Scaffolding Load Calculation

FRONT VIEW SIDE VIEW

1) LOADING
NO DISCRIPTION WEIGHT (KG) LIFT BIL SIZE TOTAL (KG) SCAFFOLDING INFORMATION
1 GI Pipe (6 M) 26.22 1 0 0
MANHOLE
2 GI Pipe (3M) 13.11 1 1 13.11 L W H TOTAL M3
3 GI Pipe (2.5 M) 10.925 1 4 43.7 3 3 3 27
4 GI Pipe (2 M) 8.74 1 5 43.7
5 GI Pipe (1½ M) 6.555 1 6 39.33 NO OF STANDART : 1
6 GI Pipe (1 M) 4.37 1 1 4.37 NO OF BAY 1
7 Matel Dack (3 M) 9 1 0 0 NO OF WORKING
1
8 Matel Dack (2 M) 6 1 5 0 PLATFORM
9 Matel Dack (1½M) 4.5 1 2 0 DUTY OF SCAFFOLD LIGHT
MASTERBATCH 10 Matel Dack (1 M) 3 1 5 15 LOAD OF SCAFFOLD 225
11 Right Angle Cupler 1.25 1 18 22.5 SAFETY FACTOR 4
12 Swivel Cumper 1.25 1 0 0
13 Sleeve Cupler 1.13 1 0 0
14 Ladder (6m) 6 1 0 0
15 Ladder (4m) 4 1 0 0
16 Ladder (3m) 3 1 0 0
17 Base Plate 1 1 0 0
TOTAL WEIGHT (KG) 181.71

* Duty References
2m Light Medium Heavy
225kg 450kg 675kg

2) LIVE LOAD

X X No of Working X
Worker No of worker Total (Kg)
Platform
80 X 2 X 1 X 160

3) IMPOSED LOAD

Dead Load ˖ Live Load Total (Kg)


181.71 ˖ 160 341.71

4) SAFE WORKING LOAD

AXIAL LOAD

Proposed Axial Load According To Table 14,BS 5973 2M effective length 24.9 KN * Refer Table 14
Total Selfweight Of The Structure (LL X SF) + D.L 821.71 KG
No Of Standard Supporting This Weight Directly No Of Standarts 1
Load Per Standard Total selfweight/standard 821.71 KG
8.1 KN
24.9 > 8.1 ok

HORIZONTAL LOAD

safe ledger load referring to table 18 ,BS 5973 1.2m center point mass x 2 242.0 kg * Refer Table 18
Total Selfweight Of The Structure (LL X SF) + D.L 821.71 KG
No Of Ledger Supporting Total load No Of ledger 2
Load Per ledger Total selfweight/standard 410.86 KG
4.0 KN
484.0 > 410.9 ok
TOP VIEW
5) Tubes properties
** Table reference

Legend

* Tube of Scaffolding

* Tube of Bracing

* Matel Deck / Teo Bord Scaffolding

* Soul plate / Base plate Scaffolding

* Ladder

* cotton rag

Tube Color Code

PIPE 3 METRE
MANHOLE

PIPE 2.5 METRE

PIPE 2 METRE

PIPE 1.5 METRE

PIPE 1 METRE

TYPE OF SCAFFOLD: SCAFFOLDING TOWER ERECTION DATE : ____________________________________________

LOC/EQUIP NO: ____________________________________________


PE-2-M-825 A INSPECTION DATE : ____________________________________________
TAG NO: _______________________________________________ DRAWING NO : RWNA/BSSB/RWPE/101 PREPARED BY :_________________________________________ ENDORSE BY: APPROVED BY `

SCAFFOLDING SIZE : L W R UNIT JOB NO : ____________________________________________ NAME :_______________________________________________ NAME :_______________________________ NAME :______________________________
M3
POSITION :SCAFFOLDING INSPECTOR POSITION :______________________________ POSITION :__________________________