD WORK DAY GT-GTG-12 COLLECTOR HOUSE ASSEMBLY AND FINAL INSPECTION MECHANIC TEAM

CLEANING OF MOISTURE AND RUST IN THE HEX BOLT AND THE VALVE BODY,
6092 GE-HEC-1402 25.02.2020 02.03.2020 COLD WORK DAY GT-12 FINAL INSPECTION WITH CEEG/GE PIPING TEAM

6093 GE-HEC-1403 23.02.2020 29.02.2020 COLD WORK DAY GT-21 REINSTATEMENT OF PIPE, TOUCH UP PAINTING, SCAFFOLDING INSTALLATION AN PIPING TEAM

6094 GE-HEC-1404 23.02.2020 29.02.2020 COLD WORK DAY GT-GTG-21 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

6095 GE-HEC-1405 23.02.2020 29.02.2020 COLD WORK DAY GT-12 PEECC(DC) TO GT-21 PEECCABLE PULLING AND TERMINATION OF TEMPORARY CABLE ELECTRIC TEAM

6096 12318 22.02.2020 29.02.2020 HOT WORK DAY GTB-2 CCW CONDUIT AND FIRE ALARM INSTALLATION ELECTRICAL

6097 7376 22.02.2020 27.02.2020 COLD WORK DAY GT-21/22 CCW PUNCH LIST CLEARING ELECTRICAL

GTB-1 JB-AF89 FUSE


6098 GE-HEC-1406 23.02.2020 29.02.2020 COLD WORK DAY ENCLOSURE TO GTB-2 JB-AF89 CONTINUITY TEST OF CONTROL CABLE WITH QC, GE, CEEG ELECTRIC TEAM
FUSE ENCLOSURE

CCB(DCS 1st .F G.F TO STB 10, CABLE PULLING


6099 5184 23.02.2020 28.02.2020 COLD WORK DAY AUX BOILER, FFAC10) ELECTRIC TEAM

6100 3873 23.02.2020 29.02.2020 COLD WORK DAY GT-22 PUNCH LIST CLEARING ELECTRICAL
6101 GE-HEC-1407 23.02.2020 29.02.2020 COLD WORK DAY PEECC-12/exitation RM #12 cable pulling of temporary DC power for PECC#12 install temporary power distribuELECTRIC TEAM

6102 7200 23.02.2020 29.02.2020 COLD WORK DAY NGSS INSPECTION METAL CLADDING QC

6103 GE-HEC-1408 23.02.2020 27.02.2020 COLD WORK DAY GT-21 PERFORMING COMMISSIONING WORK COMMISSIONING

6104 5060 23.02.2020 28.02.2020 COLD WORK DAY CHEMICAL STORAGE CHEMICAL UN LOADING AND FILLING MECHANIC TEAM

6105 15546 24.02.2020 01.03.2020 HOT WORK DAY GT-22 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM

6106 7371 22.02.2020 27.02.2020 COLD WORK DAY CCB(G.F) CABLE TERMINATION WORK ELECTRICAL

6107 3874 23.02.2020 27.02.2020 COLD WORK DAY BSDG CABLE TERMINATION ELECTRICAL

6108 5196 23.02.2020 29.02.2020 COLD WORK DAY GT-22 GCB FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

6109 8582 23.02.2020 28.02.2020 COLD WORK DAY GTB-1 CCW SCAFFOLDING DISMANTLE ELECTRIC TEAM

6110 GE-HEC-1409 23.02.2020 24.02.2020 COLD WORK DAY GT-11 HOUSEKEEPING COMMISSIONING

6111 5195 24.02.2020 01.03.2020 COLD WORK DAY GT-22 PEECC SHIELD TERMINATION & INSPECTION ELECTRIC TEAM

6112 GE-HEC-1410 24.02.2020 01.03.2020 HOT WORK DAY GT-12 INSTALLATION OF LUG PLATE AND 'U' BOLT PIPING TEAM

6113 12015 23.02.2020 28.02.2020 HOT WORK DAY GTB-2 CCW GRINDING TANK AND PUMP FOUNDATION, PAINTING WORK MECHANIC TEAM

6114 GE-HEC-1411 23.02.2020 27.02.2020 HOT WORK DAY GT-21 IPB WELDING AND CLEANING ELEMENT IPB MECHANICAL
6115 GE-HEC-1412 23.02.2020 27.02.2020 HOT WORK DAY GT-21 PUNCH LIST CLEARING MECHANICAL

6116 GE-HEC-1413 24.02.2020 01.03.2020 COLD WORK DAY GT-12 REMOVE THE VALVE EKG10AA001 & INSTALL THE VALVE EKG10AA002 COMMISSIONING

6117 7180 24.02.2020 01.03.2020 COLD WORK DAY GT-22 NGFS REMOVE THE VALVE EKG10AA001 & INSTALL THE VALVE EKG10AA002 COMMISSIONING

6118 7181 24.02.2020 01.03.2020 COLD WORK DAY UEB-2, CCB, CCW-2 HOT LOOP TEST COMMISSIONING

6119 5197 24.02.2020 01.03.2020 COLD WORK DAY GT-22 FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

6120 5198 24.02.2020 01.03.2020 COLD WORK DAY GT-22 FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

6121 7395 23.02.2020 29.02.2020 COLD WORK DAY GT-22 TESTING CABLE ELECTRICAL

6122 5120 24.02.2020 01.03.2020 COLD WORK DAY GT-22 PEECC PUNCH LIST CLEARING, PANEL CLEANING ELECTRIC TEAM

6123 GE-HEC-1414 24.02.2020 01.03.2020 HOT WORK DAY GT-11 PEECC GPP-GCB-11 LOOP CHECKING, ENERGIZING PANEL, FUNCTIONAL TEST ELECTRIC TEAM

6124 GE-HEC-1415 24.02.2020 01.03.2020 HOT WORK DAY GT-12 PEECC GPP-GCB-12 LOOP CHECKING, ENERGIZING PANEL, FUNCTIONAL TEST ELECTRIC TEAM

6125 GE-HEC-1416 24.02.2020 01.03.2020 HOT WORK DAY GT-21 PEECC/21BRA01-12BTL01CABLE PULLING OF TEMPORARY AC/DC POWER & CABLE TERMINATION ELECTRIC TEAM

6126 5239 25.02.2020 02.03.2020 COLD WORK DAY GT-22 PEECC PUNCH CLEARING AS PER HIGHLITED LIST(PEECC UPS PANEL) ELECTRIC TEAM

6127 6924 24.02.2020 27.02.2020 COLD WORK DAY GT-22 GENERATOR GENERATOR MONTBLY INSULATION RESISTANCE TESTING ELECTRIC TEAM

6128 GE-HEC-1417 25.02.2020 02.03.2020 COLD WORK DAY GT-GTG-12 SIGN BOARD INSTALLATION ACTIVITY MECHANIC TEAM
6129 GE-HEC-1418 25.02.2020 02.03.2020 COLD WORK DAY GT-GTG-11 SIGN BOARD INSTALLATION ACTIVITY MECHANIC TEAM

6130 GE-HEC-1419 25.02.2020 02.03.2020 COLD WORK DAY GT-21 ADDITIONAL CABLE SUPPORT INSTALLATION ELECTRIC TEAM

6131 GE-HEC-1420 25.02.2020 27.02.2020 HOT WORK DAY GT-21 PUNCH CLEARING MECHANICAL

6132 GE-HEC-1421 24.02.2020 01.03.2020 COLD WORK DAY GT-21 REPLACE THE VALVE EKG10AA001 WITH THE VALVE EKG10AA002 COMMISSIONING

6133 14940 24.02.2020 29.02.2020 HOT WORK DAY GT-22 METAL CLADDING, CUTTING WORK ARCHITECTURE TEAM

6134 14941 24.02.2020 01.03.2020 HOT WORK DAY UEB-1 ACCESS FLOOR INSTALLATION ARCHITECTURE TEAM

6135 GE-HEC-1422 25.02.2020 02.03.2020 HOT WORK DAY GT-12 NGFS INSTALLATION OF LUG PLATE AND 'U' BOLT PIPING TEAM

6136 GE-HEC-1423 25.02.2020 02.03.2020 HOT WORK DAY GTB-1 INSTALLATION OF PADLOCKS SUPPORTS COMMISSIONING

6137 5241 25.02.2020 02.03.2020 COLD WORK DAY UEB-1 TO ST BLDG-10 CABLE PULLING ELECTRIC TEAM

6138 5240 25.02.2020 01.03.2020 COLD WORK DAY CCB INSTALLATION OF CABLES SS TAG ELECTRIC TEAM

6139 5199 26.02.2020 03.03.2020 COLD WORK DAY ACB CABLE TERMINATION & LOOP CHECK & INSTALLATION OF SCAFFOLDING ELECTRIC TEAM

6140 5242 25.02.2020 02.03.2020 COLD WORK DAY GT-22 PEECC FDM INSPECTION WITH QC, GE, CEEG FOR MLI A314, A014, A204 ELECTRIC TEAM

6141 7183 26.02.2020 03.03.2020 COLD WORK DAY GT-22 MOTOR GREASE INJECTION COMMISSIONING

6142 9977 26.02.2020 03.03.2020 COLD WORK DAY BSDG REPAIR THE FLIXIBLE HOSE JOINT LEAKAGE COMMISSIONING
6143 GE-HEC-1424 26.02.2020 03.03.2020 COLD WORK DAY GT-21 MOTOR GREASE INJECTION COMMISSIONING

6144 GE-HEC-1425 26.02.2020 03.03.2020 COLD WORK DAY GT-21 INSPECTION FOR PUNCH AS PER ATTACHED LIST WITH GE AND CEEG ELECTRIC TEAM

6145 7445 25.02.2020 02.03.2020 COLD WORK DAY CCB(UPS ROOM) TESTING CABLE ELECTRICAL

6146 5244 26.02.2020 02.03.2020 COLD WORK DAY UEB-1 GLANDING CABLE ELECTRIC TEAM

6147 19783 26.02.2020 03.03.2020 HOT WORK DAY CCB SILING FLOOR ARCHITECTURE

6148 5243 26.02.2020 03.03.2020 COLD WORK DAY GT-22 FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

6149 GE-HEC-1426 26.02.2020 03.03.2020 COLD WORK DAY GT-21 PEECC CLEAN THE FLOOR ARCHITECTURE TEAM

6150 12336 29.02.2020 05.03.2020 HOT WORK DAY GT-22 GROUNDING INSTALLATION ELECTRICAL

6151 8530 26.02.2020 03.03.2020 COLD WORK DAY GT-12 EGBS CLEANING, TOUCH-UP AT SEAL AIR FAN & HYDRAULIC MECHANIC TEAM

6152 8760 29.02.2020 06.03.2020 COLD WORK DAY GT-22 NGFS CLEANING, SCAFFOLDING, PAINTING INSPECTION ACTIVITY MECHANIC TEAM

6153 7411 29.02.2020 05.03.2020 COLD WORK DAY CCB(G.F TO 1st F) CABLE PULLING ELECTRICAL

REINSTATEMENT WORK: GASKET REPLACEMENT, BOLTING, GROUTING, AIR


6154 19526 29.02.2020 06.03.2020 HOT WORK DAY GT-22 BLOWING, PIPES SUPPORT, REPAIR & MODIFICATION PIPING TEAM

6155 19326 29.02.2020 06.03.2020 HOT WORK DAY GT-22 JB, INSTRUMENT, CONDUIT, INSTALLATION CALIBRATION, LEAK TEST, PUNCH POININSTRUMENT TEAM

6156 4645 26.02.2020 02.03.2020 COLD WORK DAY GT-22 NGFS CALIBRATION FOR INSTRUMENT INSTRUMENT TEAM

6157 7414 29.02.2020 05.03.2020 COLD WORK DAY CHEMICAL STORAGE TOW/T CABLE PULLING ELECTRICAL
6158 3844 29.02.2020 05.03.2020 COLD WORK DAY GT-22 PEECC CABLE PULLING ELECTRICAL

6159 GE-HEC-1427 26.02.2020 02.03.2020 COLD WORK DAY GT-GT-21 BORESCOPE INSPECTION MECHANIC TEAM

6160 5245 26.02.2020 03.03.2020 COLD WORK DAY GT-22 GCB PUNCH CLEARING AS PER ATTACHED LIST ELECTRIC TEAM

6161 6309 29.02.2020 06.03.2020 HOT WORK DAY UEB-1 CONDUIT INSTALLATION, CABLE LAYING TERMINATION & FIRE ALARM, DEVIES TESELECTRIC TEAM

CUTTING, GRINDING, DRILLING, WELDING OF UNISTRUIT CANNEL FOR CONDUIT


6162 8727 29.02.2020 06.03.2020 HOT WORK DAY GT-22 SUPPORT & INSTALLATION OF CONDUIT ELECTRIC TEAM

6163 15469 29.02.2020 06.03.2020 HOT WORK DAY CCB CUTTING, DRILLING, GRINDING, CHIPPING WORKS INSTALLATION OF CONDUIT A ELECTRIC TEAM

6164 5089 29.02.2020 06.03.2020 COLD WORK DAY CCB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

6165 5114 29.02.2020 06.03.2020 COLD WORK DAY CCB PANEL MONITORING, LINE CHECK FOR TEMPORARY TEST POWER ELECTRIC TEAM

6166 5113 29.02.2020 06.03.2020 COLD WORK DAY UEB-1 PANEL TEST INTERWIRING WORKS ELECTRIC TEAM

REPAIR, MODIFICATION, FIXING, INSTALLATION F/F MATERIALS NEEDED,


6167 19531 27.02.2020 04.03.2020 HOT WORK DAY GT-22 PAINTING OF PIPE & SUPPORT, SCAFFOLDING WORKS PIPING TEAM

6168 7232 27.02.2020 04.03.2020 HOT WORK DAY GT-11 IPB IPB REPAIR SIDE GCB ELECTRICAL

6169 GE-HEC-1428 29.02.2020 06.03.2020 COLD WORK DAY GT-12 SCAFFOLDING INSTALLATION/DISMANTLE ELECTRIC TEAM

6170 GE-HEC-1429 29.02.2020 06.03.2020 COLD WORK DAY GT-11 SCAFFOLDING INSTALLATION/DISMANTLE ELECTRIC TEAM

FIRE FIGHTING SYSTEM, CONDUIT INSTALLATION, CABLE LAYING TERMINATION,


6171 GE-HEC-1430 29.02.2020 06.03.2020 COLD WORK DAY GT-12 BENDING JUMPER INSTALLATION ELECTRIC TEAM
FIRE FIGHTING SYSTEM, CONDUIT INSTALLATION, CABLE LAYING TERMINATION,
6172 GE-HEC-1431 29.02.2020 06.03.2020 COLD WORK DAY GT-11 BENDING JUMPER INSTALLATION ELECTRIC TEAM

6173 GE-HEC-1432 27.02.2020 03.03.2020 COLD WORK DAY GT-12 MOTOR TEST AND INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

6174 GE-HEC-1433 27.02.2020 04.03.2020 COLD WORK DAY GT-21 TOP W/D LOAD COMMUTATED INVERTER (LCI)+TRANSFORMER(BPT10) COMMISSIONING

6175 3846 27.02.2020 04.03.2020 COLD WORK DAY GT-22 GENERATOR FDM INSPECTION WIH QC, GE, CEEG ELECTRIC TEAM

6176 7453 27.02.2020 03.03.2020 COLD WORK DAY UEB-2(BASEMENT) TESTING RESISTANCE GROUNDING MEASUREMENT ELECTRICAL

6177 5247 27.02.2020 04.03.2020 COLD WORK DAY GT-21 EGBS PUNCH CLEARING AS PER ATTACHD LIST ELECTRIC TEAM

6178 8869 29.02.2020 06.03.2020 HOT WORK DAY CCB INSTALLATION OF CONDUIT & PANEL ELECTRIC TEAM

6179 5246 29.02.2020 06.03.2020 COLD WORK DAY CCB CABLE TERMINATION & LOP CHECK & INSTALLATION OF SCAFFOLDING ELECTRIC TEAM

6180 19765 29.02.2020 06.03.2020 HOT WORK DAY CCB(1st Floor) HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING) HVAC

6181 19766 29.02.2020 06.03.2020 HOT WORK DAY UEB-1 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING) HVAC

6182 19769 29.02.2020 06.03.2020 HOT WORK DAY GT-22 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING) HVAC

6183 4001 29.02.2020 06.03.2020 COLD WORK DAY GT-22 NGFS PAINTING AND PIPE INSULATION WORK PIPING

6184 4003 29.02.2020 06.03.2020 COLD WORK DAY GT-22 PAINTING AND PIPE INSULATION WORK PIPING

6185 8584 01.03.2020 07.03.2020 HOT WORK DAY CCB CABLE TRAY INSTALLATION ELECTRIC TEAM
6186 GE-HEC-1434 29.02.2020 05.03.2020 COLD WORK DAY GT-11 PERFORMING COMMISSIONING WORK COMMISSIONING

6187 GE-HEC-1435 29.02.2020 05.03.2020 COLD WORK DAY GT-12 PERFORMING COMMISSIONING WORK COMMISSIONING

6188 GE-HEC-1436 29.02.2020 05.03.2020 COLD WORK DAY GT-11 PEECC COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING COMMISSIONING
VALVE AND DEVISE START MOTOR

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


6189 GE-HEC-1437 29.02.2020 05.03.2020 COLD WORK DAY GT-12 PEECC COMMISSIONING
VALVE AND DEVISE START MOTOR

6190 GE-HEC-1438 29.02.2020 05.03.2020 COLD WORK DAY GT-21 PERFORMING COMMISSIONING WORK COMMISSIONING

6191 GE-HEC-1439 29.02.2020 05.03.2020 COLD WORK DAY GT-21 PEECC COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING COMMISSIONING
VALVE AND DEVISE START MOTOR

6192 7377 29.02.2020 05.03.2020 COLD WORK DAY CCB(DCS) CABLE TERMINATINO AND PUNCH LIST ELECTRICAL

6193 7378 29.02.2020 05.03.2020 COLD WORK DAY CCB CABLE TERMINATINO AND PUNCH LIST ELECTRICAL

6194 7400 29.02.2020 05.03.2020 COLD WORK DAY GT-22 PUNCH LIST CLEANING ELECTRICAL

6195 7235 29.02.2020 06.03.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

6196 12382 29.02.2020 05.03.2020 HOT WORK DAY GT-22 IPB WELDING AND CLEANING ELEMENT IPB MECHANICAL

6197 12350 29.02.2020 06.03.2020 HOT WORK DAY BSDG CONDUIT FIRE ALARM AND LIGHTING INSTALLATION ELECTRICAL

6198 12351 29.02.2020 06.03.2020 HOT WORK DAY W/T CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6199 12362 29.02.2020 06.03.2020 HOT WORK DAY GT-22 CONDUIT FIRE ALARM AND LIGHTING AND INSTALLATION PANEL ELECTRICAL

6200 12330 29.02.2020 06.03.2020 HOT WORK DAY GT-22 PEECC INSTALLATION OF PANEL ELECTRICAL
6201 12367 29.02.2020 06.03.2020 HOT WORK DAY CCB(BASEMENT & G.F)) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6202 12368 29.02.2020 06.03.2020 HOT WORK DAY CCB(1st Floor) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6203 8533 29.02.2020 06.03.2020 COLD WORK DAY FWPB RUNNING THE PUMP FOR HYDROTEST OF THE TANK MECHANIC TEAM

6204 8533 29.02.2020 06.03.2020 COLD WORK DAY NGSS INSULATION AND CLADDING WORK MECHANIC TEAM

6205 8533 29.02.2020 06.03.2020 COLD WORK DAY GTB-2 CCW FAN ALIGHNEMENT MECHANIC TEAM

MISSING CALIBRATION AND STICKER FOR INSTALLATION CALBRATION WITH


6206 GE-HEC-1440 27.02.2020 03.03.2020 COLD WORK DAY GT-21 NGFS PROVIDE OF THE CALIBRATION SHEET OF INSTALALTION SKID INSTRUMENT TEAM

6207 GE-HEC-1441 29.02.2020 06.03.2020 COLD WORK DAY GT-11 INSULATION WORK PIPING

6208 GE-HEC-1442 29.02.2020 06.03.2020 HOT WORK DAY GT-21 HVAC(DUCT WORK, FIXATION, ISOLATION) HVAC

6209 GE-HEC-1443 29.02.2020 05.03.2020 HOT WORK DAY GT-21 PUNCH CLEAR MECHANICAL

6210 GE-HEC-1444 29.02.2020 05.03.2020 HOT WORK DAY GT-21 IPB WELDING AND CLEANING ELEMENT IPB MECHANICAL

6211 GE-HEC-1445 29.02.2020 06.03.2020 HOT WORK DAY GT-21 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6212 GE-HEC-1446 29.02.2020 06.03.2020 COLD WORK DAY GT-21 PUNCH CLEAR WORK ATTACHED WITH LIST AND INSPECTION ELECTRIC TEAM

6213 GE-HEC-1447 29.02.2020 06.03.2020 HOT WORK DAY GT-21 PUNCH LIST CLOSE OU ACTIVITY MECHANIC TEAM

6214 GE-HEC-1448 29.02.2020 06.03.2020 HOT WORK DAY GT-22 GAS TURBINE FIX AND POINT ADJUSTMENT MECHANIC TEAM
6215 GE-HEC-1449 29.02.2020 06.03.2020 COLD WORK DAY GTB-1 HOUSEKEEPING, REMOVING FORMWORK ARCHITECTURE TEAM

6216 GE-HEC-1450 29.02.2020 06.03.2020 COLD WORK DAY GT-11 88QA-1, 88QA-2, 88ES-1 TESTING COMMISSIONING

6217 GE-HEC-1451 29.02.2020 06.03.2020 COLD WORK DAY GT-12 NGFS LEAK TEST WITH NATURAL GAS FOR GT-11 NGFS & GAS FUEL MODULE COMMISSIONING

6218 7236 27.02.2020 04.03.2020 HOT WORK DAY GT-12 REPAIR IPB SIDE GCB ELECTRICAL

6219 5201 29.02.2020 06.03.2020 COLD WORK DAY CCB-DCS(G.F) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6220 5202 29.02.2020 06.03.2020 COLD WORK DAY CCB-DCS(1st FLOOR) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6221 5203 29.02.2020 06.03.2020 COLD WORK DAY GT-22 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6222 5204 29.02.2020 06.03.2020 COLD WORK DAY BSDG PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6223 5249 29.02.2020 06.03.2020 COLD WORK DAY NGSS PUNCH CLEAR AND INSPECTION ELECTRIC TEAM

6224 5250 29.02.2020 06.03.2020 COLD WORK DAY CCB-SWGR & UPS PUNCH CLELAR, CABLE LINE CHECK, CABLE ARRANGEMENT, CABLE TERMINATION ELECTRIC TEAM

6225 9978 29.02.2020 06.03.2020 COLD WORK DAY GT-22 DEMI WATER FLUSHING FOR CCW COMMISSIONING

6226 9978 29.02.2020 06.03.2020 COLD WORK DAY GT-22 LUBE OIL FLUSHING PASE 1/2/3 COMMISSIONING

6227 9978 29.02.2020 06.03.2020 COLD WORK DAY GT-11 BHP ROOM INSTALL THE TEMPORARY PIPE FOR BHP OIL LINE COMMISSIONING

6228 15550 03.03.2020 09.03.2020 HOT WORK DAY GT-GT-22 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM
6229 9801 29.02.2020 06.03.2020 COLD WORK DAY GT-21 CCW DISASSEMBLE THE PUMP FOR INSIDE & INSPECTION COMMISSIONING

6230 GE-HEC-1452 29.02.2020 26.03.2020 COLD WORK DAY GT-12 INSPECTION FOR PUNCH AS PER ATTACHED LIST WITH GE AND CEEG ELECTRIC TEAM

6231 GE-HEC-1453 29.02.2020 06.03.2020 COLD WORK DAY GT-21 CCW COOLER RESTORATION OF PERMANENT PIPE FOR CCW COOLER COMMISSIONING

6232 5065 29.02.2020 06.03.2020 COLD WORK DAY W/T PUNCH CLEARING AND TOUCH-UP PAINTING AND HOUSEKEEPING MECHANIC TEAM

6233 7432 29.02.2020 05.03.2020 COLD WORK DAY CCB-UPS CABLE TERMINATION AND PUNCH CLEARING ELECTRICAL

6234 GE-HEC-1454 29.02.2020 06.03.2020 COLD WORK DAY GT-12 FIRE ALARM DEVIES TESTING ELECTRIC TEAM

6235 GE-HEC-1455 29.02.2020 06.03.2020 COLD WORK DAY GT-11 LFAP/FIRE ALARM DEVIES TESTING ELECTRIC TEAM

6236 12383 29.02.2020 05.03.2020 HOT WORK DAY GT-22 CLEANING AND FINISH WORK MECHANICAL

CCB(DCS 1st .F G.F TO STB 10,


6237 5248 01.03.2020 06.03.2020 COLD WORK DAY AUX BOILER, FFAC10) CABLE PULLING ELECTRIC TEAM

6238 5213 29.02.2020 06.03.2020 COLD WORK DAY CCB CABLE PULLING AND TERMINATION INSTRUMENT TEAM

6239 5214 01.03.2020 07.03.2020 COLD WORK DAY GT-22 PEECC PUNCH CLEARING AS PER HIGHLIGHTED LIST ELECTRIC TEAM

6240 GE-HEC-1456 01.03.2020 07.03.2020 COLD WORK DAY GT-11 GEN COOLER RETIGHTENING OF GEN COOLER COVER BOLTS COMMISSIONING

REINSTATEMENT WORK: GASKET REPLACEMENT, BOLTING, CLEANING, REPAIR &


6241 GE-HEC-1457 01.03.2020 07.03.2020 HOT WORK DAY GT-21 MODIFICATION AND FIXING OF PARTS / ACCESSORIES, PIPE AND SUPPORT PIPING TEAM
TOUCH UP

6242 GE-HEC-1458 01.03.2020 07.03.2020 COLD WORK DAY GT-11 NGFS PIPE SURFICE CLEANING AND PAINTING PIPING TEAM

6243 GE-HEC-1459 01.03.2020 07.03.2020 COLD WORK DAY GT-12 NGFS PIPE SURFICE CLEANING AND PAINTING PIPING TEAM
6244 GE-HEC-1460 01.03.2020 07.03.2020 COLD WORK DAY GT-21 INTERNAL CABLE CONNECTION ELECTRIC TEAM

6245 GE-HEC-1461 01.03.2020 07.03.2020 COLD WORK DAY GT-21 PIPE INSULATION AND FIXING OF CLADING PIPING TEAM

6246 GE-HEC-1462 01.03.2020 07.03.2020 COLD WORK DAY GT-GTG-12 GENERATOR LAGGING SUPPORT INSTALLAION MECHANIC TEAM

6247 19770 04.03.2020 10.03.2020 HOT WORK DAY CCB SILNG FLOOR ARCHITECTURE

6248 19784 01.03.2020 06.03.2020 HOT WORK DAY DWPB HVAC(DUCT, EQUIPMENT INSTALLATION PIPING, CONTROL CABLE, PULING) HVAC

6249 19785 01.03.2020 06.03.2020 HOT WORK DAY SWPB HVAC(DUCT, EQUIPMENT INSTALLATION PIPING, CONTROL CABLE, PULING) HVAC

6250 GE-HEC-1463 01.03.2020 07.03.2020 HOT WORK DAY GT-12 PEECC-12/12BUA01-12BTTERMINATION OF TEMPORARY DC POWER FOR PEECC321 GE ELECTRIC TEAM
PANELS(ENERGIZING TEMPORARY DC POWER)

6251 7451 01.03.2020 07.03.2020 COLD WORK DAY W/T CLEANING AND PAINTING MECHANICAL

6252 14943 29.02.2020 06.03.2020 HOT WORK DAY GT-22 METAL CLADDING, CUTTING WORK ARCHITECTURE TEAM

6253 7455 01.03.2020 07.03.2020 COLD WORK DAY FWPB ADJUSTEMENT OF THE PUMP AND GAOUT MECHANICAL

MODIFICATION FOR INTERNAL WIRING OF WIRING OF FIRE FIGHTING SYSTEM


6254 GE-HEC-1464 02.03.2020 08.03.2020 COLD WORK DAY GT-21 BETWEEN JB AND FIRE CONTROL PANEL ELECTRIC TEAM

6255 GE-HEC-1465 02.03.2020 08.03.2020 COLD WORK DAY GT-12 RECONNECTION OF GROUNDING CABLE FOR SHAFT VOLTAGE DETECTOR ELECTRIC TEAM

6256 GE-HEC-1466 02.03.2020 08.03.2020 COLD WORK DAY GT-21 INSPECTION WITH GE AND CEEG AS PER ATTACHED PUNCHLIST ELECTRIC TEAM

6257 GE-HEC-1467 02.03.2020 08.03.2020 COLD WORK DAY GT-21 INSPECTION WITH GE AND CEEG AS PER ATTACHED PUNCHLIST ELECTRIC TEAM

6258 GE-HEC-1468 02.03.2020 08.03.2020 COLD WORK DAY GT-21 EXCITATION ROOM PUNCH CLEAR WORK ATTACHED WITH LIST AND INSPECTION ELECTRIC TEAM
GT-21 PEECC/DC&UPS
6259 GE-HEC-1469 02.03.2020 08.03.2020 HOT WORK DAY PANEL/MCC3E/3B PANEL INTERWIRING TESTING BATTERY CHARGING AND DISCHARGING ELECTRIC TEAM

6260 7161 02.03.2020 08.03.2020 COLD WORK DAY W/T STRAINER REMOVE & CLEANING COMMISSIONING

TOP W/D OF AIR INLET AND EXHAUST SYSTEM & INLET BLEED HEATING & IGV
6261 GE-HEC-1470 02.03.2020 08.03.2020 COLD WORK DAY GT-21 AND AIR PRODUCTION UNIT & COOLING AND SEALING AIR SYSTEM COMMISSIONING

6262 5217 02.03.2020 08.03.2020 COLD WORK DAY GT-22 PEECC CABLE SHIELD TERMINATION ELECTRIC TEAM

6263 GE-HEC-1471 02.03.2020 06.03.2020 COLD WORK DAY GT-12 INSPECTION WITH CLIENT (CEEG) PIPING

6264 GE-HEC-1472 02.03.2020 06.03.2020 COLD WORK DAY GT-21 HVAC(DUCT WORK, INSULATION) HVAC

6265 GE-HEC-1473 02.03.2020 08.03.2020 COLD WORK DAY GT-21 PIPE SUPPORT SURFACE CLEANING AND PAINTING PIPING TEAM

6266 3673 02.03.2020 08.03.2020 COLD WORK DAY GT-22 PIPE/SUPPORT SRFACE CLEANING AND PAINTING PIPING TEAM

6267 7460 02.03.2020 08.03.2020 COLD WORK DAY GT-22 PEECC TESTING CABLE ELECTRICAL

6268 5218 03.03.2020 09.03.2020 COLD WORK DAY UEB-1 TO ST BLDG-10 CABLE PULLING ELECTRIC TEAM

6269 3674 03.03.2020 09.03.2020 COLD WORK DAY GT-22 PNEUMATIC TEST, PIPE RESTORATION, PIPE CLEANING PIPING TEAM

6270 4647 02.03.2020 06.03.2020 COLD WORK DAY UEB-1 FIBER OPTIC , CABLE TAGGING INSTRUMENT TEAM

6271 GE-HEC-1474 02.03.2020 06.03.2020 COLD WORK DAY GT-21 POUR CONCRETE OF GIRDER NORTH SIDE OF GT-21 ARCHITECTURE TEAM

6272 5219 03.03.2020 09.03.2020 COLD WORK DAY UEB-1 GLANDING CABLE AND TERMINATION ELECTRIC TEAM

6273 3847 02.03.2020 08.03.2020 COLD WORK DAY BSDG CABLE TERMINATION & LOOP CHECK ELECTRIC TEAM
6274 GE-HEC-1475 03.03.2020 07.03.2020 HOT WORK DAY GT-21 ADDITIONALCONDUIT INSTALLATION FOR GT LIGHTINGPANEL BOARD ELECTRIC TEAM

6275 GE-HEC-1476 03.03.2020 09.03.2020 COLD WORK DAY GT-21 CONTINUITY TEST AND INSPECTION WITH GE AND CEEG ELECTRIC TEAM

6276 GE-HEC-1477 03.03.2020 09.03.2020 COLD WORK DAY GT-21 PUNCH CLEARING AS PER ATTACHED LIST ELECTRIC TEAM

6277 GE-HEC-1478 02.03.2020 02.03.2020 COLD WORK DAY GT-GTG-11 GENERATOR INSULATION LAGGING AND COVER PLATE INSTALLATION MECHANIC TEAM

6278 GE-HEC-1479 03.03.2020 09.03.2020 HOT WORK DAY GT-12 IPB GENERATOR SIDE REPAIR IPB SIDE GENERATOR ELECTRICAL

6279 3677 03.03.2020 09.03.2020 COLD WORK DAY BSDG PIPE & SUPPORT SURFACE CLEANING AND PAINTING PIPING TEAM

6280 5220 02.03.2020 08.03.2020 COLD WORK DAY GT-22 FDM WITH GE AND CEEG QC

6281 GE-HEC-1480 03.03.2020 09.03.2020 COLD WORK DAY GT-21 DEMI WATER FLUSHING FOR CCW COMMISSIONING

6282 5129 03.03.2020 09.03.2020 COLD WORK DAY GT-22 PEECC PANEL TEST INTERWIRING WORKS FOR DC/UPS PANEL, PANEL FIXING ELECTRIC TEAM

6283 7461 02.03.2020 07.03.2020 COLD WORK DAY CCB(UPS ROOM) TESTING CABLE ELECTRICAL

6284 3848 04.03.2020 10.03.2020 COLD WORK DAY ACB CABLE TERMINATION & LOOP CHECK INSTALLATION OF SCAFFPLDING ELECTRIC TEAM

6285 9802 04.03.2020 10.03.2020 COLD WORK DAY GT-22 GREASE INJECTION OF 9FR MOTORS COMMISSIONING

6286 7237 07.03.2020 13.03.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

6287 GE-HEC-1481 07.03.2020 13.03.2020 HOT WORK DAY GT-21 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6288 8537 04.03.2020 06.03.2020 COLD WORK DAY BSDG RE-INSTALL THE WATER TANK OF GROUP N:4 MECHANIC TEAM

6289 7238 05.03.2020 11.03.2020 HOT WORK DAY GT-11 IPB REPAIR IPB SIDE GCB ELECTRICAL
6290 7239 05.03.2020 11.03.2020 HOT WORK DAY GT-12 IPB REPAIR IPB SIDE GCB ELECTRICAL

6291 GE-HEC-1482 04.03.2020 10.03.2020 COLD WORK DAY GT-21 PEECC POWER CABLE LAYING WITH ATTACHED CABLE SCHEDULE, CABLE TERMINATION ELECTRIC TEAM

6292 7462 03.03.2020 07.03.2020 COLD WORK DAY W/T TO DWPB TESTING CABLE ELECTRICAL

6293 GE-HEC-1483 04.03.2020 10.03.2020 COLD WORK DAY GT-21 TORQUING OF CABLE FROM LCI FUSE(AF89) TO GENERATOR COMPARTMENT ELECTRIC TEAM

6294 GE-HEC-1484 04.03.2020 10.03.2020 COLD WORK DAY GT-21 TOP WALKDOWN TANSFORMER (BPT10) COMMISSIONING

6295 12319 07.03.2020 13.03.2020 HOT WORK DAY CCB(1st Floor) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6296 12371 07.03.2020 13.03.2020 HOT WORK DAY GT-22 PEECC INSTALLATION OF PANEL ELECTRICAL

6297 12378 07.03.2020 13.03.2020 HOT WORK DAY W/T CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6298 12396 07.03.2020 13.03.2020 HOT WORK DAY CCB(BASEMENT & G.F)) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6299 12399 07.03.2020 13.03.2020 HOT WORK DAY GT-22 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6300 12434 07.03.2020 12.03.2020 HOT WORK DAY GT-22 GROUNDING INSTALLATION ELECTRICAL

6301 7471 07.03.2020 12.03.2020 COLD WORK DAY GT-22 PEECC CABLE PULLING ELECTRICAL

6302 7473 07.03.2020 12.03.2020 COLD WORK DAY CCB(G.F TO 1st F) CABLE PULLING ELECTRICAL

6303 8538 04.03.2020 10.03.2020 COLD WORK DAY GT-12 EGBS CLEANING, TOUCH-UP AT SEAL AIR FAN & HYDRAULIC MECHANIC TEAM

6304 8761 07.03.2020 13.03.2020 COLD WORK DAY GT-22 NGFS CLEANING, SCAFFOLDING, PAINTING INSPECTION ACTIVITY MECHANIC TEAM

6305 8857 04.03.2020 10.03.2020 HOT WORK DAY CCB-UPS-BATT RM PANEL TESTING, BATTERY CHERGING & DISHARGING ELECTRIC TEAM

FIRE ALARM DEVIES TESTING, CABLE LAYING & TERMINATION / CONDUIT


6306 6317 07.03.2020 13.03.2020 HOT WORK DAY UEB-1 MODIFICATION ELECTRIC TEAM
6307 8826 07.03.2020 13.03.2020 HOT WORK DAY W/T CUTTING, DRILLING, GRINDING, CHIPPING WORKS INSTALLATION OF CONDUIT A ELECTRIC TEAM

6308 8856 07.03.2020 13.03.2020 HOT WORK DAY CCB-UPS-BATT RM PANEL TESTING, BATTERY CHERGING & DISHARGING ELECTRIC TEAM

CUTTING, GRINDING, DRILLING, WELDING OF UNISTRUIT CANNEL FOR CONDUIT


6309 15400 07.03.2020 13.03.2020 HOT WORK DAY GT-22 SUPPORT & INSTALLATION OF CONDUIT ELECTRIC TEAM

6310 6814 07.03.2020 13.03.2020 COLD WORK DAY W/T INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

6311 5123 07.03.2020 13.03.2020 COLD WORK DAY UEB-1 PANEL CHECK, INTERWIRING WORKS, PANEL TEST FUNCTIONAL ELECTRIC TEAM

6312 5222 04.03.2020 10.03.2020 COLD WORK DAY MAIN TR-1 TO UEB-2 FDM INSPECTION WITH QC, GE, CEEG ELECTRIC TEAM

6313 5130 05.03.2020 11.03.2020 COLD WORK DAY UEB-1 RE-CONNECT CABLE / TERMINATION IN INTERFACE PANEL ELECTRIC TEAM

6314 5131 05.03.2020 11.03.2020 COLD WORK DAY BSDG REMOVAL OF TEMPORARY PANEL & CABLES ELECTRIC TEAM

6315 GE-HEC-1485 05.03.2020 11.03.2020 COLD WORK DAY GT-21 AIR BLOWING & LEAK TEST FOR MONIFOLD OF FILTER HOUSE COMMISSIONING

REINSTATEMENT WORKS: GASKET REPLACEMENT, BOLTING, AIR BLOWING,


6316 19560 07.03.2020 13.03.2020 HOT WORK DAY GT-22 REPAIR / MODIFICATION OF PIPE & SUPORT PIPING TEAM

FIRE ALARM CONDUIT INSTALLATION, CABLE LAYING & TERMINATION / FIRE


6317 GE-HE-1486 07.03.2020 13.03.2020 COLD WORK DAY GT-11 ALARM DEVIES TESTING ELECTRIC TEAM

FIRE ALARM CONDUIT INSTALLATION, CABLE LAYING & TERMINATION / FIRE


6318 GE-HE-1487 07.03.2020 13.03.2020 COLD WORK DAY GT-12 ALARM DEVIES TESTING ELECTRIC TEAM

6319 9981 05.03.2020 11.03.2020 COLD WORK DAY ACB OIL FILTER REPLACEMENT COMMISSIONING

6320 9982 05.03.2020 11.03.2020 COLD WORK DAY NGSS MAINTENANCE OF PSV (00EKG33CT101) COMMISSIONING

6321 19561 05.03.2020 11.03.2020 HOT WORK DAY GT-22 PIPE SUPPORT PAINTING, REPAIR, MODIFICATION, CO2 CYLINDER PIPING TEAM
ARRANGEMENT & FIXING, SCAFFOLDING WORKS & INSPECTION

6322 17001 07.03.2020 14.03.2020 HOT WORK DAY GT-22 HANDREAL REPAIR WORK & METAL CLADDING REPAIR WORK ARCHITECTURE TEAM

6323 4101 07.03.2020 13.03.2020 COLD WORK DAY W/T & CHEMICAL STORAGE PUNCH CLEARING, TOUCH-UP PAINTING MECHANIC TEAM
6324 7482 05.03.2020 05.03.2020 COLD WORK DAY CCB(1st FLOOR) CABLE TERMINATION WORK ELECTRICAL

6325 GE-HEC-1488 04.03.2020 10.03.2020 HOT WORK DAY GT-21 HANDREAL REPAIR WORK & METAL CLADDING REPAIR WORK ARCHITECTURE TEAM

6326 GE-HEC-1489 04.03.2020 10.03.2020 HOT WORK DAY GTB-1 HANDREAL REPAIR WORK & METAL CLADDING REPAIR WORK ARCHITECTURE TEAM

6327 19439 07.03.2020 13.03.2020 HOT WORK DAY GT-22 JB, INSTRUMENT, CONDUIT, CALIBRATION, LEAK TEST, PUNCH POINT INSTRUMENT TEAM

6328 12424 07.03.2020 12.03.2020 HOT WORK DAY GT-22 FINISH WORK MECHANICAL

6329 19801 07.03.2020 13.03.2020 HOT WORK DAY DWPB HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING) HVAC

6330 19802 07.03.2020 13.03.2020 HOT WORK DAY SWPB HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING) HVAC

6331 19803 07.03.2020 13.03.2020 HOT WORK DAY CCB(1st FLOOR) SILNG FLOOR ARCHITECTURE

6332 19804 07.03.2020 13.03.2020 HOT WORK DAY UEB-1 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING) HVAC

6333 19805 07.03.2020 13.03.2020 HOT WORK DAY CCB(1st FLOOR) HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING) HVAC

6334 19807 07.03.2020 13.03.2020 HOT WORK DAY GT-22 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING) HVAC

6335 8962 07.03.2020 13.03.2020 COLD WORK DAY GT-22 PAINTING AND PIPE INSULATION WORK PIPING

6336 8963 07.03.2020 13.03.2020 COLD WORK DAY GT-22 NGFS PAINTING AND PIPE INSULATION WORK PIPING

6337 5223 07.03.2020 13.03.2020 COLD WORK DAY CCB CABLE TERMINATION & LOOP CHECK INSTALLATION OF SCAFFPLDING & REMOVALELECTRIC TEAM
6338 15989 05.03.2020 11.03.2020 HOT WORK DAY W/T PUNCH CLEANIN OF INERGEN LINE PIPING TEAM

MOTOR PUMP ALIGNMENT & PIPING INSTALLATION INCLUDING CUTTING,


6339 15990 06.03.2020 12.03.2020 HOT WORK DAY FWPB GRINDING, WELDING & GROUTING WORKS PIPING TEAM

6340 GE-HEC-1490 05.03.2020 11.03.2020 COLD WORK DAY GT-21 MODIFICATION OF PIPE INSULATION CLADDING(COVER) IN PIPE SUPPORT PLACE PIPING TEAM

6341 GE-HEC-1491 05.03.2020 11.03.2020 COLD WORK DAY GT-12 FINAL INSPECTION WITH CEEG/GE PIPING TEAM

6342 GE-HEC-1492 07.03.2020 12.03.2020 HOT WORK DAY GT-21 IPB WELDING AND CLEANING ELEMENT IPB MECHANIC TEAM

6343 GE-HEC-1493 07.03.2020 13.03.2020 HOT WORK DAY GT-21 LCI ROOM ADJUSTEMENT OF LIGHTING CABLE TRUNK ELECTRIC TEAM

6344 GE-HEC-1494 07.03.2020 13.03.2020 HOT WORK DAY GT-GTG-21 GAS TURBINE FIX AND POINT ADJUSTMENT MECHANIC TEAM

6345 GE-HEC-1495 07.03.2020 13.03.2020 COLD WORK DAY GT-GTG-21 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

6346 GE-HEC-1496 07.03.2020 13.03.2020 COLD WORK DAY GT-21 INSULATION WORK PIPING

6347 GE-HEC-1497 07.03.2020 13.03.2020 COLD WORK DAY GT-11 PS CALIBRATION 11PGG72CP001-11PGG52CP001-11PGG44CP001 & PUNCH POINTINSTRUMENT TEAM

6348 GE-HEC-1498 07.03.2020 13.03.2020 COLD WORK DAY GT-12 PS CALIBRATION12PGG72CP001-12PGG52CP001-12PGG44CP001 PUNCH POINT INSTRUMENT TEAM

6349 4651 07.03.2020 12.03.2020 COLD WORK DAY GT-22 FDM INSPECTION WITH GE AND CEEG ELECTRIC TEAM

6350 4652 07.03.2020 12.03.2020 COLD WORK DAY GT-22 FDM INSPECTION WITH GE AND CEEG ELECTRIC TEAM

6351 7405 07.03.2020 12.03.2020 COLD WORK DAY CCB(UPS ROOM) CABLE TERMINATION ELECTRICAL
6352 7406 07.03.2020 12.03.2020 COLD WORK DAY CCB(DCS) CABLE TERMINATION AND PUNCH LIST ELECTRICAL

6353 7408 07.03.2020 12.03.2020 COLD WORK DAY GT-22 PUNCH LIST ELECTRICAL

6354 5227 07.03.2020 13.03.2020 COLD WORK DAY W/T 400V MCC SWITCHGEAR PANEL REPLACE THERUSTE BOLT /NUT WITH ELECTRIC TEAM
WASHER(MCC FEEDER) & CABLE LINE CHECK CONNECTION

6355 5228 07.03.2020 13.03.2020 COLD WORK DAY GT-22 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6356 5229 07.03.2020 13.03.2020 COLD WORK DAY CCB-DCS(1st FLOOR) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6357 5230 07.03.2020 13.03.2020 COLD WORK DAY CCB-SWGR & UPS PUNCH CLEAR, CABLE LINE CHECK,CABLE ARRANGEMENT, CABLE CONNECTION & ELECTRIC TEAM

6358 5251 07.03.2020 13.03.2020 COLD WORK DAY CCB-DCS(G.F) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

PUNCH CLEAR, LIGHTING PANEL CABLE LINE CHECK, CABLE ARRANGEMENT,


6359 5253 07.03.2020 13.03.2020 COLD WORK DAY BSDG CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6360 9983 07.03.2020 13.03.2020 COLD WORK DAY ACB AIR & OIL FILTER REPLACEMENT COMMISSIONING

6361 9984 07.03.2020 13.03.2020 COLD WORK DAY GT-22 DEMI WATER FLUSHING FOR CCW COMMISSIONING

6362 9985 07.03.2020 13.03.2020 COLD WORK DAY GT-22 LUBE OIL FLUSHING PASE 1/2/3 COMMISSIONING

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


6363 GE-HEC-1499 07.03.2020 12.03.2020 COLD WORK DAY GT-11 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


6364 GE-HEC-1500 07.03.2020 12.03.2020 COLD WORK DAY GT-21 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

6365 9986 07.03.2020 11.03.2020 COLD WORK DAY GT-22 CCW INSPECTIO OF PUMP INTERNAL PARTS & ALIGNMENT COMMISSIONING

6366 7240 07.03.2020 13.03.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL
6367 GE-HEC-1501 07.03.2020 12.03.2020 COLD WORK DAY GT-21 PERFORMING COMMISSIONING WORK COMMISSIONING

6368 GE-HEC-1502 07.03.2020 12.03.2020 COLD WORK DAY GT-12 PERFORMING COMMISSIONING WORK COMMISSIONING

6369 5252 08.03.2020 13.03.2020 COLD WORK DAY UEB-1 TO PIPE RACK BLK1 CABLE PULLING ELECTRIC TEAM

6370 7463 07.03.2020 11.03.2020 COLD WORK DAY GT-22 TESTING AND MEASUREMENT RISITANCE(GROUNDING) ELECTRICAL

6371 8539 07.03.2020 13.03.2020 COLD WORK DAY BSDG EXPANDION TANK REPLACE FOR BSDG MECHANIC TEAM

6372 12403 07.03.2020 12.03.2020 HOT WORK DAY GT-22 IPB WELDING, CLEANING ELEMENTS IPB MECHANICAL

6373 7433 07.03.2020 12.03.2020 COLD WORK DAY GTB-2 FIN FAN PUNCH LIST CLEARING ELECTRICAL

6374 GE-HEC-1503 07.03.2020 12.03.2020 HOT WORK DAY GT-21 PUNCH CLEAR MECHANICAL

6375 GE-HEC-1504 07.03.2020 13.03.2020 COLD WORK DAY GT-GTG-11 INSULATION WORK OF INTERNAL PIPE AND VALVES FOR EQUIPMENT MECHANICA TEAM

6376 GE-HEC-1505 07.03.2020 13.03.2020 COLD WORK DAY GT-GTG-12 INSULATION WORK OF INTERNAL PIPE AND VALVES FOR EQUIPMENT MECHANICA TEAM

6377 GE-HEC-1506 07.03.2020 13.03.2020 COLD WORK DAY GT-GTG-21 VENT HEADER INSTALLATION MECHANICA TEAM

6378 GE-HEC-1507 08.03.2020 14.03.2020 COLD WORK DAY GTB-1 INSPECTION OF HP CO2 LOCAL FIRE SUPPRESSION SYSTEM PANEL PIPING TEAM

6379 GE-HEC-1508 08.03.2020 14.03.2020 COLD WORK DAY GT-12 NGFS PIPE SURFACE CLEANING AND PAINTING PIPING TEAM

6380 GE-HEC-1509 08.03.2020 14.03.2020 COLD WORK DAY GT-11 NGFS PIPE SURFACE CLEANING AND PAINTING PIPING TEAM

F/F AND SUPPORT REPAIR, MODIFICATION AND PAINTING, SCAFFOLDING


6381 GE-HEC-1510 08.03.2020 14.03.2020 COLD WORK DAY GT-21 INSTALLATION MODIFICATION, DISMANTLING & INSPECTION/WALKDOWN PIPING TEAM
6382 GE-HEC-1511 07.03.2020 12.03.2020 COLD WORK DAY GT-21 BATTERY ROOM TESTING AND MEASUREMENT RISITANCE(GROUNDING) ELECTRICAL

6383 5255 08.03.2020 14.03.2020 COLD WORK DAY BSDG CABLE TERMINATION & LOOP CHECK ELECTRIC TEAM

6384 8893 08.03.2020 14.03.2020 HOT WORK DAY BSDG INSTALLATION OF CONDUIT SUPPORT ELECTRIC TEAM

6385 8894 08.03.2020 14.03.2020 HOT WORK DAY CCB INSTALLATION OF CONDUIT & PANEL ELECTRIC TEAM

6386 8861 08.03.2020 14.03.2020 HOT WORK DAY UEB-2/SWGR2A/2B ENERGIZING BYPASS TR FEEDER PRIOR TO UPS TESTING ELECTRIC TEAM

6387 GE-HEC-1512 08.03.2020 14.03.2020 COLD WORK DAY GT-11 APPLY THE TEFLON LEIQUID FOR MOTOR BEARING DRAIN CAP AND OIL MAKE UP COMMISSIONING

6388 8541 07.03.2020 13.03.2020 COLD WORK DAY NGSS INSULATION & CLADDING MECHANIC TEAM

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


6389 GE-HEC-1513 07.03.2020 12.03.2020 COLD WORK DAY GT-12 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

6390 GE-HEC-1514 07.03.2020 12.03.2020 COLD WORK DAY GT-11 PERFORMING COMMISSIONING WORK COMMISSIONING

6391 8876 08.03.2020 14.03.2020 HOT WORK DAY CCB CABLE TRAY INSTALLATION & GROUNDING CABLE INSTAllATION ELECTRIC TEAM

6392 GE-HEC-1515 09.03.2020 15.03.2020 COLD WORK DAY GT-11 CABLE VERIFICATION IN LCI ROOM-11(VISUAL CHECK OF LCI CABLES) ELECTRIC TEAM

6393 5231 08.03.2020 14.03.2020 COLD WORK DAY CCB CABLE TERMINATINO ELECTRIC TEAM

6394 5257 08.03.2020 14.03.2020 COLD WORK DAY GT-22 CABLE TERMINATION INSPECTION ELECTRIC TEAM

6395 7436 08.03.2020 12.03.2020 COLD WORK DAY W/T TO DWPB TESTING CABLE ELECTRICAL

6396 12071 07.03.2020 13.03.2020 HOT WORK DAY CCB CABLE PULLING AND TERMINATION INSTRUMENT TEAM
6397 7435 08.03.2020 12.03.2020 COLD WORK DAY GT-22 VERIFICATION DE CHARGE AND DECHARGE OF BATTERY WITH HEC ELECTRICAL

6398 7498 08.03.2020 12.03.2020 COLD WORK DAY GT-22 FDM INSPECTION WITH GE, CEEG QC

6399 7499 08.03.2020 12.03.2020 COLD WORK DAY GT-22 FDM INSPECTION QC

6400 5259 08.03.2020 14.03.2020 COLD WORK DAY GT-22 (TRA TO UEB-2) FDM INSPECTION WITH GE AND CEEG ELECTRIC TEAM

6401 5260 09.03.2020 15.03.2020 COLD WORK DAY GT-22 CABLE PULLING & CABLE TERMINATION ELECTRIC TEAM

6402 5261 09.03.2020 15.03.2020 COLD WORK DAY GT-22 CABLE SHIELD TERMINATION & ARRANGEMENT ELECTRIC TEAM

6403 5262 09.03.2020 15.03.2020 COLD WORK DAY GT-22 PEECC PUNCH CLEARING AS PER ATTACHED LIST ELECTRIC TEAM

6404 GE-HEC-1516 10.03.2020 16.03.2020 COLD WORK DAY GT-11 LCI TO ISOLATION TR-11 CABLE PULLING ELECTRIC TEAM

6405 GE-HEC-1517 08.03.2020 12.03.2020 COLD WORK DAY GT-21 PUNCH CLEARING ELECTRICAL

GT-21 PEECC/DC&UPS
6406 GE-HEC-1518 09.03.2020 15.03.2020 HOT WORK DAY PANEL/MCC3E/3B PANEL INTERWIRING TESTING BATTERY CHARGING AND DISCHARGING ELECTRIC TEAM

6407 GE-HEC-1519 07.03.2020 13.03.2020 COLD WORK DAY GT-12 SCAFFOLDING INSTALLATION ELECTRIC TEAM

6408 GE-HEC-1520 07.03.2020 13.03.2020 COLD WORK DAY GT-11 SCAFFOLDING INSTALLATION ELECTRIC TEAM

6409 GE-HEC-1521 09.03.2020 15.03.2020 COLD WORK DAY GT-12 TO REPAIR THE AIR LEAKAGE(PIPE FITTINGS AND VALVE CONNECTION TIGHTENINGPIPING TEAM

6410 7407 08.03.2020 12.03.2020 COLD WORK DAY CCB(G.F) CABLE TERMINATION AND PUNCH LISST CLEARING ELECTRICAL

6411 GE-HEC-1522 09.03.2020 15.03.2020 COLD WORK DAY GT-21 TOP W/D OF ATOMIZING AIR SYSTEM COMMISSIONING
6412 GE-HEC-1523 09.03.2020 15.03.2020 COLD WORK DAY GT-21 TOP W/D OF GENERATOR H2/CO2 COMMISSIONING

6413 GE-HEC-1524 09.03.2020 15.03.2020 COLD WORK DAY GT-21 GENERATOR CO2/H2 LINE AIR BACK BLOWING COMMISSIONING

6414 12369 08.03.2020 13.03.2020 HOT WORK DAY BSDG CONDUIT FIRE ALARM AND LIGHTING AND PUNCH CLEAR ELECTRICAL

6415 5264 09.03.2020 15.03.2020 COLD WORK DAY GT-22 MOTOR AIR TEST ELECTRIC TEAM

GT-22 PEECC 22/DC-UPS


6416 16887 09.03.2020 15.03.2020 HOT WORK DAY PANEL/MCC 4B/4E PANEL INTERWIRING TESTING BATTERY CHARGING AND DISCHARGING TESTING ELECTRIC TEAM

6417 GE-HEC-1525 09.03.2020 15.03.2020 COLD WORK DAY GT-12 NGFS LEAK TEST WITH NATURAL GAS COMMISSIONING

6418 9987 09.03.2020 15.03.2020 COLD WORK DAY GT-22 REMOVE THE PSV(QJB20/AA603 FOR CALIBRATION COMMISSIONING

6419 GE-HEC-1526 08.03.2020 12.03.2020 COLD WORK NIGHT GT-21 VERIFICATION DE CHARGE AND DECHARGE OF BATTERY WITH HEC ELECTRICAL

6420 15552 10.03.2020 16.03.2020 HOT WORK DAY GT-22 SCAFFOLDING, PAINTING, GRINDING, CLEANING, LIFTING, WELDING, CUTTING, MECHANIC TEAM
INSPECTION, FIT-UP

6421 5267 09.03.2020 15.03.2020 COLD WORK DAY UEB-1 GLANDING CABLE AND TERMINATION ELECTRIC TEAM

6422 9989 09.03.2020 15.03.2020 COLD WORK DAY CCB, UEB-2, GT-22 LINE CHECK COMMISSIONING

6423 7430 09.03.2020 12.03.2020 COLD WORK DAY FWPB PUNCH CLEARING ELECTRICAL

6424 5269 10.03.2020 16.03.2020 COLD WORK DAY UEB-1 TO ST BLDG-10 CABLE PULLING ELECTRIC TEAM

6425 GE-HEC-1527 10.03.2020 16.03.2020 COLD WORK DAY UEB-1 GLANDING CABLES AND TERMINATION & INSPECTION WITH GE AND CEEG ELECTRIC TEAM
6426 GE-HEC-1528 09.03.2020 12.03.2020 COLD WORK DAY GT-21 PEECC CABLE TERMINATION ELECTRICAL

6427 GE-HEC-1529 10.03.2020 16.03.2020 COLD WORK DAY GT-11 CONTINUITY TEST AND INSULATION RESISTANCE TEST OF POWER CONTROL CABLEELECTRIC TEAM

6428 GE-HEC-1530 10.03.2020 16.03.2020 HOT WORK DAY GT-12 IPB GENERATOR SIDE REPAIR IPB SIDE GGENERATOR ELECTRICAL

6429 5217 10.03.2020 16.03.2020 COLD WORK DAY ACB PUNCH CLEARING INSPECTION ELECTRIC TEAM

6430 GE-HEC-1531 10.03.2020 16.03.2020 COLD WORK DAY GT-12 CONTINUITY TEST AND INSULATION RESISTANCE TEST OF POWER CONTROL CABLEELECTRIC TEAM

6431 GE-HEC-1532 12.03.2020 18.03.2020 COLD WORK DAY GT-11/12 GCB HOT LOOP TEST COMMISSIONING

6432 GE-HEC-1533 09.03.2020 13.03.2020 COLD WORK DAY GTB-11 FIRE PROTECTION PANEL(TESTING SIMULATION WITH GTB-LFAP) ELECTRIC TEAM

6433 GE-HEC-1534 09.03.2020 13.03.2020 COLD WORK DAY GTB-12 FIRE PROTECTION PANEL(TESTING SIMULATION WITH GTB-LFAP) ELECTRIC TEAM

MODIFICATION OF INERGEN LINE INCLUDING TOUCH-UP, PAINTING &


6434 3697 10.03.2020 16.03.2020 COLD WORK DAY CCB SCAFFOLDING IF REQUIRED PIPING TEAM

6435 GE-HEC-1535 10.03.2020 16.03.2020 COLD WORK DAY GT-21 PIPE AND SUPPORT SURFACE CLEANING AND PAINTING PIPING TEAM

6436 9990 10.03.2020 16.03.2020 COLD WORK DAY SDT, SUT FOR GT-11/12,UEB-1(DLOOP CHECK COMMISSIONING

6437 GE-HEC-1536 10.03.2020 16.03.2020 COLD WORK DAY GT-21 DEMI WATER FLUSHING FOR CCW COMMISSIONING

6438 3714 10.03.2020 16.03.2020 COLD WORK DAY BSDG PIPE SUPPORT SURFACE & CLEANING AND PAINTING PIPING TEAM

6439 3715 10.03.2020 16.03.2020 COLD WORK DAY GT-22 PIPE SUPPORT SURFACE & CLEANING AND PAINTING PIPING TEAM

6440 4124 10.03.2020 12.03.2020 COLD WORK DAY GT-22 PEECC FDM INSPECTION ELECTRICAL
6441 9991 10.03.2020 16.03.2020 COLD WORK DAY BSDG EXPANASION CHEMICAL TANK CLEANING COMMISSIONING

6442 15553 10.03.2020 13.03.2020 HOT WORK DAY GTB-2 FIN FAN ALL STEEL STRUCTURE FOUMDATION TRATMENT 'GRINDING' MECHANIC TEAM

6443 4127 10.03.2020 12.03.2020 COLD WORK DAY GT-22 FDM INSPECTION(ETF-22.01 ELECTRICAL

6444 9992 10.03.2020 16.03.2020 COLD WORK DAY BSDG COOLING WATER PIPE CLEANING (INLET & OUTLET) COMMISSIONING

6445 7241 12.03.2020 18.03.2020 HOT WORK DAY GT-11 IPB REPAIR IPB SIDE GCB ELECTRICAL

6446 7242 12.03.2020 18.03.2020 HOT WORK DAY GT-12 IPB REPAIR IPB SIDE GCB ELECTRICAL

6447 7243 14.03.2020 20.03.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

6448 7244 14.03.2020 20.03.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

6449 GE-HEC-1537 14.03.2020 20.03.2020 HOT WORK DAY GT-21 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

VERIFING EOCR SETTING VALUES, VISUAL CHECK KKS TAG OF ALL MCC MODULES
6450 GE-HEC-1538 11.03.2020 17.03.2020 COLD WORK DAY GT-12 PEECC MCC MODULES AS PER ACTUAL AND DRAWING ELECTRIC TEAM

VERIFING EOCR SETTING VALUES, VISUAL CHECK KKS TAG OF ALL MCC MODULES
6451 GE-HEC-1539 11.03.2020 17.03.2020 COLD WORK DAY GT-11 PEECC MCC MODULES AS PER ACTUAL AND DRAWING ELECTRIC TEAM

6452 GE-HEC-1540 11.03.2020 17.03.2020 HOT WORK DAY GTB-1 SCAFFOLDING FOR MAIN ACCESS DOORS ARCHITECTURE TEAM

6453 GE-HEC-1541 11.03.2020 17.03.2020 HOT WORK DAY GT-11 REPAIR HANDRAIL IN 1st floor & METAL CLADDING ARCHITECTURE TEAM

6454 GE-HEC-1542 11.03.2020 17.03.2020 HOT WORK DAY GT-21 REPAIR HANDRAIL & PLASTER & LCI ROOM DOOR MAKING ARCHITECTURE TEAM

6455 9993 11.03.2020 17.03.2020 COLD WORK DAY NGSS MAINTENANCE OF PRV (00EKG33AA071) COMMISSIONING
6456 9994 11.03.2020 17.03.2020 COLD WORK DAY GT-22 GREASE INJECTION OF 9FR MOTORS COMMISSIONING

6457 5211 11.03.2020 17.03.2020 COLD WORK DAY UEB-1 CABLE TERMINATION ELECTRIC TEAM

6458 12436 14.03.2020 19.03.2020 HOT WORK DAY GT-22 GROUNDING INSTALLATION ELECTRICAL

6459 8882 11.03.2020 17.03.2020 HOT WORK DAY ACB CONDUIT & PANEL INSTALLATION ELECTRIC TEAM

6460 4136 11.03.2020 12.03.2020 COLD WORK DAY CCB(1st FLOOR) CABLE TERMINATION AND PUNCH CLEARING ELECTRICAL

6461 17012 11.03.2020 17.03.2020 HOT WORK DAY GT-22 STEEL STRUCTURE REPAIR WORK ARCHITECTURE TEAM

6462 17026 11.03.2020 17.03.2020 HOT WORK DAY UEB-1 ACCESS FLOOR INSTALLATION WORK ARCHITECTURE TEAM

FIRE ALARM CONDUIT & COREING WORK DC/UPS -CABLE CONNECTION (FOR
6463 5275 11.03.2020 17.03.2020 COLD WORK DAY CCB(DC/UPS ROOM) SYSTEM SHUT DOWN) ELECTRIC TEAM

6464 4119 11.03.2020 12.03.2020 COLD WORK DAY GT-22 FDM INSPECTION QC

6465 4116 14.03.2020 19.03.2020 COLD WORK DAY CCB CABLE PULLING ELECTRICAL

6466 6324 14.03.2020 20.03.2020 HOT WORK DAY UEB-1 FIRE ALARM-DEVIES TESTING CABLE LAYING & TERMINATION /CONDUIT MODIFIC ELECTRIC TEAM

6467 8888 14.03.2020 20.03.2020 HOT WORK DAY GT-22 CONDUITING, WELDING, THREADING WORK, GRINDING WORK ELECTRIC TEAM

6468 8860 14.03.2020 20.03.2020 HOT WORK DAY CCB(UPS ROOM/BATT ROOM) PANEL TESTING , BATTERY CHARGING & DISCHARGING ELECTRIC TEAM

CUTTING, DRILLING, GRINDING, CHIPPING WORKS INSTALLATION OF CONDUIT


6469 8829 14.03.2020 20.03.2020 HOT WORK DAY W/T AND SUPPORT ELECTRIC TEAM

6470 8830 14.03.2020 20.03.2020 HOT WORK DAY CCB CUTTING, DRILLING, BACIC, GRINDING, CHIPPING WORKS INSTALLATION OF ELECTRIC TEAM
CONDUIT WORKS AND SUPPORT
6471 6815 14.03.2020 20.03.2020 COLD WORK DAY W/T INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

6472 6816 14.03.2020 20.03.2020 COLD WORK DAY CCB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

6473 5132 14.03.2020 20.03.2020 COLD WORK DAY UEB-1 PANEL TEST, INTERWIRING WORKS ELECTRIC TEAM

6474 12453 14.03.2020 20.03.2020 HOT WORK DAY BSDG CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6475 12460 14.03.2020 20.03.2020 HOT WORK DAY CCB(1st FLOOR) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6476 12470 14.03.2020 20.03.2020 HOT WORK DAY GT-22 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6477 12471 14.03.2020 20.03.2020 HOT WORK DAY GT-22 PEECC CONDUIT FIRE ALARM AND LIGHTING & INSTALLATION PANEL ELECTRICAL

6478 12472 14.03.2020 20.03.2020 HOT WORK DAY CCB(BASEMENT & G.F)) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6479 12469 14.03.2020 20.03.2020 HOT WORK DAY W/T CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6480 19808 14.03.2020 20.03.2020 HOT WORK DAY CCB(1st FLOOR) SILING FLOOR ARCHITECTURE

6481 19821 14.03.2020 20.03.2020 HOT WORK DAY GT-22 FLUSHING WORK ARCHITECTURE

6482 12094 14.03.2020 20.03.2020 HOT WORK DAY CCB(G.F) CABLE PULLING & TERMINATION INSTRUMENT TEAM

6483 19441 14.03.2020 20.03.2020 HOT WORK DAY GT-22 JB, INSTRUMENT, CONDUIT, CALIBRATION, LEAK TEST, PUNCH POINT INSTRUMENT TEAM

6484 7431 11.03.2020 12.03.2020 COLD WORK DAY ACB PUNCH CLEARING ELECTRICAL

6485 12457 14.03.2020 20.03.2020 HOT WORK DAY GT-22 CONDUIT FIRE ALARM AND LIFGTING(CABLE CULVERT) ELECTRICAL
6486 GE-HEC-1543 12.03.2020 18.03.2020 COLD WORK DAY GT-21 INSPECTION FOR PUNCH LIST WITH GE AND CEEG ELECTRIC TEAM

6487 GE-HEC-1544 12.03.2020 18.03.2020 COLD WORK DAY GT-21 INSPECTION FOR PUNCH LIST WITH GE AND CEEG ELECTRIC TEAM

6488 GE-HEC-1545 12.03.2020 18.03.2020 COLD WORK DAY GT-21 INSPECTION FOR PUNCH LIST WITH GE AND CEEG ELECTRIC TEAM

6489 4653 14.03.2020 20.03.2020 COLD WORK DAY GT-12 EGBS TOUCH-UP, CLEANING, INSPETION ACTIVITY FOR SEAL & HYDRAULIC UNIT MECHANIC TEAM

6490 4654 14.03.2020 20.03.2020 COLD WORK DAY GT-22 NGFS TOUCH-UP, SCAFFOLDING, CLEANING, INSPETION ACTIVITY MECHANIC TEAM

6491 19811 14.03.2020 20.03.2020 HOT WORK DAY CCB(1st FLOOR) HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING) HVAC

6492 19816 14.03.2020 20.03.2020 HOT WORK DAY DWPB HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING) HVAC

6493 19817 14.03.2020 20.03.2020 HOT WORK DAY SWPB HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING) HVAC

6494 19818 14.03.2020 20.03.2020 HOT WORK DAY UEB-1 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING) HVAC

6495 19822 14.03.2020 20.03.2020 HOT WORK DAY GT-22 HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING) HVAC

6496 8967 14.03.2020 20.03.2020 COLD WORK DAY GT-22 PAINTING AND PIPE INSULATION WORK PIPING

6497 8969 14.03.2020 20.03.2020 COLD WORK DAY GT-22 NGFS PAINTING AND PIPE INSULATION WORK PIPING
6498 GE-HEC-1546 11.03.2020 17.03.2020 COLD WORK DAY GT-21 TUBE REPAIR FOR HYDROGEN CONTROL PANEL INSTRUMENT TEAM

6499 GE-HEC-1547 14.03.2020 20.03.2020 COLD WORK DAY GT-11 SCAFFOLDING INSTALLATION ELECTRIC TEAM

FIRE FIGHTING CONDUIT INSTALLATION, CABLE LAYING & TERMINATION / FIRE


6500 GE-HEC-1548 14.03.2020 20.03.2020 HOT WORK DAY GT-11 ALARM DEVIES TESTING ELECTRIC TEAM

6501 GE-HEC-1549 14.03.2020 20.03.2020 COLD WORK DAY GT-12 SCAFFOLDING INSTALLATION ELECTRIC TEAM

6502 GE-HEC-1550 14.03.2020 20.03.2020 HOT WORK DAY GT-12 FIRE FIGHTING CONDUIT INSTALLATION, CABLE LAYING & TERMINATION / FIRE ELECTRIC TEAM
ALARM DEVIES TESTING

6503 GE-HEC-1551 14.03.2020 20.03.2020 HOT WORK DAY GT-21 CLOSE OPENNING AND SCFFOLDING INSIDE AND OUTSIDE NORTH AREA ARCHITECTURE TEAM

6504 19596 14.03.2020 20.03.2020 HOT WORK DAY GT-22 REINSTATEMENT WORKS: GASKET REPLACEMENT, BOLTING, AIR BLOWING, PIPING TEAM
REPAIR / MODIFICATION OF PIPE & SUPORT

6505 3728 12.03.2020 17.03.2020 COLD WORK DAY GT-22 ECC WALKDOWN/INSPECTION WITH QA,QC AND CEEG PIPING TEAM

6506 8896 14.03.2020 20.03.2020 HOT WORK DAY BSDG INSTALLATION OF CONDUIT & PANEL ELECTRIC TEAM

6507 8897 14.03.2020 20.03.2020 HOT WORK DAY CCB INSTALLATION OF CONDUIT & PANEL ELECTRIC TEAM

6508 5278 14.03.2020 20.03.2020 COLD WORK DAY BSDG CABLE TERMINATION & LOOP CHECK ELECTRIC TEAM

6509 5279 14.03.2020 20.03.2020 COLD WORK DAY CCB CABLE TERMINATION & LOOP CHECK & INSTALLATION OF SCAFFOLDING ELECTRIC TEAM

6510 9995 12.03.2020 18.03.2020 COLD WORK DAY CCB-UPS ENERGIZED FIRE ALARM SYSTEM FOM UPS ELECTRIC TEAM
6511 5283 14.03.2020 20.03.2020 COLD WORK DAY GT-22 TESTING THE RESISTANCE AND CONTINUITY OF EARTHING SYSTEM ELECTRIC TEAM

6512 GE-HEC-1552 14.03.2020 19.03.2020 COLD WORK DAY GT-11 PERFORMING COMMISSIONING WORK COMMISSIONING

6513 GE-HEC-1553 14.03.2020 19.03.2020 COLD WORK DAY GT-12 PERFORMING COMMISSIONING WORK COMMISSIONING

6514 GE-HEC-1554 14.03.2020 19.03.2020 COLD WORK DAY GT-21 PERFORMING COMMISSIONING WORK COMMISSIONING

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


6515 GE-HEC-1555 14.03.2020 19.03.2020 COLD WORK DAY GT-11 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

6516 GE-HEC-1556 14.03.2020 19.03.2020 COLD WORK DAY GT-12 PEECC COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING COMMISSIONING
VALVE AND DEVISE START MOTOR

6517 GE-HEC-1557 14.03.2020 19.03.2020 COLD WORK DAY GT-21 PEECC COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING COMMISSIONING
VALVE AND DEVISE START MOTOR

6518 5282 14.03.2020 20.03.2020 COLD WORK DAY GT-22 NGFS REPLACEMENT OF CONDUIT REDUCERS TO ATEX TYPE / CLOSE PUNCH LIST ELECTRIC TEAM

6519 12374 14.03.2020 20.03.2020 HOT WORK DAY FWPB CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6520 19599 14.03.2020 20.03.2020 HOT WORK DAY GT-22 F/F AND SUPPORT REPAIR, MODIFICATION AND PAINTING, CO2 CYLINDER PIPING TEAM
ARRANGEMENT & FIXING, SCAFFOLDING WORK INSPECTION

6521 GE-HEC-1558 14.03.2020 20.03.2020 HOT WORK DAY GT-GTG-21 GAS TURBINE FIX AND POINT ADJUSTMENT MECHANIC TEAM

6522 GE-HEC-1559 14.03.2020 20.03.2020 COLD WORK DAY GT-GTG-21 GAS TURBINE FINAL ALIGNMENT ACTIVITY MECHANIC TEAM
6523 GE-HEC-1560 14.03.2020 20.03.2020 COLD WORK DAY GT-GTG-21 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

6524 GE-HEC-1561 14.03.2020 20.03.2020 COLD WORK DAY GT-11 TOUCH-UP, PAINTING PIPING

6525 GE-HEC-1562 14.03.2020 20.03.2020 COLD WORK DAY GT-12 TOUCH-UP, PAINTING PIPING

6526 GE-HEC-1563 14.03.2020 20.03.2020 COLD WORK DAY GT-11 NGFS PIPE INSULATION PIPING

6527 GE-HEC-1564 14.03.2020 20.03.2020 COLD WORK DAY GT-12 NGFS PIPE INSULATION PIPING

6528 GE-HEC-1565 14.03.2020 20.03.2020 COLD WORK DAY GT-21 INSULATION WORK PIPING

6529 GE-HEC-1566 14.03.2020 20.03.2020 COLD WORK DAY GT-21 FLUSHING WORK PIPING

6530 GE-HEC-1567 12.03.2020 18.03.2020 COLD WORK NIGHT GT-21 VERIFICATION CHARGE AND DISCHARGE OF BATTERY QC

METAL CLADDING AND STEEL STRUCTURE & SCAFFOLDING INSIDE AND OUTSIDE
6531 GE-HEC-1568 14.03.2020 20.03.2020 HOT WORK DAY GT-11 SOUTH AREA ARCHITECTURE TEAM

METAL CLADDING AND STEEL STRUCTURE & SCAFFOLDING INSIDE AND OUTSIDE
6532 GE-HEC-1569 14.03.2020 20.03.2020 HOT WORK DAY GT-12 SOUTH AREA ARCHITECTURE TEAM

6533 4188 14.03.2020 20.03.2020 COLD WORK DAY NGSS INSULATION AND CLADDING WORK MECHANIC TEAM

PUNCH CLEAR, LIGHTING PANEL CABLE LINE CHECK, CABLE ARRANGEMENT,


6534 5284 14.03.2020 20.03.2020 COLD WORK DAY BSDG CABLE CONNECTION & INSPECTION ELECTRIC TEAM

PUNCH CLEAR, CABLE LINE CHECK, CABLE ARRANGEMENT, CABLE CONNECTION


6535 5285 14.03.2020 20.03.2020 COLD WORK DAY CCB-SWGR & INSPECTION ELECTRIC TEAM
6536 5286 14.03.2020 20.03.2020 COLD WORK DAY CCB-DCS(G.F) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6537 5287 14.03.2020 20.03.2020 COLD WORK DAY GT-22 GCB PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6538 5288 14.03.2020 20.03.2020 COLD WORK DAY GT-22 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6539 5280 15.03.2020 21.03.2020 COLD WORK DAY CCB TO LEB-1 CABLE PULLING ELECTRIC TEAM

6540 4131 14.03.2020 19.03.2020 COLD WORK DAY CCB(1st FLOOR) PUNCH CLEARING AND CABLE TERMINATION ELECTRICAL

6541 4133 14.03.2020 19.03.2020 COLD WORK DAY CCB(G.F) PUNCH CLEARING AND CABLE TERMINATION ELECTRICAL

6542 4134 14.03.2020 19.03.2020 COLD WORK DAY GT-22 PUNCH CLEARING AND CABLE TERMINATION ELECTRICAL

6543 4137 14.03.2020 19.03.2020 COLD WORK DAY CCB-DCS PUNCH CLEARING AND CABLE TERMINATION ELECTRICAL

6544 4190 14.03.2020 20.03.2020 COLD WORK DAY GTB-1 CCW FIN FAN CLEAN PUNCH ITEMS & POURING GROUT MECHANIC TEAM

6545 4190 14.03.2020 20.03.2020 COLD WORK DAY GTB-2 CCW FIN FAN CLEAN PUNCH ITEMS MECHANIC TEAM

6546 12405 14.03.2020 19.03.2020 HOT WORK DAY GT-22 PUUNCH CLEAR MECHANICAL

6547 12406 14.03.2020 19.03.2020 HOT WORK DAY GT-22 IPB WELDING AND CLEANING ELEMENT IPB MECHANICAL

6548 9996 14.03.2020 20.03.2020 COLD WORK DAY GT-22 DEMI WATER FLUSHING FOR CCW COMMISSIONING

6549 9997 14.03.2020 20.03.2020 COLD WORK DAY GT-22 1,2 BEARING SPOOL INSTALL & LUBE OIL CHANGE COMMISSIONING
6550 9998 14.03.2020 20.03.2020 COLD WORK DAY GT-22 CHEMICAL CLEANING COMMISSIONING

6551 9999 14.03.2020 20.03.2020 COLD WORK DAY NGSS FUEL GAS LINE STRAINER(STR-01-001/STR-01-002)CLEANING COMMISSIONING

6552 3730 15.03.2020 21.03.2020 COLD WORK DAY GT-22 PICKLING AND INSTALLATION OF INSULLATION AND CLADDING PIPING TEAM

6553 4148 14.03.2020 15.03.2020 COLD WORK DAY GT-22 PEECC FDM INSPECTION QC

6554 5289 15.03.2020 20.03.2020 COLD WORK DAY CCB TO UEB-1 CABLE PULLING ELECTRIC TEAM

6555 GE-HEC-1570 14.03.2020 20.03.2020 COLD WORK DAY GT-21 BEARING NUMBER-01 & HYDROLIC PIPE INSPECTION COMMISSIONING

6556 GE-HEC-1571 14.03.2020 20.03.2020 COLD WORK DAY GT-21 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

POWER CABLE AND CONTROL CHANGE FROM 400V MCC FEEDER TO FEEDER AS
6557 GE-HEC-1572 15.03.2020 21.03.2020 COLD WORK DAY GT-21 PEECC PER ATTACHED CABLE SHEDULE AND CONNECTION ELECTRIC TEAM

6558 GE-HEC-1573 15.03.2020 21.03.2020 COLD WORK DAY GT-21 FIXING/INSTALLATION OF PIPE CLADDING(ALUMINUM SHEET COVER) PIPING TEAM

6559 GE-HEC-1574 15.03.2020 21.03.2020 COLD WORK DAY GT-21 FIXING/INSTALLATION OF PIPE CLADDING(ALUMINUM SHEET COVER) PIPING TEAM

6560 GE-HEC-1575 15.03.2020 21.03.2020 COLD WORK DAY GT-21 FIXING/INSTALLATION OF PIPE CLADDING(ALUMINUM SHEET COVER) PIPING TEAM

6561 GE-HEC-1576 15.03.2020 21.03.2020 HOT WORK DAY GT-21 IPB WELDING AND CLEANING ELEMENT IPB MECHANICAL

6562 GE-HEC-1577 15.03.2020 21.03.2020 HOT WORK DAY GT-21 PUNCH CLEAR MECHANICAL

6563 9040 15.03.2020 21.03.2020 HOT WORK DAY FWPB PUMP ALIGNMENT & PIPING INSTALLATION INCLUDING CUTTING, GRINDING, PIPING TEAM
WELDING WORKS & INSPECTION
6564 GE-HEC-1578 15.03.2020 21.03.2020 COLD WORK DAY GT-12 NGFS PIPE AND SUPPORT SURFACE CLEANING AND PAINTING PIPING TEAM

GT-21 PEECC/DC&UPS
6565 GE-HEC-1579 16.03.2020 22.03.2020 HOT WORK DAY PANEL/MCC3B/3E PANEL INTERWIRING/TESTING, BATTERY CHARGING AND DISCHARGING/FUNCTION
ELECTRIC TEAM

6566 GE-HEC-1580 14.03.2020 19.03.2020 COLD WORK DAY GT-21 VERIFICATION CHARGE AND DISCHARGE OF BATTERY ELECTRICAL

6567 5338 15.03.2020 21.03.2020 COLD WORK DAY UEB-1 GLANDING AND TERMINATION CABLES ELECTRIC TEAM

SCAFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING,


6568 15555 17.03.2020 23.03.2020 HOT WORK DAY GT-22 INSPECTION, LIFTING, FIT-UP MECHANIC TEAM

6569 8903 14.03.2020 20.03.2020 HOT WORK DAY CCB-UPS ROOM MODIFICATION / ADJUSTMENT LIGHTING ELECTRIC TEAM

6570 4159 15.03.2020 19.03.2020 COLD WORK DAY W/T PAINTING PIPING AND SUPORT PIPING

6571 17625 15.03.2020 19.03.2020 HOT WORK DAY CCB GROUNDING INSTALLATION ELECTRICAL

6572 7448 16.03.2020 19.03.2020 COLD WORK DAY BSDG FINAL INSPECTION WITH HEC, CEEG ARCHITECTURE

6573 19826 16.03.2020 20.03.2020 HOT WORK DAY W/T HVAC(DUCT, EQUIPMENT INSTALLATION, PIPING, CONTROL CABLE, PULING) HVAC

6574 GE-HEC-1581 16.03.2020 22.03.2020 HOT WORK DAY GT-21 GROUNDING INSTALLATION ELECTRICAL

TOP PUNCH CLEARING, PIPE AND SUPPORT PAINTING, SCFFOLDING


6575 GE-HEC-1582 16.03.2020 22.03.2020 COLD WORK DAY GT-21 MODIFICATION & DISMANTLING PIPING TEAM

6576 8908 16.03.2020 22.03.2020 HOT WORK DAY GT-22 PEECC PANEL TESTING , BATTERY CHARGING & DISCHARGING TEST ELECTRIC TEAM

6577 4163 15.03.2020 21.03.2020 COLD WORK DAY GT-22 PEECC MEASEREMENT RISISTANCE(GROUNDING) ELECTRICAL

6578 GE-HEC-1583 16.03.2020 22.03.2020 COLD WORK DAY GT-21 TOP W/D OF ATOMIZING AIR SYSTEM COMMISSIONING
6579 GE-HEC-1584 16.03.2020 22.03.2020 COLD WORK DAY GT-21 NGFS RETIGHTENING OF FLANGE BOLTS AND APPLY THE LIQUID TEFRON ON PLUG COMMISSIONING

6580 GE-HEC-1585 16.03.2020 22.03.2020 HOT WORK DAY GT-21 EXPANSION JOINT STOP WELDING(BEARING N'1) COMMISSIONING

6581 GE-HEC-1586 15.03.2020 20.03.2020 COLD WORK DAY GT-11 SCAFFOLDING INSTALLATION ELECTRIC TEAM

6582 GE-HEC-1587 15.03.2020 20.03.2020 HOT WORK DAY GT-12 CONDUIT INSTALLATION, CABLE LAYING TERMINATION ELECTRIC TEAM

6583 4161 15.03.2020 21.03.2020 COLD WORK DAY CCB TESTING CABLE ELECTRICAL

6584 4164 16.03.2020 22.03.2020 COLD WORK DAY UEB-2 TESTING CABLE ELECTRICAL

6585 1068 16.03.2020 20.03.2020 COLD WORK DAY W/T PUNCH CLEARING TOUCH-UP, PAINTING AND HOUSEKEEPING MECHANIC TEAM

6586 4110 16.03.2020 19.03.2020 COLD WORK DAY CCB-UPS CABLE TERMINATION ELECTRICAL

6587 7162 15.03.2020 21.03.2020 COLD WORK DAY GTB-2 CCW FIN FAN, UEB-2 LAOD TEST COMMISSIONING

6588 7164 16.03.2020 22.03.2020 COLD WORK DAY CCB, UEB-2, GT-22 LINE CHECK COMMISSIONING

6589 7245 16.03.2020 22.03.2020 HOT WORK DAY GT-22 PEECC COLD/HOT LOOP CHECK ELECTRICAL

6590 GE-HEC-1588 16.03.2020 22.03.2020 HOT WORK DAY GT-21 PEECC COLD LOOP CHECK ELECTRICAL

6591 GE-HEC-1589 17.03.2020 23.03.2020 HOT WORK DAY GT-12 IPB GENERATOR SIDE REPAIR IPB SIDE GENERATOR ELECTRICAL

6592 7201 17.03.2020 23.03.2020 COLD WORK DAY SDT, SUT FOR GT-11/12,UEB-1(DLOOP CHECK COMMISSIONING

6593 GE-HEC-1590 16.03.2020 22.03.2020 COLD WORK DAY GT-12 NGFS LEAK TEST WITH NATURAL GAS COMMISSIONING
6594 19598 17.03.2020 23.03.2020 HOT WORK DAY FWPB-STORAGE TANK INSTALLAITON OF PIPE DRAIN LINE AND SUPPORT & CUTTING GRINDING, FIT-UP, PIPING TEAM

6595 GE-HEC-1591 17.03.2020 23.03.2020 COLD WORK DAY GT-21 TOP W/D FUEL GAS SYSTEM, FUEL GAS SCUBBER, FUEL GAS ABSOLUTE COMMISSIONING
SEPARATOR, FUEL PURGE SYSTEM

6596 GE-HEC-1592 17.03.2020 23.03.2020 COLD WORK DAY GT-21 CCW DEMI WATER FLUSHING FOR CCW COMMISSIONING

6597 5341 17.03.2020 23.03.2020 COLD WORK DAY CCB GLANDING CABLES AND TERMINATION ELECTRIC TEAM

6598 GE-HEC-1593 17.03.2020 23.03.2020 COLD WORK DAY GTB-1 APU VISUAL INSPECTION OF APU AND CLEANING(IF REQUIRED) MECHANIC TEAM

6599 4120 17.03.2020 22.03.2020 COLD WORK DAY BSDG TESTIG CABLE(MEGGER) ELECTRICAL

6600 4165 17.03.2020 22.03.2020 COLD WORK DAY UEB-2 TESTIG CABLE(MEGGER) ELECTRICAL

6601 4166 17.03.2020 22.03.2020 COLD WORK DAY W/T TESTIG CABLE(MEGGER) ELECTRICAL

6602 4167 17.03.2020 22.03.2020 COLD WORK DAY CCB(UPS) TESTIG CABLE(MEGGER) ELECTRICAL

6603 17031 17.03.2020 20.03.2020 HOT WORK DAY GT-22 HANDREAL REPAIR WORK & METAL CLADDING REPAIR WORK ARCHITECTURE TEAM

6604 19771 18.03.2020 23.03.2020 HOT WORK DAY W/T TOUCH-UP (SILICON FOR WINDOWS) ARCHITECTURE

6605 19859 18.03.2020 23.03.2020 HOT WORK DAY BSDG TOUCH-UP (SILICON FOR WINDOWS) ARCHITECTURE

6606 7185 17.03.2020 23.03.2020 COLD WORK DAY GT-22 CCW MAINTENANCE OF THE PUMP N'2 IN CCW COMMISSIONING

6607 7184 18.03.2020 24.03.2020 COLD WORK DAY GT-22 AIR BLOWING & LEAK TEST FOR MONIFOLD OF FILTER HOUSE COMMISSIONING
6608 8938 17.03.2020 23.03.2020 HOT WORK DAY UEB-1 CABLE TRAY INSTALLATION ELECTRIC TEAM

6609 8952 18.03.2020 24.03.2020 HOT WORK DAY FWPB CONDUIT INSTALLATION & DEVICE INSTALLATION ELECTRIC TEAM

6610 5291 18.03.2020 24.03.2020 COLD WORK DAY FWPB CABLE TERMINATION & LOOP TEST & SCFFOLDING ERECTION ELECTRIC TEAM

6611 3743 18.03.2020 24.03.2020 COLD WORK DAY BSDG PIPE AND SUPPORT SURFACE CLEANING AND PAINTING PIPING TEAM

6612 GE-HEC-1594 18.03.2020 24.03.2020 COLD WORK DAY GT-21 AIR BLOWING & LEAK TEST FOR MONIFOLD OF FILTER HOUSE COMMISSIONING

6613 GE-HEC-1595 18.03.2020 24.03.2020 HOT WORK DAY GT-12 METAL CLADDING INSTALLATION WORK AND SCFFOLDING ARCHITECTURE TEAM

6614 4258 17.03.2020 23.03.2020 COLD WORK DAY CCB(1st FLOOR) TESTING FIBER OPTICAL ELECTRICAL

6615 4260 17.03.2020 23.03.2020 COLD WORK DAY W/T TESTING FIBER OPTICAL ELECTRICAL

6616 4261 17.03.2020 23.03.2020 COLD WORK DAY FWPB TESTING CABLE(MEGGER) ELECTRICAL

6617 4263 17.03.2020 23.03.2020 COLD WORK DAY CCB(1st FLOOR) TESTING CABLE ELECTRICAL

6618 5353 18.03.2020 24.03.2020 COLD WORK DAY CCB CABLE TERMINATION ELECTRIC TEAM

6619 11265 21.03.2020 27.03.2020 HOT WORK DAY W/T CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6620 11266 21.03.2020 27.03.2020 HOT WORK DAY BSDG CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6621 11267 21.03.2020 27.03.2020 HOT WORK DAY CCB(1s FLOOR) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6622 11268 21.03.2020 27.03.2020 HOT WORK DAY CCB(BASEMENT & G.F)) CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL
6623 11269 21.03.2020 27.03.2020 HOT WORK DAY GT-22 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6624 11279 21.03.2020 27.03.2020 HOT WORK DAY FWPB CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6625 12489 21.03.2020 27.03.2020 HOT WORK DAY GT-22 CONDUIT FIRE ALARM AND LIGHTING(CABLE CULVERT) ELECTRICAL

6626 4272 21.03.2020 26.03.2020 COLD WORK DAY CCB(BASEMENT & G.F TO DCS) CABLE PULLING ELECTRICAL

6627 5354 21.03.2020 27.03.2020 COLD WORK DAY CCB CABLE TERMINATION & LOOP CHECK ELECTRIC TEAM

6628 5297 19.03.2020 25.03.2020 COLD WORK DAY NGSS REPLACEMENT OF CURRENT TRANSFORMER INSIDE MCC ELECTRIC TEAM

6629 8590 21.03.2020 27.03.2020 HOT WORK DAY UEB-1 FIRE ALARM, CONDUIT INSTALALTION, CABLE LAYING & TERMINATION/NAC ELECTRIC TEAM
PANEL TERMINATION

6630 8831 21.03.2020 27.03.2020 HOT WORK DAY CCB CUTTING, DRILLING, GRINDING, CHIPPING WORK, INSTALALTION OF CONDUIT AN ELECTRIC TEAM

6631 8832 21.03.2020 27.03.2020 HOT WORK DAY W/T CUTTING, DRILLING, GRINDING, CHIPPING WORK, INSTALALTION OF CONDUIT AN ELECTRIC TEAM

6632 5090 21.03.2020 27.03.2020 COLD WORK DAY CCB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

6633 8909 21.03.2020 27.03.2020 COLD WORK DAY CCB(G.F) PANEL TESTING, FUNCTIONAL CHECK, INTERWIRING ELECTRIC TEAM

6634 5091 21.03.2020 27.03.2020 COLD WORK DAY W/T INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

6635 5295 21.03.2020 27.03.2020 COLD WORK DAY UEB-1 PANEL TEST, INTERWIRING, FUNCTIONAL TESTING ELECTRIC TEAM

6636 11283 21.03.2020 26.03.2020 HOT WORK DAY GT-22 GROUNDING INSTALLATION ELECTRICAL
6637 7246 19.03.2020 25.03.2020 HOT WORK DAY GT-12 IPB REPAIR IPB SIDE GCB ELECTRICAL

6638 7247 19.03.2020 25.03.2020 HOT WORK DAY GT-11 IPB REPAIR IPB SIDE GCB ELECTRICAL

6639 5388 19.03.2020 25.03.2020 COLD WORK DAY CCB TO AUX BOILER CABLE PULLING ELECTRIC TEAM

6640 7186 19.03.2020 25.03.2020 COLD WORK DAY GT-21 EGBS INSTALL THE BYPASS HOSE & OIL CLEANING COMMISSIONING

6641 5356 21.03.2020 27.03.2020 COLD WORK DAY GT-22 NGFS GENERAL CLEANING, SCAFFOLDING, TOUCH-UP ACTIVITY MECHANIC TEAM

6642 5389 19.03.2020 25.03.2020 COLD WORK DAY GT-22 PUNCH CLEARING AS PER ATTACHED LIST ELECTRIC TEAM

6643 GE-HEC-1596 19.03.2020 25.03.2020 COLD WORK DAY GT-11 NGFS HOUSEKEEPING COMMISSIONING

6644 GE-HEC-1597 19.03.2020 25.03.2020 COLD WORK DAY GT-12 NGFS HOUSEKEEPING COMMISSIONING

6645 GE-HEC-1598 21.03.2020 27.03.2020 COLD WORK DAY GT-21 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

6646 GE-HEC-1599 21.03.2020 27.03.2020 COLD WORK DAY GT-21 PUNCH LIST CLOSE OUT ACTIVITY MECHANIC TEAM

6647 GE-HEC-1600 21.03.2020 27.03.2020 COLD WORK DAY GT-21 GAS TURBINE FINAL ALIGNMENT ACTIVITY MECHANIC TEAM

6648 GE-HEC-1601 21.03.2020 27.03.2020 COLD WORK DAY GT-21 GAS TURBINE FIX AND POINT ADJUSTMENT MECHANIC TEAM

6649 GE-HEC-1602 21.03.2020 27.03.2020 HOT WORK DAY GT-21 CONDUIT FIRE ALARM AND LIGHTING ELECTRICAL

6650 GE-HEC-1603 21.03.2020 26.03.2020 HOT WORK DAY GT-21 IPB GROUNDING INSTALLATION ELECTRICAL
6651 GE-HEC-1604 21.03.2020 26.03.2020 COLD WORK DAY GT-11 PERFORMING COMMISSIONING WORK COMMISSIONING

6652 GE-HEC-1605 21.03.2020 26.03.2020 COLD WORK DAY GT-12 PERFORMING COMMISSIONING WORK COMMISSIONING

6653 GE-HEC-1606 21.03.2020 26.03.2020 COLD WORK DAY GT-21 PERFORMING COMMISSIONING WORK COMMISSIONING

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


6654 GE-HEC-1607 21.03.2020 26.03.2020 COLD WORK DAY GT-11 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


6655 GE-HEC-1608 21.03.2020 26.03.2020 COLD WORK DAY GT-12 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING


6656 GE-HEC-1609 21.03.2020 26.03.2020 COLD WORK DAY GT-21 PEECC VALVE AND DEVISE START MOTOR COMMISSIONING

6657 19442 21.03.2020 27.03.2020 HOT WORK DAY GT-22 JB, INSTRUMENT, CONDUIT, CALIBRATION, LEAK TEST, PUNCH POINT INSTRUMENT TEAM

6658 19617 19.03.2020 25.03.2020 HOT WORK DAY UEB-1 PIPE AND SUPPORT MODIFICATION AND PAINTING PIPING TEAM

REINSTATEMENT WORKS: GASKET REPLACEMENT, BOLTING, AIR BLOWING,


6659 19627 21.03.2020 27.03.2020 HOT WORK DAY GT-22 REPAIR / MODIFICATION OF PIPE & SUPORT PIPING TEAM

6660 3748 19.03.2020 25.03.2020 COLD WORK DAY GT-22 ECC WALKDOWN/INSPECTION WITH QA,QC AND CEEG PIPING TEAM

6661 5398 21.03.2020 27.03.2020 COLD WORK DAY CCB INSULLATION RESISTANCE AND CONTINUITY TEST WITH QC, GE, CEEG ELECTRIC TEAM

6662 19848 21.03.2020 27.03.2020 HOT WORK DAY W/T HVAC(DUCT, EQUIPMENT INSTALLATION PIPING, CONTROL CABLE PULING) HVAC

6663 19851 21.03.2020 27.03.2020 HOT WORK DAY UEB-1 HVAC(DUCT, EQUIPMENT INSTALLATION PIPING, CONTROL CABLE PULING) HVAC

6664 19852 21.03.2020 27.03.2020 HOT WORK DAY SWPB HVAC(DUCT, EQUIPMENT INSTALLATION PIPING, CONTROL CABLE PULING) HVAC

6665 19854 21.03.2020 27.03.2020 HOT WORK DAY DWPB HVAC(DUCT, EQUIPMENT INSTALLATION PIPING, CONTROL CABLE PULING) HVAC

6666 19855 21.03.2020 27.03.2020 HOT WORK DAY CCB(1st Floor) HVAC(DUCT, EQUIPMENT INSTALLATION PIPING, CONTROL CABLE PULING) HVAC
6667 19858 21.03.2020 27.03.2020 HOT WORK DAY GT-22 HVAC(DUCT, EQUIPMENT INSTALLATION PIPING, CONTROL CABLE PULING) HVAC

6668 4010 21.03.2020 27.03.2020 COLD WORK DAY GT-22 NGFS PAINTING AND PIPE INSULATION WORK PIPING TEAM

6669 4011 21.03.2020 27.03.2020 COLD WORK DAY GT-22 PAINTING AND PIPE INSULATION WORK PIPING TEAM

6670 GE-HEC-1610 21.03.2020 27.03.2020 HOT WORK DAY GT-11 MODIFICATION OF CONDUIT & RACEWAY CABLE LAYING & TERMINATION ELECTRIC TEAM

6671 GE-HEC-1611 21.03.2020 27.03.2020 HOT WORK DAY GT-12 FIRE FIGHTING CONDUIT INSTALLATION, CABLE LAYING & TERMINATION ELECTRIC TEAM

6672 GE-HEC-1612 21.03.2020 27.03.2020 HOT WORK DAY GT-11 FIRE FIGHTING CONDUIT INSTALLATION, CABLE LAYING & TERMINATION ELECTRIC TEAM

6673 GE-HEC-1613 21.03.2020 27.03.2020 COLD WORK DAY GT-11 SCAFFOLDING INSTALLATION ELECTRIC TEAM

6674 GE-HEC-1614 21.03.2020 27.03.2020 COLD WORK DAY GT-12 SCAFFOLDING INSTALLATION ELECTRIC TEAM

6675 GE-HEC-1615 21.03.2020 27.03.2020 HOT WORK DAY GT-21 IPB WELDING AND CLEANING ELEMENT IPB MECHANICAL

6676 GE-HEC-1616 21.03.2020 27.03.2020 HOT WORK DAY GT-21 PUNCH CLEAR MECHANICAL

6677 GE-HEC-1617 21.03.2020 27.03.2020 HOT WORK DAY GT-21 PUNCH CLEAR MECHANICAL

6678 GE-HEC-1618 21.03.2020 27.03.2020 COLD WORK DAY GT-21 PUNCH CLEARING AS PER ATTACHED HIGHLIGHTED LIST ELECTRIC TEAM

6679 18066 21.03.2020 26.03.2020 HOT WORK DAY GT-22 PUNCH CLEAR MECHANICAL

PUNCH CLEAR, LIGHTING PANEL CABLE LINE CHECK, CABLE ARRANGEMENT,


6680 5390 21.03.2020 27.03.2020 COLD WORK DAY BSDG ELECTRIC TEAM
CABLE CONNECTION & INSPECTION

6681 5392 21.03.2020 27.03.2020 COLD WORK DAY CCB-DCS(G.F) PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6682 5393 21.03.2020 27.03.2020 COLD WORK DAY CCB-SWGR-UPS PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6683 5394 21.03.2020 27.03.2020 COLD WORK DAY GT-22 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM
6684 17016 21.03.2020 27.03.2020 HOT WORK DAY ACB COMPRESSEUR ROOF FONDATION SETTING WORK ARCHITECTURE TEAM

6685 17042 21.03.2020 27.03.2020 HOT WORK DAY CCB CELLING REPAIR WORK ARCHITECTURE TEAM

6686 17039 21.03.2020 27.03.2020 HOT WORK DAY GT-22 CLOSE OPENNING AND SCFFOLDING INSIDE AND OUTSIDE NORTH AREA ARCHITECTURE TEAM

6687 GE-HEC-1619 21.03.2020 27.03.2020 HOT WORK DAY GT-11 METAL CLADDING INSTALLATION WORK AND SCFFOLDING ARCHITECTURE TEAM

6688 GE-HEC-1620 21.03.2020 27.03.2020 HOT WORK DAY GT-21 CLOSE OPENNING + SCFFOLDING & STELL STRUCTURE REPAIR WORK ARCHITECTURE TEAM

6689 GE-HEC-1621 21.03.2020 27.03.2020 COLD WORK DAY NGFS-12 MAINTENACE OF CONDESAT DRAIN VALVES OF SCRUBBER & SEPARATOR COMMISSIONING

6690 GE-HEC-1622 21.03.2020 27.03.2020 COLD WORK DAY GT-11 TOUCH UP SILICON FOR WINDOWS ARCHITECTURE

6691 GE-HEC-1623 21.03.2020 27.03.2020 COLD WORK DAY NGFS-12 INSULATION AND PINTING PI[ING

6692 GE-HEC-1624 21.03.2020 27.03.2020 COLD WORK DAY GT 21-NGFS INSULATION AND PINTING PIPING

6693 GE-HEC-1625 21.03.2020 27.03.2020 COLD WORK DAY GT-12 TOUCH UP SILICON FOR WINDOWS ARCHITECTURE

6694 7204 21.03.2020 27.03.2020 COLD WORK DAY GT-22 LUBE OIL TANK CLEANING AND OIL CHANGE COMMISSIONING

6695 7202 21.03.2020 27.03.2020 COLD WORK DAY GT-22 CCW CHEMICAL CLEANING COMMISSIONING

6696 5405 21.03.2020 27.03.2020 COLD WORK DAY CCB CABLE TERMINATION AND LOOP CHECK ELECTRIC TEAM

6697 5407 22.03.2020 27.03.2020 COLD WORK DAY CCB TO UEB-2 CABLE PULLING ELECTRIC TEAM

6698 7248 21.03.2020 27.03.2020 HOT WORK DAY UEB-1 TEST OF PANEL ELECTRICAL

6699 8542 21.03.2020 27.03.2020 COLD WORK DAY GT-22 NGFS VENT STACK PIPE INSULATION MECHANIC TEAM

6700 8543 21.03.2020 27.03.2020 COLD WORK DAY GTB-2 CCW FIN FAN PUNCH ITEMS CLEANING MECHANIC TEAM
6701 4193 21.03.2020 27.03.2020 COLD WORK DAY NGSS CLADDING WORK MECHANIC TEAM

6702 GE-HEC-1626 21.03.2020 27.03.2020 COLD WORK DAY GT-21 VENT STACK PIPE INSULATION MECHANIC TEAM

INSPECTION FOR CONTINUITY AND RESISTANCE TEST OF GOUNDING SYSTEM FOR


6703 GE-HEC-1627 21.03.2020 27.03.2020 COLD WORK DAY GT-21 DC AND UPS SYSTEM ELECTRIC TEAM

400V MCC SWITCHGEAR PANEL CONTROL, CABLE CONNECTION AS PER


6704 GE-HEC-1628 21.03.2020 27.03.2020 COLD WORK DAY GT-21 PEECC ATTACHED CABLE SCHEDULE AND INSPECTION ELECTRIC TEAM

GT-12 PEECC-12/12BUA01- RECONNECTION OF INTERNAL CABLE INSIDE 125 DC DISTRUBUTION PANEL,


6705 GE-HEC-1629 22.03.2020 28.03.2020 HOT WORK DAY 12BTL01/02, EXCITATION REMOVAL OF TEMP & CABLES GOING TO PEECC-21 & ENERGIZE ELECTRIC TEAM
ROOM CORRESPONDING BREAKERS

MODIFICATION OF INERGEN LINE INCLUDING TOUCH-UP, PAINTING &


6706 9424 22.03.2020 28.03.2020 COLD WORK DAY CCB SCAFFOLDING IF REQUIRED PIPING TEAM

6707 GE-HEC-1630 21.03.2020 27.03.2020 HOT WORK DAY GT-12 PEECC/EXCITATION ROO METAL CLADDING WORK ARCHITECTURE TEAM

6708 GE-HEC-1631 21.03.2020 27.03.2020 HOT WORK DAY GT-11 PEECC/EXCITATION ROO METAL CLADDING WORK ARCHITECTURE TEAM

6709 8977 21.03.2020 27.03.2020 HOT WORK DAY GT-22 SUPPORT CONDUIT INSTALLATION ELECTRIC TEAM

6710 15557 24.03.2020 30.03.2020 HOT WORK DAY GT-22 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM

6711 7205 22.03.2020 28.03.2020 COLD WORK DAY W/T DEMI WATER TRANSFOR PUMP COMMISSIONING

6712 5408 22.03.2020 21.03.2020 COLD WORK DAY GT-22 PUNCH CLEARING AS PER ATTACHED LIST ELECTRIC TEAM

6713 7206 22.03.2020 28.03.2020 COLD WORK DAY GT-21 EGBS OIL TANK FILLING COMMISSIONING

6714 5409 23.03.2020 29.03.2020 COLD WORK DAY UEB-1 GLANDING CABLES AND TERMINATION ELECTRIC TEAM

6715 7208 22.03.2020 28.03.2020 COLD WORK DAY GT-22 NGFS MAINTENANCE OF CONDENSATE DRAIN VALVE FOR SCRUBER & REPARATION COMMISSIONING

TOP W/D OF GAS SYSTEM, FUEL GAS SCRUBER, FUEL GAS ABSOLUTE SEPARATOR, COMMISSIONING
6716 GE-HEC-1632 24.03.2020 30.03.2020 COLD WORK DAY GT-21
FUEL PURGE SYSTEM
6717 GE-HEC-1633 24.03.2020 30.03.2020 COLD WORK DAY GT-12 LEAK TEST WITH NATURAL GAS COMMISSIONING

6718 GE-HEC-1634 23.03.2020 27.03.2020 HOT WORK DAY GT-21 Blowing of tubes as per punch list INSTRUMENT TEAM

6719 GE-HEC-1635 23.03.2020 27.03.2020 COLD WORK DAY GT-21 RectifiCATION OF PUNCH AND INSPECTION INSTRUMENT TEAM

6720 GE-HEC-1636 24.03.2020 30.03.2020 COLD WORK DAY GT-11 Disconnecting the temporary supply for lighting panel and connect the permanentELECTRIC TEAM

6721 5414 24.03.2020 30.03.2020 COLD WORK DAY BSDG Punch clearing as per highligHTED LIST ELECTRIC TEAM

6722 19444 28.03.2020 03.04.2020 HOT WORK DAY GT22 Instrument JB, conduit, Instrument calibration leak test,punch point INSTRUMENT TEAM

6723 GE-HEC-1637 28.03.2020 03.04.2020 HOT WORK DAY GT11 Raceway&conduit height adjustment cable laying & termination(lighting fixtures) ELECTRIC TEAM

6724 GE-HEC-1638 28.03.2020 03.04.2020 HOT WORK DAY GT11 Fire fighting conduit instaalation cable laying & termination ELECTRIC TEAM

6725 GE-HEC-1639 28.03.2020 03.04.2020 HOT WORK DAY GT12 Fire fighting conduit instaalation cable laying & termination ELECTRIC TEAM

6726 GE-HEC-1640 25.03.2020 31.03.2020 COLD WORK DAY GT21 EGBS PLC power supply COMMISSIONING

6727 8596 28.03.2020 03.04.2020 HOT WORK DAY UEB1 Fire alarm device testing, cable laying/termination,conduit ,modification ELECTRIC TEAM

6728 7211 26.03.2020 01.04.2020 COLD WORK DAY Aux Boiler Air Blowing for IA&SA system of Aux Boiler COMMISSIONING

6729 7212 26.03.2020 01.04.2020 COLD WORK DAY Aux Boiler Air Blowing for F.O & NG system of Aux Boiler COMMISSIONING

6730 7249 26.03.2020 01.04.2020 HOT WORK DAY IPB11 Repair IPB side GCB cutting and welding electrical

6731 10016 25.03.2020 31.03.2020 COLD WORK DAY GT22 PneuMATIC TEST, system RESTORATION, CLEANING Piping

6732 19654 28.03.2020 03.04.2020 HOT WORK DAY GT22 ReiNSTATEMENT WORKS: GASKET REPLACEMENT, BOLTING, AIR BLOWING, REPAIRPiping

6733 21502 26.03.2020 01.04.2020 HOT WORK DAY GT22 Cutting of pipe prior modification of the interference between air support line andPiping
6734 GE-HEC-1641 26.03.2020 01.04.2020 HOT WORK DAY GT21 cutting of pipe {1/2} for fixing of coupling {connect and alignment the tubing Piping
behind H2 panel}

6735 GE-HEC-1642 28.03.2020 02.04.2020 COLD WORK DAY GT11 commiSSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING VALV COMMISSIONING

6736 GE-HEC-1643 28.03.2020 02.04.2020 COLD WORK DAY GT21 commiSSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING VALV COMMISSIONING

6737 GE-HEC-1644 28.03.2020 02.04.2020 COLD WORK DAY GT12 commiSSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING VALV COMMISSIONING

INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION,


6738 6819 28.03.2020 03.04.2020 COLD WORK DAY FWPB CONNECTION ELECTRIC TEAM

6739 8836 28.03.2020 03.04.2020 HOT WORK DAY FWPB CUTTING, DRILLING, GRINDING, CHIPPING WORKS INSTALLATION OF CONDUIT ELECTRIC TEAM
AND SUPPORT

6740 6818 28.03.2020 03.04.2020 COLD WORK DAY CCB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, ELECTRIC TEAM
CONNECTION

6741 8835 28.03.2020 03.04.2020 HOT WORK DAY CCB CUTTING, DRILLING, GRINDING, CHIPPING WORKS INSTALLATION OF CONDUIT ELECTRIC TEAM
AND SUPPORT

CUTTING, DRILLING, GRINDING, CHIPPING WORKS INSTALLATION OF CONDUIT


6742 8834 28.03.2020 03.04.2020 HOT WORK DAY WTB AND SUPPORT ELECTRIC TEAM

INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION,


6743 6817 28.03.2020 03.04.2020 COLD WORK DAY WTB CONNECTION ELECTRIC TEAM

6744 5303 28.03.2020 03.04.2020 COLD WORK DAY CCB panel test, interwiring WORKS, termination ELECTRIC TEAM

6745 5298 28.03.2020 03.04.2020 COLD WORK DAY UEB 1 panel test, interwiring WORKS, termination ELECTRIC TEAM

6746 5416 26.03.2020 01.04.2020 COLD WORK DAY UEB 2 punch clear work and inspection ELECTRIC TEAM

6747 5357 28.03.2020 03.04.2020 COLD WORK DAY NGFS22 Filter installation, cleaning, torque tighting, inspection activity MECHANIC TEAM

6748 7214 28.03.2020 02.04.2020 COLD WORK DAY GT22 Lube oil filling new one(134drum) COMMISSIONING

6749 6331 28.03.2020 03.04.2020 HOT WORK DAY ST10 Air blowing for CCW COMMISSIONING

6750 GE-HEC-1645 28.03.2020 03.04.2020 HOT WORK DAY LCI11 panel installation & fixation works ELECTRIC TEAM
6751 15561 28.03.2020 03.04.2020 HOT WORK DAY GT22 scarfolding,painting,grinding,cleaning,welding,cutting,inspection, fit-up MECHANIC TEAM

6752 GE-HEC-1646 28.03.2020 03.04.2020 COLD WORK DAY GT21 punch list close out activity MECHANIC TEAM

6753 GE-HEC-1647 28.03.2020 03.04.2020 HOT WORK DAY GT21 gas turbine fix and POINT ADJUSTMENT MECHANIC TEAM

6754 GE-HEC-1648 28.03.2020 03.04.2020 COLD WORK DAY GT21 punch list close out activity MECHANIC TEAM

6755 GE-HEC-1649 28.03.2020 03.04.2020 COLD WORK DAY GT21 gas turbine finAL ALIGNMENT ACTIVITY MECHANIC TEAM

6756 9426 27.03.2020 02.04.2020 COLD WORK DAY GT22 UEB2 line modification of CO2 & punch list including scafolding & touch up painting piping

6757 GE-HEC-1650 28.03.2020 03.04.2020 COLD WORK DAY GT21 Blowing of tubes as per punch list INSTRUMENT TEAM

6758 GE-HEC-1651 28.03.2020 03.04.2020 COLD WORK DAY GT21 RectifiCATION OF PUNCH AND INSPECTION INSTRUMENT TEAM

6759 GE-HEC-1652 28.03.2020 03.04.2020 HOT WORK DAY GT12 fire fighting conduit installation cable laying&termination ELECTRIC TEAM

6760 GE-HEC-1653 28.03.2020 03.04.2020 HOT WORK DAY GT11 fire fighting conduit installation cable laying&termination ELECTRIC TEAM

6761 GE-HEC-1654 28.03.2020 03.04.2020 COLD WORK DAY GT21 punch clearing as per attached list and inspection ELECTRIC TEAM

6762 5420 28.03.2020 03.04.2020 COLD WORK DAY CCB cable termination and loop check ELECTRIC TEAM

6763 5421 28.03.2020 03.04.2020 COLD WORK DAY GT22 transformer punch clear work for 22 BAT01+22BBT01 transformer and inspection ELECTRIC TEAM

6764 5418 28.03.2020 03.04.2020 COLD WORK DAY GT22 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6765 5417 28.03.2020 03.04.2020 COLD WORK DAY SWPB punch clear work for HVAC system and inspection ELECTRIC TEAM

6766 5419 28.03.2020 03.04.2020 COLD WORK DAY DWPB punch clear work for HVAC system and inspection ELECTRIC TEAM

6767 GE-HEC-1655 28.03.2020 02.04.2020 COLD WORK DAY GT21 perFORMING COMMISSIONING WORK COMMISSIONING
6768 GE-HEC-1656 28.03.2020 02.04.2020 HOT WORK DAY IPB21 welding ELEMENT IPB(CLEANING) ELECTRIC

6769 5423 28.03.2020 03.04.2020 COLD WORK DAY UEB1 disconnecting the temporary supply for lighting panel and connect the permanent ELECTRIC TEAM

6770 5422 28.03.2020 03.04.2020 COLD WORK DAY GT22 insatalling of fuse for panel of 22BUA01 and inspection ELECTRIC TEAM

6771 7216 29.03.2020 04.04.2020 COLD WORK DAY GT22 Air blowing for IA line of GT22 COMMISSIONING

6772 7215 28.03.2020 03.04.2020 COLD WORK DAY CCW GT21 load test for ccw moter A&B COMMISSIONING

6773 4203 28.03.2020 03.04.2020 COLD WORK DAY NGSS cladding activity MECHANIC TEAM

6774 GE-HEC-1657 28.03.2020 03.04.2020 HOT WORK DAY GTB12 LCI Raceway&conduit height adjustment(lighting) cable laying & termination ELECTRIC TEAM

6775 GE-HEC-1658 28.03.2020 03.04.2020 COLD WORK DAY GT21 TOP W/D of GT cooling water system COMMISSIONING

6776 5424 29.03.2020 04.04.2020 COLD WORK DAY CCB insulation resistance test of power cable with QC, CEEG, GE ELECTRIC TEAM

6777 GE-HEC-1659 30.03.2020 05.04.2020 COLD WORK DAY GT21 punch clearing as per attached list and inspection ELECTRIC TEAM

6778 10019 30.03.2020 05.04.2020 COLD WORK DAY GT22 inspection/ECC walk down with QA/QC and client piping

6779 3699 30.03.2020 05.04.2020 COLD WORK DAY UEB1 touch up painting & scafolding if required piping

6780 3700 31.03.2020 06.04.2020 COLD WORK DAY CCB touch up painting & scafolding if required piping

6781 GE-HEC-1660 31.03.2020 06.04.2020 COLD WORK DAY GT11 fire fighting activities : touch up painting of fire fighting materials piping

6782 7166 31.03.2020 06.04.2020 COLD WORK DAY ACB COMPRESSEUR Maintenance of after filter connection for SA COMMISSIONING

6783 GE-HEC-1661 31.03.2020 06.04.2020 COLD WORK DAY GT12 NGFS pressure drop test with natural gas COMMISSIONING

6784 8958 04.04.2020 11.04.2020 HOT WORK DAY UEB1 fire alarm device testing, cable laying/termination,conduit ,modification ELECTRIC TEAM
6785 8840 04.04.2020 10.04.2020 HOT WORK DAY CCB cutting drilling grinding chipping works installation of conduit and supports ELECTRIC TEAM

6786 6821 04.04.2020 10.04.2020 COLD WORK DAY CCB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

6787 8839 04.04.2020 10.04.2020 HOT WORK DAY WTB cutting drilling grinding chipping works installation of conduit and supports ELECTRIC TEAM

6788 6822 04.04.2020 10.04.2020 COLD WORK DAY WTB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

6789 6820 04.04.2020 10.04.2020 COLD WORK DAY FWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

6790 8841 04.04.2020 10.04.2020 HOT WORK DAY FWPB cutting drilling grinding chipping works installation of conduit and supports ELECTRIC TEAM

6791 GE-HEC-1662 04.04.2020 07.04.2020 COLD WORK DAY GT21 line checking & termination for lighting system ELECTRIC TEAM

6792 7165 31.03.2020 07.04.2020 COLD WORK DAY GT22 EGBS GT22 EGBS oil flushing & tank clean & p'p operation COMMISSIONING

6793 7219 31.03.2020 06.04.2020 COLD WORK DAY GT22 EGBS GT21 EGBS oil flushing & tank clean & p'p operation COMMISSIONING

6794 5425 31.03.2020 06.04.2020 COLD WORK DAY BSDG CONTINUITY TEST of CONTROL CABLES with QC, GE, CEEG ELECTRIC TEAM/QC

6795 5427 31.03.2020 06.04.2020 COLD WORK DAY CCB CONTINUITY TEST of CONTROL CABLES with QC, GE, CEEG ELECTRIC TEAM/QC

6796 5426 31.03.2020 06.04.2020 COLD WORK DAY UEB2 CONTINUITY TEST of CONTROL CABLES with QC, GE, CEEG ELECTRIC TEAM/QC

6797 6824 01.04.2020 07.04.2020 COLD WORK DAY GT22 GCB GT22 GCB 22BAC01 punch clearing work ELECTRIC TEAM

6798 5305 04.04.2020 10.04.2020 COLD WORK DAY CCB panel check, cable line check, termination ELECTRIC TEAM

6799 5304 04.04.2020 10.04.2020 COLD WORK DAY UEB1 panel test, functional test ELECTRIC TEAM

6800 12087 04.04.2020 10.04.2020 HOT WORK DAY CCB cable pulling, termination INSTRUMENT TEAM

6801 19468 04.04.2020 10.04.2020 HOT WORK DAY GT22 instrument JB, conduit, Instrument calibration leak test,punch point INSTRUMENT TEAM

6802 GE-HEC-1663 04.04.2020 10.04.2020 HOT WORK DAY GT11 fire fighting conduit/support insatallation, cable laying/termination ELECTRIC TEAM
6803 GE-HEC-1664 04.04.2020 10.04.2020 HOT WORK DAY GT12 LCI Raceway & conduit height adjustment, cable laying/termination(lighting-fixture) ELECTRIC TEAM

6804 GE-HEC-1665 04.04.2020 10.04.2020 COLD WORK DAY GT12 PEECC IP telephone & LAN cabinet,cable termination/horn/strobe installation ELECTRIC TEAM

6805 GE-HEC-1666 04.04.2020 10.04.2020 COLD WORK DAY GT11 PEECC IP telephone & LAN cabinet,cable termination/horn/strobe installation ELECTRIC TEAM

6806 GE-HEC-1667 04.04.2020 10.04.2020 HOT WORK DAY GT12 fire fighting conduit/support insatallation, cable laying/termination ELECTRIC TEAM

6807 8982 04.04.2020 10.04.2020 HOT WORK DAY GT22 suPPORT CONDUIT INSTALLATION works and punch list ELECTRIC TEAM

6808 6825 01.04.2020 07.04.2020 COLD WORK DAY GT21 GCB GT21 GCB 21BAC01 punch clearing work ELECTRIC TEAM

6809 GE-HEC-1668 02.04.2020 08.04.2020 COLD WORK DAY GT11 NGFS maintenance of vent valve, condensate drain valve(work shop leak test) COMMISSIONING

6810 GE-HEC-1669 02.04.2020 08.04.2020 COLD WORK DAY GT21 NGFS maintenance of vent valve, condensate drain valve(work shop leak test) COMMISSIONING

6811 GE-HEC-1670 02.04.2020 08.04.2020 COLD WORK DAY GT21 H2/CO2 valve station Air blowing for GT21 H2 gas supply line COMMISSIONING

6812 GE-HEC-1671 02.04.2020 08.04.2020 COLD WORK DAY GT21 Air intake filter house leak check and air blowing for #21 inlet air system COMMISSIONING

6813 19680 04.04.2020 10.04.2020 HOT WORK DAY GT22 reiNSTATEMENT WORKS: GASKET REPLACEMENT, BOLTING, AIR BLOWING, REPAIRPiping

6814 5428 02.04.2020 08.04.2020 COLD WORK DAY CCB,UPS,DCS cable line check and termination ELECTRIC TEAM

6815 5310 02.04.2020 08.04.2020 HOT WORK DAY GT22 piping & support installation including cutting, grinding, drilling, welding works Piping

6816 7167 03.04.2020 09.04.2020 COLD WORK DAY GT22 lube oil purifier operating COMMISSIONING

6817 GE-HEC-1672 04.04.2020 10.04.2020 COLD WORK DAY GT21 inspection for punch list WITH GE AND CEEG(GENU-21-02) ELECTRIC TEAM

6818 GE-HEC-1673 04.04.2020 10.04.2020 COLD WORK DAY GT21 inspection for punch list WITH GE AND CEEG(GENU-21-01) ELECTRIC TEAM

6819 GE-HEC-1674 04.04.2020 10.04.2020 COLD WORK DAY GT21 punch list close out activity MECHANIC TEAM

6820 GE-HEC-1675 04.04.2020 10.04.2020 COLD WORK DAY GT21 gas turbine finaL ALIGNMENT ACTIVITY MECHANIC TEAM

6821 GE-HEC-1676 04.04.2020 10.04.2020 HOT WORK DAY GT21 gas turbine fix and POINT ADJUSTMENT MECHANIC TEAM
6822 15565 04.04.2020 10.04.2020 HOT WORK DAY GT22 SCAFFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION,MECHANIC TEAM

6823 5360 04.04.2020 10.04.2020 COLD WORK DAY NGFS22 clraning, touch up, inspection activity MECHANIC TEAM

6824 GE-HEC-1677 04.04.2020 10.04.2020 COLD WORK DAY GT21 punch list close out activity MECHANIC TEAM

6825 GE-HEC-1678 04.04.2020 09.04.2020 COLD WORK DAY GT12 PEECC commiSSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING VALV cOMMISSIONING

6826 GE-HEC-1679 04.04.2020 09.04.2020 COLD WORK DAY GT12 PEECC PERFORMING COMMISSIONING WORK cOMMISSIONING

6827 GE-HEC-1680 04.04.2020 09.04.2020 HOT WORK DAY LCI11 panel installation & fixation works ELECTRIC TEAM

6828 GE-HEC-1681 04.04.2020 09.04.2020 HOT WORK DAY PEECC21 emergency DC seal oil motor starter functional test ELECTRIC TEAM

6829 GE-HEC-1682 01.04.2020 07.04.2020 COLD WORK DAY GT21 TOP W/D of GT cooling water system COMMISSIONING

6830 7187 05.04.2020 11.04.2020 COLD WORK DAY ST10 air blowing & demi water flushing COMMISSIONING

6831 7188 04.04.2020 10.04.2020 COLD WORK DAY Aux Boiler air blowing for fuel oil sts. Of aux boiler COMMISSIONING

6832 5432 04.04.2020 10.04.2020 COLD WORK DAY GT22 PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6833 5431 04.04.2020 10.04.2020 COLD WORK DAY GT22 transformer PUNCH CLEAR, CABLE ARRANGEMENT, CABLE CONNECTION & INSPECTION ELECTRIC TEAM

6834 19681 04.04.2020 10.04.2020 HOT WORK DAY NGSS installation of pipe spools & pipe supports cutting, grinding, fit up, tacking, weldinPiping

6835 5436 05.04.2020 11.04.2020 COLD WORK DAY Generator 22 FDM inspection with QC,GE,CEEG ELECTRIC TEAM/QC

6836 5435 05.04.2020 11.04.2020 COLD WORK DAY GT22 cable pulling & caBLE TERMINATION ELECTRIC TEAM

6837 GE-HEC-1683 05.04.2020 10.04.2020 COLD WORK DAY GT21 Repair, cleaning, installation of instruments and temporary tubes as per punch list INSTRUMENT TEAM

6838 GE-HEC-1684 05.04.2020 10.04.2020 COLD WORK DAY GT11 removal of temporary instruments(P야) & tubing for strainer INSTRUMENT TEAM

6839 GE-HEC-1685 05.04.2020 11.04.2020 COLD WORK DAY GT21 Punch clearing as oer attached list and inspection ELECTRIC TEAM
6840 5437 05.04.2020 11.04.2020 COLD WORK DAY GT22 CONTINUITY TEST and instllation resistance test of cable with QC, GE, CEEG ELECTRIC TEAM/QC

6841 GE-HEC-1686 05.04.2020 11.04.2020 COLD WORK DAY GT21 inspection for punch list with GE, and CEEG ELECTRIC TEAM

6842 10505 11.04.2020 17.04.2020 HOT WORK DAY GT22 conduit/support installation works ELECTRIC TEAM

6843 GE-HEC-1687 06.04.2020 12.04.2020 COLD WORK DAY GT11 disconnection cable for 88QA01, 88BL-1, 88BL-2 motors cOMMISSIONING

6844 4211 06.04.2020 12.04.2020 COLD WORK DAY NGSS scaffolding dismentle activity MECHANIC TEAM

6845 GE-HEC-1688 06.04.2020 12.04.2020 HOT WORK DAY GT21 Exhaust area Adjustment, modification of conduit ELECTRIC TEAM

6846 GE-HEC-1689 06.04.2020 12.04.2020 COLD WORK DAY PEECC21 removal of temporary UPS power cable and connect the permanent one for sockets
ELECTRIC TEAM

6847 GE-HEC-1690 08.04.2020 14.04.2020 COLD WORK DAY GT21 line checking & termination for lighting system ELECTRIC TEAM

6848 8963 11.04.2020 17.04.2020 HOT WORK DAY UEB1 fire fighting conduit modification, cable laying & termination/comm system terminELECTRIC TEAM

6849 5438 07.04.2020 13.04.2020 COLD WORK DAY GT22 cable continuITY TEST and termination ELECTRIC TEAM

6850 GE-HEC-1691 07.04.2020 13.04.2020 COLD WORK DAY GT21 punch clearing as per attached list and inspection(GTU-21-03) ELECTRIC TEAM

6851 GE-HEC-1692 07.04.2020 13.04.2020 COLD WORK DAY GT21 punch clearing as per attached list and inspection(GENU-21-05) ELECTRIC TEAM

6852 GE-HEC-1693 07.04.2020 13.04.2020 COLD WORK DAY GT21 inspection for punch list with GE and CEEG ELECTRIC TEAM

6853 GE-HEC-1694 07.04.2020 13.04.2020 COLD WORK DAY NGFS11 installation of gasket. Bolt, and nuts piping

6854 15568 07.04.2020 13.04.2020 HOT WORK DAY WTB piping support welding including scaffolding activity MECHANIC TEAM

6855 4212 07.04.2020 13.04.2020 COLD WORK DAY GT22 FDM walkdown activity, fuel forward area MECHANIC TEAM

6856 7220 08.04.2020 14.04.2020 COLD WORK DAY GT22 scrubber & separation s/v install & drain v/v removal cOMMISSIONING
6857 10036 08.04.2020 14.04.2020 COLD WORK DAY UEB2 PENUMATIC TEST, PIPE RESTORATION, REINSTATEMENT PIPING

6858 10038 08.04.2020 14.04.2020 COLD WORK DAY GT22 inspection ECC walkdown with QA/QC and CEEG PIPING

6859 GE-HEC-1695 08.04.2020 14.04.2020 COLD WORK DAY GT21 gas turbine load coupling assembly MECHANIC TEAM

6860 GE-HEC-1696 08.04.2020 14.04.2020 COLD WORK DAY GT12 LCI Room #12 remove door & reinstallation modification of scaffolding around builarch

6861 19470 11.04.2020 17.04.2020 HOT WORK DAY GT22 instrument, calibration, J.B conduit punch point INSTRUMENT TEAM

6862 7221 08.04.2020 14.04.2020 COLD WORK DAY UEB1 DCS LCP Loop CHECK COMMISSIONING

6863 GE-HEC-1697 11.04.2020 17.04.2020 HOT WORK DAY GT11 fire fighting conduit and support installation cable laying and termination ELECTRIC TEAM

6864 GE-HEC-1698 11.04.2020 17.04.2020 HOT WORK DAY GT12 fire fighting conduit and support installation cable laying and termination ELECTRIC TEAM

6865 3698 08.04.2020 14.04.2020 COLD WORK DAY CCB pouch up painting and scaffolding if required piping

6866 GE-HEC-1699 11.04.2020 17.04.2020 HOT WORK DAY LCI11 panel installation & fixation works ELECTRIC TEAM

6867 10512 08.04.2020 14.04.2020 HOT WORK DAY IPB21(outside) welding work ELECTRIC TEAM

6868 5441 11.04.2020 17.04.2020 COLD WORK DAY CCB insulation resistance and continuity test of power cable with QC, CEEG, GE ELECTRIC TEAM

6869 5092 11.04.2020 17.04.2020 COLD WORK DAY ACB COMPRESSEUR INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

6870 5095 11.04.2020 17.04.2020 COLD WORK DAY SWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

6871 5094 11.04.2020 17.04.2020 COLD WORK DAY DWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM

6872 5093 11.04.2020 17.04.2020 COLD WORK DAY FWPB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONELECTRIC TEAM
6873 5141 11.04.2020 17.04.2020 COLD WORK DAY UEB1 panel testing, functional test ELECTRIC TEAM

6874 5312 11.04.2020 17.04.2020 COLD WORK DAY CCB panel monitoring, line checking, cables interviewing works ELECTRIC TEAM

6875 5442 09.04.2020 10.04.2020 COLD WORK DAY BSDG maintenance switch cover bolt ELECTRIC TEAM

6876 5676 09.04.2020 16.04.2020 COLD WORK DAY GT transformer 11 MOV energization and testing ELECTRIC TEAM

6877 5677 09.04.2020 16.04.2020 COLD WORK DAY GT transformer 12 MOV energization and testing ELECTRIC TEAM

6878 GE-HEC-1700 11.04.2020 17.04.2020 COLD WORK DAY GT 11 NGFS pressure drop test with natural gas COMMISSIONING

6879 5311 09.04.2020 15.04.2020 HOT WORK DAY GT 22 F/F piping & support installation including cutting, grinding, drilling, welding works piping-F/F

6880 7222 12.04.2020 18.04.2020 COLD WORK DAY ST10 air blowing & demi water flushing COMMISSIONING

6881 21751 11.04.2020 17.04.2020 HOT WORK DAY GT 22 REiNSTATEMENT WORKS: GASKET REPLACEMENT, BOLTING, AIR BLOWING, REPAIRpiping

6882 7223 12.04.2020 18.04.2020 COLD WORK DAY GT 22 temporary by pass line remove and permernent COMMISSIONING

6883 GE-HEC-1701 11.04.2020 16.04.2020 COLD WORK DAY PEECC21 COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING VALVCOMMISSIONING

6884 GE-HEC-1702 11.04.2020 17.04.2020 COLD WORK DAY GT 21 gas turbine final alignment activity MECHANIC TEAM

6885 GE-HEC-1703 11.04.2020 17.04.2020 COLD WORK DAY GT 21 punch list close out activity(GTU-21-06) MECHANIC TEAM

6886 GE-HEC-1704 11.04.2020 17.04.2020 COLD WORK DAY GT 21 punch list close out activity(GTU-21-11) MECHANIC TEAM

6887 GE-HEC-1705 11.04.2020 17.04.2020 HOT WORK DAY GT 21(MLI0411) gas turbine fix and point adjustment MECHANIC TEAM

6888 15695 11.04.2020 17.04.2020 HOT WORK DAY GT 22 scaffolding, painting, grinding, cleaning, welding, cutting, inspection, & fit up MECHANIC TEAM
6889 8762 11.04.2020 17.04.2020 HOT WORK DAY NGSS threading, bolting, drilling, cutting, & installation of lighting arrester ELECTRIC TEAM

6890 8907 11.04.2020 17.04.2020 HOT WORK DAY NGSS conduit and fixtures installation work ELECTRIC TEAM

6891 5474 11.04.2020 17.04.2020 COLD WORK DAY CCB cable termination and loop check(NAC) ELECTRIC TEAM

6892 GE-HEC-1706 11.04.2020 17.04.2020 COLD WORK DAY GT 21 lube oil skid(GTU-21-03) punch clear work attached with list and inspection ELECTRIC TEAM

6893 GE-HEC-1707 11.04.2020 17.04.2020 COLD WORK DAY PEECC21 GT control panel punch clear work attached with list and inspection ELECTRIC TEAM

6894 GE-HEC-1708 11.04.2020 17.04.2020 COLD WORK DAY PEECC21 GPP punch clear work attached with list and inspection ELECTRIC TEAM

6895 GE-HEC-1709 11.04.2020 17.04.2020 COLD WORK DAY GT 21 isolation transformer punch clear work attached with list and inspection ELECTRIC TEAM

6896 GE-HEC-1710 11.04.2020 17.04.2020 COLD WORK DAY PEECC21 fire protection panel punch clear work attached with list and inspection ELECTRIC TEAM

6897 5475 11.04.2020 13.04.2020 COLD WORK DAY GT 22 punch clear work attached with list and inspection ELECTRIC TEAM

6898 5440 12.04.2020 18.04.2020 COLD WORK DAY CCB to HRSG12 cable pulling ELECTRIC TEAM

6899 GE-HEC-1711 12.04.2020 18.04.2020 COLD WORK DAY GT21 Air intake filter house air blowing and leak check for self cleaning filter COMMISSIONING

6900 7224 11.04.2020 17.04.2020 COLD WORK DAY GT 22 lube oil purifier operating COMMISSIONING

6901 5476 13.04.2020 19.04.2020 COLD WORK DAY CCB to UEB 1 cable pulling ELECTRIC TEAM

6902 GE-HEC-1712 14.04.2020 20.04.2020 COLD WORK DAY PEECC 11&12 cable pulling(GT building basement culvert trench) ELECTRIC TEAM

6903 GE-HEC-1713 12.04.2020 18.04.2020 COLD WORK DAY GT21 NGFS reinstall the vent and drain valve for scrubber & seperator A/B COMMISSIONING

6904 GE-HEC-1714 12.04.2020 18.04.2020 COLD WORK DAY NGFS 12 installation of gasket. Bolt, and nuts piping

6905 6667 12.04.2020 18.04.2020 COLD WORK DAY UEB 1 cable termination ELECTRIC TEAM

6906 5477 12.04.2020 18.04.2020 COLD WORK DAY GT 22 cable pulling & cable termination ELECTRIC TEAM
6907 GE-HEC-1715 13.04.2020 18.04.2020 COLD WORK DAY GT 11 load test 88QA-1, 88BL-1&2 COMMISSIONING

6908 8988 18.04.2020 24.04.2020 HOT WORK DAY GT 22 conduit / support / fixture installation works & punch list ELECTRIC TEAM

6909 5479 12.04.2020 17.04.2020 COLD WORK DAY BSDG damper switch connection ELECTRIC TEAM

6910 10064 12.04.2020 17.04.2020 COLD WORK DAY GT 22 check/inspection of filter installed in MBN60-AT001 piping

6911 4702 11.04.2020 17.04.2020 COLD WORK DAY CCB cable checking and termination INSTRUMENT TEAM

6912 4213 13.04.2020 19.04.2020 COLD WORK DAY GT 22 Pulse air piping, leak testing, inspection activity MECHANIC TEAM

6913 7225 15.04.2020 21.04.2020 COLD WORK DAY GT 12 Maintenance for pump of CCWP A/B MECHANIC TEAM

6914 GE-HEC-1716 13.04.2020 20.04.2020 COLD WORK DAY GT 21, MLI 1160 Cable Pulling and termination ELECTRIC TEAM

6915 7226 14.04.2020 20.04.2020 COLD WORK DAY Fuel Oil air blowing for fuel oil sts. Of aux boiler COMMISSIONING

6916 GE-HEC-1717 13.04.2020 19.04.2020 COLD WORK DAY GTU-21-11 Repairing of pipe leakage on IGV and APU system COMMISSIONING

6917 5484 14.04.2020 20.04.2020 COLD WORK DAY GT 22 Punch clearing and inspection Electrical Team

6918 GE-HEC-1718 15.04.2020 21.04.2020 COLD WORK DAY GT 21 Punch clearing and inspection Electrical Team

6919 8846 18.04.2020 24.04.2020 HOT WORK DAY Chemical Storage Bldg Cutting, drilling, grinding, chipping works, install of conduit and supports, cable pulElectrical Team

6920 8845 18.04.2020 24.04.2020 HOT WORK DAY SERVICE GAS SHEELTER Cutting, drilling, grinding, chipping works, install of conduit and supports, cable pulElectrical Team

6921 8844 18.04.2020 24.04.2020 HOT WORK DAY CCWP 20 shelter Cutting, drilling, grinding, chipping works, install of conduit and supports, cable pulElectrical Team

6922 8842 18.04.2020 24.04.2020 HOT WORK DAY WTB Cutting, drilling, grinding, chipping works, install of conduit and supports, cable pulElectrical Team
6923 5143 18.04.2020 24.04.2020 COLD WORK DAY UEB 1 panel test, functional test Electrical Team

6924 8764 14.04.2020 24.04.2020 COLD WORK DAY NGSS area Dismantling of scaffolding & flatform MECHANIC TEAM

6925 GE-HEC-1719 18.04.2020 24.04.2020 HOT WORK DAY GTB 11 fire fighting conduit/support insatallation, cable laying/termination Electrical Team

6926 GE-HEC-1720 18.04.2020 24.04.2020 HOT WORK DAY GTB 12 fire fighting conduit/support insatallation, cable laying/termination Electrical Team

6927 GE-HEC-1721 15.04.2020 21.04.2020 COLD WORK DAY GTB 21 Gas turbine coupling guard installation activity MECHANIC TEAM

6928 2245 18.04.2020 20.04.2020 COLD WORK DAY NGSS Change instrument (air receiver) (00QFA61CP01) INSTRUMENT TEAM

6929 19473 18.04.2020 24.04.2020 HOT WORK DAY GT 22 Instrument calibration, JB, conduit punch point INSTRUMENT TEAM

6930 4703 18.04.2020 24.04.2020 COLD WORK DAY CCB cable checking and termination, Instrument installation C&I

6931 GE-HEC-1722 15.04.2020 21.04.2020 COLD WORK DAY GT 21 Installation of monitor brush rigging as per attached location drawing Electrical Team

6932 GE-HEC-1723 15.04.2020 21.04.2020 HOT WORK DAY GT 21 Temporary AC installation (LCI room -1) HVAC

6933 5486 15.04.2020 21.04.2020 COLD WORK DAY UEB-1 to LEB-1 Cable Pulling Electrical Team

6934 5487 15.04.2020 21.04.2020 COLD WORK DAY UEB-1 to fuel oil (FOTP) Cable Pulling Electrical Team

6935 7227 16.04.2020 22.04.2020 COLD WORK DAY SDT, SUT FOR GT-11/12,UEB-1(DLOOP CHECK COMMISSIONING

6936 5370 16.04.2020 22.04.2020 COLD WORK DAY NGFS 21 AREA Touch up painting activity MECHANIC TEAM

6937 10042 15.04.2020 21.04.2020 COLD WORK DAY CCB area touch up painting & scafolding if required Piping

6938 7231 16.04.2020 22.04.2020 COLD WORK DAY GT 22 GT 22 Air Inlet filter blowing COMMISSIONING
6939 5490 16.04.2020 16.04.2020 COLD WORK DAY GT 22 Punch clearing as per attach list Electrical Team

6940 7230 19.04.2020 25.04.2020 COLD WORK DAY ST10 Demi Water Flushing & strainer cleaning COMMISSIONING

6941 7228 19.04.2020 25.04.2020 COLD WORK DAY GT22 Temporary by pass line remove and permernent COMMISSIONING

6942 5489 16.04.2020 22.04.2020 COLD WORK DAY BSDG Cable Termination inspection with QC, GE, CEEG Electrical Team

6943 5488 16.04.2020 22.04.2020 COLD WORK DAY UEB 20 Cable Termination inspection with QC, GE, CEEG Electrical Team

6944 GE-HEC-1724 16.04.2020 22.04.2020 COLD WORK DAY GT 21 Welding of Log Plate COMMISSIONING

6945 8993 18.04.2020 24.04.2020 COLD WORK DAY NGSS Conduit/support installation by clamping/bolting: Cable Pulling Electrical Team

6946 19730 18.04.2020 24.04.2020 HOT WORK DAY GT22 Re-instatement works: Gasket replacement, pipe & support manifection, air blowiPiping

6947 8848 18.04.2020 24.04.2020 HOT WORK DAY Fire Fighting Pump Bldg. Cutting, drilling, grinding, chipping works, install of conduit and supports, cable pulElectrical Team

6948 GE-HEC-1725 18.04.2020 23.04.2020 COLD WORK DAY PEECC unit 21 COMMISSIONING WIRING LOOP JB TO MARK6 AND CALIBRATION & TESTING VALVCOMMISSIONING

6949 GE-HEC-1726 18.04.2020 23.04.2020 COLD WORK DAY GT UNIT 21 PEFORMING COMMISSIONING WORK COMMISSIONING

6950 10383 18.04.2020 24.04.2020 HOT WORK DAY GTB 22 F/F Piping modification & touch up painting including cutiing, grinding, drilling & weld Piping

6951 GE-HEC-1727 18.04.2020 24.04.2020 COLD WORK DAY GTG 21 AREA Punch list close out activity MECHANIC TEAM

6952 GE-HEC-1728 18.04.2020 24.04.2020 COLD WORK DAY GTG 21 AREA Gas turbine final alignment activity MECHANIC TEAM

6953 GE-HEC-1729 18.04.2020 24.04.2020 COLD WORK DAY GTG 21 AREA Punch list close out activity MECHANIC TEAM
6954 GE-HEC-1730 18.04.2020 24.04.2020 HOT WORK DAY GTG 21 AREA Gas turbine fix and point adjustment MECHANIC TEAM

6955 15705 18.04.2020 24.04.2020 HOT WORK DAY GTG 22 AREA Scaffolding, painting, grinding, cleaning, welding, writing, cutting inspection & fit-uMECHANIC TEAM

6956 GE-HEC-1731 18.04.2020 24.04.2020 COLD WORK DAY GTB 11 P.A System termination (STB-011) Electrical Team

6957 GE-HEC-1732 18.04.2020 24.04.2020 COLD WORK DAY GTB 12 P.A System termination (STB-011) Electrical Team

6958 10266 18.04.2020 24.04.2020 COLD WORK DAY GT22 AREA Pneumatic test, pipe restoration and cleaning Piping

6959 16253 18.04.2020 24.04.2020 COLD WORK DAY WTB Cable Termination Inspection with QC CEEG Electrical Team/QC

6960 16254 18.04.2020 24.04.2020 COLD WORK DAY CCB 1st flr Cable Pulling (Control Rm. Electronic Rm) Electrical Team

6961 5491 18.04.2020 24.04.2020 COLD WORK DAY CCB Cabel Termination & Loop check, installation of scaffolding Electrical Team

6962 16251 18.04.2020 24.04.2020 COLD WORK DAY GT 22 FDM Inspection with CEEG, GE & QC Electrical Team

6963 7232 18.04.2020 24.04.2020 COLD WORK DAY GT 22 Lube oil purifier operation COMMISSIONING

6964 16255 18.04.2020 24.04.2020 COLD WORK DAY CCB DCS Cable line check & make support & cable alignment connection Electrical Team

6965 16256 18.04.2020 24.04.2020 COLD WORK DAY GT 22 Punch clear work attached with list & inspection Electrical Team

6966 GE-HEC-1733 19.04.2020 25.04.2020 HOT WORK DAY PECC 21 emergency DC seal oil motor starter battery rundown test Electrical Team

6967 GE-HEC-1734 19.04.2020 25.04.2020 HOT WORK DAY LCI11 panel installation & fixation works Electrical Team
6968 GE-HEC-1735 19.04.2020 25.04.2020 COLD WORK DAY PEECC-21 punch clear work attached with list and inspection Electrical Team

6969 GE-HEC-1736 18.04.2020 24.04.2020 COLD WORK DAY GT21 Repairing of leakage on lift oil at bearing No. 1&2 COMMISSIONING

6970 8987 19.04.2020 25.04.2020 HOT WORK DAY GT 22 BYPASS Conduit/Support/fixture/devices installation works Electrical Team

6971 16257 19.04.2020 25.04.2020 COLD WORK DAY GT22 cable pulling & cable termination Electrical Team

6972 8807 18.04.2020 24.04.2020 HOT WORK DAY UEB-1 fire fighting conduit modification, cable laying & termination/comm system terminElectrical Team

6973 10079 19.04.2020 25.04.2020 COLD WORK DAY GT22 Final Inspection of system with QA/QC and Client Piping

6974 GE-HEC-1737 20.04.2020 26.04.2020 COLD WORK DAY GT21 Removal of plastic from the 0909 Connection of 0706 and inspection with client Piping

6975 GE-HEC-1738 18.04.2020 23.04.2020 COLD WORK DAY GT12 PERFORMING COMMISSIONING WORK COMMISSIONING

6976 5374 20.04.2020 26.04.2020 COLD WORK DAY CCW GT Blocl 1 Alignment of pumps and Inspection MECHANIC TEAM

6977 5483 19.04.2020 20.04.2020 COLD WORK DAY H2 BLDG. Cable Line Check and Connection Electrical Team

6978 16258 20.04.2020 26.04.2020 COLD WORK DAY GT22 FDM Inspection with QC, GE &CEEG Electrical Team/QC

6979 16259 20.04.2020 26.04.2020 COLD WORK DAY GEN. 22 FDM Inspection with QC, GE &CEEG Electrical Team/QC

6980 GE-HEC-1739 20.04.2020 26.04.2020 COLD WORK DAY GT21 Installation of Air Filter at GT 21 air inlet filter house MECHANIC TEAM

6981 16260 20.04.2020 26.04.2020 COLD WORK DAY CCB-DCS gnd floor Cable arrangement, making cable support, cable spare wire ferrule inspection Electrical Team

6982 GE-HEC-1740 21.04.2020 24.04.2020 HOT WORK DAY GTB 11 Installation of cable tray cover Electrical Team
6983 GE-HEC-1741 21.04.2020 27.04.2020 COLD WORK DAY PEECC 11&12 Cable Pulling Electrical Team

6984 GE-HEC-1742 21.04.2020 27.04.2020 COLD WORK DAY GT21 COLLECTOR HOUSE ASSEMBLY MECHANIC TEAM

6985 16263 21.04.2020 27.04.2020 COLD WORK DAY GT22 Punch clear as per attached list and inspection Electrical Team

6986 GE-HEC-1743 21.04.2020 28.04.2020 HOT WORK DAY GTB 11 LCI Room #11 Re-installation remove door metal cladding repair work Arch

6987 16261 22.04.2020 28.04.2020 COLD WORK DAY NGSS Cable termination & loop check Electrical Team

6988 7168 21.04.2020 23.04.2020 COLD WORK DAY GT21 Air Intake filter house drain valve leak inspection COMMISSIONING

6989 GE-HEC-1744 21.04.2020 27.04.2020 COLD WORK DAY GT21 Gas turbine coupling guard installation activity MECHANIC TEAM

6990 10516 25.04.2020 01.05.2020 HOT WORK DAY WTB Cutting, drilling, chipping works, grinding, install of conduit and support, cable pul Electrical Team

6991 8849 25.04.2020 01.05.2020 HOT WORK DAY GIS Bldg. Cutting, drilling, chipping works, grinding, install of conduit and support, cable pul Electrical Team

6992 GE-HEC-1745 22.04.2020 28.04.2020 COLD WORK DAY NGFS 12 Final Inspection of with QA/QC and CEEG Piping

6993 GE-HEC-1746 22.04.2020 28.04.2020 COLD WORK DAY NGFS 11 Final Inspection of with QA/QC and CEEG Piping

6994 GE-HEC-1747 25.04.2020 01.05.2020 HOT WORK DAY GT11 Fire Fighting-conduit Installation, cable laying & termination/NAC-01 Energization Electrical Team

6995 GE-HEC-1748 25.04.2020 01.05.2020 HOT WORK DAY GT12 Fire Fighting-conduit Installation, cable laying & termination/NAC-01 Energization Electrical Team

6996 GE-HEC-1749 22.04.2020 28.04.2020 COLD WORK DAY GT21 Inspection for punch list with GE and CEEG including torquing of cable and panel bElectrical Team

6997 GE-HEC-1750 22.04.2020 28.04.2020 COLD WORK DAY GT21 Punch list close out activity MECHANIC TEAM

6998 GE-HEC-1751 22.04.2020 28.04.2020 COLD WORK DAY GT21 Punch list close out activity MECHANIC TEAM
6999 5097 25.04.2020 01.05.2020 COLD WORK DAY WTB INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONElectrical Team

7000 5096 25.04.2020 01.05.2020 COLD WORK DAY GIS Bldg. INSTALLATION OF DEVICE, TESTING, CABLE PULLING TERMINATION, CONNECTIONElectrical Team

7001 5315 25.04.2020 02.05.2020 COLD WORK DAY UEB1 panel test, functional test Electrical Team

7002 5317 25.04.2020 02.05.2020 COLD WORK DAY CCB Gr. Line checking , panel monitoring Electrical Team

7003 7168 22.04.2020 23.04.2020 COLD WORK DAY GT21 Air Intake filter house drain valve leak inspection COMMISSIONING

7004 4704 25.04.2020 01.05.2020 COLD WORK DAY CCB Gr. Cable Screwling & termination & line check large scale monitor isolation C&I

7005 19447 25.04.2020 01.05.2020 HOT WORK DAY ST10 Lube oil skid Instument calibration, JB, conduit, punch point, cable laying termination C&I

7006 19446 25.04.2020 01.05.2020 HOT WORK DAY GT22 Instrument calibration, JB, conduit punch point C&I

7007 GE-HEC-1752 23.04.2020 29.04.2020 HOT WORK DAY GT21 Gen. lagging support installation MECHANIC TEAM

7008 GE-HEC-1753 23.04.2020 29.04.2020 COLD WORK DAY GT21 Punch list close out activity MECHANIC TEAM

7009 GE-HEC-1754 23.04.2020 29.04.2020 COLD WORK DAY GT21 Punch list close out activity MECHANIC TEAM

7010 GE-HEC-1755 22.04.2020 28.04.2020 COLD WORK DAY GT21 Installation of O-ring seal 21MBV22AT001 at GT lube oil system COMMISSIONING

7011 GE-HEC-1756 22.04.2020 28.04.2020 COLD WORK DAY GT11 Installation of orifice QJC0BP001 at H2/CO2 system COMMISSIONING

7012 GE-HEC-1757 22.04.2020 28.04.2020 COLD WORK DAY GT12 Installation of orifice QJC0BP001 at H2/CO2 system COMMISSIONING

7013 GE-HEC-1758 25.04.2020 30.04.2020 COLD WORK DAY PEEEC 21 Commissioning wiring loop & JB to mark and calibration COMMISSIONING

7014 GE-HEC-1759 25.04.2020 30.04.2020 COLD WORK DAY UNIT 21 PERFORMING COMMISSIONING WORK COMMISSIONING

7015 GE-HEC-1760 23.04.2020 29.04.2020 COLD WORK DAY NGFS11 1. Installation of end cap with teflon 2. Installation of permanent gasket bolts and Piping
7016 21516 23.04.2020 29.04.2020 COLD WORK DAY GIS Bldg. Installation of additional vertical pipe supports Piping

7017 21514 23.04.2020 29.04.2020 COLD WORK DAY WWT 1. Rectification of pipe support 2. Valve corrosion cleaning Piping

7018 21515 23.04.2020 29.04.2020 COLD WORK DAY Fire Fighting Pump Bldg. Installation of additional vertical pipe supports Piping

7019 16266 23.04.2020 29.04.2020 COLD WORK DAY BYPASS STACK 22 Cable arrangement and cable termination Electrical team

7020 3701 23.04.2020 29.04.2020 COLD WORK DAY CCB AREA Touch up paint & scaffolding if required (including from /ceiling opening Piping

7021 GE-HEC-1761 25.04.2020 01.05.2020 HOT WORK DAY GT21 Gas turbine fix and point adjustment MECHANIC TEAM

7022 GE-HEC-1762 25.04.2020 01.05.2020 COLD WORK DAY GT21 Gas turbine final alignment activity MECHANIC TEAM

7023 15714 25.04.2020 01.05.2020 HOT WORK DAY GT22 Scaffolding, painting, grinding, cleaning, welding, writing, cutting inspection & fit-uMECHANIC TEAM

7024 GE-HEC-1763 25.04.2020 01.05.2020 HOT WORK DAY NGFS11 Welding of structure ladder support Piping

7025 GE-HEC-1764 25.04.2020 01.05.2020 HOT WORK DAY NGFS12 Welding of structure ladder support Piping

7026 7169 23.04.2020 28.04.2020 COLD WORK DAY GT12 CCWP Maintenance for CCWP A COMMISSIONING

7027 16271 25.04.2020 01.05.2020 COLD WORK DAY UEB2 Panel cover fitting, cable line check, cable arrangement, connection and inspectionELECTRICAL TEAM

7028 16269 25.04.2020 01.05.2020 COLD WORK DAY BSDG Cable line check, cable arrangement, connection and inspection ELECTRICAL TEAM

7029 16268 25.04.2020 01.05.2020 COLD WORK DAY CCB SWGR Cable line check, cable arrangement, connection and inspection ELECTRICAL TEAM

7030 16267 25.04.2020 01.05.2020 COLD WORK DAY GT 22 Puch clear work attached with list & inspection ELECTRICAL TEAM

7031 16270 25.04.2020 01.05.2020 COLD WORK DAY CCB DCS GR Cable arrangement, making cable support, cable spare wire provide ferrule, conneELECTRICAL TEAM

7032 7189 25.04.2020 01.05.2020 COLD WORK DAY GT22 Lube oil purifier operation COMMISSIONING

7033 GE-HEC-1765 26.04.2020 02.05.2020 HOT WORK DAY LCI11 panel installation & fixation works ELECTRICAL TEAM
7034 16272 26.04.2020 02.05.2020 COLD WORK DAY GT22 cable pulling & cable termination ELECTRICAL TEAM

7035 GE-HEC-1766 26.04.2020 01.05.2020 COLD WORK DAY GT11 P.A System termination (STB-011) ELECTRICAL TEAM

7036 10530 26.04.2020 01.05.2020 HOT WORK DAY UEB1 Fire fighting conduit modification, cable laying & termination/speaker cable termi ELECTRICAL TEAM

7037 GE-HEC-1767 26.04.2020 02.05.2020 COLD WORK DAY GT 21 EXCITATION RM (2Cx10 & 3Cx35 mm) Temporary power cable pulling from GT21 Excitation rm to GELECTRICAL TEAM

7038 GE-HEC-1768 26.04.2020 02.05.2020 COLD WORK DAY NGFS 12 Installation of restriction orifice - RO12KT20BP201 PIPPING

7039 GE-HEC-1769 26.04.2020 02.05.2020 COLD WORK DAY GT21 PUNCH LIST CLOSE OU ACTIVITY MECHANIC TEAM

7040 7233 27.04.2020 03.05.2020 COLD WORK DAY GT22 Leak test for NOI bearing hydraulic line COMMISSIONING

7041 7190 28.04.2020 04.05.2020 COLD WORK DAY Aux Boiler Inside inspection for FO storage tank COMMISSIONING

7042 16274 27.04.2020 02.05.2020 COLD WORK DAY CCB TO LEB-1 Cable Pulling ELECTRICAL TEAM

7043 GE-HEC-1770 26.04.2020 02.05.2020 COLD WORK DAY GT22 Top walk down inspection for protection system (GPP-324H) COMMISSIONING

7044 5323 26.04.2020 02.05.2020 COLD WORK DAY UEB2 Cable redressing of control cables inside MV switchgear incomer panel ELECTRICAL TEAM

7045 5324 26.04.2020 02.05.2020 COLD WORK DAY UEB1 Cable redressing of control cables inside MV switchgear incomer panel ELECTRICAL TEAM

7046 GE-HEC-1771 26.04.2020 02.05.2020 COLD WORK DAY GT11 PEECC Cable Termination ELECTRICAL TEAM

7047 GE-HEC-1772 26.04.2020 02.05.2020 COLD WORK DAY GT12 PEECC Cable Termination ELECTRICAL TEAM

7048 GE-HEC-1773 27.04.2020 03.05.2020 COLD WORK DAY GT21 Installation of Air Filter at GT 21 air inlet filter house MECHANIC TEAM

7049 7235 26.04.2020 02.05.2020 COLD WORK DAY ST10 CCW Demi Water Flushing & strainer cleaning COMMISSIONING

7050 7234 26.04.2020 02.05.2020 COLD WORK DAY GT22 Temporary By pass line remove and permernent spool installa for CCW COMMISSIONING

7051 16275 26.04.2020 02.05.2020 COLD WORK DAY PEEECC 22 Cable Termination inspection witg QC, GE & CEEG ELECTRICAL/QC TEAM
7052 16273 26.04.2020 02.05.2020 COLD WORK DAY CCB Cable Termination inspection witg QC, GE & CEEG ELECTRICAL/QC TEAM

7053 8998 02.05.2020 08.05.2020 HOT WORK DAY GT22 ByPASS Conduit/Support/Device punchlist, inspection ELECTRICAL TEAM

7054 5099 02.05.2020 08.05.2020 COLD WORK DAY 400KV GIS Bldg Installation of device, testing termination =, connection ELECTRICAL TEAM

7055 5100 02.05.2020 08.05.2020 COLD WORK DAY WTB Installation of device, testing termination =, connection ELECTRICAL TEAM

7056 GE-HEC-1774 27.04.2020 08.05.2020 COLD WORK DAY GT11 GT11 (GCB), HOT LOOP TEST COMMISSIONING

7057 GE-HEC-1775 27.04.2020 08.05.2020 COLD WORK DAY GT12 GT12 (GCB), HOT LOOP TEST COMMISSIONING

7058 GE-HEC-1776 28.04.2020 04.05.2020 COLD WORK DAY GT21 Gas turbine coupling guard installation activity MECHANIC TEAM

7059 GE-HEC-1777 28.04.2020 04.05.2020 COLD WORK DAY GT21 COLLECTOR HOUSE ASSEMBLY MECHANIC TEAM

7060 GE-HEC-1778 27.04.2020 03.05.2020 COLD WORK DAY GT21 Inspection for punch list with GE & CEEG ELECTRICAL TEAM

7061 16277 28.04.2020 04.05.2020 COLD WORK DAY GT22 Puch clearing as per attached list and inspection ELECTRICAL TEAM

7062 GE-HEC-1778 28.04.2020 04.05.2020 COLD WORK DAY GT21 Inspection for punch list with GE & CEEG ELECTRICAL TEAM

7063 6945 27.04.2020 03.05.2020 COLD WORK DAY CCB AREA Cabel Termination & Loop check, installation of scaffolding ELECTRICAL TEAM

7064 GE-HEC-1779 28.04.2020 04.05.2020 COLD WORK DAY PEECC21 230V AC Distribution panel power cable continuity test, cable connection as per atELECTRICAL TEAM

7065 GE-HEC-1780 28.04.2020 04.05.2020 COLD WORK DAY LCI21 Power cable continuity test, cable connection as per attached cable schedule and ELECTRICAL TEAM

7066 16278 28.04.2020 04.05.2020 COLD WORK DAY UEB1 to GIS Cable Pulling ELECTRICAL TEAM

7067 6944 29.04.2020 05.05.2020 COLD WORK DAY NGSS Cable termination & loop check ELECTRICAL TEAM
7068 GE-HEC-1781 29.04.2020 05.05.2020 COLD WORK DAY GT21 EXCITATION TR Puch clear work attached with list & inspection ELECTRICAL TEAM

7069 GE-HEC-1782 29.04.2020 05.05.2020 COLD WORK DAY GT21 Punch list close out activity MECHANIC TEAM

7070 GE-HEC-1783 29.04.2020 05.05.2020 COLD WORK DAY GT21 Punch list close out activity MECHANIC TEAM

7071 5319 02.05.2020 08.05.2020 COLD WORK DAY UEB1 Panel test / functional test ELECTRICAL TEAM

7072 5320 02.05.2020 08.05.2020 COLD WORK DAY CCB Panel monitoring, line checking ELECTRICAL TEAM

7073 GE-HEC-1784 29.04.2020 05.05.2020 COLD WORK DAY GT11 CABLE TERMINATION AND CONTINUITY TEST PIPING

7074 GE-HEC-1785 29.04.2020 05.05.2020 COLD WORK DAY GT21 Installation / fixing of pipe spools and support to connect in turning gear oil drain PIPING

7075 GE-HEC-1786 29.04.2020 05.05.2020 COLD WORK DAY PEECC21 Termination of temporary CD/UPS power prior to commissioning works in PEECC2 ELECTRICAL TEAM

7071 GE-HEC-1787 29.04.2020 05.05.2020 COLD WORK DAY GT21 FDM inspection with QC,GE,CEEG ELECTRICAL TEAM

7072 GE-HEC-1788 20.04.2020 06.05.2020 COLD WORK DAY PEECC22 Temporary Air conditioner installation HVAC

7073 GE-HEC-1789 28.04.2020 04.05.2020 COLD WORK DAY GT21 Top walk inspection check for turbine & turning gear COMMISSIONING

7074 GE-HEC-1790 30.04.2020 06.05.2020 HOT WORK DAY GT21 GENERATOR LAGGING SUPPORT INSTALLAION MECHANIC TEAM

7075 GE-HEC-1791 30.04.2020 06.05.2020 COLD WORK DAY GT21 PUNCH LISTE CLOSE OUT ACTIVITY MECHANIC TEAM

7076 GE-HEC-1792 30.04.2020 06.05.2020 COLD WORK DAY GT 21 PUNCH LISTE CLOSE OUT ACTIVITY MECHANIC TEAM

7077 21545 29.04.2020 05.05.2020 HOT WORK DAY NGFS 22 INSTALLATION OF PIPE SUPPORTS FIXING OF GASKET BOULTING ALIGNMENT Piping

7078 19475 02.05.2020 08.05.2020 HOT WORK DAY GT 22 Instrument calibration, JB, conduit punch point C&I
7079 GE-HEC-1793 02.05.2020 08.05.2020 HOT WORK DAY GT 12 fire fighting conduit installation cable laying&termination ELECTRICAL TEAM

7080 GE-HEC-1794 02.05.2020 08.05.2020 HOT WORK DAY GT 11 fire fighting conduit installation cable laying&termination ELECTRICAL TEAM

7081 GE-HEC-1795 30.04.2020 06.05.2020 HOT WORK DAY NGFSS 21 INSTALLATION OF PIPE SUPPORTS FIXING OF GASKET BOULTING ALIGNMENT Piping

7082 15721 02.05.2020 08.05.2020 HOT WORK DAY GT22 SCAFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING, INSPECTION, MECHANIC
L TEAM

7083 10043 02.05.2020 08.05.2020 COLD WORK DAY CCB line modification of CO2 & punch list including scafolding & touch up painting PIPING

7084 7237 02.05.2020 08.05.2020 COLD WORK DAY ST10 CCW GREASE INJECTION FOR FFAC OF ST 10 CCW COMMISSIONING

7085 GE-HEC-1796 02.05.2020 07.05.2020 COLD WORK DAY GT 21 PERFORMING COMMISSIONING WORK COMMISSIONING

7086 GE-HEC-1797 02.05.2020 07.05.2020 COLD WORK DAY GT 21 COMMISSIONING WIRING LOOP JB MARK 6 COMMISSIONING

7087 GE-HEC-1798 02.05.2020 07.05.2020 COLD WORK DAY GT 21 INSPECTION FOR PUNCH WITH GE AND CEEG ELECTRICAL TEAM

7088 GE-HEC-1799 02.05.2020 08.05.2020 COLD WORK DAY GT 21 INSPECTION WITH GE AND CEEG ELECTRICAL TEAM

7089 GE-HEC-1800 02.05.2020 07.05.2020 COLD WORK DAY GT 21 INSPECTION QC AND CLENT PIPING

7090 GE-HEC-1801 02.05.2020 07.05.2020 COLD WORK DAY GT 21 INSPECTION OF PUNCH INSTRUMENT TEAM

7091 7236 02.05.2020 08.05.2020 COLD WORK DAY GT 22 H2 CO2 AIR BLOWING COMMISSIONING

7092 7239 03.05.2020 08.05.2020 COLD WORK DAY GT 22 CCW TEMPRORY BY LING COMMISSIONING

7093 7240 03.05.2020 08.05.2020 COLD WORK DAY ST 10 CCW FLUSHING COMMISSIONING

7094 16282 02.05.2020 08.05.2020 COLD WORK DAY WTB cable continuITY TEST and termination ELECTRICAL TEAM
7092 21546 03.05.2020 08.05.2020 HOT WORK DAY WWT Pipe resoration /additional support sim plate fixing PIPING

7093 21547 03.05.2020 08.05.2020 HOT WORK DAY FWPB Insulation of additional pipe support and fixing PIPING

7094 16283 03.05.2020 08.05.2020 COLD WORK DAY GT 22 cable pulling and termination ELECTRICAL TEAM

7095 10580 09.05.2020 15.05.2020 HOT WORK DAY GT 22 CONDUITE SUPPORTS FIXING INSTALATION ELECTRICAL TEAM

7096 16285 04.05.2020 10.05.2020 COLD WORK DAY CCB CABLE TERMINATION ELECTRICAL TEAM

7097 10581 04.05.2020 10.05.2020 HOT WORK DAY CCB INSTALATION CONDUITE ELECTRICAL TEAM

7098 7241 04.05.2020 10.05.2020 COLD WORK DAY ST 10 ccwp maintenanceof pump B COMMISSIONING

7099 7243 04.05.2020 10.05.2020 COLD WORK DAY wtp demi Water pump motor load test COMMISSIONING

7100 7244 04.05.2020 10.05.2020 COLD WORK DAY EGBS 21 22 FLEXIBLE HOSE RESTRORATION COMMISSIONING

7101 10107 03.05.2020 09.05.2020 COLD WORK DAY GT 22 INSPECTION / W.D PIPING

7102 GE-HEC-1802 04.05.2020 10.05.2020 COLD WORK DAY GT 12 GT # 12 GCB Hot loop test COMMISSIONING

7103 GE-HEC-1803 04.05.2020 10.05.2020 COLD WORK DAY GT 11 GT # 12 GCB Hot loop test COMMISSIONING

7104 GE-HEC-1804 04.05.2020 10.05.2020 COLD WORK DAY GT 11 WATER FLUSHING FOR GT# 11 WATER INJECTION DEMI SUPPLY LING COMMISSIONING

7105 GE-HEC-1805 04.05.2020 10.05.2020 COLD WORK DAY GT 12 WATER FLUSHING FOR GT# 12 WATER INJECTION DEMI SUPPLY LING COMMISSIONING

7106 GE-HEC-1806 04.05.2020 10.05.2020 COLD WORK DAY GT 21 LCI MV CABLE SHIELD VERYFICATION & ISOLATE THE SHILD AS PER ATTACHED CABLE ELECTRICAL TEAM

7107 16288 04.05.2020 10.05.2020 COLD WORK DAY CCB CABLE ARRANGEMENT AND MAKING CABLE SUPPORT ELECTRICAL TEAM
7108 16290 04.05.2020 10.05.2020 COLD WORK DAY GT 22 FDM INSPECTION WITH GE AND CEEG QC

7109 GE-HEC-1807 05.05.2020 11.05.2020 COLD WORK DAY GT 21 LCI TEMPRORY LIGHTING AND CABLE DRESSING ELECTRICAL TEAM

7110 16292 05.05.2020 11.05.2020 COLD WORK DAY UEB #2 PWER CABLE SHIELD ISPLATION SHIELD GROUNDING CONNECCTION AND INSPECTELECTRICAL TEAM

7111 GE-HEC-1808 06.04.2020 12.05.2020 COLD WORK DAY GT 21 PUNCH LIST CLOSE OUT ACTIVITY GTU 21.02 MECHANIC TEAM

7112 16295 05.05.2020 11.05.2020 COLD WORK DAY CCB CNTINUITY TEST WITH QC CEEG GE ELECTRICAL TEAM

7113 GE-HEC-1809 05.05.2020 11.05.2020 COLD WORK DAY GT 11 MCC insulation resistance test of power cable with QC, CEEG, GE ELECTRICAL TEAM

7114 GE-HEC-1810 05.05.2020 11.05.2020 COLD WORK DAY GT 11 MCC AC/DC insulation resistance test of power cable with QC, CEEG, GE ELECTRICAL TEAM

7115 GE-HEC-1811 05.05.2020 11.05.2020 COLD WORK DAY GT 11 MCC TR insulation resistance test of power cable with QC, CEEG, GE ELECTRICAL TEAM

7116 GE-HEC-1812 05.05.2020 11.05.2020 COLD WORK DAY ISOLATION TR12 DCS 00.01 TR insulation resistance test of power cable with QC, CEEG, GE ELECTRICAL TEAM

7117 GE-HEC-1813 05.05.2020 11.05.2020 COLD WORK DAY GT 21 GTU 06 PUNCH LIST CLOSE ACTIVITY MECHANIC TEAM

7118 GE-HEC-1814 05.05.2020 11.05.2020 COLD WORK DAY GT21 NGFS PUNCH LIST CLOSE ACTIVITY ELECTRICAL TEAM

7119 GE-HEC-1815 05.05.2020 11.05.2020 COLD WORK DAY GT 21 RIGGIN BRUSH CABLE PULLING & TERMINATION ELECTRICAL TEAM

7120 16294 05.05.2020 11.05.2020 COLD WORK DAY GT 22 INSPECTION FOR PUNCH WITH GE AND CEEG ELECTRICAL TEAM

7121 16291 05.05.2020 11.05.2020 COLD WORK DAY GT 22 INSTALATION &CABLE PULLING TERMINATION ELECTRICAL TEAM

7122 GE-HEC-1816 04.05.2020 07.05.2020 COLD WORK DAY GT 21 PECC COMMISSIONING WIRING LOOP JB COMMISSIONING
7123 GE-HEC-1817 04.05.2020 07.05.2020 COLD WORK DAY GT 21 PERFORMING COMMISSIONING WORK COMMISSIONING

7124 16293 05.05.2020 11.05.2020 COLD WORK DAY GT 22 PECC 230 V POWER ERACTION FROM AC DISTRIBUTION ELECTRICAL TEAM

7125 GE-HEC-1818 07.05.2020 13.05.2020 COLD WORK DAY GT 21 WATER FLUSHING FOR 21 WATER INJECTION DEMI SUPPLY COMMISSIONING

7126 7245 07.05.2020 13.05.2020 COLD WORK DAY GT 22 WATER FLUSHING FOR 22 WATER INJECTION DEMI SUPPLY COMMISSIONING

7127 5101 09.05.2020 15.05.2020 COLD WORK DAY WTB INSPECTION OF DEVICE TESTING INSTALATION CONNECTION TERMINATION ELECTRICAL TEAM

7128 5103 09.05.2020 15.05.2020 COLD WORK DAY UEB1 INSPECTION OF DEVICE TESTING INSTALATION CONNECTION TERMINATION ELECTRICAL TEAM

7129 GE-HEC-1819 06.05.2020 12.05.2020 COLD WORK DAY GT 11 CABLE TERMINATION AND CONTINUITY TEST ELECTRICAL TEAM

7130 GE-HEC-1820 06.05.2020 12.05.2020 COLD WORK DAY GT 21 INSPECTIONT FOR LIST WITH GE & CEEG ELECTRICAL TEAM

7131 GE-HEC-1821 05.05.2020 11.05.2020 HOT WORK DAY GT 21 H2 CO2 REPAIRING OF MIS ALIGNMENT OF PIPE SPOOL COMMISSIONING

7131 GE-HEC-1822 06.05.2020 12.05.2020 COLD WORK DAY GT 21 TOP WALKI DOWN INSPECTION CHECK FOR TURNING GEAR COMMISSIONING

7132 5327 09.05.2020 15.05.2020 COLD WORK DAY CCB PANEL MONITORING LINE CHECK ELECTRICAL TEAM

7133 5325 09.05.2020 15.05.2020 COLD WORK DAY UEB PANEL MONITORING LINE CHECK ELECTRICAL TEAM

GENERATOR TO IPB CONNECTION SIDE CPRROSION POINT CUT AND NEW


7134 GE-HEC-1823 06.05.2020 12.05.2020 HOT WORK DAY GT 12 WELDING IN IPB CONECTION POINT ONLY L1 L2 L3 ELECTRICAL TEAM

7135 GE-HEC-1824 07.05.2020 13.05.2020 COLD WORK DAY GT 21 INLET PLENUM CLEANING AND TOUCH UP PAINT MECHANIC TEAM

7136 GE-HEC-1825 09.05.2020 15.05.2020 HOT WORK DAY GT 12 FIRE FIGHTING CONDUIT INST CABLE Lying termination ELECTRICAL TEAM

7137 GE-HEC-1826 09.05.2020 15.05.2020 HOT WORK DAY GT 11 FIRE FIGHTING CONDUIT INST CABLE Lying termination ELECTRICAL TEAM

7138 12151 07.05.2020 09.05.2020 HOT WORK DAY WWT CHANGE NIPPINE FOR PI C&I

7139 19476 09.05.2020 15.05.2020 HOT WORK DAY GTG#22 INSTALATION CALIBRATION JB C&I
7140 GE-HEC-1827 09.05.2020 14.05.2020 COLD WORK DAY GT 21 PERFORMING COMMISSIONING WORK COMMISSIONING

7141 GE-HEC-1828 09.05.2020 14.05.2020 COLD WORK DAY GT 21 PERFORMING COMMISSIONING WORK COMMISSIONING

7142 GE-HEC-1829 06.05.2020 13.05.2020 HOT WORK DAY NGFS 21 AREA INSTALLATION OF PIPE SUPPORTS PIPING

7143 GE-HEC-1830 07.05.2020 13.05.2020 COLD WORK DAY GT 21 INLET GUIDE VANE IGV MECHANIC TEAM

7144 10586 07.05.2020 13.05.2020 HOT WORK DAY GT 22 INSTALATION OF SUPPORTS AND FITING ELECTRICAL TEAM

7145 9918 07.05.2020 13.05.2020 COLD WORK DAY GT 22LP CO2 LP CO2 FIRE PROTECTION AIR BLOWING FOR GT 22 COMMISSIONING

7146 4214 06.05.2020 12.05.2020 COLD WORK DAY NGFS 22 CLEANING&INSPECTION MECHANIC TEAM

SCAFOLDING, PAINTING, GRINDING, CLEANING, WELDING, CUTTING,


7147 15727 09.05.2020 15.05.2020 COLD WORK DAY GT 22 INSPECTION, LIFTING, FIT-UP MECHANIC TEAM

7148 GE-HEC-1831 09.05.2020 15.05.2020 COLD WORK DAY GT 21 LINE CHEKING & CABLE TERMINATION FOR LIGHTING SYSTEM ELECTRICAL TEAM

7149 21574 07.05.2020 15.05.2020 HOT WORK DAY NGFS 22 INSTALATION OF PIPE SUPPORTS PIPING

7150 21573 09.05.2020 15.05.2020 HOT WORK DAY GT 22 INSTALATION OF PIPE SUPPORTS PIPING

7151 GE-HEC-1832 09.05.2020 15.05.2020 COLD WORK DAY NGFS 12 PINTING ONLY PIPING

7152 GE-HEC-1833 09.05.2020 15.05.2020 COLD WORK DAY NGFS 11 PINTING ONLY PIPING

7153 16296 10.05.2020 16.05.2020 COLD WORK DAY GT 22 CABLE PULLING & TERMINATION MECHANIC TEAM

7154 7248 09.05.2020 15.05.2020 COLD WORK DAY GT 21 CONDENSANT PP A&B HOT LOOP CHECK COMMISSIONING

7155 9919 09.05.2020 16.05.2020 COLD WORK DAY GT 22 TEMPORARY BY PASS LINE REMOVE &PERMANENT SPOOL INSTALL FOR 22GT COMMISSIONING
7156 7250 09.05.2020 16.05.2020 COLD WORK DAY ST 10 CCW SYSTEM WATE FLUSHING AND SUCTON STRAINER CLEANING COMMISSIONING

7157 16298 09.05.2020 15.05.2020 COLD WORK DAY NGSS INSPECTION FIRE ALARM ELECTRICAL TEAM
Performing Authority
Company Discipline (HEC In Charge) Area Authority Status Comments

HEC COMMISSIONING JAN RIGOR ARAFA. T CLOSED 11.01.2020

HEC COMMISSIONING JAN RIGOR ARAFA. T CLOSED 08.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING M.G CHOI KANG CLOSED 08.01.2020

RANAFORT COMMISSIONING SOMAR SAWAN KIM SUNG JIN CANCELLED23.01.2020

RANAFORT COMMISSIONING SOMAR SAWAN KIM SUNG JIN CANCELLED23.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 06.01.2020

HEC COMMISSIONING YOON. BH LEE G J CLOSED 11.01.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 15.01.2020

HEC COMMISSIONING AJAY J.H MFUNG CANCELLED14.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 14.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 14.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 14.01.2020


IRMA COMMISSIONING AFAKI KANG CLOSED 14.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 14.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 14.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 14.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 14.01.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 14.01.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 14.01.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 20.01.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 20.01.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 20.01.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 20.01.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 20.01.2020

ETTERKIB COMMISSIONING BELHAJ KANG CLOSED 20.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 13.01.2020


HEC COMMISSIONING H.S KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 14.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 14.01.2020

HEC COMMISSIONING J. AGUIL CHOI. HS CLOSED 11.01.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 18.01.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 18.01.2020

ETTERKIB COMMISSIONING BELBACHA KANG

HEC COMMISSIONING TL. KIM KANG CLOSED 13.01.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 13.01.2020


HEC COMMISSIONING RIMA J.H MFUNG

HEC COMMISSIONING ARNOLD. CAJILIG HEO TAEWON CLOSED 15.01.2020

RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN CLOSED 13.01.2020

RANAFORT COMMISSIONING SERIDJ. M KIM SUNG JIN CLOSED 13.01.2020

RANAFORT COMMISSIONING SERIDJ. M KIM SUNG JIN CLOSED 13.01.2020

RANAFORT COMMISSIONING SERIDJ. M KIM SUNG JIN CLOSED 13.01.2020

RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN CLOSED 13.01.2020

RANAFORT COMMISSIONING SERIDJ. M CHOI. HS CLOSED 13.01.2020

RANAFORT COMMISSIONING LABIOD. I CHOI. HS CLOSED 13.01.2020

RANAFORT COMMISSIONING LABIOD. I CHOI. HS CLOSED 13.01.2020

RANAFORT COMMISSIONING LABIOD. I CHOI. HS CLOSED 13.01.2020

ETTERKIB COMMISSIONING CHIBOUT. S KANG CLOSED 13.01.2020

ETTERKIB COMMISSIONING CHIBOUT. S KANG CLOSED 13.01.2020

RANAFORT COMMISSIONING WASSOUF. I CHOI. HS CLOSED 13.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 14.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 07.01.2020

HEC COMMISSIONING TL. KIM MESSAOUD. KESBIA CLOSED 07.01.2020

IRMA COMMISSIONING AFAKI KANG


RANAFORT COMMISSIONING SERIDJ. M MESSAOUD. KESBIA CLOSED 13.01.2020

RANAFORT COMMISSIONING SERIDJ. M MESSAOUD. KESBIA CLOSED 13.01.2020

RANAFORT COMMISSIONING SERIDJ. M ARAFA. T

RANAFORT COMMISSIONING SERIDJ. M ARAFA. T

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 11.01.2020

HEC COMMISSIONING MESSAOUD. KESBIA MESSAOUD. KESBIA CLOSED 18.01.2020

HEC COMMISSIONING MESSAOUD. KESBIA MESSAOUD. KESBIA CLOSED 18.01.2020

HEC COMMISSIONING MASSINISSA LGHBRIOUEMASSINISSA LGHBRIOUENCLOSED 18.01.2020

HEC COMMISSIONING MALEK BELKHIR MALEK BELKHIR CLOSED 18.01.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 18.01.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 28.01.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 14.01.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 28.01.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 28.01.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 13.01.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 13.01.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG


HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 11.01.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 11.01.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 11.01.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 11.01.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 11.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KANG CLOSED 13.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KANG CLOSED 13.01.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 11.01.2020

ETTERKIB COMMISSIONING N. TAHIR HEO TAEWON CLOSED 08.02.2020

HEC COMMISSIONING TL. KIM H.S KIM CLOSED 13.01.2020

HEC COMMISSIONING JAN RIGOR ARAFA. T CLOSED 13.01.2020

HEC COMMISSIONING JAN RIGOR ARAFA. T

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 11.01.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 11..01.2020

ETTERKIB COMMISSIONING ATTAR. AW KANG CLOSED 19.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 07.01.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 11.01.2020


ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 13.01.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 11.01.2020

HEC COMMISSIONING R. ALFARO KANG CLOSED 13.01.2020

HEC COMMISSIONING A. REMITA KANG CLOSED 11.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KANG CLOSED 13.01.2020

HEC COMMISSIONING JAN RIGOR MALEK BELKHIR CLOSED 14.01.2020

HEC COMMISSIONING JAN RIGOR ARAFA. T CLOSED 13.01.2020

HEC COMMISSIONING CEMIL KAYA BELKHIR. M

HEC COMMISSIONING R. ALFARO MASSINISSA LGHBRIOUENCLOSED 08.01.2020

HEC COMMISSIONING CEMIL KAYA ARAFA. T CLOSED 13.01.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING PARK J C S.W LIM

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 13.01.2020

HEC COMMISSIONING DENHIS C AGDAN MASSINISSA LGHBRIOUENCLOSED 08.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 13.01.2020

RANAFORT COMMISSIONING SERIDJ. M KIM SUNG JIN CLOSED 13.01.2020 ISOLATION CERTIFICATE DATE OF ISOLATION PHONE NUMBER

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 08.01.2020 ELECTRIC TEAM 05.01.200----11.01.2020 AMAR. 0665574317
HEC COMMISSIONING M.G CHEON KANG CLOSED 13.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 11.01.2020

ETTERKIB COMMISSIONING A. REMITA KANG CANCELLED07.01.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 11.01.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 15.01.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 13.01.2020

HEC COMMISSIONING M.G CHEON MESSAOUD. KESBIA CLOSED 11.01.2020

HEC COMMISSIONING M.G CHEON MESSAOUD. KESBIA CLOSED 11.01.2020

HEC COMMISSIONING D.H KIM JH. KIM CLOSED 19.01.2020

HEC COMMISSIONING J. AGUIL CHOI. HS CLOSED 18.01.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 14.01.2020

HEC COMMISSIONING RANDY PAULO KANG CLOSED 13.01.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 11.01.2020 ELECTRIC TEAM 06.01.2020---12.01.2020AMAR. 0665574317

HEC COMMISSIONING MR. GAVINO Y.J JEONG CLOSED 14.01.2020

HEC COMMISSIONING MR. GAVINO Y.J JEONG CLOSED 14.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 14.01.2020


HEC COMMISSIONING M.G BAE J.H MFUNG CLOSED 15.01.2020

RANAFORT COMMISSIONING WASSOUF. I Y.S KIM CLOSED 13.01.2020

HEC COMMISSIONING D.H KIM ARAFA. T CLOSED 11.01.2020

HEC COMMISSIONING A. REMITA KH. JUNG CLOSED 14.01.2020

HEC COMMISSIONING M.G CHEON MALEK BELKHIR CLOSED 11.01.2020

HEC COMMISSIONING R. ALFARO MASSINISSA LGHBRIOUENCLOSED 14.01.2020

HEC COMMISSIONING R. ALFARO MASSINISSA LGHBRIOUENCLOSED 15.01.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 19.01.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 19.01.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 19.01.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 19.01.2021

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 19.01.2022

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 19.01.2023

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 19.01.2024

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 19.01.2025

ETTERKIB COMMISSIONING BELBACHA. L KANG CLOSED 19.01.2026

ETTERKIB COMMISSIONING BELBACHA. L KANG CLOSED 19.01.2027


ETTERKIB COMMISSIONING BELBACHA. L KANG CLOSED 19.01.2028

ETTERKIB COMMISSIONING BELBACHA. L KANG CLOSED 19.01.2029

HEC COMMISSIONING Y.S KIM Y.S KIM CLOSED 18.01.2020

HEC COMMISSIONING M.G CHEON MESSAOUD. KESBIA CLOSED 15.01.2020

HEC COMMISSIONING CEMIL KAYA J.H MFUNG CLOSED 15.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KANG CLOSED 13.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 14.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 14.01.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 14.01.2020 ELECTRIC TEAM 08.01.2020----14.01.202 RANDY. 0699017540

ETTERKIB COMMISSIONING OULHACI. B J.H MFUNG CLOSED 23.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 21.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 19.01.2020


HEC COMMISSIONING H.S KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING TL. KIM KANG CANCELLED28.01.2020

HEC COMMISSIONING ALLVINE Y.J JEONG CLOSED 14.01.2020

ETTERKIB COMMISSIONING ROUIBI TAREK KH. JUNG CLOSED 20.01.2020

HEC COMMISSIONING Y.S KIM Y.S KIM CLOSED 07.03.2020

HEC COMMISSIONING Y.S KIM Y.S KIM CLOSED 19.01.2020

HEC COMMISSIONING Y.S KIM Y.S KIM CLOSED 19.01.2020

HEC COMMISSIONING Y.S KIM Y.S KIM CLOSED 19.01.2020

HEC COMMISSIONING Y.S KIM Y.S KIM CLOSED 19.01.2020

HEC COMMISSIONING RIMA J.H MFUNG CLOSED 18.01.2020

HEC COMMISSIONING SANSEEN CATIPAY KANG CLOSED 15.01.2020


HEC COMMISSIONING JAN RIGOR MASSINISSA LGHBRIOUENCLOSED 18.01.2020

HEC COMMISSIONING JAN RIGOR MASSINISSA LGHBRIOUENCLOSED 18.01.2020

HEC COMMISSIONING CEMIL KAYA MASSINISSA LGHBRIOUENCLOSED 18.01.2020

HEC COMMISSIONING TL. KIM KANG

HEC COMMISSIONING TL. KIM MALEK BELKHIR CLOSED 19.01.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 18.01.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 18.01.2020

HEC COMMISSIONING J. AGUIL CHOI. HS CLOSED 18.01.2020

HEC COMMISSIONING TW. HEO CHOI. HS

HEC COMMISSIONING DENHIS C AGDAN MESSAOUD. KESBIA CLOSED 15.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 21.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 23.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 23.01.2020


IRMA COMMISSIONING AFAKI KANG CLOSED 19.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 19.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 19.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 19.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 19.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 19.01.2020

ETTERKIB COMMISSIONING CHIBOUT. S KANG

ETTERKIB COMMISSIONING CHIBOUT. S KANG CLOSED 20.01.2020

ETTERKIB COMMISSIONING M. DAKICHE K.K JUNG CLOSED 18.01.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 13.01.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 15.01.2020

GE COMMISSIONING MESSAOUD. KESBIA MESSAOUD. KESBIA CLOSED 22.01.2020

GE COMMISSIONING MESSAOUD. KESBIA MESSAOUD. KESBIA CLOSED 22.01.2020

GE COMMISSIONING MALEK BELKHIR MALEK BELKHIR CLOSED 22.01.2020

GE COMMISSIONING MASSINISSA LGHBRIOUEMASSINISSA LGHBRIOUENCLOSED 22.01.2020

HEC COMMISSIONING DENHIS C AGDAN KH. JUNG CANCELLED11.01.2020


HEC COMMISSIONING DENHIS C AGDAN KH. JUNG

HEC COMMISSIONING RANDY PAULO KANG CLOSED 14.01.2020

RANAFORT COMMISSIONING SERIDJ. M Y. Z MO CLOSED 22.01.2020

RANAFORT COMMISSIONING SERIDJ. M Y. Z MO CLOSED 22.01.2020

RANAFORT COMMISSIONING SERIDJ. M Y. Z MO CLOSED 22.01.2020

RANAFORT COMMISSIONING WASSOUF. I Y.S KIM CLOSED 22.01.2020

RANAFORT COMMISSIONING SERIDJ. M CHOI. HS CLOSED 22.01.2020

RANAFORT COMMISSIONING SERIDJ. M CHOI. HS CLOSED 22.01.2020

RANAFORT COMMISSIONING SERIDJ. M CHOI. HS CLOSED 22.01.2020

RANAFORT COMMISSIONING SERIDJ. M CHOI. HS CLOSED 22.01.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 19.01.2020 ELECTRIC TEAM 09.01.2020----15.01.202 0549648065

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 18.01.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 18.01.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 18.01.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 18.01.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 18.01.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 18.01.2020

RANAFORT COMMISSIONING SERIDJ. M CHOI. HS CLOSED 23.01.2020


RANAFORT COMMISSIONING SERIDJ. M CHOI. HS CLOSED 23.01.2020

RANAFORT COMMISSIONING SERIDJ. M MESSAOUD. KESBIA CLOSED 22.01.2020

RANAFORT COMMISSIONING SERIDJ. M MESSAOUD. KESBIA CLOSED 22.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 23.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 23.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KH. JUNG CLOSED 19.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KH. JUNG CLOSED 19.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KH. JUNG CLOSED 19.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KH. JUNG CLOSED 19.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KH. JUNG CLOSED 19.01.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 20.01.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 20.01.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 19.01.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 19.01.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 18.01.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 18.01.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 18.01.2020


ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 18.01.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 18.01.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 20.01.2020

ETTERKIB COMMISSIONING ISMAIL. W KH. JUNG CLOSED 18.01.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 13.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 23.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 23.01.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 18.01.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 18.01.2020

HECC COMMISSIONING CEMIL KAYA ARAFA. T CLOSED 20.01.2020 MECHANIC TEAM 13.01.2020--19.01.2020 AJAY. 0699650349

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 21.01.2020

HEC COMMISSIONING MR. CHOI BELKHIR. M CLOSED 23.01.2020

HEC COMMISSIONING CHEON KANG CLOSED 20.01.2020

HEC COMMISSIONING J.H.KIM J.H.KIM CLOSED 23.01.2020

HEC COMMISSIONING D.H.KIM JH. KIM CLOSED 15.01.2020 PROCESS & ELECTRICAL 13.01.2020-19.01.2020

HEC COMMISSIONING D.H.KIM JH. KIM CLOSED 15.01.2020 PROCESS & ELECTRICAL 13.01.2020-19.01.2020
HEC COMMISSIONING CHOI. HS CLOSED 27.01.2020

HEC COMMISSIONING H.S.KIM KANG CLOSED 20.01.2020

HEC COMMISSIONING T.L.KIM KANG CLOSED 15.01.2020

HEC COMMISSIONING H.S.KIM MESSAOUD. KESBIA CLOSED 23.01.2020

HEC COMMISSIONING TW. HEO HAMZA CLOSED 15.01.2020 PROCESS & ELECRICAL 13.01.2020-19.01.2020

HEC COMMISSIONING H.S.KIM KANG CLOSED 20.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 21.01.2020

HEC COMMISSIONING DENHIS C AGDAN KH. JUNG CLOSED 21.01.2020

HEC COMMISSIONING Y.G KIM KH. JUNG CLOSED 14.01.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 18.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KH. JUNG

HEC COMMISSIONING CEMIL KAYA ARAFA. T CLOSED 20.01.2020

HEC COMMISSIONING R. ALFARO KANG CLOSED 20.01.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 19.01.2020


HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 20.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 23.01.2020

HEC COMMISSIONING R. ALFARO KANG CANCELLED14.01.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 23.01.2020

HEC COMMISSIONING E. WS MASSINISSA LGHBRIOUENCLOSED 18.01.2020

HEC COMMISSIONING D.H.KIM JH. KIM CLOSED 18.01.2020

HEC COMMISSIONING DENHIS C AGDAN KH. JUNG CLOSED 21.01.2020 ELECTRIC TEAM 14.01.2020--20.01.2020 AMAR. 0665574317

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 19.01.2020 ELECTRIC TEAM 14.01.2020--20.01.2021 AMAR. 0665574318

HEC COMMISSIONING Y.S KIM Y.S KIM CLOSED 19.01.2020

HEC COMMISSIONING E. WS ARAFA. T CLOSED 23.01.2020

HEC COMMISSIONING R. ALFARO MESSAOUD. KESBIA

ETTERKIB COMMISSIONING ROUIBI TAREK KANG CLOSED 01.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 26.01.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 26.01.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 26.01.2020


ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 26.01.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 26.01.2020

ETTERKIB COMMISSIONING BOUHALI. H KANG CLOSED 26.01.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 26.01.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 26.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 26.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 26.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 27.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 27.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 26.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 26.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 26.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 26.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 26.01.2020


HEC COMMISSIONING H.S KIM KANG CLOSED 26.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 26.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 26.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 26.01.2020

HEC COMMISSIONING TL. KIM KANG

HEC COMMISSIONING TL. KIM KANG CLOSED 28.01.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 26.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 28.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 27.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 27.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 27.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 27.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 27.01.2020

HEC COMMISSIONING SANSEEN CATIPAY KH. JUNG CLOSED 19.01.2020

HEC COMMISSIONING SANSEEN CATIPAY KH. JUNG CLOSED 23.01.2020


HEC COMMISSIONING E. WS E. WS CLOSED 23.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 28.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 28.01.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 23.01.2020

ETTERKIB COMMISSIONING CHIBOUT. S KANG CLOSED 26.01.2020

ETTERKIB COMMISSIONING CHIBOUT. S KANG CLOSED 26.01.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 26.01.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 26.01.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 28.01.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 28.01.2020

HEC COMMISSIONING E. WS E. WS CLOSED 23.01.2020

HEC COMMISSIONING K. K JUNG S.H CHO CLOSED 27.01.2020

HEC COMMISSIONING TW. HEO S.H CHO CLOSED 18.01.2020

HEC COMMISSIONING TW. HEO S.H CHO CLOSED 27.01.2020

HEC COMMISSIONING TW. HEO S.H CHO CLOSED 27.01.2020


HEC COMMISSIONING TW. HEO S.H CHO CLOSED 28.01.2020

HEC COMMISSIONING TW. HEO S.H CHO CLOSED 28.01.2020

HEC COMMISSIONING S.H CHO S.H CHO CANCELLED18.01.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 19.01.2020

HEC COMMISSIONING K. SEONG JH. KIM

HEC COMMISSIONING Y.S KIM Y.S KIM CLOSED 23.01.2020

HEC COMMISSIONING Y.S KIM Y.S KIM CLOSED 18.02.2020

HEC COMMISSIONING Y.S KIM Y.S KIM CLOSED 28.01.2020

HEC COMMISSIONING C. RAJIGANDHI KANG CLOSED 25.01.2020

HEC COMMISSIONING C. RAJIGANDHI KANG CLOSED 25.01.2020

HEC COMMISSIONING C. RAJIGANDHI KANG CLOSED 25.01.2020

HEC COMMISSIONING C. RAJIGANDHI KANG CLOSED 25.01.2020

HEC COMMISSIONING C. RAJIGANDHI KANG CLOSED 25.01.2020

HEC COMMISSIONING C. RAJIGANDHI KANG CLOSED 25.01.2020

HEC COMMISSIONING AJAY INHO KM CLOSED 26.01.2020

HEC COMMISSIONING AJAY INHO KM CLOSED 27.01.2020


HEC COMMISSIONING AJAY Q.H KIM

HEC COMMISSIONING SERIDJ. M KO CLOSED 28.01.2020

HEC COMMISSIONING SERIDJ. M KO CLOSED 28.01.2020

HEC COMMISSIONING SERIDJ. M KO CLOSED 28.01.2020

HEC COMMISSIONING LABIOD. I CHOI. HS CLOSED 28.01.2020

HEC COMMISSIONING LABIOD. I CHOI. HS CLOSED 28.01.2020

HEC COMMISSIONING SERIDJ. M CHOI. HS CLOSED 01.02.2020

HEC COMMISSIONING LABIOD. I CHOI. HS CLOSED 01.02.2020

HEC COMMISSIONING WASSOUF. I Y.S KIM CLOSED 28.01.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 28.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 20.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 27.01.2020

HEC COMMISSIONING Y.S KIM Y.S KIM CLOSED 28.01.2020

HEC COMMISSIONING GY. KIM H.S KIM CLOSED 23.01.2020

GE COMMISSIONING MESSAOUD. KESBIA MESSAOUD. KESBIA CLOSED 20.02.2020

GE COMMISSIONING MESSAOUD. KESBIA MESSAOUD. KESBIA CLOSED 20.02.2020

GE COMMISSIONING HAMZA. B HAMZA. B CLOSED 20.02.2020


GE COMMISSIONING MALEK BELKHIR MALEK BELKHIR CLOSED 20.02.2020

HEC COMMISSIONING JAN RIGOR ARAFA. T CLOSED 27.01.2020

HEC COMMISSIONING CEMIL KAYA ARAFA. T CLOSED 26.01.2021

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING DENHIS C AGDAN MESSAOUD. KESBIA CLOSED 22.01.2020

RANAFORT COMMISSIONING SERIDJ. M ARAFA. T CLOSED 28.01.2020

RANAFORT COMMISSIONING WASSOUF. I J.H MFUNG CANCELLED28.01.2020

HEC COMMISSIONING TL. KIM KH. JUNG

HEC COMMISSIONING TL. KIM KH. JUNG CLOSED 28.01.2020

RANAFORT COMMISSIONING SERIDJ. M MESSAOUD. KESBIA CLOSED 28.01.2020

RANAFORT COMMISSIONING SERIDJ. M MESSAOUD. KESBIA CLOSED 28.01.2020

HEC COMMISSIONING K. SEONG LEE G J CLOSED 22.01.2020

HEC COMMISSIONING K. SEONG LEE G J CLOSED 22.01.2020

HEC COMMISSIONING E. WS E. WS CLOSED 26.01.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 26.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KANG CLOSED 26.01.2020


ETTERKIB COMMISSIONING ATTAR. AW KANG

ETTERKIB COMMISSIONING ATTAR. AW KANG CLOSED 26.01.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 26.01.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 26.01.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 26.01.2020

HEC COMMISSIONING S.U LEE INHO KM CLOSED 26.01.2020

ETTERKIB COMMISSIONING M. DAKICHE K.K JUNG CLOSED 27.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KANG CLOSED 26.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KANG CLOSED 26.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KANG CLOSED 26.01.2020

RANAFORT COMMISSIONING SOMAR. S KIM SUNG JIN CLOSED 28.01.2020

RANAFORT COMMISSIONING SOMAR. S KIM SUNG JIN CLOSED 28.01.2020

HEC COMMISSIONING C. RAJIGANDHI KANG CLOSED 25.01.2020

HEC COMMISSIONING CEMIL KAYA SIDALI. B CLOSED 27.01.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 24.02.2020


HEC COMMISSIONING H.S KIM KANG CLOSED 26.01.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 27.01.2020

HEC COMMISSIONING JH. KIM ARAFA. T CLOSED 19.01.2020

HEC COMMISSIONING YOUCE MESSAI LEE G J CLOSED 26.01.2020

HEC COMMISSIONING MR. KIM Y.J JEONG

HEC COMMISSIONING MR. KIM Y.J JEONG CLOSED 05.02.2020

HEC COMMISSIONING Y.G KIM KANG CLOSED 22.01.2020

HEC COMMISSIONING KIM JUN IL MALEK BELKHIR CLOSED 28.01.2020

HEC COMMISSIONING K.K JUNG S.H CHO CLOSED 28.01.2020

HEC COMMISSIONING CEMIL KAYA SIDALI. B CLOSED 27.01.2020

HEC COMMISSIONING R. ALFARO HAMZA. B CLOSED 22.01.2020

HEC COMMISSIONING R. ALFARO HAMZA. B CLOSED 22.01.2020

HEC COMMISSIONING M.G CHEON ZEKAD. A CLOSED 28.01.2020

HEC COMMISSIONING M.G CHEON ZEKAD. A CLOSED 28.01.2020

HEC COMMISSIONING TW. HEO SIDALI. B CLOSED 27.01.2020

HEC COMMISSIONING TW. HEO SIDALI. B CLOSED 27.01.2020


HEC COMMISSIONING MR. KIM Y.J JEONG

HEC COMMISSIONING M.G CHEON KANG CLOSED 28.01.2020

HEC COMMISSIONING CEMIL KAYA SIDALI. B CLOSED 26.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KH. JUNG CLOSED 25.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KH. JUNG CLOSED 25.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KH. JUNG CLOSED 25.01.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 25.01.2020

HEC COMMISSIONING AYOUB. B INHO KM CLOSED 26.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 23.01.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 28.01.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 28.01.2020

HEC COMMISSIONING K. SEONG LEE G J CLOSED 30.01.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 28.01.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 23.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KANG CLOSED 26.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KANG CLOSED 26.01.2020


HEC COMMISSIONING H.S KIM ZEKAD. A CLOSED 28.01.2020

HEC COMMISSIONING B.C KIM KANG CLOSED 01.02.2020

HEC COMMISSIONING B.C KIM KANG CLOSED 01.02.2020

HEC COMMISSIONING K . K. P KANG

HEC COMMISSIONING K . K. P KANG

HEC COMMISSIONING TW. HEO S.H CHO CLOSED 28.01.2020

HEC COMMISSIONING TW. HEO S.H CHO CLOSED 02.02.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 29.01.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 09.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 22.01.2020

HEC COMMISSIONING MOHAMMED. B KH. JUNG CLOSED 28.01.2020

HEC COMMISSIONING JH. KIM JH. KIM

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 28.01.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 28.01.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 25.01.2020

HEC COMMISSIONING DENHIS C AGDAN Y.G KIM CLOSED 03.02.2020


HEC COMMISSIONING DENHIS C AGDAN Y.G KIM CLOSED 03.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG CLOSED 03.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG CLOSED 03.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG CLOSED 03.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG CLOSED 03.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG CLOSED 03.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG CLOSED 03.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG CLOSED 03.02.2020

HEC COMMISSIONING MG. BAE INHO KM

HEC COMMISSIONING MG. BAE INHO KM CLOSED 02.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 02.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 02.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 01.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 01.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 01.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 03.02.2020


HEC COMMISSIONING H.S KIM KANG CLOSED 01.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 01.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 01.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 01.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 01.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 01.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 01.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 01.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 02.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 03.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 03.02.2020

HEC COMMISSIONING MR. HAN Y.J JEONG CLOSED 11.03.2020

HEC COMMISSIONING MR. HAN Y.J JEONG CLOSED 05.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 03.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 03.02.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 09.02.2020


IRMA COMMISSIONING AFAKI KANG CLOSED 09.02.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 09.02.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 09.02.2020

HEC COMMISSIONING TW. HEO S.H CHO CLOSED 02.02.2020

HEC COMMISSIONING TW. HEO S.H CHO CLOSED 02.0.2020

ETTERKIB COMMISSIONING CHIBOUT. S KANG CLOSED 02.02.2020

ETTERKIB COMMISSIONING CHIBOUT. S KANG CLOSED 02.02.2020

HEC COMMISSIONING KK. JUNG S.H CHO CLOSED 27.01.2020

HEC COMMISSIONING B.C KIM KANG CLOSED 01.02.2020

ETTERKIB COMMISSIONING ATTAR. AW KANG CANCELLED26.01.2020

ETTERKIB COMMISSIONING ATTAR. AW KANG CANCELLED26.01.2020

RANAFORT COMMISSIONING LABIOD. I S.H CHO CLOSED 01.02.2020

RANAFORT COMMISSIONING LABIOD. I S.H CHO CLOSED 01.02.2020

RANAFORT COMMISSIONING LABIOD. I S.H CHO CLOSED 01.02.2020

RANAFORT COMMISSIONING LABIOD. I S.H CHO CLOSED 01.02.2020

HEC COMMISSIONING TW. HEO S.H CHO CLOSED 28.01.2020

HEC COMMISSIONING RYAN EVARISTO SIDALI. B CLOSED 01.02.2020


GE COMMISSIONING ZEKAD. A ZEKAD. A CLOSED 20.02.2020

GE COMMISSIONING MESSAOUD. KESBIA MESSAOUD. KESBIA CLOSED 20.02.2020

GE COMMISSIONING HAMZA. B HAMZA. B CLOSED 20.02.2020

GE COMMISSIONING MALEK BELKHIR MALEK BELKHIR CLOSED 20.02.2020

HEC COMMISSIONING RANDY PAULO KANG CANCELLED28.01.2020

HEC COMMISSIONING KK. JUNG S.H CHO CLOSED 01.02.2020

HEC COMMISSIONING K. SEONG LEE G J

ETTERKIB COMMISSIONING T. HENDA INHO KM CLOSED 02.02.2020

HEC COMMISSIONING AJAY INHO KM CLOSED 02.02.2020

HEC COMMISSIONING AYOUB. B INHO KM CLOSED 01.02.2020

HEC COMMISSIONING AYOUB. B INHO KM CLOSED 01.02.2020

HEC COMMISSIONING AYOUB. B INHO KM CLOSED 01.02.2020

HEC COMMISSIONING R. ALFARO KANG CLOSED 01.02.2020

ETTERKIB COMMISSIONING ROUIBI TAREK KH. JUNG CLOSED 01.02.2020

HEC COMMISSIONING UMECH Y.J JEONG CLOSED 05.02.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 01.02.2020


HEC COMMISSIONING MR. KIM Y.J JEONG CLOSED 05.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 02.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 02.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 02.02.2020

HEC COMMISSIONING JAN RIGOR ARAFA. T CLOSED 30.01.2020

HEC COMMISSIONING JAN RIGOR ARAFA. T CLOSED 01.02.2020

HEC COMMISSIONING BADACHE. S ARAFA. T CLOSED 03.02.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CANCELLED20.02.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CANCELLED20.02.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CANCELLED20.02.2020

HEC COMMISSIONING SERIDJ. M ARAFA. T

HEC COMMISSIONING SERIDJ. M ZEKAD. A CLOSED 01.02.2020

HEC COMMISSIONING SERIDJ. M ARAFA. T

HEC COMMISSIONING SERIDJ. M ZEKAD. A CLOSED 01.02.2020

HEC COMMISSIONING RANDY PAULO MESSAOUD. KESBIA CLOSED 01.02.2020


RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN CLOSED 01.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 01.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 01.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 01.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 01.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 01.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 01.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 01.02.2020

HEC COMMISSIONING DENHIS C AGDAN B.S CHIN CLOSED 28.01.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 02.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 02.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 28.01.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 01.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 01.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 01.02.2020

ETTERKIB COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 01.02.2020


HEC COMMISSIONING YOUCE MESSAI LEE G J CLOSED 08.02.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 01.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 02.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 02.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 02.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 02.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 02.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 03.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 01.02.2020

HEC COMMISSIONING AJAY INHO KM CLOSED 02.02.2020

HEC COMMISSIONING AJAY INHO KM CLOSED 04.02.2020

HEC COMMISSIONING AJAY INHO KM CLOSED 04.02.2020

HEC COMMISSIONING CEMIL KAYA ARAFA. T CLOSED 01.02.2020

HEC COMMISSIONING CEMIL KAYA ARAFA. T CLOSED 04.02.2020

HEC COMMISSIONING M.G CHEON HAMZA. B CLOSED 02.02.2020


HEC COMMISSIONING M.G CHEON HAMZA. B CLOSED 02.02.2020

RANAFORT COMMISSIONING SOMAR. S KIM SUNG JIN CANCELLED05.02.2020

RANAFORT COMMISSIONING SOMAR. S KIM SUNG JIN CANCELLED05.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 01.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CANCELLED27.01.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CANCELLED27.01.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CANCELLED01.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 02.02.2020

HEC COMMISSIONING JH. KIM ARAFA. T CLOSED 01.02.2020

ETTERKIB COMMISSIONING M. DAKICHE K.K JUNG CLOSED 05.02.2020

HEC COMMISSIONING R. ALFARO KANG CANCELLED27.01.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 03.02.2020

HEC COMMISSIONING KK. JUNG S.H CHO CLOSED 04.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 02.02.2020

GE COMMISSIONING SIDALI. B J.S KIM CLOSED 20.02.2020


HEC COMMISSIONING M.G CHEON KANG CLOSED 04.02.2020

HEC COMMISSIONING Y.G KIM KANG CLOSED 09.02.2020

HEC COMMISSIONING E. WS E. WS CLOSED 03.02.2020

ELECTRO THARWATCOMMISSIONING KAOUS ISAM KANG

HEC COMMISSIONING H.S KIM ZEKAD. A CLOSED 03.02.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 05.02.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 05.02.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 05.02.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 04.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 03.02.2020

HEC COMMISSIONING SANSEEN CATIPAY KH. JUNG CLOSED 05.02.2020

HEC COMMISSIONING SANSEEN CATIPAY KH. JUNG CLOSED 05.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 01.02.2020

RANAFORT COMMISSIONING LABIOD. I S.H CHO CLOSED 10.02.2020

HEC COMMISSIONING Y.G KIM KH. JUNG CLOSED 28.01.2020

HEC COMMISSIONING R. ALFARO KANG CLOSED 05.02.2020


HEC COMMISSIONING M.G CHEON ARAFA. T CLOSED 01.02.2020

HEC COMMISSIONING Y.G KIM KANG CANCELLED28.01.2020

HEC COMMISSIONING K. SEONG E. WS CLOSED 01.02.2020

HEC COMMISSIONING AJAY ARAFA. T

HEC COMMISSIONING AJAY ARAFA. T

HEC COMMISSIONING RYAN EVARISTO ARAFA. T CLOSED 05.02.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 18.02.2020

HEC COMMISSIONING E. WS E. WS CLOSED 05.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 08.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 08.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 08.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 08.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 08.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KANG CLOSED 08.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 05.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG


ETTERKIB COMMISSIONING A. REMITA KH. JUNG

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 10.02.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 10.02.2020

HEC COMMISSIONING RYAN EVARISTO S.H CHO CLOSED 08.02.2020

HEC COMMISSIONING RYAN EVARISTO S.H CHO CLOSED 08.02.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 09.02.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 09.02.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 09.02.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 09.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 09.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 09.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 10.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 09.02.2020

HEC COMMISSIONING H.S KIM KANG

HEC COMMISSIONING H.S KIM KANG CLOSED 09.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 09.02.2020

HEC COMMISSIONING K.K JUNG S.H CHO CLOSED 08.02.2020


HEC COMMISSIONING ARNOLD CAJILIG S.H CHO CLOSED 10.02.2020

HEC COMMISSIONING KANG J.O KANG CLOSED 11.02.2020

HEC COMMISSIONING KANG J.O KANG CLOSED 11.02.2020

HEC COMMISSIONING H.S KIM SIDALI. B CLOSED 11.02.2020

ETTERKIB COMMISSIONING A. REMITA ZEKAD. A CLOSED 05.02.2020

ETTERKIB COMMISSIONING A. REMITA ZEKAD. A CLOSED 05.02.2020

GE COMMISSIONING ZEKAD. A MESSAOUD. KESBIA CLOSED 20.02.2020

GE COMMISSIONING ZEKAD. A MESSAOUD. KESBIA CLOSED

GE COMMISSIONING MASSINISSA LGHBRIOUEMASSINISSA LGHBRIOUENCLOSED

GE COMMISSIONING HAMZA. B HAMZA. B CLOSED

HEC COMMISSIONING RYAN EVARISTO ARAFA. T CLOSED 05.02.2020

HEC COMMISSIONING YM. JANG S.H CHO CLOSED 08.02.2020

HEC COMMISSIONING YM. JANG S.H CHO CLOSED 08.02.2020

HEC COMMISSIONING DH. KIM LEE G J CLOSED 10.02.2020

HEC COMMISSIONING YM. JANG S.H CHO CLOSED 08.02.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 28.02.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 18.02.2020


HEC COMMISSIONING Y.S KIM KIM SUNG JIN CANCELLED27.02.2020

ETTERKIB COMMISSIONING ROUIBI TAREK KH. JUNG CLOSED 11.02.2020

ETTERKIB COMMISSIONING ROUIBI TAREK KH. JUNG CLOSED 11.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 06.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 04.02.2020

HEC COMMISSIONING AJAY ARAFA. T CLOSED 02.02.2020

HEC COMMISSIONING CEMIL KAYA ARAFA. T CLOSED 06.02.2020

HEC COMMISSIONING YOON. BH LEE G J CLOSED 08.02.2020

HEC COMMISSIONING YOON. BH LEE G J CLOSED 08.02.2020

RANAFORT COMMISSIONING SERIDJ. M S.H CHO CLOSED 08.02.2020

RANAFORT COMMISSIONING SERIDJ. M S.H CHO CLOSED 08.02.2020

RANAFORT COMMISSIONING SERIDJ. M S.H CHO

RANAFORT COMMISSIONING SERIDJ. M S.H CHO CLOSED 08.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 08.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 08.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 08.02.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 08.02.2020


HEC COMMISSIONING AJAY J.H MFUNG CLOSED 08.02.2020

HEC COMMISSIONING Y.G KIM KANG CLOSED 09.02.2020

HEC COMMISSIONING Y.G KIM KANG CLOSED 09.02.2020

ETTERKIB COMMISSIONING CHIBOUT. S KH. JUNG

ETTERKIB COMMISSIONING CHIBOUT. S KH. JUNG CLOSED 09.02.2020

HEC COMMISSIONING K.H JUNG KANG

RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN CLOSED 08.02.2020

RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN CLOSED 08.02.2020

RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN

HEC COMMISSIONING JAN RIGOR J.H MFUNG CLOSED 08.02.2020

HEC COMMISSIONING JAN RIGOR SIDALI. B CLOSED 08.02.2020

HEC COMMISSIONING JAN RIGOR SIDALI. B CLOSED 08.02.2020

HEC COMMISSIONING AJAY SIDALI. B CLOSED 08.02.2020

IRMA COMMISSIONING AFAKI KANG CANCELLED06.02.2020

HEC COMMISSIONING Y.G KIM KANG CLOSED 03.02.2020


HEC COMMISSIONING RYAN EVARISTO SIDALI. B CLOSED 03.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CANCELLED01.03.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 01.03.2020

HEC COMMISSIONING Y.G KIM KH. JUNG CLOSED 03.02.2020

HEC COMMISSIONING SIDALI. B SIDALI. B CLOSED 20.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 11.02.2020

HEC COMMISSIONING H.S KIM KANG CANCELLED11.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 11.02.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG

HEC COMMISSIONING MR. CHOI Y.J JEONG

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 10.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 08.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 08.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 08.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 08.02.2020


HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 08.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 08.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 08.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 08.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 08.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 08.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 10.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 09.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 09.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 09.02.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 10.02.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 10.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 06.02.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 06.02.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 06.02.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 05.02.2020


ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 08.02.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 08.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 09.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 09.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 09.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 09.02.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 10.02.2020

HEC COMMISSIONING MR. SIM Y.J JEONG CLOSED 10.02.2020

HEC COMMISSIONING MR. SIM Y.J JEONG CLOSED 10.02.2020

HEC COMMISSIONING MR. SIM Y.J JEONG CLOSED 10.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 08.02.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 18.02.2020

HEC COMMISSIONING JANG KANG CLOSED 10.02.2020

HEC COMMISSIONING TL. KIM KH. JUNG CLOSED 09.02.2020

HEC COMMISSIONING DENHIS C AGDAN KH. JUNG CLOSED 03.02.2020 ELECTRIC TEAM 02.02.2019/08.02.2020 AMAR. 0665574317
ETTERKIB COMMISSIONING OULHACI. B K.K JUNG CLOSED 08.02.2020

ETTERKIB COMMISSIONING OULHACI. B J.H MFUNG CLOSED 08.02.2020

ETTERKIB COMMISSIONING OULHACI. B J.H MFUNG CLOSED 08.02.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 06.02.2020

HEC COMMISSIONING H.S KIM ZEKAD. A CLOSED 04.02.2020

HEC COMMISSIONING H.S KIM ZEKAD. A CLOSED 10.02.2020

HEC COMMISSIONING R. ALFARO B. HAMZA CLOSED 09.02.2020

HEC COMMISSIONING AJAY SIDALI. B CLOSED 10.02.2020

HEC COMMISSIONING K.H JUNG CHOI. HS CLOSED 08.02.2020

HEC COMMISSIONING TL. KIM ZEKAD. A CLOSED 10.02.2020

HEC COMMISSIONING TL. KIM ZEKAD. A CLOSED 10.02.2020

ETTERKIB COMMISSIONING M. DAKICHE K.K JUNG CLOSED 09.02.2020

HEC COMMISSIONING E. WS E. WS CLOSED 10.02.2020

HEC COMMISSIONING DENHIS C AGDAN KANG

HEC COMMISSIONING JANG KANG CLOSED 11.002.2020

HEC COMMISSIONING ARNOLD CAJILIG K.K JUNG CLOSED 10.02.2020


HEC COMMISSIONING H.S KIM KANG CLOSED 16.02.2020

HEC COMMISSIONING C. RAJIGANDHI KANG CLOSED 08.02.2020

HEC COMMISSIONING C. RAJIGANDHI KANG CLOSED 08.02.2020

HEC COMMISSIONING JAN RIGOR ZEKAD. A CLOSED 13.02.2020

HEC COMMISSIONING RYAN EVARISTO SIDALI. B CLOSED 15.02.2020

HEC COMMISSIONING S.H KIM KANG CANCELLED06.02.2020

HEC COMMISSIONING K.H JUNG KANG CLOSED 08.02.2020

HEC COMMISSIONING MR. JU HAMZA. B CLOSED 05.02.2020

HEC COMMISSIONING H.S KIM ZEKAD. A CLOSED 10.02.2020

HEC COMMISSIONING S.H CHO S.H CHO CLOSED 15.02.2020

HEC COMMISSIONING S.H CHO S.H CHO CLOSED 08.02.2020

HEC COMMISSIONING TL. KIM ZEKAD. A CLOSED 09.02.2020

HEC COMMISSIONING DH. KIM LEE G J CLOSED 06.02.2020

HEC COMMISSIONING MR. CHOI OH. SH CLOSED 10.02.2020

HEC COMMISSIONING MR. CHOI OH. SH CLOSED 10.02.2020


HEC COMMISSIONING KIM SUNG JIN KIM SUNG JIN CLOSED 12.03.2020

HEC COMMISSIONING R. ALFARO KANG CLOSED 11.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 22.02.2020

HEC COMMISSIONING E. WS E. WS CLOSED 12.0.2020

HEC COMMISSIONING C. RAJIGANDHI KANG CANCELLED08.02.2020

HEC COMMISSIONING SANSEEN CATIPAY KH. JUNG CLOSED 16.02.2020

HEC COMMISSIONING DENHIS C AGDAN KH. JUNG CLOSED 16.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 09.02.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 09.02.2020

RANAFORT COMMISSIONING LABIOD. I S.H CHO CANCELLED06.02.2020

ETTERKIB COMMISSIONING ROUIBI TAREK KH. JUNG CLOSED 16.02.2020

ETTERKIB COMMISSIONING ROUIBI TAREK KH. JUNG CLOSED 16.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 15.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 22.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 16.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 16.02.2020


HEC COMMISSIONING H.S KIM KANG CLOSED 19.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 15.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 15.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 15.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 15.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 22.02.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 20.02.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 20.02.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 20.02.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 16.02.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 16.02.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 19.02.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 19.02.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG

HEC COMMISSIONING MR. CHOI Y.J JEONG

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 11.02.2020


ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 11.02.2020

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG CLOSED 15.02.2020

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG CLOSED 15.02.2020

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG CLOSED 15.02.2020

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG CLOSED 15.02.2020

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG CLOSED 15.02.2020

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG CLOSED 15.02.2020

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG CLOSED 15.02.2020

HEC COMMISSIONING CEMIL KAYA SIDALI. B CLOSED 13.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 11.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 11.02.2020

GE COMMISSIONING ZEKAD. A MESSAOUD. KESBIA CLOSED 20.02.2020

GE COMMISSIONING ZEKAD. A ZEKAD. A CLOSED 20.02.2020

GE COMMISSIONING HAMZA. B HAMZA. B CLOSED 20.02.2020

GE COMMISSIONING MASSINISSA LGHBRIOUEMASSINISSA LGHBRIOUENCLOSED 20.02.2020

HEC COMMISSIONING JOK KANG CLOSED 19.02.2020


HEC COMMISSIONING JOK KANG CLOSED 19.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 19.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 19.02.2020

HEC COMMISSIONING TL. KIM KH. JUNG CLOSED 10.02.2020 ELECTRIC TEAM 08.02.2020/14.02.2020 DENNIS. 0699034808

IRMA COMMISSIONING AFAKI KANG CLOSED 22.02.2020

HEC COMMISSIONING GAVINO B. HAMZA CLOSED 10.02.2020

HEC COMMISSIONING YOON. BH LEE G J CLOSED 13.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 13.02.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 10.02.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 16.02.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 15.02.2020

HEC COMMISSIONING K.K JUNG CHOI. HS CLOSED 15.02.2020

HEC COMMISSIONING K.K JUNG CHOI. HS CLOSED 15.02.2020

HEC COMMISSIONING KIM KANG CLOSED 16.02.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 17.02.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 17.02.2020


RANAFORT COMMISSIONING LABIOD. I S.H CHO CLOSED 16.02.2020

RANAFORT COMMISSIONING SERIDJ. M S.H CHO CLOSED 16.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 16.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 16.02.2020

HEC COMMISSIONING YOON. BH MASSINISSA LGHBRIOUENCLOSED 13.02.2020

HEC COMMISSIONING JEASON ASUNCION S.H CHO CLOSED 29.02.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 18.02.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 26.02.2020

RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN CLOSED 16.02.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CANCELLED19.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 16.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 16.02.2020

HEC COMMISSIONING JAN RIGOR J.H MFUNG CLOSED 15.02.2020

HEC COMMISSIONING JAN RIGOR SIDALI. B CLOSED 15.02.2020

HEC COMMISSIONING JAN RIGOR SIDALI. B CLOSED 15.02.2020

HEC COMMISSIONING CEMIL KAYA SIDALI. B CLOSED 15.02.2020

HEC COMMISSIONING AJAY SIDALI. B CLOSED 15.02.2020


RANAFORT COMMISSIONING SERIDJ. M SIDALI. B CLOSED 16.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 19.02.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 15.02.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 15.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 16.02.2020

HEC COMMISSIONING DH. KIM E. WS CLOSED 11.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 15.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 15.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 15.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 15.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 15.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG LOSS 18.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 15.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 15.02.2020

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CLOSED 16.02.2020


ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CLOSED 16.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 16.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 16.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 16.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 16.02.2020

ETTERKIB COMMISSIONING OULHACI. B K.K JUNG CLOSED 18.02.2020

ETTERKIB COMMISSIONING OULHACI. B J.H MFUNG CLOSED 18.02.2020

ETTERKIB COMMISSIONING OULHACI. B J.H MFUNG CLOSED 18.02.2020

ETTERKIB COMMISSIONING OULHACI. B J.H MFUNG CLOSED 18.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 15.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 15.02.2020

HEC COMMISSIONING SIDALI. B SIDALI. B

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 13.02.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 13.02.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 16.02.2020


HEC COMMISSIONING H.S KIM MESSAOUD. KESBIA CLOSED 15.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 15.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 15.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 15.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 15.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 18.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 16.02.2020

HEC COMMISSIONING JEASON ASUNCION S.H CHO CLOSED 16.02.2020

HEC COMMISSIONING JEASON ASUNCION S.H CHO CLOSED 16.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 15.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 15.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 15.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 15.02.2020

HEC COMMISSIONING JUNG JUNG CLOSED 17.02.2020

ETTERKIB COMMISSIONING M. DAKICHE K.K JUNG CLOSED 15.02.2020


HEC COMMISSIONING MR. LEE CHOI. HS

HEC COMMISSIONING MR. LEE CHOI. HS

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 15.02.2020

HEC COMMISSIONING DENHIS C AGDAN MESSAOUD. KESBIA CLOSED 10.02.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 16.02.2020

HEC COMMISSIONING JAN RIGOR MESSAOUD. KESBIA CLOSED 18.02.2020

HEC COMMISSIONING CEMIL KAYA SIDALI. B CLOSED 17.02.2020

HEC COMMISSIONING R. ALFARO MASSINISSA LGHBRIOUENCLOSED 18.02.2020

HEC COMMISSIONING R. ALFARO MASSINISSA LGHBRIOUENCLOSED 18.02.2020

HEC COMMISSIONING R. ALFARO MASSINISSA LGHBRIOUENCLOSED 18.02.2020

HEC COMMISSIONING R. ALFARO MASSINISSA LGHBRIOUENCLOSED 18.02.2020

HEC COMMISSIONING R. ALFARO MASSINISSA LGHBRIOUENCLOSED 18.02.2020

HEC COMMISSIONING ZUBAIR AHMAD HAMZA. B CLOSED 18.02.2020

HEC COMMISSIONING ZUBAIR AHMAD HAMZA. B CLOSED 18.02.2020

HEC COMMISSIONING ZUBAIR AHMAD HAMZA. B CLOSED 18.02.2020


HEC COMMISSIONING ZEYA ALAM HAMZA. B CLOSED 18.02.2020

HEC COMMISSIONING ZEYA ALAM HAMZA. B CLOSED 18.02.2020

HEC COMMISSIONING ZEYA ALAM HAMZA. B CLOSED 18.02.2020

HEC COMMISSIONING ZEYA ALAM HAMZA. B CLOSED 18.02.2020

HEC COMMISSIONING ZEYA ALAM HAMZA. B CLOSED 18.02.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 20.02.2020

HEC COMMISSIONING DH. KIM LEE G J CLOSED 13.02.2020

HEC COMMISSIONING H.S KIM ZEKAD. A CLOSED 10.02.2020

HEC COMMISSIONING H.S KIM ZEKAD. A CLOSED 18.02.2020

HEC COMMISSIONING ZUBAIR AHMAD KH. JUNG CLOSED 16.02.2020

HEC COMMISSIONING ALAM. B KH. JUNG CLOSED 17.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 17.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 18.02.2020

HEC COMMISSIONING ALAM. B KH. JUNG CLOSED 17.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 17.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 15.02.2020


HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 15.02.2020

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG CLOSED 15.02.2020

HEC COMMISSIONING ARNOLD CAJILIG K.K JUNG CLOSED 19.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 18.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 15.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 19.03.2020

HEC COMMISSIONING GAVINO MASSINISSA LGHBRIOUENCLOSED 26.02.2020

HEC COMMISSIONING GAVINO Y.J JEONG CLOSED 19.02.2020

HEC COMMISSIONING TL. KIM MESSAOUD. KESBIA CLOSED 20.02.2020

HEC COMMISSIONING DENHIS C AGDAN KH. JUNG CLOSED 16.02.2020

HEEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 16.02.2020

HEC COMMISSIONING JUNG KH. JUNG CLOSED 15.02.2020

HEC COMMISSIONING JUNG KH. JUNG CLOSED 19.02.2020

HEC COMMISSIONING GAVINO HAMZA. B CLOSED 19.03.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 18.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 23.02.2020


ETTERKIB COMMISSIONING A. REMITA KH. JUNG

ETTERKIB COMMISSIONING A. REMITA KH. JUNG

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 18.02.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 19.02.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 11.03.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG

HEC COMMISSIONING MR. YASSINE KH. JUNG

IRMA COMMISSIONING AFAKI KH. JUNG CLOSED 22.02.2020

HEC COMMISSIONING DH. KIM SIDALI. B CLOSED 12.02.2020

HEC COMMISSIONING DH. KIM E. WS CLOSED 17.02.2020

HEC COMMISSIONING CEMIL KAYA SIDALI. B CLOSED 20.02.2020

ETTERKIB COMMISSIONING ROUIBI TAREK KH. JUNG

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 19.02.2020

HEC COMMISSIONING E. WS E. WS CLOSED 19.02.2020

HEC COMMISSIONING E. WS E. WS CLOSED 12.02.2020

HEC COMMISSIONING MG. BAE J.H MFUNG CLOSED 15.02.2020


HEC COMMISSIONING MR.CHOI Y.J JEONG CLOSED 26.02.2020

HEC COMMISSIONING MR.CHOI Y.J JEONG CLOSED 26.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 22.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 22.02.2020

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG CLOSED 24.02.2020

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG CLOSED 24.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG CLOSED 24.02.2020

ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 24.02.2020

ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 24.02.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG CLOSED 24.02.2020

ETTERKIB COMMISSIONING BOUDADI KH. JUNG CLOSED 22.02.2020

ETTERKIB COMMISSIONING BOUDADI KH. JUNG CLOSED 22.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 23.02.2020


HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING TL. KIM KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 15.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 22.02.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 24.02.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 24.02.2020

HEC COMMISSIONING AJAY J.H MFUNG


IRMA COMMISSIONING AFAKI KH. JUNG CLOSED 22.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KH. JUNG CLOSED 16.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 26.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 26.02.2020

HEC COMMISSIONING H.S KIM H.S KIM CLOSED 26.02.2020

HEC COMMISSIONING H.S KIM H.S KIM CLOSED 26.02.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 23.02.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 23.02.2020

HEC COMMISSIONING K.K JUNG CHOI. HS CLOSED 20.02.2020

HEC COMMISSIONING K.K JUNG CHOI. HS CLOSED 20.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 22.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 17.02.2020

HEC COMMISSIONING YOON. BH LEE G J CLOSED 20.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG

GE COMMISSIONING ZEKAD. A ZEKAD. A CLOSED 12.03.2020

GE COMMISSIONING ZEKAD. A ZEKAD. A CLOSED 12.03.2020


GE COMMISSIONING MASSINISSA LGHBRIOUEMASSINISSA LGHBRIOUENCLOSED 12.03.2020

GE COMMISSIONING HAMZA. B HAMZA. B CLOSED 12.03.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 22.02.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 26.02.2020

RANAFORT COMMISSIONING LABIOD. I S.H CHO CLOSED 25.02.2020

RANAFORT COMMISSIONING SERIDJ. M S.H CHO CLOSED 25.02.2020

RANAFORT COMMISSIONING SERIDJ. M S.H CHO CLOSED 25.02.2020

RANAFORT COMMISSIONING SERIDJ. M S.H CHO CLOSED 25.02.2020

RANAFORT COMMISSIONING SERIDJ. M S.H CHO CLOSED 25.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 25.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 25.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 25.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 25.02.2020

HEC COMMISSIONING MG. BAE J.H MFUNG CLOSED 23.02.2020

HEC COMMISSIONING CEMIL KAYA ARAFA. T CLOSED 22.02.2020

HEC COMMISSIONING JAN RIGOR ARAFA. T CLOSED 22.02.2020

HEC COMMISSIONING JH. KIM SIDALI. B CLOSED 17.02.2020


ETTERKIB COMMISSIONING ATTOUI. R KH. JUNG CLOSED 23.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KH. JUNG CLOSED 18.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING GAVINO Y.J JEONG CLOSED 19.02.2020

HEC COMMISSIONING GAVINO Y.J JEONG

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 22.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 22.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 23.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 16.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KH. JUNG CLOSED 23.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KH. JUNG CLOSED 23.02.2020

ETTERKIB COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 22.02.2020

ETTERKIB COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 22.02.2020

ETTERKIB COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 22.02.2020

ETTERKIB COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 22.02.2020


ETTERKIB COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 22.02.2020

ETTERKIB COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 22.02.2020

ETTERKIB COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 22.02.2020

HEC COMMISSIONING ARNOLD CAJILIG K.K JUNG CLOSED 22.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 23.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 23.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 23.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 22.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 23.02.2020

GE COMMISSIONING MASSINISSA LGHBRIOUEMASSINISSA LGHBRIOUENCLOSED 12.03.2020

HEC COMMISSIONING B.C KIM KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING E. WS JH. KIM CLOSED 25.02.2020

RANAFORT COMMISSIONING SOMAR. S KIM SUNG JIN CLOSED 25.02.2020

RANAFORT COMMISSIONING SOMAR. S KIM SUNG JIN CLOSED 25.02.2020


RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 25.02.2020

HEC COMMISSIONING T.L Kim K.K JUNG CLOSED 20.02.2020

HEC COMMISSIONING Y.S KIM SIDALI. B CLOSED 25.02.2020

HEC COMMISSIONING GAVINO Y.J JEONG CLOSED 26.02.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 26.02.2020

HEC COMMISSIONING SANSEEN CATIPAY K.H KIM CLOSED 24.02.2020

HEC COMMISSIONING JH. KIM SIDALI. B CLOSED 17.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING E. WS MASSINISSA LGHBRIOUENCLOSED 17.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 23.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 22.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 24.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 24.02.2020

HEC COMMISSIONING H.S KIM ZEKAD. A CLOSED 24.02.2020

HEC COMMISSIONING JAN RIGOR ARAFA. T CLOSED 24.02.2020


RANAFORT COMMISSIONING SERIDJ. M S.H CHO CANCELLED25.02.2020

HEC COMMISSIONING DH. KIM E. WS CLOSED 22.02.2020

HEC COMMISSIONING DENHIS C AGDAN KH. JUNG CLOSED 18.02.2020

HEC COMMISSIONING CEMIL KAYA ARAFA. T CLOSED 18.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 24.02.2020

HEC COMMISSIONING JAN RIGOR ARAFA. T CLOSED 24.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING TL. KIM KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING TL. KIM KH. JUNG CLOSED 02.03.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING E. WS E. WS CLOSED 24.02.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 23.02.2020

ETTERKIB COMMISSIONING A. REMITA MASSINISSA LGHBRIOUENCLOSED 22.02.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 22.02.2020


HEC COMMISSIONING JAN RIGOR ZEKAD. A

HEC COMMISSIONING TL. KIM ZEKAD. A CLOSED 24.02.2020

HEC COMMISSIONING TL. KIM ZEKAD. A CLOSED 24.02.2020

HEC COMMISSIONING R. ABREA KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING CEMIL KAYA SIDALI. B CLOSED 26.02.2020

HEC COMMISSIONING YOUCE MESSAI LEE G J CLOSED 20.02.2020

HEC COMMISSIONING DH. KIM E. WS CLOSED 24.02.2020

HEC COMMISSIONING R. ALFARO KH. JUNG CLOSED 01.03.2020

RANAFORT COMMISSIONING SERIDJ. M ARAFA. T

ETTERKIB COMMISSIONING ATTOUI. R KH. JUNG CLOSED 20.02.2020

ETTERKIB COMMISSIONING ATTOUI. R KH. JUNG CLOSED 08.03.2020

ETTERKIB COMMISSIONING ATTOUI. R MASSINISSA LGHBRIOUENCLOSED 08.03.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 18.02.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 20.02.2020

HEC COMMISSIONING JAN RIGOR SIDALI. B CLOSED 25.02.2020


HEC COMMISSIONING JAN RIGOR SIDALI. B CLOSED 25.02.2020

HEC COMMISSIONING YOUCE MESSAI LEE G J CLOSED 29.02.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 27.02.2020

ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 24.02.2020

HEC COMMISSIONING M.G CHEON ZEKAD. A CLOSED 23.02.2020

HEC COMMISSIONING M.G CHEON ZEKAD. A CLOSED 20.02.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 20.02.2020

HEC COMMISSIONING R. ALFARO KANG CLOSED 16.03.2020

HEC COMMISSIONING TL. KIM KH. JUNG CLOSED 09.03.2020

HEC COMMISSIONING TL. KIM KH. JUNG CLOSED 02.03.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 26.02.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 22.02.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 22.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 26.02.2020

HEC COMMISSIONING DH. KIM SIDALI. B CLOSED 24.02.2020

ETTERKIB COMMISSIONING OULHACI. B J.H MFUNG CANCELLED23.02.2020

HEC COMMISSIONING CEMIL KAYA J.H MFUNG


HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING GAVINO MASSINISSA LGHBRIOUENCLOSED 26.02.2020

HEC COMMISSIONING GAVINO MASSINISSA LGHBRIOUENCLOSED 04.03.2020

ETTERKIB COMMISSIONING ATTOUI. R KH. JUNG CLOSED 04.03.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 27.02.2020

HEC COMMISSIONING E. WS E. WS CLOSED 01.03.2020

ETTERKIB COMMISSIONING ROUIBI TAREK KH. JUNG CLOSED 02.03.2020

ETTERKIB COMMISSIONING ROUIBI TAREK KH. JUNG CLOSED 03.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 01.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 01.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 01.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 01.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 01.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 01.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 01.03.2020

HEC COMMISSIONING MR. CHOI KIM JUN JL CLOSED 04.03.2020


HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 04.03.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 01.03.2020

hec COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 12.03.2020

HEC COMMISSIONING TL. KIM KH. JUNG CLOSED 02.03.2020

HEC COMMISSIONING TL. KIM KH. JUNG CLOSED 02.03.2020

GE COMMISSIONING MASSINISSA LGHBRIOUEMASSINISSA LGHBRIOUENCLOSED 12.03.2020

GE COMMISSIONING HAMZA. B HAMZA. B CLOSED 12.03.2020

GE COMMISSIONING ZEKAD. A ZEKAD. A CLOSED 12.03.2020

GE COMMISSIONING ZEKAD. A ZEKAD. A CLOSED 12.03.2020

GE COMMISSIONING MASSINISSA LGHBRIOUEMASSINISSA LGHBRIOUENCLOSED 12.03.2020

ETTERKIB COMMISSIONING BELBACHA. L KH. JUNG CLOSED 01.03.2020

ETTERKIB COMMISSIONING BELBACHA. L KH. JUNG CLOSED 01.03.2020

ETTERKIB COMMISSIONING BELBACHA. L KH. JUNG CLOSED 01.03.2020

HEC COMMISSIONING B.C KIM KH. JUNG CLOSED 07.03.2020


HEC COMMISSIONING B.C KIM KH. JUNG CLOSED 07.03.2020

HEC COMMISSIONING JUNG MALEK BELKHIR CLOSED 23.02.2020

HEC COMMISSIONING JUNG KANG CANCELLED20.02.2020

HEC COMMISSIONING JAN RIGOR ARAFA. T CLOSED 27.02.2020

HEC COMMISSIONING YOUCE MESSAI ARAFA. T CLOSED 29.02.2020

ETTERKIB COMMISSIONING A. REMITA KANG CANCELLED20.02.2020

HEC COMMISSIONING JEASON ASUNCION CHOI. HS CANCELLED23.02.2020

HEC COMMISSIONING JEASON ASUNCION CHOI. HS CLOSED 29.02.2020

HEC COMMISSIONING TW. HEO CHOI. HS CANCELLED23.02.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 29.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 01.03.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 02.03.2020

HEC COMMISSIONING MG. BAE J.H MFUNG CLOSED 01.03.2020

ETTERKIB COMMISSIONING ATTAR. A KH. JUNG CLOSED 08.03.2020


ETTERKIB COMMISSIONING ATTAR. A KH. JUNG CLOSED 23.02.2020

ETTERKIB COMMISSIONING ATTAR. A KH. JUNG CLOSED 08.03.2020

HEC COMMISSIONING GAVINO HAMZA. B CLOSED 04.03.2020

HEC COMMISSIONING GAVINO HAMZA. B CLOSED 04.03.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 29.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 29.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 29.02.2020

RANAFORT COMMISSIONING LABIOD. I CHOI. HS CLOSED 02.03.2020

RANAFORT COMMISSIONING LABIOD. I CHOI. HS CLOSED 02.03.2020

HEC COMMISSIONING MR. CHOI KIM JUN JL CLOSED 11.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 29.02.2020

HEC COMMISSIONING TL. KIM KH. JUNG CLOSED 23.02.2020

ETTERKIB COMMISSIONING CHIBOUT. S KH. JUNG CLOSED 29.02.2020

ETTERKIB COMMISSIONING CHIBOUT. S KH. JUNG CLOSED 29.02.2020


HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 23.02.2020

HEC COMMISSIONING ZUBAIR AHMAD ZEKAD. A CLOSED 29.02.2020

HEC COMMISSIONING ZUBAIR AHMAD ARAFA. T CLOSED 27.02.2020

HEC COMMISSIONING ZUBAIR AHMAD KH. JUNG CANCELLED01.03.2020

HEC COMMISSIONING R. ALFARO ZEKAD. A CLOSED 01.03.2020

HEC COMMISSIONING R. ALFARO KANG CLOSED 01.03.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 27.02.2020

HEC COMMISSIONING Y.S KIM Y.J JEONG CLOSED 26.03.2020

HEC COMMISSIONING B.C KIM KANG CLOSED 25.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 29.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CANCELLED29.02.2020

RANAFORT COMMISSIONING SERIDJ. M KO CANCELLED29.02.2020

HEC COMMISSIONING JH. KIM SIDALI. B CLOSED 27.02.2020

HEC COMMISSIONING JH. KIM SIDALI. B CLOSED 02.03.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 29.02.2020


HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 01.03.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 29.02.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 01.03.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 01.03.2021

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 01.03.2022

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 01.03.2020

HEC COMMISSIONING J.S SIM KANG CLOSED 07.03.2020

HEC COMMISSIONING J.S SIM KANG CLOSED 07.03.2020

HEC COMMISSIONING YOON. BH LEE G J CLOSED 29.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 27.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 27.02.2020

HEC COMMISSIONING E. WS ARAFA. T CLOSED 29.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 29.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 29.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 29.02.2020


HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 29.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 29.02.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 29.02.2020

IRMA COMMISSIONING AFAKI KH. JUNG CLOSED 01.03.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 02.03.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 29.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 01.03.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 01.03.2020

HEC COMMISSIONING SANSEEN CATIPAY KANG CLOSED 04.03.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 24.02.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 01.03.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 01.03.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 01.03.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 01.03.2020


HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 01.03.2020

ETTERKIB COMMISSIONING T. HENDA J.H MFUNG CLOSED 01.03.2020

ETTERKIB COMMISSIONING KANOUN. M KH. JUNG CLOSED 01.03.2020

HEC COMMISSIONING H.S KIM KANG

HEC COMMISSIONING ZEYA ALAM MASSINISSA LGHBRIOUENCLOSED 01.03.2020

HEC COMMISSIONING CEMIL KAYA ZEKAD. A CLOSED 02.03.2020

HEC COMMISSIONING TW. HEO ARAFA. T

HEC COMMISSIONING JEASON ASUNCION S.H CHO CLOSED 01.03.2020

HEC COMMISSIONING HAROUN J.H MFUNG CLOSED 01.03.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 04.03.2020

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG CLOSED 19.03.2020

ETTERKIB COMMISSIONING ATTAR. A KH. JUNG CLOSED 08.03.2020

HEC COMMISSIONING DENHIS C AGDAN ZEKAD. A CLOSED 26.02.2020

HEC COMMISSIONING B.C KIM KANG CLOSED 29.02.2020

ETTERKIB COMMISSIONING KANOUN. M KH. JUNG CLOSED 01.03.2020


HEC COMMISSIONING B.C KIM KANG CLOSED 02.03.2020

HEC COMMISSIONING PARK JUNG HO S. W KIM

GE COMMISSIONING ZEKAD. A ZEKAD. A CLOSED 12.03.2020

HEC COMMISSIONING MG. BAE J.H MFUNG CLOSED 01.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 02.03.2020

ETTERKIB COMMISSIONING KANOUN. M KH. JUNG CLOSED 01.03.2020

ETTERKIB COMMISSIONING KANOUN. M KANG

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 24.02.2020

HEC COMMISSIONING M. LOTFI KH. JUNG CLOSED 15.03.2020

HEC COMMISSIONING JH. KIM ARAFA. T CLOSED 26.02.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 02.03.2020

HEC COMMISSIONING JERIMIE ATIENZA CHOI. HS CLOSED 26.02.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 29.02.2020

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CLOSED 29.02.2020


ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CANCELLED25.02.200

HEC COMMISSIONING DH. KIM ARAFA. T

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 25.02.2020

HEC COMMISSIONING YOON. BH LEE G J CLOSED 03.03.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 24.02.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 03.03.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 01.03.2020

HEC COMMISSIONING TL. KIM H.S KIM CLOSED 09.03.2020

HEC COMMISSIONING TL. KIM ZEKAD. A CANCELLED27.02.2020

HEC COMMISSIONING TL. KIM ZEKAD. A CANCELLED27.02.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 09.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 01.03.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 01.03.2020

HEC COMMISSIONING JAN RIGOR ARAFA. T CLOSED 03.03.2020


HEC COMMISSIONING JAN RIGOR ARAFA. T CLOSED 03.03.2020

HEC COMMISSIONING R. ALFARO KH. JUNG CLOSED 01.03.2020

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CLOSED 29.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 25.02.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 12.03.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 07.03.2020

HEC COMMISSIONING JERIMIE ATIENZA ARAFA. T CLOSED 26.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 26.02.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 09.03.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 01.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 05.03.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 03.03.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 27.02.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 27.02.2020


HEC COMMISSIONING JH. KIM JH. KIM CLOSED 27.02.2020

HEC COMMISSIONING ZEYA ALAM KANG CLOSED 09.03.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 02.03.2020

HEC COMMISSIONING R. ALFARO KH. JUNG CLOSED 03.03.2020

RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN CLOSED 07.03.2020

HEC COMMISSIONING DENHIS C AGDAN KH. JUNG CLOSED 05.03.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 17.03.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 145.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 04.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 07.03.2020

ETTERKIB COMMISSIONING ROUIBI TAREK KANG CLOSED 09.03.2020

HEC COMMISSIONING TW. HEO CHOI. HS

HEC COMMISSIONING MR. CHOI KIM JUN JL CLOSED 11.03.2020

HEC COMMISSIONING GAVINO KIM JUN JL CLOSED 11.03.2020

ETTERKIB COMMISSIONING BOUCHAALA.H KANG CLOSED 11.03.2020


ETTERKIB COMMISSIONING ROUIBI TAREK KANG CLOSED 09.03.2020

HEC COMMISSIONING AJAY ARAFA. T CLOSED 09.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 01.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 18.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 10.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 08.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 08.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 09.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 09.03.2020

HEC COMMISSIONING JEASON ASUNCION CHOI. HS CLOSED 05.03.2020

ETTERKIB COMMISSIONING AFAKI KH. JUNG CLOSED 07.03.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 12.03.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 12.03.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 12.03.2020


HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 12.03.2020

HEC COMMISSIONING R. ALFARO ARAFA. T CLOSED 02.03.2020

HEC COMMISSIONING DH. KIM LEE G J CLOSED 04.03.2020

HEC COMMISSIONING DENHIS C AGDAN KH. JUNG CLOSED 05.03.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 05.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 05.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 07.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 07.03.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 07.03.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 07.03.2020

RANAFORT COMMISSIONING SERIDJ. M KO CLOSED 07.03.2020

RANAFORT COMMISSIONING LABIOD. I CHOI. HS CLOSED 07.03.2020

RANAFORT COMMISSIONING LABIOD. I CHOI. HS CLOSED 07.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 08.03.2020


GE COMMISSIONING ZEKAD. A ZEKAD. A CLOSED 12.03.2020

GE COMMISSIONING ZEKAD. A ZEKAD. A CLOSED 12.03.2020

GE COMMISSIONING MASSINISSA LGHBRIOUEMASSINISSA LGHBRIOUENCLOSED 12.03.2020

GE COMMISSIONING MALEK BELKHIR MALEK BELKHIR CLOSED 12.03.2020

GE COMMISSIONING ZEKAD. A ZEKAD. A CLOSED 12.03.2020

GE COMMISSIONING MASSINISSA LGHBRIOUEMASSINISSA LGHBRIOUENCLOSED 12.03.2020

ETTERKIB COMMISSIONING KANOUN. M KH. JUNG CLOSED 07.03.2020

ETTERKIB COMMISSIONING KANOUN. M KH. JUNG CLOSED 07.03.2020

ETTERKIB COMMISSIONING KANOUN. M KH. JUNG CLOSED 07.03.2020

ETTERKIB COMMISSIONING AFAKI KANG CLOSED 07.03.2020

ETTERKIB COMMISSIONING CHIBOUT. S KH. JUNG CLOSED 07.03.2020

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG CLOSED 07.03.2020

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG CLOSED 07.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 07.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 07.03.2020


ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 07.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 07.03.2020

HEC COMMISSIONING RIMA J.H MFUNG CLOSED 19.03.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 18.03.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 07.03.2020

HEC COMMISSIONING GAVINO Y.J JEONG CLOSED 11.03.2020

RANAFORT COMMISSIONING LABIOD. I ARAFA. T

RANAFORT COMMISSIONING AHMED. GH KO CANCELLED01.03.2020

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CLOSED 07.03.2020

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CLOSED 07.03.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG CLOSED 07.03.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 07.03.2020

HEC COMMISSIONING CEMIL KAYA J.H MFUNG CLOSED 07.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 07.03.2020


HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 11.03.2020

HEC COMMISSIONING YOUCE MESSAI ARAFA. T CLOSED 12.03.2020

HEC COMMISSIONING JH. KIM ARAFA. T CLOSED 07.03.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 07.03.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 07.03.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 07.03.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 07.03.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 07.03.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 07.03.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 07.03.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 07.03.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 07.03.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 07.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 15.03.2020


HEC COMMISSIONING JH. KIM JH. KIM CLOSED 09.03.2020

HEC COMMISSIONING ZUBAIR AHMAD ZEKAD. A CLOSED 01.03.2020

HEC COMMISSIONING JH. KIM ARAFA. T

HEC COMMISSIONING MG. BAE J.H MFUNG

ETTERKIB COMMISSIONING ATTAR. A KANG CLOSED 07.03.2020

HEC COMMISSIONING H.S KIM KANG CANCELLED07.03.2020

HEC COMMISSIONING H.S KIM KANG CANCELLED07.03.2020

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CLOSED 07.03.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 07.03.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 11.03.2020

HEC COMMISSIONING M.M ALEE KH. JUNG CLOSED 04.03.2020

HEC COMMISSIONING JH. KIM ARAFA. T CLOSED 05.03.2020

HEC COMMISSIONING JEASON ASUNCION CHOI. HS CLOSED 08.03.2020

HEC COMMISSIONING TW. HEO ARAFA. T CLOSED 07.03.2020

HEC COMMISSIONING TW. HEO ARAFA. T CANCELLED07.03.2020


HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 02.03.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 12.03.2020

HEC COMMISSIONING CEMIL KAYA ZEKAD. A CLOSED 02.03.2020

RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN CLOSED 10.03.2020

RANAFORT COMMISSIONING AHMED. GH KO CLOSED 11.03.2020

RANAFORT COMMISSIONING AHMED. GH KO CLOSED 07.03.2020

HEC COMMISSIONING TL. KIM KH. JUNG CLOSED 09.03.2020

ETTERKIB COMMISSIONING OULHACI. B J.H MFUNG

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 11.03.2020

ETTERKIB COMMISSIONING OULHACI. B K.K JUNG

HEC COMMISSIONING B. YASSIN KANG

HEC COMMISSIONING RANDY PAULO ARAFA. T CLOSED 04.03.2020

HEC COMMISSIONING ZEYA ALAM MALEK BELKHIR CLOSED 09.03.2020

HEC COMMISSIONING ZEYA ALAM MALEK BELKHIR CLOSED 09.03.2020

HEC COMMISSIONING C. RAJIGANDHI KANG CLOSED 14.03.2020


HEC COMMISSIONING TL. KIM KANG CLOSED 14.03.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 03.03.2020

HEC COMMISSIONING DH. KIM E. WS CLOSED 08.03.2020

HEC COMMISSIONING M.M ALEE KH. JUNG CLOSED 09.03.2020

RANAFORT COMMISSIONING AHMED. GH CHOI. HS CLOSED 07.03.2020

RANAFORT COMMISSIONING AHMED. GH KO CLOSED 07.03.2020

HEC COMMISSIONING RYAN EVARISTO CHOI. HS CLOSED 09.03.2020

HEC COMMISSIONING RYAN EVARISTO CHOI. HS CLOSED 09.03.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 11.03.2020

HEC COMMISSIONING H.S KIM KH. JUNG CLOSED 12.03.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 08.03.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 11.03.2020

HEC COMMISSIONING Y.S KIM MASSINISSA LGHBRIOUENCLOSED 11.03.2020

HEC COMMISSIONING R. ALFARO KH. JUNG CLOSED 16.03.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 09.03.2020


HEC COMMISSIONING R. ALFARO KH. JUNG CLOSED 07.03.2020

HEC COMMISSIONING DENHIS C AGDAN KH. JUNG CLOSED 11.03.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 10.03.2020

HEC COMMISSIONING CEMIL KAYA J.H MFUNG CLOSED 07.03.2020

IRMA COMMISSIONING AFAKI KH. JUNG CLOSED 21.03.2020

HEC COMMISSIONING RYAN EVARISTO CHOI. HS CLOSED 08.03.2020

HEC COMMISSIONING AMAR KANG CLOSED 08.03.2020

HEC COMMISSIONING J.S SEO J.S SEO CLOSED 10.03.2020

HEC COMMISSIONING TL. KIM KH. JUNG CLOSED 14.03.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 05.03.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 11.03.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 11.03.2020

IRMA COMMISSIONING AFAKI KH. JUNG CLOSED 21.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KANG CLOSED 15.03.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG

IRMA COMMISSIONING AFAKI KH. JUNG CLOSED 21.03.2020


IRMA COMMISSIONING AFAKI KH. JUNG CLOSED 21.03.2020

HEC COMMISSIONING JANG YOUNG TAE KH. JUNG CLOSED 07.03.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 07.03.2020

HEC COMMISSIONING R. ALFARO MESSAOUD. KESBIA CLOSED 04.03.2020

HEC COMMISSIONING DH. KIM LEE G J CLOSED 08.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KANG CLOSED 15.03.2020

ETTERKIB COMMISSIONING W. BELHAJ KANG CLOSED 15.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KANG CLOSED 15.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KANG CLOSED 15.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KANG CLOSED 15.03.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 15.03.2020

ETTERKIB COMMISSIONING ROUIBI TAREK KH. JUNG CLOSED 11.03.2020

ETTERKIB COMMISSIONING ROUIBI TAREK KH. JUNG CLOSED 15.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 12.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 15.03.2020

HEC COMMISSIONING TL. KIM KH. JUNG CLOSED 09.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 18.03.2020


HEC COMMISSIONING H.S KIM KANG CLOSED 14.03.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 14.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 14.03.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 14.03.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 14.03.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 08.03.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 14.03.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 09.03.2020

HEC COMMISSIONING DH. KIM JH. KIM CLOSED 12.03.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 15.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 18.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 18.03.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 07.03.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 07.03.2020

HEC COMMISSIONING JEASON ASUNCION CHOI. HS

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CANCELLED17.03.2020

HEC COMMISSIONING MG. BAE J.H MFUNG


ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 07.03.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 11.03.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 12.03.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 19.03.2020

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CLOSED 15.03.2020

RANAFORT COMMISSIONING AHMED. GH KO CLOSED 14.03.2020

RANAFORT COMMISSIONING AHMED. GH KO CLOSED 14.03.2020

RANAFORT COMMISSIONING SOMAR. S KIM SUNG JIN CLOSED 14.03.2020

RANAFORT COMMISSIONING AHMED. GH KO CLOSED 14.03.2020

RANAFORT COMMISSIONING AHMED. GH KO CLOSED 14.03.2020

RANAFORT COMMISSIONING AHMED. GH KO CLOSED 14.03.2020

RANAFORT COMMISSIONING LABIOD. I CHOI. HS CLOSED 14.03.2020

RANAFORT COMMISSIONING LABIOD. I CHOI. HS CLOSED 14.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 14.03.2020


HEC COMMISSIONING ARNOLD CAJILIG K.K JUNG CLOSED 14.03.2020

HEC COMMISSIONING ARNOLD CAJILIG K.K JUNG CLOSED 15.03.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 15.03.2020

HEC COMMISSIONING TW. HEO ARAFA. T CLOSED 19.03.2020

HEC COMMISSIONING CHIBOUT. S J.H MFUNG

HEC COMMISSIONING R. ABREA KH. JUNG CLOSED 14.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 14.03.2020

HEC COMMISSIONING CEMIL KAYA J.H MFUNG CLOSED 14.03.2020

RANAFORT COMMISSIONING SERIDJ. M CHOI. HS CLOSED 14.03.2020

HEC COMMISSIONING MR. KIM Y.J JEONG CLOSED 19.03.2020

HEC COMMISSIONING MR. KIM Y.J JEONG CLOSED 19.03.2020

HEC COMMISSIONING DENHIS C AGDAN KH. JUNG CLOSED 04.05.2020

HEC COMMISSIONING DENHIS C AGDAN KH. JUNG CLOSED 04.05.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 14.03.2020


ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 14.03.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 14.03.2020

HEC COMMISSIONING WAHEB KH. JUNG CLOSED 14.03.2020

HEC COMMISSIONING WAHEB KH. JUNG CLOSED 14.03.2020

HEC COMMISSIONING WAHEB KH. JUNG CLOSED 14.03.2020

HEC COMMISSIONING WAHEB KH. JUNG CLOSED 14.03.2020

HEC COMMISSIONING WAHEB KH. JUNG CLOSED 14.03.2020

HEC COMMISSIONING WAHEB KH. JUNG CLOSED 14.03.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 09.03.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 14.03.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 14.03.2020

GE COMMISSIONING MASSINISSA LGHBRIOUEMASSINISSA LGHBRIOUEN

GE COMMISSIONING MASSINISSA LGHBRIOUEMASSINISSA LGHBRIOUEN

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 09.03.2020

IRMA COMMISSIONING AFAKI KH. JUNG CLOSED 21.03.2020


GE COMMISSIONING ZEKAD. A ZEKAD. A

GE COMMISSIONING ZEKAD. A ZEKAD. A

HEC COMMISSIONING H.S KIM KANG CLOSED 14.03.2020

ETTERKIB COMMISSIONING A. REMITA KANG

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 14.03.2020

ETTERKIB COMMISSIONING CHIBOUT. S KH. JUNG CLOSED 15.03.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CLOSED 15.03.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 19.03.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 19.03.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 19.03.2020

HEC COMMISSIONING JEASON ASUNCION CHOI. HS CLOSED 15.03.2020

HEC COMMISSIONING TW. HEO ARAFA. T CLOSED 14.03.2020

HEC COMMISSIONING TW. HEO ARAFA. T CLOSED 11.03.2020

HEC COMMISSIONING JEASON ASUNCION CHOI. HS CLOSED 15.03.2020


ETTERKIB COMMISSIONING A. REMITA KANG

HEC COMMISSIONING M.G CHEON KANG CLOSED 14.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 14.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 14.03.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 14.03.2020

HEC COMMISSIONING JH. KIM SIDALI. B CLOSED 11.03.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 14.03.2020

GE COMMISSIONING MALEK BELKHIR MALEK BELKHIR

GE COMMISSIONING ZEKAD. A ZEKAD. A

HEC COMMISSIONING H.S KIM KANG CLOSED 18.03.2020

HEC COMMISSIONING M.G CHEON MESSAOUD. KESBIA CLOSED 16.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 15.03.2020

HEC COMMISSIONING DENHIS C AGDAN KH. JUNG

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 11.03.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG


ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 14.03.2020

ETTERKIB COMMISSIONING ATTAR. A KH. JUNG CLOSED 11.03.2020

ETTERKIB COMMISSIONING ATTAR. A KH. JUNG CLOSED 10.03.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 12.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 16.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 15.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 16.03.2020

HEC COMMISSIONING H.S KIM MESSAOUD. KESBIA CLOSED 12.03.2020

ETTERKIB COMMISSIONING ATTAR. A KANG CLOSED 16.03.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 18.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 18.03.200

HEC COMMISSIONING H.S KIM KANG CLOSED 18.03.2020

HEC COMMISSIONING TW. HEO ARAFA. T CLOSED 18.03.2020

ETTERKIB COMMISSIONING ATTOUI. R KANG CLOSED 14.03.2020

HEC COMMISSIONING DH. KIM E. WS CLOSED 16.03.2020


HEC COMMISSIONING DH. KIM E. WS CLOSED 12.03.2020

HEC COMMISSIONING DH. KIM SIDALI. B CLOSED 12.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KH. JUNG CLOSED 15.03.2020

HEC COMMISSIONING R. ALFARO KH. JUNG CLOSED 30.03.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 18.03.2020

HEC COMMISSIONING JH. KIM ARAFA. T CLOSED

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 12.03.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 14.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 17.03.2020

HEC COMMISSIONING R. ALFARO KANG CLOSED 11.03.2020

HEC COMMISSIONING YOON. BH LEE G J CLOSED 16.03.2020

ETTERKIB COMMISSIONING ATTAR. A KANG CLOSED 14.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 18.03.2020

HEC COMMISSIONING R. ALFARO MESSAOUD. KESBIA CLOSED 11.03.2020


ETTERKIB COMMISSIONING ATTAR. A KANG CLOSED 14.03.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 15.03.2020

IRMA COMMISSIONING AFAKI KANG CLOSED 21.03.2020

HEC COMMISSIONING ALAM. B KANG CLOSED 12.03.2020

HEC COMMISSIONING DENHIS C AGDAN KANG CLOSED 15.03.2020

HEC COMMISSIONING YOON. BH LEE G J CANCELLED12.03.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 18.03.2020

HEC COMMISSIONING M.G CHEON KH. JUNG CLOSED 18.03.2020

HEC COMMISSIONING ARNOLD CAJILIG K.K JUNG CLOSED 18.03.2020

HEC COMMISSIONING RYAN EVARISTO CHOI. HS

HEC COMMISSIONING YOON. BH LEE G J CLOSED 17.03.2020

HEC COMMISSIONING J.S SEO JH. KIM CLOSED 17.03.2020

HEC COMMISSIONING RYAN EVARISTO CHOI. HS

HEC COMMISSIONING RYAN EVARISTO CHOI. HS

ETTERKIB COMMISSIONING M. DAKICHE KH. JUNG CLOSED 11.03.2020


HEC COMMISSIONING E. WS E. WS CLOSED 17.03.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG

ETTERKIB COMMISSIONING M. DAKICHE KH. JUNG CLOSED 11.03.2020

HEC COMMISSIONING E. WS E. WS CLOSED 17.03.2020

IRMA COMMISSIONING AFAKI KH. JUNG CLOSED 21.03.2020

IRMA COMMISSIONING AFAKI KH. JUNG CLOSED 21.03.2020

IRMA COMMISSIONING AFAKI KH. JUNG

IRMA COMMISSIONING AFAKI KH. JUNG CLOSED 21.03.2020

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG

HEC COMMISSIONING TL. KIM KANG CLOSED 18.03.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 18.03.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 19.03.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 14.03.2020


HEC COMMISSIONING JH. KIM JH. KIM CLOSED 12.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 18.03.2020

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 19.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 19.03.2020

ETTERKIB COMMISSIONING ATTAR. A KH. JUNG CLOSED 14.03.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN CLOSED 17.03.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING JANG YOUNG TAE KH. JUNG CLOSED 21.03.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 17.03.2020

ETTERKIB COMMISSIONING ROUIBI TAREK KANG

HEC COMMISSIONING H.S KIM KANG

HEC COMMISSIONING H.S KIM KANG CLOSED 22.03.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 21.03.2020

HEC COMMISSIONING H.S KIM KANG

HEC COMMISSIONING H.S KIM KANG


HEC COMMISSIONING H.S KIM KANG

HEC COMMISSIONING H.S KIM KANG

HEC COMMISSIONING H.S KIM KANG CLOSED 21.03.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG

ETTERKIB COMMISSIONING W. BELHAJ KH. JUNG

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG

RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN

RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 31.03.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 31.03.2020

ETTERKIB COMMISSIONING ATTAR. A KH. JUNG CLOSED 14.03.2020

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG


HEC COMMISSIONING R. ALFARO KANG CANCELLED18.03.2020

HEC COMMISSIONING R. ALFARO KANG CLOSED 18.03.2020

HEC COMMISSIONING R. ALFARO KANG CLOSED 18.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 21.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 21.03.2020

RANAFORT COMMISSIONING AHMED. GH KO

RANAFORT COMMISSIONING AHMED. GH KO

RANAFORT COMMISSIONING AHMED. GH KO

RANAFORT COMMISSIONING AHMED. GH KO

RANAFORT COMMISSIONING AHMED. GH KO

RANAFORT COMMISSIONING LABIOD. I CHOI. HS

RANAFORT COMMISSIONING LABIOD. I CHOI. HS


HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 19.03.2020

HEC COMMISSIONING H.S KIM KANG

HEC COMMISSIONING H.S KIM KANG

HEC COMMISSIONING H.S KIM KANG

HEC COMMISSIONING H.S KIM KANG CLOSED 09.04.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING RYAN EVARISTO CHOI. HS CLOSED 22.03.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 19.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 19.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 21.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 21.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 22.03.2020

HEC COMMISSIONING PARK DJ KH. JUNG CLOSED 19.03.2020


HEC COMMISSIONING SANSEEN CATIPAY KANG CLOSED 30.03.2020

GE COMMISSIONING MESSAOUD. KESBIA MESSAOUD. KESBIA

GE COMMISSIONING MESSAOUD. KESBIA MESSAOUD. KESBIA

GE COMMISSIONING MESSAOUD. KESBIA MESSAOUD. KESBIA

GE COMMISSIONING MALEK BELKHIR MALEK BELKHIR

GE COMMISSIONING HAMZA. B HAMZA. B

GE COMMISSIONING MALEK BELKHIR MALEK BELKHIR

HEC COMMISSIONING JANG YOUNG TAE KH. JUNG CLOSED 22.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KANG

HEC COMMISSIONING JEASON ASUNCION CHOI. HS

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 21.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 21.03.2020


HEC COMMISSIONING JAN RIGOR ARAFA. T CLOSED 21.03.2020

RANAFORT COMMISSIONING LABIOD. I CHOI. HS

RANAFORT COMMISSIONING LABIOD. I CHOI. HS

RANAFORT COMMISSIONING SERIDJ. M ARAFA. T

RANAFORT COMMISSIONING SERIDJ. M ARAFA. T

RANAFORT COMMISSIONING SERIDJ. M CHOI. HS

RANAFORT COMMISSIONING SOMAR. S CHOI. HS

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 16.03.2020

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 21.03.2020

HEC COMMISSIONING WAHEB KH. JUNG CLOSED 21.03.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 21.03.2020


HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 21.03.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 21.03.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 21.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 16.04.2020

ETTERKIB COMMISSIONING ATTAR. A KANG

ETTERKIB COMMISSIONING ATTAR. A KANG

ETTERKIB COMMISSIONING ATTAR. A KANG

ETTERKIB COMMISSIONING ATTAR. A KANG

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 21.03.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 22.03.2020

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CLOSED 21.03.2020

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CLOSED 21.03.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 21.03.2020

HEC COMMISSIONING E. WS E. WS CLOSED 21.03.2020


HEC COMMISSIONING JH. KIM JH. KIM CLOSED 21.03.2020

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 19.03.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 28.03.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG CLOSED 16.03.2020

HEC COMMISSIONING B.C KIM KANG CLOSED 21.03.2020

HEC COMMISSIONING E. WS E. WS

HEC COMMISSIONING JAN RIGOR J.H MFUNG CLOSED 21.03.2020

HEC COMMISSIONING C. RAJIGANDHI MALEK BELKHIR CLOSED 18.03.2020

HEC COMMISSIONING TW. HEO B.S KIM CLOSED 28.03.2020

HEC COMMISSIONING TW. HEO B.S KIM CLOSED 28.03.2020

HEC COMMISSIONING TW. HEO B.S KIM CLOSED 28.03.2020

ETTERKIB COMMISSIONING CHIBOUT. S KH. JUNG CLOSED 21.03.2020

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CANCELLED15.03.2020

HEC COMMISSIONING ARNOLD CAJILIG K.K JUNG


HEC COMMISSIONING JOSELITO OPINA CHOI. HS

HEC COMMISSIONING TL. KIM KANG CLOSED 28.03.2020

ETTERKIB COMMISSIONING M. DAKICHE KH. JUNG CLOSED 16.03.2020

HEC COMMISSIONING R. ALFARO KANG

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 02.04.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 22.03.2020

ETTERKIB COMMISSIONING N. TAHIR K.K JUNG

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 19.03.2020

HEC COMMISSIONING LAIB FARID KIM SUNG JIN CLOSED 18.03.2020

RANAFORT COMMISSIONING AHMED. GH KO

ETTERKIB COMMISSIONING A. REMITA KANG CLOSED 19.03.2020

HEC COMMISSIONING JEASON ASUNCION CHOI. HS CLOSED 28.03.2020

HEC COMMISSIONING TL. KIM KANG CLOSED 28.03.2020

ETTERKIB COMMISSIONING A. REMITA KANG

HEC COMMISSIONING DH. KIM E. WS CLOSED 21.03.2020


HEC COMMISSIONING JH. KIM JH. KIM CLOSED 17.03.2020

HEC COMMISSIONING JH. KIM ARAFA. T CLOSED 17.03.2020

HEC COMMISSIONING H.S KIM KANG

HEC COMMISSIONING H.S KIM KANG

ETTERKIB COMMISSIONING A. REMITA KANG

ETTERKIB COMMISSIONING A. REMITA KANG

HEC COMMISSIONING MG. BAE J.H MFUNG

ETTERKIB COMMISSIONING ATTOUI. R KH. JUNG

HEC COMMISSIONING YOUCE MESSAI LEE G J CLOSED 21.03.2020

HEC COMMISSIONING YOON. BH LEE G J

IRMA COMMISSIONING AFAKI KH. JUNG

IRMA COMMISSIONING AFAKI MESSAOUD. KESBIA

IRMA COMMISSIONING AFAKI MESSAOUD. KESBIA

HEC COMMISSIONING YOON. BH LEE G J CLOSED 30.04.2020

HEC COMMISSIONING JH. KIM ARAFA. T


HEC COMMISSIONING YM. JANG CHOI. HS CLOSED 22.03.2020

HEC COMMISSIONING DH. KIM ARAFA. T CLOSED 22.03.2020

HEC COMMISSIONING E. WS E. WS

HEC COMMISSIONING R. ALFARO KANG CLOSED 22.03.2020

HEC COMMISSIONING AJAY ARAFA. T CLOSED 21.03.2020

ETTERKIB COMMISSIONING A. REMITA KANG

ETTERKIB COMMISSIONING A. REMITA KANG

ETTERKIB COMMISSIONING A. REMITA KANG

ETTERKIB COMMISSIONING A. REMITA KANG

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN

RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 22.03.2020

HEC COMMISSIONING JH. KIM JH. KIM


HEC COMMISSIONING H.S KIM KH. JUNG

HEC COMMISSIONING M.G CHEON KANG CLOSED 25.03.2020

HEC COMMISSIONING M.G CHEON KANG

HEC COMMISSIONING RYAN EVARISTO CHOI. HS CLOSED 05.04.2020

HEC COMMISSIONING JH. KIM JH. KIM

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

ETTERKIB COMMISSIONING A. REMITA KANG

ETTERKIB COMMISSIONING A. REMITA KANG

ETTERKIB COMMISSIONING A. REMITA KANG

ETTERKIB COMMISSIONING A. REMITA KANG

HEC COMMISSIONING M.G CHEON KANG

ETTERKIB COMMISSIONING BENCHAMMA. B KANG

ETTERKIB COMMISSIONING BELBACHA. B KANG

ETTERKIB COMMISSIONING BENCHAMMA. B KH. JUNG

ETTERKIB COMMISSIONING BENCHAMMA. B KANG


ETTERKIB COMMISSIONING BENCHAMMA. B KANG

ETTERKIB COMMISSIONING BENCHAMMA. B KANG

ETTERKIB COMMISSIONING BELBACHA. B KANG

ETTERKIB COMMISSIONING ROUIBI TAREK KANG

HEC COMMISSIONING M.G CHEON KANG

HEC COMMISSIONING TL. KIM KANG CLOSED 23.03.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 09.04.2020

HEC COMMISSIONING H.S KIM KANG

HEC COMMISSIONING H.S KIM KANG

HEC COMMISSIONING H.S KIM KANG

HEC COMMISSIONING TL. KIM KANG CLOSED 05.04.2020

HEC COMMISSIONING TL. KIM KANG

HEC COMMISSIONING TL. KIM KANG CLOSED 05.04.2020

ETTERKIB COMMISSIONING A. REMITA KH. JUNG


IRMA COMMISSIONING AFAKI KH. JUNG

IRMA COMMISSIONING AFAKI KH. JUNG

HEC COMMISSIONING H.S KIM KANG CLOSED 16.04.2020

HEC COMMISSIONING JH. KIM JH. KIM

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 28.03.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 25.03.2020

HEC COMMISSIONING JH. KIM ARAFA. T CLOSED 22.03.2020

HEC COMMISSIONING JH. KIM ARAFA. T CLOSED 22.03.2020

HEC COMMISSIONING JAN RIGOR J.H MFUNG CLOSED 28.03.2020

HEC COMMISSIONING JAN RIGOR J.H MFUNG CLOSED 28.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 28.03.2020

HEC COMMISSIONING AJAY J.H MFUNG CLOSED 28.03.2020

ETTERKIB COMMISSIONING BELBACHA. B KANG

ETTERKIB COMMISSIONING A. REMITA KANG


GE COMMISSIONING MESSAOUD. KESBIA MESSAOUD. KESBIA

GE COMMISSIONING MESSAOUD. KESBIA MESSAOUD. KESBIA

GE COMMISSIONING MESSAOUD. KESBIA MESSAOUD. KESBIA

GE COMMISSIONING MALEK BELKHIR MALEK BELKHIR

GE COMMISSIONING MALEK BELKHIR MALEK BELKHIR

GE COMMISSIONING MALEK BELKHIR MALEK BELKHIR

HEC COMMISSIONING MR. CHOI Y.J JEONG CLOSED 31.03.2020

HEC COMMISSIONING K.K JUNG CHOI. HS CLOSED 28.03.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 28.03.2020

HEC COMMISSIONING TW. HEO CHOI. HS CLOSED 28.03.2020

HEC COMMISSIONING DENHIS C AGDAN KH. JUNG

RANAFORT COMMISSIONING AHMED. GH KO

RANAFORT COMMISSIONING AHMED. GH KO

RANAFORT COMMISSIONING AHMED. GH KO

RANAFORT COMMISSIONING AHMED. GH KO

RANAFORT COMMISSIONING AHMED. GH KO


RANAFORT COMMISSIONING AHMED. GH KO

RANAFORT COMMISSIONING LABIOD. I CHOI. HS

RANAFORT COMMISSIONING LABIOD. I CHOI. HS

HEC COMMISSIONING H.S KIM MESSAOUD. KESBIA CLOSED 09.04.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 09.04.2020

HEC COMMISSIONING H.S KIM KANG CLOSED 09.04.2020

HEC COMMISSIONING H.S KIM KANG

HEC COMMISSIONING H.S KIM KANG CLOSED 09.04.2020

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CANCELLED

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CANCELLED

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CANCELLED

HEC COMMISSIONING M.G CHEON KANG

ETTERKIB COMMISSIONING CHIBOUT. S J.H MFUNG CANCELLED

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 28.03.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 28.03.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG CLOSED 28.03.2020

HEC COMMISSIONING C. RAJIGANDHI KH. JUNG


HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING Y.S KIM KIM SUNG JIN

HEC COMMISSIONING Y.S KIM HAMZA. B

HEC COMMISSIONING J.H.KIM ARAFA. T

RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN

RANAFORT COMMISSIONING SERIDJ. M CHOI. HS

RANAFORT COMMISSIONING SERIDJ. M CHOI. HS

RANAFORT COMMISSIONING WASSOUF. I KIM SUNG JIN

HEC COMMISSIONING E. WS E. WS CLOSED 29.03.2020

HEC COMMISSIONING J.H.KIM J.H.KIM

HEC COMMISSIONING M.G CHEON KANG CLOSED 20.03.2020

HEC COMMISSIONING B.C KIM KANG

IRMA COMMISSIONING AFAKI KH. JUNG

HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 28.03.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG


HEC COMMISSIONING AYOUB. B J.H MFUNG CLOSED 28.03.2020

HEC COMMISSIONING AYOUB. B J.H MFUNG

HEC COMMISSIONING SANSEEN CATIPAY KANG CLOSED 12.04.2020

HEC COMMISSIONING C. RAJIGANDHI KANG CLOSED 28.03.2020

HEC COMMISSIONING TL. KIM MESSAOUD. KESBIA CLOSED 28.03.2020

HEC COMMISSIONING ARNOLD CAJILIG K.K JUNG CLOSED 28.03.2020

HEC COMMISSIONING KIM SUNG JIN KIM SUNG JIN

HEC COMMISSIONING KIM SUNG JIN KIM SUNG JIN

HEC COMMISSIONING JANG YOUNG TAE KH. JUNG

HEC COMMISSIONING AJAY J.H MFUNG

HEC COMMISSIONING YOUCE MESSAI LEE G J CLOSED 30.4.2020

HEC COMMISSIONING M.G CHEON KANG CLOSED 25.03.2020

HEC COMMISSIONING JH. KIM JH. KIM

HEC COMMISSIONING R. ALFARO KH. JUNG

HEC COMMISSIONING JH. KIM JH. KIM CLOSED 25.03.2020

HEC COMMISSIONING D.H KIM E. WS CLOSED 29.03.2020


HEC COMMISSIONING JH. KIM ARAFA. T CLOSED 30.03.2020

HEC COMMISSIONING Gavino CLOSED 15.04.2020

HEC COMMISSIONING Gavino CLOSED 15.04.2020

HEC COMMISSIONING RANDY PAULO CLOSED 30.03.2020

HEC COMMISSIONING Cheon CLOSED 28.03.2020

HEC COMMISSIONING Mr.Choi

HEC COMMISSIONING H.S KIM CLOSED 09.04.2020

HEC COMMISSIONING H.S KIM CLOSED 09.04.2020

HEC COMMISSIONING H.S KIM CLOSED 09.04.2020

HEC COMMISSIONING Lee G.J CLOSED 30.04.2020

HEC COMMISSIONING H.S KIM CLOSED 09.04.2020

HEC COMMISSIONING J.H.KIM E. WS CLOSED 29.03.2020

HEC COMMISSIONING J.H.KIM E. WS CLOSED 02.04.2020

IRMA COMMISSIONING AFAKI

HEC COMMISSIONING TW. HEO CLOSED 05.04.2020

HEC COMMISSIONING TW. HEO CLOSED 28.03.2020

HEC COMMISSIONING TW. HEO CLOSED 30.03.2020


HEC COMMISSIONING TW. HEO CLOSED 01.04.2020

GE COMMISSIONING Bouasbana Hamza

GE COMMISSIONING Bouasbana Hamza

GE COMMISSIONING Bouasbana Hamza

HEC COMMISSIONING H.S KIM CLOSED 04.04.2020

HEC COMMISSIONING H.S KIM CLOSED 04.04.2020

HEC COMMISSIONING H.S KIM CLOSED 04.04.2020

HEC COMMISSIONING H.S KIM CLOSED 04.04.2020

HEC COMMISSIONING H.S KIM CLOSED 04.04.2020

HEC COMMISSIONING H.S KIM CLOSED 04.04.2020

HEC COMMISSIONING T.L Kim CLOSED 05.04.2020

HEC COMMISSIONING T.L Kim CLOSED 05.04.2020

HEC COMMISSIONING Y.T Jang CANCELLED02.04.2020

HEC COMMISSIONING AJAY

HEC COMMISSIONING E. WS CANCELLED02.04.2020

HEC COMMISSIONING E. WS CLOSED 04.04.2020

HEC COMMISSIONING T.L Kim CANCELLED31.03.2020


HEC COMMISSIONING AJAY CLOSED 04.04.2020

HEC COMMISSIONING JAN RIGOR CLOSED 04.04.2020

HEC COMMISSIONING AJAY CLOSED 04.04.2020

HEC COMMISSIONING AJAY CLOSED 04.04.2020

HEC COMMISSIONING AJAY CLOSED 04.04.2020

HEC COMMISSIONING ARNOLD CAJILIG CLOSED 11.04.2020

HEC COMMISSIONING Bavino CLOSED 15.04.2020

HEC COMMISSIONING Bavino CLOSED 15.04.2020

HEC COMMISSIONING H.S KIM CLOSED 09.04.2020

HEC COMMISSIONING H.S KIM CLOSED 09.04.2020

HEC COMMISSIONING Y.T Jang CANCELLED02.04.2020

HEC COMMISSIONING Cheon CLOSED 04.04.2020

HEC COMMISSIONING Y.T Jang CLOSED 06.04.2020

HEC COMMISSIONING Y.T Jang CLOSED 04.04.2020

HEC COMMISSIONING Y.T Jang CLOSED 06.04.2020

HEC COMMISSIONING Y.T Jang CLOSED 06.04.2020

GE COMMISSIONING ZEKAD. A
ETTERKIB COMMISSIONING conboni

HEC COMMISSIONING R.Alfaro CLOSED 04.04.2020

HEC COMMISSIONING R.Alfaro CLOSED 30.03.2020

HEC COMMISSIONING J.H.KIM CLOSED 29.03.20230

HEC COMMISSIONING K.J Lee CLOSED 30.04.2020

HEC COMMISSIONING AJAY

HEC COMMISSIONING H.S KIM CLOSED 09.04.2020

HEC COMMISSIONING D.H KIM

HEC COMMISSIONING DENHIS C AGDAN

HEC COMMISSIONING Cheon CLOSED 06.04.2020

HEC COMMISSIONING T.W HEO CLOSED 07.04.2020

HEC COMMISSIONING ARNOLD CAJILIG CLOSED 11.04.2020

HEC COMMISSIONING ARNOLD CAJILIG CLOSED 11.04.2020

HEC COMMISSIONING ARNOLD CAJILIG CLOSED 11.04.2020

HEC COMMISSIONING J.H.KIM CLOSED 02.04.2020

HEC COMMISSIONING J.H.KIM CLOSED 05.04.2020

HEC COMMISSIONING H.S KIM CLOSED 16.04.2020


HEC COMMISSIONING H.S KIM CLOSED 11.04.2020

HEC COMMISSIONING H.S KIM CLOSED 11.04.2020

HEC COMMISSIONING H.S KIM CLOSED 11.04.2020

HEC COMMISSIONING H.S KIM CLOSED 11.04.2020

HEC COMMISSIONING H.S KIM CLOSED 11.04.2020

HEC COMMISSIONING H.S KIM CLOSED 11.04.2020

HEC COMMISSIONING H.S KIM CLOSED 08.04.2020

HEC COMMISSIONING E. WS CLOSED 09.04.2020

HEC COMMISSIONING E. WS

HEC COMMISSIONING DENHIS C AGDAN

HEC COMMISSIONING DENHIS C AGDAN

HEC COMMISSIONING DENHIS C AGDAN

HEC COMMISSIONING H.S KIM CLOSED 08.04.2020

HEC COMMISSIONING T.L Kim CLOSED 11.04.2020

HEC COMMISSIONING T.L Kim CLOSED 11.04.2020

HEC COMMISSIONING Mr.Choi

HEC COMMISSIONING Mr.Choi CLOSED 12.04.2020

HEC COMMISSIONING H.S KIM CLOSED 16.04.2020


HEC COMMISSIONING H.S KIM CLOSED 16.04.2020

HEC COMMISSIONING H.S KIM CLOSED 16.04.2020

HEC COMMISSIONING H.S KIM CLOSED 16.04.2020

HEC COMMISSIONING H.S KIM CLOSED 16.04.2020

HEC COMMISSIONING K.H Jung

HEC COMMISSIONING H.S KIM CLOSED 08.04.2020

HEC COMMISSIONING JS SEO CLOSED 08.04.2020

HEC COMMISSIONING JS SEO CLOSED 08.04.2020

HEC COMMISSIONING JS SEO CLOSED 02.04.2020

HEC COMMISSIONING JS SEO CLOSED 08.04.2020

HEC COMMISSIONING T.W HEO CHOI. HS CLOSED 11.04.2020

HEC COMMISSIONING JANG YOUNG TAE Kang CLOSED 09.04.2020

HEC COMMISSIONING ARNOLD CAJILIG CHOI. HS CLOSED 09.04.2020

HEC COMMISSIONING E. WS CLOSED 11.04.2020

HEC COMMISSIONING R.Alfaro CLOSED 12.04.2020

HEC COMMISSIONING R.Alfaro CLOSED 12.04.2020

HEC COMMISSIONING JAN RIGOR CLOSED 12.04.2020

HEC COMMISSIONING AJAY CLOSED 13.04.2021

HEC COMMISSIONING AJAY CLOSED 13.04.2022


HEC COMMISSIONING AJAY CLOSED 12.04.2020

HEC COMMISSIONING AJAY

HEC COMMISSIONING JAN RIGOR CLOSED 12.04.2020

GE COMMISSIONING Bouasbana Hamza

GE COMMISSIONING ZEKAD. A

HEC COMMISSIONING T.L Kim CLOSED 18.04.2020

HEC COMMISSIONING T.L Kim CLOSED 18.04.2020

HEC COMMISSIONING D.H KIM CLOSED 05.04.2020

HEC COMMISSIONING J.S SEO E. WS CLOSED 12.04.2020

HEC COMMISSIONING J.S SEO E. WS

HEC COMMISSIONING Y.T Jang Kang CLOSED 11.04.2020

HEC COMMISSIONING Y.T Jang Kang CLOSED 11.04.2020

HEC COMMISSIONING Y.M Jang CHOI. HS CLOSED 11.04.2020

HEC COMMISSIONING DENHIS C AGDAN Kang CLOSED 07.04.2020

HEC COMMISSIONING Cheon Kang CLOSED 12.04.2020

HEC COMMISSIONING Bavino CLOSED 15.04.2020

HEC COMMISSIONING Bavino

HEC COMMISSIONING Mr. Jang Kang CLOSED 18.04.2020


HEC COMMISSIONING DENHIS C AGDAN Kang

HEC COMMISSIONING R.Alfaro Kang CLOSED 12.04.2020

HEC COMMISSIONING D.H KIM Kang

HEC COMMISSIONING Kumar.A K.J Lee

HEC COMMISSIONING AJAY J.H Myung

HEC COMMISSIONING R.Alfaro Kang CLOSED 13.04.2020

HEC COMMISSIONING T.L Kim Kang CLOSED 18.04.2020

HEC COMMISSIONING H.S KIM Kang CLOSED 13.04.2020

HEC COMMISSIONING Cheon Kang

HEC COMMISSIONING Cheon Kang CLOSED 13.04.2020

HEC COMMISSIONING Cheon Kang

HEC COMMISSIONING Cheon Kang CLOSED 14.04.2020

HEC COMMISSIONING ZEKAD. A Kang CLOSED 11.04.2020

HEC COMMISSIONING T.W HEO CLOSED 11.04.2020

HEC COMMISSIONING AJAY

HEC COMMISSIONING AJAY

HEC COMMISSIONING E. WS J.H KIM CLOSED 14.04.2020


HEC COMMISSIONING T.W HEO

HEC COMMISSIONING T.W HEO CLOSED 18.04.2020

HEC COMMISSIONING AJAY CLOSED 15.04.2020

HEC COMMISSIONING Y.S KIM

HEC COMMISSIONING Mr.Choi

HEC COMMISSIONING YOON. BH GJ Lee CLOSED 30.04.2020

HEC COMMISSIONING H.S KIM Kang CLOSED 21.04.2020

HEC COMMISSIONING H.S KIM Kang

HEC COMMISSIONING ARNOLD CAJILIG CLOSED 16.04.2020

HEC COMMISSIONING T.L Kim Kang

HEC COMMISSIONING DENHIS C AGDAN Kang

HEC COMMISSIONING DENHIS C AGDAN Kang

HEC COMMISSIONING H.S KIM Kang CLOSED 18.04.2020

HEC COMMISSIONING H.S KIM Kang CLOSED 18.04.2020

HEC COMMISSIONING H.S KIM Kang CLOSED 18.04.2020

HEC COMMISSIONING H.S KIM Kang CLOSED 18.04.2020


HEC COMMISSIONING T.L Kim Kang CLOSED 18.04.2020

HEC COMMISSIONING T.L Kim Kang

HEC COMMISSIONING JANG YOUNG TAE Kang CLOSED 09.04.2020

HEC COMMISSIONING H.S KIM Kang

HEC COMMISSIONING H.S KIM Kang

HEC COMMISSIONING JH KIM CLOSED 13.04.2020

HEC COMMISSIONING ARNOLD CAJILIG CHOI. HS CLOSED 16.04.2020

HEC COMMISSIONING JS SEO JH. KIM CLOSED 19.04.2020

HEC COMMISSIONING TW HER CHOI. HS CLOSED 19.04.2020

HEC COMMISSIONING JS SEO JH. KIM CLOSED 19.04.2020

GE COMMISSIONING Bouasbana Hamza

HEC COMMISSIONING ALH G. PACIFICO J.H Myung CLOSED 19.04.2020

HEC COMMISSIONING ALH G. PACIFICO J.H Myung CLOSED 19.04.2020

HEC COMMISSIONING ALH G. PACIFICO J.H Myung CLOSED 19.04.2020

HEC COMMISSIONING ALH G. PACIFICO J.H Myung CLOSED 19.04.2020

HEC COMMISSIONING ALH G. PACIFICO J.H Myung


HEC COMMISSIONING Ki Pyoung Kang

HEC COMMISSIONING KH Jung Kang CLOSED 18.04.2020

HEC COMMISSIONING Cheon Kang CLOSED 18.04.2020

HEC COMMISSIONING Y.T Jang Kang CLOSED 18.04.2020

HEC COMMISSIONING Y.T Jang Kang CLOSED 18.04.2020

HEC COMMISSIONING Y.T Jang Kang CANCELLED13.04.2020

HEC COMMISSIONING Y.T Jang Kang CLOSED 18.04.2020

HEC COMMISSIONING Y.T Jang Kang CLOSED 18.04.2020

HEC COMMISSIONING Cheon Kang CLOSED 14.04.2020

HEC COMMISSIONING H.S KIM Kang CLOSED 22.04.2020

HEC COMMISSIONING JS SEO JH. KIM CLOSED 14.04.2020

HEC COMMISSIONING JS SEO JH. KIM CLOSED 18.04.2020

HEC COMMISSIONING H.S KIM Kang CLOSED 22.04.2020

HEC COMMISSIONING H.S KIM Kang

HEC COMMISSIONING JS SEO JH. KIM CLOSED 14.04.2020

HEC COMMISSIONING TW HER S.H. Lee CLOSED 14.04.2020

HEC COMMISSIONING Cheon Kang CLOSED 21.04.2020

HEC COMMISSIONING Cheon Kang CLOSED 19.04.2020


HEC COMMISSIONING Avish Kumar GJ Lee CLOSED 04.05.2020

HEC COMMISSIONING Ki Pyoung Kang

HEC COMMISSIONING JANG YOUNG TAE Kang CLOSED 18.04.2020

HEC COMMISSIONING TW HER CHOI. HS CLOSED 18.04.2020

HEC COMMISSIONING MR. CHOI Y.J JEONG

HEC COMMISSIONING AJAY G.H. KIM

HEC COMMISSIONING J.S SEO J.S SEO CLOSED 20.04.2020

HEC COMMISSIONING R. ABREA Mr. kang CANCELLED14.04.2020

HEC COMMISSIONING J.H.KIM J.S SEO CLOSED 25.04.2020

HEC COMMISSIONING J.S SEO S.H. Lee CLOSED 15.04.2020

HEC COMMISSIONING Cheon Kang CLOSED 21.04.2020

HEC COMMISSIONING Cheon Kang CLOSED 19.04.2020

HEC COMMISSIONING KH Jung Kang CLOSED 25.04.2020

HEC COMMISSIONING KH Jung Kang CLOSED 25.04.2020

HEC COMMISSIONING KH Jung Kang CLOSED 25.04.2020

HEC COMMISSIONING KH Jung Kang CLOSED 25.04.2020


HEC COMMISSIONING T.L Kim Kang CLOSED 26.04.2020

HEC COMMISSIONING Pacifico J.H. Mung CLOSED 21.04.2020

HEC COMMISSIONING K.H Jung S.H. Lee CLOSED 29.04.2020

HEC COMMISSIONING K.H Jung S.H. Lee CLOSED 29.04.2020

HEC COMMISSIONING Pacifico J.H. Mung CLOSED 23.04.2020

HEC COMMISSIONING Choi Y.J JEONG CLOSED 19.04.2020

HEC COMMISSIONING Choi Y.J JEONG CLOSED 29.04.2020

HEC COMMISSIONING Choi Y.J JEONG CLOSED 29.04.2020

HEC COMMISSIONING Cheon S.H. Lee CLOSED 22.04.2020

HEC COMMISSIONING K.Y. Ko S.H. Lee

HEC COMMISSIONING J.S. Kim Kang CLOSED 16.04.2020

HEC COMMISSIONING J.S. Kim Kang CLOSED 16.04.2020

HEC COMMISSIONING YOON. BH S.H. Lee CLOSED 26.04.2020

HEC COMMISSIONING J. Pacifico J.R Hyng CLOSED 23.04.2020

HEC COMMISSIONING ARNOLD CAJILIG S.H. Cho CLOSED 28.04.2020

HEC COMMISSIONING EWS J.H. Kim CLOSED ISOLATION (1776) REMOVED LOTO 21.04.2020
HEC COMMISSIONING M.M. ALEE Kang CLOSED 23.04.2020

HEC COMMISSIONING J.S. Seo S.H. Lee CLOSED 27.04.2020

HEC COMMISSIONING J.S. Seo S.H. Lee CLOSED 27.04.2020

HEC COMMISSIONING DENHIS C AGDAN Kang

HEC COMMISSIONING DENHIS C AGDAN Kang

HEC COMMISSIONING D.H KIM S.H. Kim

HEC COMMISSIONING Ki Pyoung Kang

HEC COMMISSIONING T.W HEO CHOI. HS CLOSED 25.04.2020

HEC COMMISSIONING K.H Jung Kang CLOSED 25.04.2020

GE COMMISSIONING HAMZA. B S.H. Lee

GE COMMISSIONING HAMZA. B S.H. Lee

HEC COMMISSIONING ARNOLD CAJILIG CHOI. HS CLOSED 25.04.2020

HEC COMMISSIONING Pacifico J.H. Mung CLOSED 25.04.2020

HEC COMMISSIONING Pacifico J.H. Mung CLOSED 25.04.2020

HEC COMMISSIONING Pacifico J.H. Mung CLOSED 19.04.2020


HEC COMMISSIONING Pacifico J.H. Mung CLOSED 25.04.2020

HEC COMMISSIONING Pacifico J.H. Mung CLOSED 25.04.2020

HEC COMMISSIONING K.H Jung S.H. Lee CLOSED 29.04.2020

HEC COMMISSIONING K.H Jung S.H. Lee CLOSED 29.04.2020

HEC COMMISSIONING TW Heo CHOI. HS

HEC COMMISSIONING DENHIS C AGDAN Kang

HEC COMMISSIONING Kim BC Kang CLOSED 25.04.2020

HEC COMMISSIONING Cheon Kang CLOSED 25.04.2020

HEC COMMISSIONING Cheon Kang CLOSED ISOLATION ELEC. PA LOTO REMOVED 20.04.2020

HEC COMMISSIONING EWS J.H. Kim CLOSED 25.04.2020

HEC COMMISSIONING Jong Y.T Kang

HEC COMMISSIONING Y.T. Jang Kang CLOSED 25.04.2020

HEC COMMISSIONING T.L Kim S.H. Lee CLOSED 26.04.2020

HEC COMMISSIONING T.L Kim S.H. Lee CLOSED 26.04.2020


HEC COMMISSIONING Y.T. Jang S.H. Lee CLOSED 26.04.2020

HEC COMMISSIONING D.H KIM S.H. Lee CLOSED ISOLATION ELEC PANLOTO REMOVED 20.04.2020

HEC COMMISSIONING Kipyoung Kang

HEC COMMISSIONING Cheon Kang CLOSED 26.04.2020

HEC COMMISSIONING K.H Jung Kang CLOSED 29.04.2020

HEC COMMISSIONING TW HEO CHOI. HS

HEC COMMISSIONING TW HEO CHOI. HS

GE COMMISSIONING ZEKAD. A S.H. Lee

HEC COMMISSIONING Pacifico J.H. Mung CLOSED ISOLATION LOTO REMOVED 20.04.2020

HEC COMMISSIONING JANG YOUNG TAE Kang CLOSED 20.04.2020

HEC COMMISSIONING DENHIS C AGDAN Kang CLOSED ISOLATION LOTO REMOVED 22.04.2020

HEC COMMISSIONING deNHIS C AGDAN Kang CLOSED ISOLATION LOTO REMOVED 22.04.2020

HEC COMMISSIONING Pacifico S.H. Lee CLOSED 27.04.2020

HEC COMMISSIONING Y. T. Jang Kang CLOSED 27.04.2020

HEC COMMISSIONING B.C. Kim S.H. Lee CLOSED 25.04.2020


HEC COMMISSIONING J.S. Kim S.H. Lee CLOSED 22.04.2020

HEC COMMISSIONING Jan Zenarosa S.H. Lee CLOSED 28.04.2020

HEC COMMISSIONING Cheon Kang CLOSED 28.04.2020

HEC COMMISSIONING Y.S KIM S.H. Lee

HEC COMMISSIONING Cheon Kang CLOSED 29.04.2020

HEC COMMISSIONING Dixon EWS CANCELLEDISOLATION MECH. 22.04.2020

HEC COMMISSIONING Pacifico S.H. Lee CLOSED 28.04.2020

HEC COMMISSIONING K.H Jung Kang

HEC COMMISSIONING K.H Jung Kang

HEC cOMMISSIONING TW Heo S.H. Lee CLOSED 03.05.2020

HEC COMMISSIONING TW Heo S.H. Lee CLOSED 03.05.2020

HEC COMMISSIONING B.C. Kim S.H. Lee CLOSED 09.05.2020

HEC COMMISSIONING B.C. Kim S.H. Lee CLOSED 09.05.2020

HEC COMMISSIONING Zeya Alam S.H. Lee CLOSED 27.04.2020

HEC COMMISSIONING Jan Zenarosa S.H. Lee CLOSED 29.04.2020

HEC COMMISSIONING Jan Zenarosa S.H. Lee CLOSED 30.04.2020 ISOLATION ELEC PANEL
HEC COMMISSIONING K.H Jung Kang CLOSED 03.05.2020

HEC COMMISSIONING K.H Jung Kang CLOSED 03.05.2020

HEC COMMISSIONING T.L Kim Kang

HEC COMMISSIONING T.L Kim Kang

HEC COMMISSIONING Dixon EWS CLOSED ISOLATION MECH. LOTO REMOVED 23.04.2020

HEC COMMISSIONING Mr. Choi Y.J JEONG

HEC COMMISSIONING Mr. Choi Y.J JEONG CLOSED 05.05.2020

HEC COMMISSIONING Mr. Choi Y.J JEONG CLOSED 05.05.2020

HEC COMMISSIONING J.S. Baldeo S.H. Lee CLOSED 30.04.2020

HEC COMMISSIONING J.S. Baldeo S.H. Lee CLOSED 30.04.2020 ISOLATION ELEC PANEL

HEC COMMISSIONING J.S. Baldeo S.H. Lee CLOSED 30.04.2020

HEC COMMISSIONING D.H KIM S.H. Lee CLOSED 23.04.2020

HEC COMMISSIONING D.H KIM S.H. Lee CLOSED 26.04.2020

HEC COMMISSIONING D.H KIM S.H. Lee CLOSED 26.04.2020

GE COMMISSIONING K. Messoud S.H. Lee

GE COMMISSIONING K. Messoud S.H. Lee

HEC COMMISSIONING YM Jang S.H. Lee


HEC COMMISSIONING YM Jang H.S. Choi

HEC COMMISSIONING YM Jang H.S. Choi CLOSED 03.05.2020

HEC COMMISSIONING YM Jang H.S. Choi

HEC COMMISSIONING Cheon Kang CLOSED 29.04.2020

HEC COMMISSIONING ARNOLD CAJILIG CHOI. HS CLOSED 30.04.2020

HEC COMMISSIONING Pacifico S.H. Lee CLOSED 30.04.2020

HEC COMMISSIONING Pacifico S.H. Lee CLOSED 30.04.2020

HEC COMMISSIONING Pacifico Kang CLOSED 04.05.2020

HEC COMMISSIONING TW Heo S.H. Lee CLOSED 30.04.2020

HEC COMMISSIONING TW Heo S.H. Lee CLOSED 30.04.2020

HEC COMMISSIONING J.S. Seo J.H. Kim CLOSED 25.04.2020

HEC COMMISSIONING Y.T. Jang Kang CLOSED 02.05.2020

HEC COMMISSIONING Y.T. Jang Kang CLOSED 02.05.2020

HEC COMMISSIONING Y.T. Jang Kang CLOSED 02.05.2020

HEC COMMISSIONING Y.T. Jang Kang

HEC COMMISSIONING Y.T. Jang Kang CLOSED 05.05.2020

HEC COMMISSIONING Dixon EWS CLOSED 02.05.2020

HEC COMMISSIONING T.L Kim S.H. Lee


HEC COMMISSIONING Cheon Kang CLOSED 03.05.2020

HEC COMMISSIONING B.C. Kim S.H. Lee CLOSED 09.05.2020

HEC COMMISSIONING B.C. Kim B.C. Kim CLOSED 09.05.2020

HEC COMMISSIONING Y.T. Jang S.H. Lee CLOSED 02.05.2020

HEC COMMISSIONING YM Jang S.H. Lee CLOSED 29.04.2020

HEC COMMISSIONING Pacifico S.H. Lee CLOSED 03.05.2020 DE-ISOLATION MECH.

HEC COMMISSIONING J.S. Seo J.H KIM CLOSED 04.05.2020

HEC COMMISSIONING J.S. Seo J.H KIM CLOSED 02.05.2020

HEC COMMISSIONING J.S. Sim Kang CLOSED 28.04.2020

HEC COMMISSIONING D.H KIM S.H. Lee CLOSED ISOLATION ELEC PANLOTO REMOVED 28.04.2020

HEC COMMISSIONING T.L Kim Kang CLOSED 04.05.2020

HEC COMMISSIONING T.L Kim Kang CLOSED 04.05.2021

HEC COMMISSIONING Cheon S.H. Lee CLOSED 03.05.2020

HEC COMMISSIONING Cheon S.H. Lee CLOSED 03.05.2020

HEC COMMISSIONING Pacifico S.H. Lee CLOSED 04.05.2020

HEC COMMISSIONING J.S. Seo J.H. Kim CLOSED 03.05.2020

HEC COMMISSIONING J.S. Seo J.H. Kim CLOSED 03.05.2020

HEC COMMISSIONING DENHIS C AGDAN Kang


HEC COMMISSIONING DENHIS C AGDAN Kang

HEC COMMISSIONING Kipyoung Kang

HEC COMMISSIONING K.H Jung Kang CLOSED 09.05.2020

HEC COMMISSIONING K.H Jung Kang CLOSED 09.05.2020

HEC COMMISSIONING YOON. BH S.H. Lee CLOSED 09.05.2020 DE-ISOLATE ELEC PANEL

HEC COMMISSIONING YOON. BH S.H. Lee CLOSED 09.05.2020 DE-ISOLATE ELEC PANEL

HEC COMMISSIONING Pacifico S.H. Lee CLOSED 04.05.2020

HEC COMMISSIONING Pacifico S.H. Lee CLOSED 04.05.2020

HEC COMMISSIONING MD ZEYA ALAM S.H. Lee CLOSED 30.04.2020

HEC COMMISSIONING Cheon Kang CLOSED 05.05.2020

HEC COMMISSIONING MD ZEYA ALAM Kang CLOSED 06.05.2020

HEC COMMISSIONING MD ZEYA ALAM Kang CLOSED 04.05.2020

HEC COMMISSIONING Y.T. Jang S.H. Lee CLOSED 05.05.2020

HEC COMMISSIONING Y.T. Jang S.H. Lee CLOSED 05.05.2020

HEC COMMISSIONING J.S. Sim Kang CLOSED 30.04.2020

HEC COMMISSIONING Cheon Kang CLOSED 06.05.2020


HEC COMMISSIONING Y.T Jang S.H. Lee CLOSED 05.05.2020

HEC COMMISSIONING J.S. Baldeo S.H. Lee CLOSED 06.05.2020

HEC COMMISSIONING J.S. Baldeo S.H. Lee CLOSED 03.05.2020

HEC COMMISSIONING T.L Kim Kang

HEC COMMISSIONING T.L Kim Kang

HEC COMMISSIONING Cheon S.H. Lee CLOSED 06.05.2020

HEC COMMISSIONING Cheon S.H. Lee CANCELLED03.05.2020

HEC COMMISSIONING T.L Kim S.H. Lee

HEC COMMISSIONING Jung KH S.H. Lee CLOSED 02.05.2020

HEC COMMISSIONING K.Y. Ko S.H. Lee

HEC COMMISSIONING D.H KIM S.H. Lee CLOSED 04.05.2020 ISOLATION ELEC PANEL

HEC COMMISSIONING J.S.BALDEO CLOSED 09.05.2020

HEC COMMISSIONING J.S.BALDEO

HEC COMMISSIONING J.S.BALDEO CLOSED 09.05.2020

HEC COMMISSIONING TW HEO CHOI. HS CLOSED 06.05.2020

HEC COMMISSIONING Choi Y.J JEONG


HEC COMMISSIONING B.C. Kim

HEC COMMISSIONING B.C. Kim

HEC COMMISSIONING TW HEO CHOI. HS CLOSED 07.05.2020

HEC COMMISSIONING ALH G. PACIFICO J.H MFUNG CLOSED 09.05.2020

HEC COMMISSIONING ARNOLD CAJILIG CHOI. HS

HEC COMMISSIONING J.S.SEO J.H.KIM

GE COMMISSIONING MESSOUD KESBIA MALEK BELKHIR

GE COMMISSIONING MALEK BELKHIR MALEK BELKHIR

HEC COMMISSIONING MOHAMMAD ZEYA ALAIS.H. Lee

HEC COMMISSIONING MOHAMMAD ZEYA ALAIHAMZA. B CLOSED 06.05.2020

HEC COMMISSIONING TW. HEO

HEC COMMISSIONING Gavino

HEC COMMISSIONING J.H.KIM J.H.KIM CLOSED 07.05.2020

HEC COMMISSIONING J.S.SEO J.H.KIM CLOSED 09.05.2020

HEC COMMISSIONING J.S.SEO J.H.KIM CLOSED 09.05.2020

HEC COMMISSIONING CHEON Kang CLOSED 05.05.2020


HEC COMMISSIONING Y.M Jang CHOI. HS

HEC COMMISSIONING Y.M Jang CHOI. HS

HEC COMMISSIONING Cheon Kang

HEC COMMISSIONING KIM K.P Kang

HEC COMMISSIONING Cheon Kang

HEC COMMISSIONING Cheon Kang

HEC COMMISSIONING seo kim CLOSED 09.05.2020

HEC COMMISSIONING rbantog G.J.lee CLOSED 07.05.2020

HEC COMMISSIONING EWS J.H.KIM CLOSED 05.05.2020

HEC COMMISSIONING T.W HEO CHOI. HS

HEC COMMISSIONING YOON. BH G.J.lee de isolation

HEC COMMISSIONING YOON. BH G.J.lee de isolation

HEC COMMISSIONING J.S.SEO J.H.KIM

HEC COMMISSIONING J.S.SEO J.H.KIM

HEC COMMISSIONING Cheon ABDELRAHMAN CLOSED 06.05.2020

HEC COMMISSIONING Kang


HEC COMMISSIONING AMAR Kang

HEC COMMISSIONING K.H Jung ABDELRAHMAN CLOSED 06.05.2020

HEC COMMISSIONING Y.T. Jang Kang

HEC COMMISSIONING ALH G. PACIFICO SIDALI. B

HEC COMMISSIONING B.H.KANG KANG

HEC COMMISSIONING BH.KANG KANG

HEC COMMISSIONING BH.KANG KANG

HEC COMMISSIONING BH.KANG KANG

HEC COMMISSIONING BH.KANG KANG

HEC COMMISSIONING ALH G. PACIFICO SIDALI. B

HEC COMMISSIONING Cheon SIDALI. B

HEC COMMISSIONING Cheon ABDELRAHMAN CLOSED 09.05.2020

HEC COMMISSIONING ALAM Kang

HEC COMMISSIONING Cheon Kang

GE COMMISSIONING MALEK BELKHIR HAMZA. B


GE COMMISSIONING ABDRAHMEN ABDELRAHMAN

HEC COMMISSIONING Y.T. Jang Kang CLOSED 06.05.2020

HEC COMMISSIONING J.S.SEO JH. KIM

HEC COMMISSIONING J.S.SEO JH. KIM

HEC COMMISSIONING K.H Jung KANG

HEC COMMISSIONING K.H Jung KANG

HEC COMMISSIONING Cheon

HEC COMMISSIONING Zeya Alam

HEC COMMISSIONING D.H KIM CLOSED 09.05.2020

HEC COMMISSIONING D.H KIM

HEC COMMISSIONING T.L Kim KANG

HEC COMMISSIONING T.L Kim KANG

HEC COMMISSIONING BH.KANG

HEC COMMISSIONING J.S.BALDEO

HEC COMMISSIONING B.C. Kim

HEC COMMISSIONING B.C. Kim

HEC COMMISSIONING Choi JANG

HEC COMMISSIONING Choi JANG


GE COMMISSIONING ABDRAHMEN ABDELRAHMAN

GE COMMISSIONING MALEK BELKHIR HAMZA. B

HEC COMMISSIONING

HEC COMMISSIONING J.S.BALDEO

HEC COMMISSIONING K.K.P KANG

HEC COMMISSIONING seo J.H.KIM

HEC COMMISSIONING ALH G. PACIFICO N.G.BAY

HEC COMMISSIONING ALH G. PACIFICO G.H. KIM

HEC COMMISSIONING D.VERGARA ABDELRAHMAN

HEC COMMISSIONING Y.M Jang CHOI. HS

HEC COMMISSIONING Y.M Jang CHOI. HS

HEC COMMISSIONING Y.M Jang A.TAKI

HEC COMMISSIONING Y.M Jang B.SIDALI

HEC COMMISSIONING Cheon KANG

HEC COMMISSIONING YOON. BH G.J.lee

HEC COMMISSIONING seo J.H.KIM


HEC COMMISSIONING seo J.H.KIM

HEC COMMISSIONING R.Alfaro KANG


MASTER ISOLATION REGISTER
Departement :

Tag/Eauipement Description/
Departement Isolation
S/N Isolation Point Description PTW No. No Function
: Certificate No.

12BRA01 GE-HEC-1054 Q06


ELECTRICAL MECHANICAL

12BRA01 GE-HEC-1054 Q07


1 PUNCH
12BRA01 GE-HEC-1054 Q09
12BJB01 GE-HEC-1054 12BJB01GS024
GE-HEC-1070 88BT1
VENTILATION DUCT GE-HEC-1070 88BT2
DAMPER
2 MCC GT 11 GE-HEC-1070 88BD1
MODIFICATION
ACTIVITY GE-HEC-1070 88BD2
GE-HEC-1070 88FV
GE-HEC-1071 88BT1
MECHANICAL

VENTILATION DUCT GE-HEC-1071 88BT2


DAMPER
3 MCC GT 12 GE-HEC-1071 88BD1
MODIFICATION
ACTIVITY GE-HEC-1071 88BD2
GE-HEC-1071 88FV
88QV-1
88QV-2
88QA-1 A
COMISSIONING

88QA-1B
LIFT OIL SYSTEM 88QS
4 MCC GT 12 1209 GE-HEC -1083
HOT WORK
88ES
OMISSIONING
LIFT OIL SYSTEM
4 MCC GT 12 1209 GE-HEC -1083
HOT WORK

88QE
88HQ-1
88HQ-2
5 MECHANICAL 88BT1
88BT2
88BD1
MCC GT 12 PUNCH CLOSE 7229 GE-HEC-1076
88BD2
88BL1
88BL2
6 MECHANICAL MCC 12 PUNCH LIST 7230 GE-HEC-1093 88 IC-1
88BT1
MECHANICAL

88BT2
88BD1
7 MCC GT 12 PUNCH CLOSE GE-HEC-1106
88BD2
88BL1
88BL2
8 COMISSIONINGEUB#1 VPR74-1A GE-HEC-1109 11BFA01GS008
9 COMISSIONINGEUB#1 VPR74-1A GE-HEC-1109 11BFA01GS008
10 PIPING PECC 12 AIR COMPRESSOR GE-HEC-1112 12BJA01GS025
11 comm pecc11 23ht-1a GE-HEC-1116 23 HT-1A
23ht-1b GE-HEC-1116 23 HT-1B
12 MECHANICAL MCC 12 PUNCH LIST 7230 GE-HEC-1130 88 IC-1
13 ELECTRICAL 12BMA01 AF 89 LCI GE-HEC-1111 QAB17
14 COMM MCC 11 GE-HEC-1114 88QA-1
88BT1
MECHANICAL

88BT2
88BD1
15 MCC GT 12 PUNCH CLOSE GE-HEC-1140
88BD2
88BL1
88BL2
16 ELECTRICAL MCC HVC INSPECTION 00BJC01QAB01 HVAC
5315
17 00BJC01QAB02 HVAC
18 ELECTRICAL EUB#1 MODIFICATION 7380 6689 11BJC01GS021
EUB#2 7381 6690 12BJC01GS021
19 MECHANICAL MCC 12 PUNCH LIST GE-HEC-1174 88 IC-1
MECHANICAL 88BT1
88BT2
88BD1
20 MCC GT 12 PUNCH CLOSE 7233 GE-HEC-1184
88BD2
88BL1
88BL2
88QV1
88QV2
MECHANICAL

88HQ1
88HQ2
21 MCC GT 12 PUNCH CLOSE 7403 GE-HEC-1183
#3
QV1
QV2
QS
22 COM MCC GT 11 GRISSAGE DC MOTOR GE-HEC- #3
88TK-1
23 PIPING MCC GT 12 GE-HEC1200
88TK-2
88TK-1
24 MECHANICAL MCC GT 12 PUNCH 7404 GE-HEC-1215
88TK-2
PIPING MCC GT 12 REPARATION OF APU GE-HEC-1211 12BJA01GS025
GE-HEC-1219 88 IC-1
GE-HEC-1219 88QA-1
GE-HEC-1219 88QA-2
25 MECHANICAL MCC 12 PUNCH LIST 7234 GE-HEC-1219 88QV1A
GE-HEC-1219 88QV1B
GE-HEC-1219 88HQ2
GE-HEC-1219 88HQ1
26 MECHANICAL UEB 1 PUNCH 7236 GE-HEC-1218 88AK
88 TK -1
27 MECHANICAL GT MCC 11 COOLING FAN GE -HEC -1233
27 MECHANICAL GT MCC 11 COOLING FAN GE -HEC -1233
88 TK- 2
88 TK -1
28 PIPING GT- MCC 12 MLI 909-910 GE0-HEC-1242
88 TK- 2
29 MECHANICAL UEB 1 PUNCH 7236 GE-HEC-1262 88AK
12BJC01GS012
12BJC01GS025
30 ELECTRICAL UEB 1 cable termination 7411 5031
11BJC01GS012
11BJC01GS025
88BT-1
88BT-2
PUNCH LIST CLOSE 88BD-1
31 MECHANICAL MCC GT 12 GE-HEC -1264
OUT ACTIVITY 88BD-2
88BL-1
88BL-2
11BJC01GS002 MOTOR-1
11BJC01GS003 MOTOR-2
11BJC01GS004 MOTOR-3
11BJC01GS005 MOTOR-4
11BJC01GS008 MOTOR-5
11BJC01GS009 MOTOR-6
11BJC01GS010 MOTOR-7
11BJC01GS011 MOTOR-8
11BJC01GS015 MOTOR-9
11BJC01GS016 MOTOR-10
11BJC01GS017 MOTOR-11
11BJC01GS018 MOTOR-12
32 MECHANICAL UEB 1 finfan air cooler 12012
12BJC01GS002 MOTOR-1
12BJC01GS003 MOTOR-2
12BJC01GS004 MOTOR-3
12BJC01GS005 MOTOR-4
12BJC01GS008 MOTOR-5
12BJC01GS009 MOTOR-6
12BJC01GS010 MOTOR-7
12BJC01GS011 MOTOR-8
12BJC01GS015 MOTOR-9
12BJC01GS016 MOTOR-10
12BJC01GS017 MOTOR-11
12BJC01GS018 MOTOR-12
88 TK -1
27 MECHANICAL GT MCC 11 COOLING FAN GE -HEC -1233
88 TK- 2
00GHS21 PUMP DM TO GT
00GHS22 PUMP DM TO GT
28 MECHANICAL WWT 1206 00GHS23 PUMP DM TO GT
00GHS24 PUMP DM TO GT
00GHS25 PUMP DM TO GT
29 COMM GT MCC 12 GE-HEC-1299 88GT-1 TURNING GEAR
88BT-1
88BT-2
PUNCH LIST CLOSE 88BD-1
31 MECHANICAL MCC GT 12 7418 GE-HEC-1312
OUT ACTIVITY 88BD-2
88BL-1
88BL-2
11BJC01GS002 MOTOR-1
11BJC01GS003 MOTOR-2
11BJC01GS004 MOTOR-3
11BJC01GS005 MOTOR-4
11BJC01GS008 MOTOR-5
11BJC01GS009 MOTOR-6
11BJC01GS010 MOTOR-7
11BJC01GS011 MOTOR-8
11BJC01GS015 MOTOR-9
11BJC01GS016 MOTOR-10
11BJC01GS017 MOTOR-11
11BJC01GS018 MOTOR-12
32 MECHANICAL UEB 1 finfan air cooler 7242 1042
32 MECHANICAL UEB 1 finfan air cooler 7242 1042
12BJC01GS002 MOTOR-1
12BJC01GS003 MOTOR-2
12BJC01GS004 MOTOR-3
12BJC01GS005 MOTOR-4
12BJC01GS008 MOTOR-5
12BJC01GS009 MOTOR-6
12BJC01GS010 MOTOR-7
12BJC01GS011 MOTOR-8
12BJC01GS015 MOTOR-9
12BJC01GS016 MOTOR-10
12BJC01GS017 MOTOR-11
12BJC01GS018 MOTOR-12
00GHC21 PUMP DM TO GT
00GHC22 PUMP DM TO GT
33 MECHANICAL WWT DWP 7243 1042 00GHC23 PUMP DM TO GT
00GHC24 PUMP DM TO GT
00GHC25 PUMP DM TO GT
88 TK -1
34 MECHANICAL GT MCC 11 COOLING FAN GE -HEC -1233
88 TK- 2
GE-HEC-1327 88TG-1 TURNING GEAR
GE-HEC-1396 88BT-1
GE-HEC-1396 88BT-2
35 ELECTRICAL MCC GT 12 GE-HEC1385 88IC-1
GE-HEC1385 QAB09
GE-HEC1385 QAB23
GE-HEC1385 QAB32
00GHD31AP001
00GHD33AP001
00GHD32AP001
00GHD11AP001
GE-HEC-1399 88QA-1
36 ELECTRICAL MCC GT 12 MOTOR TEST 7461 GE-HEC-1432 88IC-1
ELECTRICAL MCC GT 12 MOTOR TEST 7461 GE-HEC-1432 QAB09
ELECTRICAL MCC GT 12 MOTOR TEST 7461 GE-HEC-1432 QAB23
ELECTRICAL MCC GT 12 MOTOR TEST 7461 GE-HEC-1432 QAB32
37 UEB 1 11BJC01GS013
UEB 1 11BJC01QAB10
MCC GT 11 11BUA01Q15
MCC GT11 11BUA01Q16
MCC GT11 11BUA01Q10

38 MCC GT12 7239 12BUA01Q16

IRMA
UEB 1 7239 12BJC01QAB10

UEB 1 7239 12BJC01GS013

MCCGT12 7239 12BUAQ10

MCCGT12 7239 12BUA01Q15

39 S.K.BAIK WWT 00SAG01AH401A

S.K.BAIK WWT 00SAG10AH401B


S.K.BAIK WWT 00SAG10AH601A
S.K.BAIK WWT 00SAG10AH601B
40 COMM UEB 1 ATOMAISING AIR GE-HEC-1512 88AK-1
41 ELECTRICAL UEB 1 LCI transformer GE-HEC-1527 11BBA01GS004
42 Pilping MCC 12 AIR COMPRESSOR GE-HEC-1521 12BJA01GS025
11BJC01GS002 MOTOR-1
11BJC01GS003 MOTOR-2
11BJC01GS004 MOTOR-3
11BJC01GS005 MOTOR-4
11BJC01GS008 MOTOR-5
11BJC01GS009 MOTOR-6
11BJC01GS010 MOTOR-7
11BJC01GS011 MOTOR-8
11BJC01GS015 MOTOR-9
11BJC01GS016 MOTOR-10
11BJC01GS017 MOTOR-11
11BJC01GS018 MOTOR-12
43 MECHANICAL UEB 1 finfan air cooler 7244 4190
12BJC01GS002 MOTOR-1
12BJC01GS003 MOTOR-2
12BJC01GS004 MOTOR-3
12BJC01GS005 MOTOR-4
12BJC01GS008 MOTOR-5
12BJC01GS009 MOTOR-6
12BJC01GS010 MOTOR-7
12BJC01GS011 MOTOR-8
12BJC01GS015 MOTOR-9
12BJC01GS016 MOTOR-10
12BJC01GS017 MOTOR-11
12BJC01GS018 MOTOR-12
UEB 1 11BJC01GS013
UEB 1 11BJC01QAB10
MCC GT 11 11BUA01Q15
MCC GT11 11BUA01Q16
MCC GT11 11BUA01Q10
44 IRMA
MCC GT12 7239 12BUA01Q16
UEB 1 7239 12BJC01QAB10
UEB 1 7239 12BJC01GS013
MCCGT12 7239 12BUAQ10
MCCGT12 7239 12BUA01Q15
MCC 11 7426 GE-HEC-1593 11BJA01GS025
45 MECHANICAL
MCC 12 7426 GE-HEC-1593 12BJA01GS025
UEB 1 3603 7247 11BJC01GS013
UEB 1 3603 7247 11BJC01QAB10
MCC GT 11 3603 7247 11BUA01Q15
MCC GT11 3603 7247 11BUA01Q16
MCC GT11 3603 7247 11BUA01Q10
46 IRMA
MCC GT12 3602 7246 12BUA01Q16
UEB 1 3602 7246 12BJC01QAB10
UEB 1 3602 7246 12BJC01GS013
MCCGT12 3602 7246 12BUAQ10
MCCGT12 3602 7246 12BUA01Q15
47 COMM MCC GT 21 88TG-1 GE-HEC-1789
11BAC01GS003
48 COMM GCB -11 ERTHING HOT LOOP TEST GE-HEC-1774 11BAC01GS004
no
no
50 COMM GCB -12 ERTHING HOT LOOP TEST GE-HEC-1775 11BAC01GS003
11BAC01GS004
HETUR 21BMA01QAB07
51 QC MCC GT21 HETUR GE-HEC-1787 QAB35
88TG-1 21BMA01GS009
88BL1
88BL2
52 MECHANICAL GT MCC 21 PUNCH CLOSE GE-HEC-1782
88VG
88VG
QAB14
53 GE-HEC-1810
QAB13
88HQ-1
54 MECHANICAL GT MCC22
IGV 7187 GE-HEC-1830 88HQ-2
TION REGISTER cod color
Wednesday, April 29, 2020
partement : COMMISSIONING
PTW LOTO TIP REMOVED

ISOLATION METHOD
Fuses/ Isolated By De-Isolated By
Switch Lock Out Tag Out Breaker Close
Numb Removed DATE Yes/N
Number o
er Name/Date
On Off Yes No LOCK Yes No Yes No Name/Date
LOCK
PTW
TIP
Off Yes NO 21F050 Yes DEFFOUS.A DEFFOUS.A 1/2/2020 Yes
Off Yes NO 14F386 Yes DEFFOUS.A DEFFOUS.A 1/2/2020 Yes
Off Yes NO 15F626 Yes DEFFOUS.A DEFFOUS.A 1/2/2020 Yes
Off Yes NO 15F633 Yes DEFFOUS.A DEFFOUS.A 1/2/2020 Yes
Off Yes NO 14 Yes DEFFOUS.A DEFFOUS.A 1/4/2020 Yes
Off Yes NO 92 Yes DEFFOUS.A DEFFOUS.A 1/4/2020 Yes
Off Yes NO 805 Yes DEFFOUS.A DEFFOUS.A 1/4/2020 Yes
Off Yes NO 708 Yes DEFFOUS.A DEFFOUS.A 1/4/2020 Yes
Off Yes NO 1267 Yes DEFFOUS.A DEFFOUS.A 1/4/2020 Yes
Off Yes NO 909 Yes DEFFOUS.A DEFFOUS.A 1/4/2020 Yes
Off Yes NO 970 Yes DEFFOUS.A DEFFOUS.A 1/4/2020 Yes
Off Yes NO 1260 Yes DEFFOUS.A DEFFOUS.A 1/4/2020 Yes
Off Yes NO 1261 Yes DEFFOUS.A DEFFOUS.A 1/4/2020 Yes
Off Yes NO 1262 Yes DEFFOUS.A DEFFOUS.A 1/4/2020 Yes
OFF Yes NO 11F535 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
OFF Yes NO 11F647 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
OFF Yes NO 14F349 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
OFF Yes NO 16F105 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
OFF Yes NO 15F550 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
OFF Yes NO 16F829 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
Off Yes NO 11F794 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
OFF Yes NO 14F380 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
OFF Yes NO 15F640 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
Off Yes NO 14F332 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
Off Yes NO 795 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
Off Yes NO 17F217 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
Off Yes NO 15F615 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
Off Yes NO 16F855 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
Off Yes NO 16F804 Yes DEFFOUS.A DEFFOUS.A 1/7/2020 Yes
Off Yes 14F386 Yes DEFFOUS.A DEFFOUS.A 1/11/2020 Yes
Off Yes NO 14F332 Yes DEFFOUS.A DEFFOUS.A 1/13/2020 Yes
Off Yes NO 795 Yes DEFFOUS.A DEFFOUS.A 1/13/2020 Yes
Off Yes NO 17F217 Yes DEFFOUS.A DEFFOUS.A 1/13/2020 Yes
Off Yes NO 15F615 Yes DEFFOUS.A DEFFOUS.A 1/13/2020 Yes
Off Yes NO 16F855 Yes DEFFOUS.A DEFFOUS.A 1/13/2020 Yes
Off Yes NO 16F804 Yes DEFFOUS.A DEFFOUS.A 1/13/2020 Yes
Off Yes 16F105 Yes DEFFOUS.A DEFFOUS.A 1/13/2020 Yes
Off Yes 21F050 Yes DEFFOUS.A DEFFOUS.A 1/13/2020 Yes
OFF Yes 15F550 Yes DEFFOUS.A DEFFOUS.A 1/14/2020 Yes
Off Yes 18 Yes DEFFOUS.A DEFFOUS.A 1/14/2020 Yes
Off Yes 19 Yes DEFFOUS.A DEFFOUS.A 1/14/2020 Yes
Off Yes 14F386 Yes DEFFOUS.A DEFFOUS.A 2/12/2020 Yes
OFF Yes 805 Yes DEFFOUS.A DEFFOUS.A 1/18/2020 Yes
15F550 Yes DEFFOUS.A DEFFOUS.A 1/19/2020 Yes
Off Yes NO 14F332 Yes DEFFOUS.A DEFFOUS.A 1/20/2020 Yes
Off Yes NO 795 Yes DEFFOUS.A DEFFOUS.A 1/20/2020 Yes
Off Yes NO 17F217 Yes DEFFOUS.A DEFFOUS.A 1/20/2020 Yes
Off Yes NO 15F615 Yes DEFFOUS.A DEFFOUS.A 1/20/2020 Yes
Off Yes NO 16F855 Yes DEFFOUS.A DEFFOUS.A 1/20/2020 Yes
Off Yes NO 16F804 Yes DEFFOUS.A DEFFOUS.A 1/20/2020 Yes
Off Yes 15F550 Yes DEFFOUS.A DEFFOUS.A 1/21/2020 Yes
Off Yes 1261 Yes DEFFOUS.A DEFFOUS.A 1/21/2020 Yes
Off No 546 NO DEFFOUS.A DEFFOUS.A 1/23/2020 Yes
Off No 1289 NO DEFFOUS.A DEFFOUS.A 1/26/2020 Yes
Off Yes 14F386 Yes DEFFOUS.A DEFFOUS.A 1/26/2020 Yes
Off Yes NO 14F332 Yes DEFFOUS.A DEFFOUS.A 1/26/2020 Yes
Off Yes NO 795 Yes DEFFOUS.A DEFFOUS.A 1/26/2020 Yes
Off Yes NO 17F217 Yes DEFFOUS.A DEFFOUS.A 1/26/2020 Yes
Off Yes NO 15F615 Yes DEFFOUS.A DEFFOUS.A 1/26/2020 Yes
Off Yes NO 16F855 Yes DEFFOUS.A DEFFOUS.A 1/26/2020 Yes
Off Yes NO 16F804 Yes DEFFOUS.A DEFFOUS.A 1/26/2020 Yes
Off Yes NO 15F640 Yes DEFFOUS.A DEFFOUS.A 1/27/2020 Yes
Off Yes NO 805 Yes DEFFOUS.A DEFFOUS.A 1/27/2020 Yes
Off Yes NO 14F349 Yes DEFFOUS.A DEFFOUS.A 1/27/2020 Yes
Off Yes NO 927 Yes DEFFOUS.A DEFFOUS.A 1/27/2020 Yes
Off Yes NO 11F647 Yes DEFFOUS.A DEFFOUS.A 1/27/2020 Yes
Off Yes NO 16F829 Yes DEFFOUS.A DEFFOUS.A 1/27/2020 Yes
Off Yes NO 11F794 Yes DEFFOUS.A DEFFOUS.A 1/27/2020 Yes
Off Yes NO 15F633 Yes DEFFOUS.A DEFFOUS.A 1/27/2020 Yes
Off Yes NO 19 Yes DEFFOUS.A DEFFOUS.A 1/27/2020 YES
Off Yes NO 1260 Yes DEFFOUS.A DEFFOUS.A 1/30/2020 Yes
Off Yes NO 1262 Yes DEFFOUS.A DEFFOUS.A 1/30/2020 Yes
Off Yes NO 55 Yes DEFFOUS.A DEFFOUS.A 1/30/2020 Yes
Off Yes NO 73 Yes DEFFOUS.A DEFFOUS.A 1/30/2020 Yes
Off Yes NO 933 Yes DEFFOUS.A DEFFOUS.A 1/30/2020 Yes
Off Yes NO 14F386 Yes DEFFOUS.A DEFFOUS.A 2/1/2020 Yes
Off Yes NO 16F829 Yes DEFFOUS.A DEFFOUS.A 2/1/2020 Yes
Off Yes NO 14F349 Yes DEFFOUS.A DEFFOUS.A 2/1/2020 Yes
Off Yes NO 11F794 Yes DEFFOUS.A DEFFOUS.A 2/1/2020 Yes
Off Yes NO 11F647 Yes DEFFOUS.A DEFFOUS.A 2/1/2020 Yes
Off Yes NO 15F633 Yes DEFFOUS.A DEFFOUS.A 2/1/2020 Yes
Off Yes NO 15F640 Yes DEFFOUS.A DEFFOUS.A 2/1/2020 Yes
Off Yes 110 19 Yes DEFFOUS.A DEFFOUS.A 2/2/2020 Yes
OFF Yes 73 Yes DEFFOUS.A DEFFOUS.A 2/3/2020 Yes
OFF Yes 55 Yes DEFFOUS.A DEFFOUS.A 2/3/2020 Yes
Off Yes 1260 Yes DEFFOUS.A DEFFOUS.A 2/5/2020 Yes
Off Yes 1262 Yes DEFFOUS.A DEFFOUS.A 2/5/2020 Yes
Off Yes 110 19 Yes DEFFOUS.A DEFFOUS.A 2/2/2020 Yes
Off Yes 15F550 Yes DEFFOUS.A DEFFOUS.A 2/8/2020 Yes
Off Yes 15F535 Yes DEFFOUS.A DEFFOUS.A 2/8/2020 Yes
Off Yes 14F369 Yes DEFFOUS.A DEFFOUS.A 2/8/2020 Yes
Off Yes 15F626 Yes DEFFOUS.A DEFFOUS.A 2/8/2020 Yes
Off Yes 14F28 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 15F615 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 14F332 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 11F622 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 16F804 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 17F217 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 15f633 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 11f647 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 14f349 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 16f349 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 15f640 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 11f794 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 14f380 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 14f386 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 933 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 1261 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 21f050 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 16f105 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 1267 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 16f855 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 78 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 18 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 69 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 14 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 16 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 544 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 550 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 549 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 92 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
Off Yes 37 Yes DEFFOUS.A DEFFOUS.A 2/9/2020 Yes
OFF Yes 55 Yes DEFFOUS.A DEFFOUS.A 2/10/2020 Yes
OFF Yes 73 Yes DEFFOUS.A DEFFOUS.A 2/10/2020 Yes
OFF Yes 702 Yes DEFFOUS.A DEFFOUS.A 2/11/2020 Yes
OFF Yes 710 Yes DEFFOUS.A DEFFOUS.A 2/11/2020 Yes
OFF Yes 795 Yes DEFFOUS.A DEFFOUS.A 2/11/2020 Yes
OFF Yes 901 Yes DEFFOUS.A DEFFOUS.A 2/11/2020 Yes
OFF Yes 927 Yes DEFFOUS.A DEFFOUS.A 2/11/2020 Yes
OFF Yes 937 Yes DEFFOUS.A DEFFOUS.A 2/12/2020 Yes
Off Yes 14F28 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 15F615 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 14F332 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 11F622 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 16F804 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 17F217 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 15f633 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 11f647 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 14f349 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 16f349 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 15f640 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 11f794 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 14f380 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 14f386 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 933 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 1261 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 21f050 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 16f105 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 1267 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 16f855 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 78 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 18 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 69 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 14 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 16 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 544 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 550 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 549 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 92 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
Off Yes 37 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
OFF Yes 702 Yes DEFFOUS.A DEFFOUS.A 2/11/2020 Yes
OFF Yes 710 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
OFF Yes 795 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
OFF Yes 901 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
OFF Yes 927 Yes DEFFOUS.A DEFFOUS.A 2/15/2020 Yes
OFF Yes 55 Yes DEFFOUS.A DEFFOUS.A 2/17/2020 Yes
OFF Yes 73 Yes DEFFOUS.A DEFFOUS.A 2/17/2020 Yes
Off Yes 841 Yes DEFFOUS.A DEFFOUS.A 2/24/2020 Yes
Off Yes 1262 Yes DEFFOUS.A DEFFOUS.A 2/24/2020 Yes
Off Yes 1260 Yes DEFFOUS.A DEFFOUS.A 2/24/2020 Yes
OFF Yes 14F369 Yes DEFFOUS.A DEFFOUS.A 2/24/2020 Yes
OFF Yes 933 Yes DEFFOUS.A DEFFOUS.A 2/24/2020 Yes
OFF Yes 1267 Yes DEFFOUS.A DEFFOUS.A 2/24/2020 Yes
OFF Yes 1261 Yes DEFFOUS.A DEFFOUS.A 2/24/2020 Yes
OFF Yes 16F855 Yes DEFFOUS.A DEFFOUS.A 3/4/2020 yes
OFF Yes 14F349 Yes DEFFOUS.A DEFFOUS.A 3/4/2020 yes
OFF Yes 16F804 Yes DEFFOUS.A DEFFOUS.A 3/4/2020 yes
OFF Yes 11F535 Yes DEFFOUS.A DEFFOUS.A 3/4/2020 yes
OFF Yes 926 Yes DEFFOUS.A DEFFOUS.A 2/23/2020 yes
OFF Yes 14F369 Yes DEFFOUS.A DEFFOUS.A 2/27/2020 yes
OFF Yes 933 Yes DEFFOUS.A DEFFOUS.A 2/27/2020 yes
OFF Yes 1267 Yes DEFFOUS.A DEFFOUS.A 2/27/2020 yes
OFF Yes 1261 Yes DEFFOUS.A DEFFOUS.A 2/27/2020 yes
OFF Yes 21F050 Yes DEFFOUS.A DEFFOUS.A 3/1/2020 yes
OFF Yes 11F647 Yes DEFFOUS.A DEFFOUS.A 3/1/2020 yes
OFF Yes 15F640 Yes DEFFOUS.A DEFFOUS.A 3/1/2020 yes
OFF Yes 877 Yes DEFFOUS.A DEFFOUS.A 3/1/2020 yes
OFF Yes 17F217 Yes DEFFOUS.A DEFFOUS.A 3/1/2020 yes

OFF Yes 15F550 Yes DEFFOUS.A DEFFOUS.A 3/8/2020 yes

OFF Yes 832 Yes DEFFOUS.A DEFFOUS.A 3/8/2020 yes

OFF Yes 901 Yes DEFFOUS.A DEFFOUS.A 3/8/2020 yes

OFF Yes 712 Yes DEFFOUS.A DEFFOUS.A 3/8/2020 yes

OFF Yes 1090 Yes DEFFOUS.A DEFFOUS.A 3/8/2020 yes

Off Yes 795 Yes DEFFOUS.A 3/8/2020 NO

Off Yes 710 Yes DEFFOUS.A 3/8/2020 NO


Off Yes 702 Yes DEFFOUS.A 3/8/2020 NO
Off Yes 927 Yes DEFFOUS.A 3/8/2020 NO
Off Yes 14F369 Yes DEFFOUS.A DEFFOUS.A 3/8/2020 Yes
Off Yes 12F034 Yes DEFFOUS.A DEFFOUS.A 3/10/2020 Yes
Off Yes 14f369 Yes DEFFOUS.A DEFFOUS.A 3/12/2020 Yes
Off Yes 954 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 1234 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 1068 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 735 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 1195 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 843 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 1233 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 3 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 1232 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 778 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 20 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 39 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 38 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 66 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 31 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 22 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 32 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 71 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 56 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 35 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 149 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 13 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 34 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
Off Yes 15 Yes DEFFOUS.A DEFFOUS.A 3/14/2020 Yes
OFF Yes 21F050 Yes DEFFOUS.A DEFFOUS.A 3/16/2020 Yes
OFF Yes 11F647 Yes DEFFOUS.A DEFFOUS.A 3/16/2020 Yes
OFF Yes 15F640 Yes DEFFOUS.A DEFFOUS.A 3/16/2020 Yes
OFF Yes 877 Yes DEFFOUS.A DEFFOUS.A 3/16/2020 Yes
OFF Yes 17F217 Yes DEFFOUS.A DEFFOUS.A 3/16/2020 Yes
OFF Yes 15F550 Yes DEFFOUS.A DEFFOUS.A 3/16/2020 Yes
OFF Yes 832 Yes DEFFOUS.A DEFFOUS.A 3/16/2020 Yes
OFF Yes 901 Yes DEFFOUS.A DEFFOUS.A 3/16/2020 Yes
OFF Yes 712 Yes DEFFOUS.A DEFFOUS.A 3/16/2020 Yes
OFF Yes 1090 Yes DEFFOUS.A DEFFOUS.A 3/16/2020 Yes
OFF Yes 93 Yes DEFFOUS.A DEFFOUS.A 3/17/2020 Yes
OFF Yes 1 Yes DEFFOUS.A DEFFOUS.A 3/17/2020 Yes
OFF Yes 21F050 Yes DEFFOUS.A 3/19/2020 Yes
OFF Yes 11F647 Yes DEFFOUS.A 3/19/2020 Yes
OFF Yes 15F640 Yes DEFFOUS.A 3/19/2020 Yes
OFF Yes 877 Yes DEFFOUS.A 3/19/2020 Yes
OFF Yes 17F217 Yes DEFFOUS.A 3/19/2020 Yes
OFF Yes 15F550 Yes DEFFOUS.A 3/19/2020 Yes
OFF Yes 832 Yes DEFFOUS.A 3/19/2020 Yes
OFF Yes 901 Yes DEFFOUS.A 3/19/2020 Yes
OFF Yes 712 Yes DEFFOUS.A 3/19/2020 Yes
OFF Yes 1090 Yes DEFFOUS.A 3/19/2020 Yes
OFF 882 Yes DEFFOUS.A 4/29/2020 Yes
1403 DEFFOUS.A 4/29/2020 NO
1405 DEFFOUS.A 4/29/2020 NO
1400 DEFFOUS.A 4/29/2020 NO
1405 DEFFOUS.A 4/29/2020 NO
1408 DEFFOUS.A 4/29/2020 NO
1409 DEFFOUS.A 4/29/2020 NO
OFF Yes 1232 Yes DEFFOUS.A 4/30/2020 Yes
OFF Yes 1238 Yes DEFFOUS.A 4/30/2020 Yes
OFF Yes 1237 Yes DEFFOUS.A 4/30/2020 Yes
OFF Yes 771 Yes DEFFOUS.A 4/30/2020 Yes
OFF Yes 768 Yes DEFFOUS.A 4/30/2020 Yes
OFF Yes 770 Yes DEFFOUS.A 4/30/2020 Yes
OFF Yes 909 Yes DEFFOUS.A 4/30/2020 Yes
15F640
15F615
OFF Yes 14F328 DEFFOUS.A 5/9/2020 NO
OFF Yes 11F622 DEFFOUS.A 5/9/2020 NO
cod color

TIP REMOVED

CLOSE
LOTO AA
DATE

1/8/2020
1/8/2020
CLERING PUNCH ELECTRIC
1/8/2020
1/8/2020
1/13/2020
1/13/2020
1/13/2020
1/13/2020
1/13/2020
TAKIADEN ARAFA
1/13/2020
1/13/2020
1/13/2020
1/13/2020
1/13/2020
1/9/2020
1/9/2020
1/9/2020
1/9/2020
1/9/2020 TAKIADEN ARAFA & D.H.KIM
1/9/2020
TAKIADEN ARAFA & D.H.KIM

1/9/2020
1/9/2020
1/9/2020
1/13/2020
1/13/2020
1/13/2020
1/13/2020
1/13/2020
1/13/2020
1/18/2020 MASSI extantiont
1/20/2020
1/20/2020
1/20/2020
extantion
1/20/2020
1/20/2020
1/20/2020
1/20/2020 TAKIADEN ARAFA & D.H.KIM
1/20/2020 TAKIADEN ARAFA & D.H.KIM
1/14/2020 HAMZA
1/16/2020 HAMZA
1/16/2020 HAMZA
1/26/2020 MASSI
1/19/2020 HOLED/ ABDELRAHMAN ( LOTO REMOVING
1/21/2020 TAKI

extantion

1/22/2020
KANG + HVAC DEPARTEMENT
1/22/2020
1/26/2020 Y.G.KIM
1/26/2020 Y.G.KIM
MASSI

extantion

1/30/2020
1/30/2020
1/30/2020
1/30/2020
TAKI ARAFA
1/30/2020
1/30/2020
1/30/2020
1/30/2020
2/1/2020 TAKI ARAFA / CLOSED BY SID ALI
2/5/2020
2/5/2020
2/10/2020
TAKI ARAFA
2/10/2020
2/5/2020 TAKI ARAFA
2/8/2020 MASSI
2/8/2020 MASSI
2/8/2020 MASSI
2/8/2020 MASSI
2/8/2020 MASSI
2/8/2020 MASSI
2/8/2020 MASSI
2/8/2020
2/8/2020 MASSI
2/8/2020 MASSI
2/8/2020
SDIM ALI
2/8/2020
2/15/2020 SID ALI
2/15/2020
2/15/2020
KANG
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
SID ALI
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
J.H.
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/15/2020
2/17/2020
MASSI
2/17/2020
2/15/2020
2/15/2020
2/15/2020 HAN
2/15/2020
2/15/2020
2/12/2020 SID ALI
2/20/2020
2/20/2020
2/20/2020
SID ALI
2/20/2020
2/20/2020
2/20/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
J.H.
J.H.
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020
2/22/2020 HAN
2/22/2020
2/22/2020
2/19/2020
MASSI
2/19/2020
3/1/2020 ZAKEED
3/1/2020
TAKI ARAFA
3/1/2020
3/1/2020
3/1/2020
ZAKEED
3/1/2020
3/1/2020
3/4/2020
3/4/2020
3/4/2020
3/4/2020
3/1/2020 PARTIAL RELESED LEE J.G
3/1/2020
3/1/2020
3/1/2020
3/1/2020
3/10/2020
3/10/2020
3/10/2020
3/10/2020
3/10/2020

3/10/2020

KANG
3/10/2020

3/10/2020

3/10/2020

3/10/2020

S.K.BAIK

3/10/2020 SID ALI


3/17/2020
3/18/2020 TAKI ARAFA
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
June
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
KANG
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
3/22/2020
G.J.LEE
3/22/2020
5/4/2020
5/5/2020
5/6/2020
5/7/2020
5/8/2020
KANG yoon loop test
5/9/2020
5/10/2020
5/11/2020
5/12/2020
5/13/2020
D.H.KIM

TIP REMOVED
G.J.LEE
GCB

5/2/2020
5/2/2020 MASSOUD
5/2/2020
5/6/2020
5/6/2020
TAKI ARAFA
5/6/2020
5/6/2020

A.TAKI
Isolation
Departemen
Isolation Certificate PTW No.
S/N t: Description
Point No.

1 COMM GT 11 VPR74-1A GE-HEC-1109

2 COMM GT 12 VPR74-1A GE-HEC-1110

3 piping APU AIR LIK GE-HEC-1112

4 piping APU AIR LIK GE-HEC-1211

COOLING
5 instrument
SYSTEM

COOLING
6
SYSTEM

COOLING
7
SYSTEM

COOLING
8
SYSTEM

COOLING
9
SYSTEM

COOLING
10
SYSTEM

11 APU AIR LIK GE-HEC-1521

INSPECTIO
APU 1595 GE-HEC-1593
N
INSPECTIO
APU 1595 GE-HEC-1593
N

INSPECTIO GE-HEC-1814
12 NGFS21
N
MECHANICAL MASTER ISOLATION REGISTER

Departement : COMMISSIONING

ISOLAT

Tag/Eauipement No Description/Function Valve Lock Out

Off Yes No

NO SUPPLAY WATER Off Yes

NO SUPPLAY WATER Off Yes

I.A Off Yes

I.A OFF Yes

CWW
11PGG30AA302 OFF Yes
CALIBRATION

CWW
11PGG51AA302 OFF Yes
CALIBRATION

11PGG43AA302 CWW
OFF Yes
CALIBRATION

CWW
12PGG30AA302 OFF Yes
CALIBRATION

CWW
12PGG51AA302 OFF Yes
CALIBRATION

CWW
12PGG43AA302 OFF Yes
CALIBRATION

air instrement
12QFA20AA028 OFF Yes
coment ling

air instrement
12QFA20AA028 OFF Yes
coment ling
air instrement
12QFA20AA028 OFF Yes
coment ling

GAZ LING MINE


21EKG01AA001 OFF Yes
VALV
ER

MISSIONING

ISOLATION METHOD

Lock Out Tag Out Removed TIP

Number Number
Yes No Yes No
LOCK TIP LOCK PTW

73 Yes YES

55 Yes YES

14 Yes YES

18 Yes YES

92 Yes YES

58 Yes YES

14F386 Yes YES

36 Yes YES

55 Yes YES

69 Yes YES

98 Yes YES

33 Yes YES
17 Yes YES

1207 Yes No
UPDATE :
9/29/2019

Isolated By De-Isolated By
Close
CLOSE
DATE Yes/No
DATE

Name/Date Name/Date

D.ABDELHADI D.ABDELHADI 1/13/2020 Yes 1/16/2020

D.ABDELHADI D.ABDELHADI 1/13/2020 Yes 1/16/2020

D.ABDELHADI D.ABDELHADI 1/14/2020 Yes 1/14/2020

D.ABDELHADI D.ABDELHADI 1/21/2020 Yes 2/5/2020

D.ABDELHADI D.ABDELHADI 3/8/2020 Yes 3/20/2020

D.ABDELHADI D.ABDELHADI 3/8/2020 Yes 3/20/2020

D.ABDELHADI D.ABDELHADI 3/8/2020 Yes 3/20/2020

D.ABDELHADI D.ABDELHADI 3/8/2020 Yes 3/20/2020

D.ABDELHADI D.ABDELHADI 3/8/2020 Yes 3/20/2020

D.ABDELHADI D.ABDELHADI 3/8/2020 Yes 3/20/2020

D.ABDELHADI D.ABDELHADI 3/12/2020 Yes 3/18/2020

D.ABDELHADI D.ABDELHADI 3/17/2020 Yes 3/22/2020


D.ABDELHADI D.ABDELHADI 3/17/2020 Yes 3/22/2020

D.ABDELHADI 05.05.2020 NO PLUS BLI


PLUS BLIDE

You might also like