Technical Specification 1
The Peak Monobore “SIM Lock” system has been developed as a selective system for setting at any
chosen depth inside Monobore type completions, or within Well Bore Tubulars where existing
production Nipples are damaged.
The Running Tool & SIM Lock is run into the well on the end of a conventional Slickline Toolstring.
Once this has been reached the lock is selectively set by activating Serrated Tubing Slips via a J-
Slot mechanism and drag springs within the Running Tool.
This is achieved by the operator stopping the winch slightly deeper than the required Lock setting
depth, Then simply pulling back on the winch controls to pick up the Toolstring & stopping at the
selected setting depth. Once the operator sits back down again the J-Slot will activate the slips
preventing the Lock and Running Tool from traveling back down the hole. At this stage, if the
Operator wishes to alter the setting position, the tool depth can be adjusted by picking back up on
the winch controls. The J-Slot will rotate allowing the slip mechanism to retract. The depth the
locking system relies upon expanding slips activated by mechanically jarring down with Spang
Jars. If the SIM Lock is run in conjunction with a Sealing Element; the Element is also compressed
at this Jarring down stage to seal against both the Tubing Wall and the inner Element Mandrel.
Once the Operator is satisfied that there has been sufficient jarring down then a “Check Pull” is
applied. Again is the Check Pull is satisfactory then the Running Tool is released and retrieved by
Jarring upwards. A Tell Tale spear pin on the Running will confirm that the SIM Lock is correctly
set.
As an option the SIM Lock can also be set in conjunction with most readily available Pyrotechnically
activated setting tools (Baker, Owen, Halliburton…) with the use of wither Electric line or a Slickline
Tubing Slips.
Applications
Installation of a retrievable Straddle System to isolate / shut off unwanted water producing zones.
Suspending Gauges anywhere within the Tubing as the Ported “Bomb Hanger” version.
Well bore isolation as a mechanical barrier along with an equalizing facility as the SIM Plug version.
Installation of an internal annulus section to extend a wells Gas lift Well fluid from below the upper production packers or to reach
receding Fluid levels.
Downhole choke or Pump Open assembly
Tubing stop
Features
Debris Catcher Sub option for Equalising Prong version
High temp setting element.
Sour service sealing & metal components
Large “Through Bore” when used in Straddle applications reducing down hole “Choke” effect.
High temperature rating.
Interchangeable components for adapting generic SIM Lock assembly to suit Multiple Applications.
Benefits
Choice of Varying Drag Spring configurations to suit operating in High angle wells.
Multiple setting options – mechanically or pyrotechnically.
Simplistic Lock design with all major working components paced within the Running Tool.
Multiple Equalising assembly options for SIM Plug version – Melon Type, Prong Type or Pump Open.
1
SIM Lock
Technical Specifications
Description: 3-1/2” SIM Lock
Assembly Number: A351-2720-001
Redress Kit :- PRK351-2720-001 (complete), PRK351-2720-002 (Bomb Hanger No Seals)
Service:- Sour
2
Disassembly Steps — SIM Lock
Remove Internal
O Ring
3
Disassembly Steps — SIM Lock
Step 02 Remove Grub Screw and unscrew Upper Sleeve. Take care not to lose either
of the 2 x Keys.
4
Disassembly Steps — SIM Lock
Step 03
Using disassembly tool, remove Ratchet
Sleeve from Upper Sleeve.
5
Disassembly Steps — SIM Lock
6
Disassembly Steps — SIM Lock
Step 05 Unscrew Upper Inner Mandrel and remove Key Support Sleeve.
7
Disassembly Steps — SIM Lock
Step 06 Remove Upper Element Retainer, Snap Ring and Seal Ring.
8
Disassembly Steps — SIM Lock
9
Disassembly Steps — SIM Lock
Inspect Belleville Washers for damage. Stack free length of 26 Spring stacked in doubles (as
shown). Must not be less than 56mm.
10
Disassembly Steps — SIM Lock
Step 09 Remove any Equalising Assembly or other option from SIM Lock lower end.
11
Disassembly Steps — SIM Lock
Inspect Belleville Washer stack for damage. Free length of Spring stack (64 washers stacked
as singles), must not be less than 180mm.
12
Disassembly Steps — SIM Lock
13
Disassembly Steps — SIM Lock
NOTE:- Take care removing Slips and Upper Slip Support from Slip Cage.
DO NOT FORCE!
14
Disassembly Steps — SIM Lock
3. Clean and inspect all parts. Ensure threads are clean and undamaged.
15
Assembly Steps — SIM Lock
Step 01
16
Assembly Steps — SIM Lock
Step 02
Upper Element Retainer
(Item 08)
17
Assembly Steps — SIM Lock
18
Assembly Steps — SIM Lock
Snap Ring
(Item 19)
19
Assembly Steps — SIM Lock
Step 05
Fit O-Ring to Element Seal Ring
O-Ring
133-090V O-Ring
O-Ring
133-090V 136-090V
20
Assembly Steps — SIM Lock
Step 06 Carefully install Seal Ring by “screwing” Seal Ring over Lower Thread.
Followed by sliding Seal Ring over Middle Mandrel.
Snap Ring
(Item 19)
Seal Ring
(Item 10) - seals already fitted
21
Assembly Steps — SIM Lock
Step 07
Elastomer Element
Snap Ring
(Item 19)
22
Assembly Steps — SIM Lock
Step 08 Install Element Support Sleeve as shown with angled face toward Seal.
23
Assembly Steps — SIM Lock
Step 09
Upper Spring Cover Sleeve
(Item 12)
24
Assembly Steps — SIM Lock
Snap Ring
(Item 19)
NOTE:- Ensure Snap Ring is positioned within Belleville Spring Housing prior to assembling Slip
Cage Assembly.
25
Assembly Steps — SIM Lock
Slip Cage
(Item 15)
26
Assembly Steps — SIM Lock
Step 12 Place all 3 of Garter Springs on 1 of Slip, then pass the other Slips through the
Garter Springs one at a time.
27
Assembly Steps — SIM Lock
NOTE:- Bottom Slip Support may be used to aid Slip and Slip Cage installation.
28
Assembly Steps — SIM Lock
Step 14 Slide Slip Assembly over Mandrel and make up to Spring Cover Sleeve.
29
Assembly Steps — SIM Lock
30
Assembly Steps — SIM Lock
O Ring 129-090V
(Item 25)
O Ring 126-090V
(Item 24)
31
Assembly Steps — SIM Lock
Ratchet Sleeve
(Item 09)
Key Support
Sleeve
(Item 04)
Adjustment Ring
Release Keys
(Item 18)
(Item 03)
32
Assembly Steps — SIM Lock
Step 18
33
Assembly Steps — SIM Lock
Install Shear Screws PSS-05 x 2. Ensure Screws located in
Step 19
the groove on Key Support Sleeve.
34
Assembly Steps — SIM Lock
Step 20
35
Assembly Steps — SIM Lock
36
Assembly Steps — SIM Lock
Step 22 Install Spring Cover Sleeve and 64 x Belleville Washers stacked as shown as
singles.
37
Assembly Steps — SIM Lock
P- Style Equalising
Assembly
Bomb Hanger
38
Assembly Steps — SIM Lock
Step 24
O-Ring
140-090V
39
Assembly Steps — SIM Lock
NOTE:- Try to align split in the internal Ratchet Ring with one of the 2 x Re-
lease Keys. A light tap with a copper mallet on the Upper Sleeve open end
may be required in order to assist with starting the threaded connection.
40
Assembly Steps — SIM Lock
Step 26
41
Assembly Steps — SIM Lock
Step 27
42
Assembly Steps — SIM Lock
Step 28
43
44