Procedure
1. Open the front cover.
2. Remove all toner container each.
3. Remove the waste toner box tray by lift-
ing upwards and from the right side.

Figure 1-5-91

4. Remove the screw and then open the


connector cover.
5. Remove the connector.
*: Remove the seal behind that connector
is recessed.
6. Remove four fixed screws of inner unit.
*: Remove the seal behind that one screw
is recessed.
Replace the seal in position.

Figure 1-5-92

1-5-55
2L6/2N6/2N5/2N4

7. Release the lock by pushing the fixed


levers at the right and left of inner unit.
8. Remove the inner unit.

Figure 1-5-93

1-5-56
2L6/2N6/2N5/2N4

(2) Detaching and refitting the developer unit and drum unit

Detaching example: Developer unit Y and Drum unit Y

Procedure
1. Remove the fuser unit (see page 1-5-
68).
2. Pull the transfer belt unit out a little (see
page 1-5-62).
3. Remove the inner unit (see page 1-5-
55).
4. Close the toner supply shutter.
5. Remove two connectors.

Figure 1-5-94

6. Pull out as one body the developer unit


and the drum unit.
(The developer unit becomes basic and
the drum units are combined.)
7. Detach the developer unit while sup-
porting bottom.

Figure 1-5-95

1-5-57
2L6/2N6/2N5/2N4-4

8. Remove the drum unit from the devel-


oper unit.
9. Check or replace the drum unit and the
developer unit and refit all the removed
parts.
*: When a new development unit is
installed, the developing roller protec-
tive sheet must be removed. Developer roller
*: To install the drum unit onto the devel- protection seat
oper unit, insert the front end first, then
the rear end of the unit.

Figure 1-5-96

10. When replacing the new developer unit,


proceed as follows:
1)Perform maintenance mode U140
(AC calibration) for 45 ppm/55 ppm
model only (see page 1-3-99).
2)Perform maintenance mode U464
(Calibration) (see page 1-3-197).
3)Perform maintenance mode U469
(Auto color registration correction)
(see page 1-3-204).
4)Perform maintenance mode U410
(Adjusting the halftone automatically)
(see page 1-3-172).

Figure 1-5-97

11. When replacing the new drum unit, proceed as follows:


1)Performing LSU cleaning (see the operation guide)
Press [Adjustment/Maintenance] and then [Next] of [Laser Scanner Cleaning].
Press [Execute] to perform LSU cleaning.
2)Perform maintenance mode U119 (drum setup) (see page 1-3-92).
3)Perform maintenance mode U930 (checking/clearing the charger roller count) and checking the
counter value (see page 1-3-229).
4)Perform maintenance mode U140 (AC calibration) for 45 ppm/55 ppm model only (see page 1-3-99).
5)Perform maintenance mode U464 (Calibration) (see page 1-3-197).
6)Perform maintenance mode U469 (Auto color registration correction) (see page 1-3-204).
7)Perform maintenance mode U412 (Adjusting the uneven density) (see page 1-3-182).
8)Perform maintenance mode U464 (Calibration) (see page 1-3-197).
9)Perform maintenance mode U410 (Adjusting the halftone automatically) (see page 1-3-172).

1-5-58
2L6/2N6/2N5/2N4

(3) Detaching and refitting the charger roller unit


Detaching example: Charger roller unit Y

Procedure
1. Remove the inner unit (see page 1-5-
55).
2. Pull out the charger roller unit by pick-
ing and releasing the MC lock lever.
3. Check or replace the charger roller unit
and refit all the removed parts.

*: When refitting the charger roller unit,


that must hook the hook certain by
operating the MC lock lever after insert-
ing the charger roller unit until bumping.

4. When replacing the new charger roller


unit, proceed as follows:
Perform maintenance mode U930
(clearing the charger roller count) (see
page 1-3-229).
Perform maintenance mode U464 (Cali-
bration) (see page 1-3-197).
Perform maintenance mode U410 (Adjust-
ing the halftone automatically) (see page1-
3-172).

Figure 1-5-98

1-5-59

You might also like