Wisdom is not Virtue but Necessity 1
REV. R9, NOV 2008
POWER-LINKER GROUP
POWER-LINKER
TUTORIAL ON
GENERATOR PROTECTION APPLICATIONS
&
SETTING CRITERIONS
BY
11kV
POWER-LINKER
1000/1
CL : PS
PHASE TO
1000/1 PHASE FAULT
1000/1 51 51N
Gen. Tr.
16MVA 400/1 51NT
11/ 6.6KV
1000/1 64T PHASE - PHASE FAULT
PHASE - GROUND FAULT ??
400A
1500/1
CL:PS
2000/1, 15VA
CL:0.5
1500/1, 30VA 32G 87G 87GT
CL:1.0 40X
2/32G
F.B 27/40V 2/27 2/59
TG 81.1/ 81.3/ 1.5/1
12.5 MW
6.6KV
~ 2/64F1
64F1 64F2
21 51V 27 24,V/F 59 81.2 81.4 60 CL:PS
1500/1
78 46G 51O/L 51V 40G 21 86A 86B 86C 86E 86T
30VA
5P10 2/46G
40T1 95/52 95/86A 95/86B 95/86C
40T2
1500/1
CL : PS
1500/1
CL : PS
51N PHASE TO GROUND FAULT 3
100/1
5VA 38 Ω
5PS 100A,For 10 sec.
POWER-LINKER GROUP
POWER-LINKER
PT
TG 2/59.1 2/59.2 U/F O/F
21
12.5 MW 40X 2/27 59.1 59.2 81.1/ 81.3/
6.6KV
~ 40V 51V 27 24,V/F 81.2 81.4 60
1500/1
30VA 78 46G 51O/L 40G 51V 21 86A 86B 86C 86E 86T
5P10 2/46G
40T1 95/52 95/86A 95/86B 95/86C
40T2
1500/1 TO 87G
CL : PS
1500/1 TO 87T
CL : PS
100/1 NOTE:
51N
5VA
SOME LOCAL AUTHORITIES MAY
5PS
38 Ω INSIST FOR PROVISION OF GENERATOR 64R
100A,For 10 sec. FOR SMALL MACHINES(<2 MW) 4
POWER-LINKER GROUP
11kV
POWER-LINKER
1000/1
CL : PS
1000/1
1000/1 51 51N
Gen. Tr.
16MVA 400/1 51NT
11/ 6.6KV
1000/1 64T
400A
1500/1
CL:PS
2000/1, 15VA
CL:0.5 F.B
87G 87GT
1500/1, 30VA 32G
CL:1.0 2/32G
TG 1.5/1
12.5 MW
6.6KV
~ 64F1 64F2 CL:PS
2/64F1 5
POWER-LINKER GROUP
POWER-LINKER
GENERATOR PROTECTION ELEMENTS
6.1 VIBRATION 7
POWER-LINKER GROUP
B 100
ROTOR CURRENT (0.8)
LIMIT
87
0.8
0p
STABILITY LIMIT
f
0.
7p FLAME STABILITY
f
25
(0.2)
A D
Q (LAG) Q (LEAD)
100 89 75 MVAR 25
(0.8) (0.6) (0.2) FIG_GEN_1
• NORMAL VOLTAGE RANGE : 95 - 105 %
• INCREASE TERMINAL VOLTAGE TO DELIVER MORE Q ON AB LINE
( ACTS AS CAPACITOR )
• DECREASE TERMINAL VOLTAGE TO ABSORB MORE Q ON CD LINE 9
( ACTS AS REACTOR ) USED DURING HIGH VOLTAGE CONDITIONS
POWER-LINKER GROUP
• INSULATION LIFE
• BACKUP TO OVERLOAD PROTECTION !!
??
• DOES U/F RELAY ACTS AS BACK UP TO
OVER LOAD PROTECTION ??
• EXHAUST GAS, HOOD TEMPERATURE
10
HIGH ON OVERLOAD CAN ACT AS BACK UP
POWER-LINKER GROUP
POWER LINKERS
CLASS Y A E B F H C
1000000
IEEE STD - 117 POWER-LINKER
, ,
CLASS ‘H’
180°C
CLASS ‘F’
100000
, 155°C
CLASS ‘B’
130°C
20,000
(BASE) CLASS ‘A’
10000
, 105°C
AVERAGE
EXPECTED
LIFE(HOURS) • RECOMMENDED 2000
1300
OPERATING
1000
TEMPERATURE
500
FOR BETTER 1550
INSULATION LIFE
FOR EVERY 10°C DROP, LIFE DOUBLES
100
40 60 80 100 120 140 160 180 200 220 240 260
12
TOTAL WINDING TEMPERATURE θ
POWER-LINKER GROUP
• FOR EXAMPLE
• IF CLASS ‘F’ INSULATION IS MAINTAINED AT 155°C
FOR 20,000 HOURS, TENSILE STRENGTH WILL
REDUCE BY HALF.
• IF CLASS ‘B’ INSULATION IS MAINTAINED AT 130°C
FOR 20,000 HOURS, TENSILE STRENGTH WILL
REDUCE BY HALF.
13
POWER-LINKER GROUP
POWER-LINKER
INSULATION LIFE
• IF TEMP IS LIMITED TO 120°
FOR CLASS ‘F’ INSULATION, EXPECTED LIFE = 200,000 HRS
POWER-LINKER
GENERATOR PROTECTION ELEMENTS
STATOR EARTH FAULT (0-95%) [ 64S]
0 – 95 %
• WHAT DOES IT MEAN BY 0-95 % AND 95 – 100 %
POWER-LINKER
ALTHOUGH,
16
POWER-LINKER GROUP
0
0 1 2 3 4 5 6 7 8 9 10 11 12
TIME IN SEC 18
SOURCE: LEROY SOMER
POWER-LINKER GROUP
NEUTRAL
DISPLACEMENT
VS 0.9 Ω 64ND RELAY
VP
(INSENSITIVE
TO THIRD
HARMONICS)
(11,000/√3) V
240
POWER-LINKER
11000
PRIMARY VOLTS = 10 x
√3 x 240
= 264 VOLTS
264
% WINDING UNPROTECTED = = 0.0415 = 4.15 % UNPROTECTED
11000
√3
21
POWER-LINKER GROUP
POWER-LINKER
STATOR EARTH FAULT (95 to 100%) [64S]
• WHY IMPORTANT? FIG_GEN_12
22
POWER-LINKER GROUP
POWER-LINKER
STATOR EARTH FAULT (95 to 100%) [ 64S]
• BASIS - ALL GENERATORS PRODUCE CERTAIN
AMOUNT OF THIRD HARMONIC VOLTAGE
3RD HARMONIC
• MEASUREMENT OF VOLTAGE
THIRD HARMONIC
VOLTAGE ⇒ FIG_GEN_13
• REMARK 23
SET RELAY (U3 OR R1) BELOW VTH AT NO LOAD.
POWER-LINKER GROUP
POWER-LINKER
GENERATOR PROTECTION ELEMENTS
STATOR EARTH FAULT (95 to 100%) [ 64S] RAGEA
• NORMAL CONDITION ( VT > 90% )
• GENERATOR PRODUCES 1 to 3% THIRD HARMONIC VOLTAGE
UNDER NORMAL CONDITIONS
• SUFFICIENT THIRD HARMONIC VOLTAGE IS AVAILABLE AT
NEUTRAL END OF GENERATOR
• RELAY R1 TUNED FOR THIRD HARMONIC IS ENERGISED AND
NC CONTACT OPENS OUT
• RELAY R2 IS A CHECK RELAY AND BRINGS THE SCHEME INTO
SERVICE ONLY AFTER NORMAL TERMINAL VOLTAGE IS
ESTABLISHED ( Say VT > 90%) .
64ND = 0 – 95 %
STATOR E/F F
RELAY I
L U3
64ND
T VOLTAGE CHECK
E TUNED UF RELAY
R FOR
150 Hz TUNED FOR 50 Hz
CONTACT CONFIGURATION
HEALTHY CONDITION, U3 HIGH NO TRIP
FAULT NEAR NEUTRAL, U3 LOW TRIP
25
FIG_GEN_13
POWER-LINKER GROUP
26
POWER-LINKER GROUP
F
64ND = 0 – 95 %
I
STATOR E/F
L
RELAY 64ND U3
T
E VOLTAGE CHECK
TUNED UF
R FOR
RELAY
150 Hz TUNED FOR 50 Hz
CONTACT CONFIGURATION
HEALTHY CONDITION, U3 HIGH NO TRIP
FAULT NEAR NEUTRAL, U3 LOW TRIP
27
FIG_GEN_13
POWER-LINKER GROUP
POWER-LINKER
STATOR OPEN
STATOR EARTH FAULT (95 to 100%) [ 64S] CIRCUIT
CHARACTRISTICS
Ι1 PROTECTED Ι2
ΙOP OPERATION FOR
OBJECT
---- Ι1
ΙN --- < BP
O ΙN OPERATING CURRENT
P
OR ΙOP = ⎜ Ι1 + Ι2 ⎜
E
R Ι2 CONVENTIONAL BIAS SCHEME
A --- < BP
ΙN ----------------
T ΙRES = √ Ι1 x Ι2 x COS α
I COS α ≥ O ;
O
THROUGH FAULT
N
slope v RESTRAINT
ΙRES = O
pick up g COS α < O ;
ΙRES INTERNAL FAULT
1 1.5 2 3 ----
ΙN FIG_GEN_2
30
BP
POWER-LINKER GROUP
~
RCT1 RCT2
RSTAB M : METROSIL
M
R
POWER-LINKER VOLTAGE
RESTRAINED OVER
GENERATOR PROTECTION ELEMENTS CURRENT
PROTECTION
POWER-LINKER
POWER-LINKER
27/50
GENERATOR PROTECTION ELEMENTS
• VOLTAGE RESTRAINED OVER CURRENT PROTECTION [51V]
• ONLY ONE CHARACTERISTICS
EHV
• CHARACTERISTICS CONTINUOUSLY MODIFIED AS PER
TERMINAL VOLTAGE
• CONCEPTUALLY AN IMPEDANCE RELAY ( V / I ) GT
• MODERN PROTECTION PHILOSOPHY
• PROVIDE BACK UP IMPEDANCE (DISTANCE)
PROTECTION(21); COVER 50% GT IMPEDANCE
• DO NOT PROVIDE 51V
• CT FOR 51V / 21 ⇒ NEUTRAL SIDE
34
• DMT CHARACTERISTICS OF VAASA - VPG 210
POWER-LINKER GROUP
ΙY1 = 0.2 X ΙY
VOL
UX1 = 0.2 UX2 = 0.8
• USEFUL WHEN TERMINAL FED STATIC EXCITATION
SYSTEM IS USED
• WHEN TERMINAL VOLTAGE FALLS, PICK UP CURRENT
VALUE ALSO FALLS LINEARLY
35
POWER-LINKER GROUP
ΙY1 = 0.2 X ΙY
VOL
UX1 = 0.2 UX2 = 0.8
• TYPICALLY ΙY IS SET 1.5 to 2 ΙRAT
• E.g. WHEN VT > 0.8, ΙPICKUP= 1.5 ΙRAT
WHEN VT = 0.2, ΙPICKUP= 0.3 ΙRAT
DMT - TIME DELAY : 1 Sec
36
• ΙY , UX1, UX2 & TIME DELAY ⇒ VARIABLE SETTING
POWER-LINKER GROUP
ΙY1 = 0.2 X ΙY
VOL
UX1 = UX2 = 0.4
• TYPICALLY ΙY IS SET 1.5 to 2 ΙRAT,
• E.g. WHEN VT > 0.4, ΙPICKUP= (1) X1.5
ΙRAT
WHEN VT < 0.4, ΙPICKUP= (0.2) X1.5 ΙRAT
DMT - TIME DELAY : 1 Sec
37
• ΙY , UX1= UX2 & TIME DELAY ⇒ VARIABLE SETTING
POWER-LINKER GROUP
POWER-LINKER
INADVERTENT ENERGISING (27/50)
• TURBINE ON TURNING GEAR & FIELD IS NOT ON
• BREAKER IS CLOSED - REASON : (GOOD OLD) HUMAN ERROR
• MACHINE WILL DRAW LARGE STATOR CURRENT ( 2 to 6 ΙRAT)
AND POSSIBLE DAMAGE TO STATOR
• LARGE CURRENT INDUCED IN ROTOR BODY
• RAPID ROTOR HEATING AND POSSIBLE DAMAGE TO ROTOR
ALTR
PRIME
MOVER 52
50
27
38
POWER-LINKER GROUP
52
50
X – DE-ENERGISED 39
27
POWER-LINKER GROUP
POWER-LINKER
INADVERTENT ENERGISING (27/50)
CAUTION
THIS RELAY & TRIP CIRCUIT SHALL BE IN SERVICE
• EVEN WHEN THE UNIT IS SHUT DOWN FOR ANY
PURPOSE
• WHEN ROTOR IS REMOVED BACK EMF IS NOT
AVAILABLE
PRIME ALTR
MOVER
52
50
27
40
POWER-LINKER GROUP
POWER-LINKER
POWER-LINKER
GEN. MAIN
FIELD ROTOR
PILOT
EXCITER PMG
ROTOR ROTOR
GEN.
~ STATOR
AVR
AVR VOLTAGE SENSING
P. T.
EXCIT
ER
STAT
OR
SH P
AF M
QDCT
TMAIN EXCIT G
ER
ROTO ROTATING ROTO R
PMG
R OT
VOLTAGE COMPENSATION
R STAT
DIODES O
OR
MAIN
1
EXCIT R
ER
STAT ISOLATION
OR STATO
R TRANSFORME
R
AVR (FOR HI
RATING
AVR POWER GENERATOR)
SUPPLY SOURCE
(IF FITTED)
POWER-LINKER
ROTOR EARTH FAULT PROTECTION [64 R]
• SECOND EARTH FAULT
• PART OR WHOLE OF WINDING GETS SHORT CIRCUITED
• FLOW OF LARGE (FIELD) FAULT CURRENT
POWER-LINKER
FIELD OVER HEATING
ROTOR EARTH FAULT PROTECTION [64 R]
• DETECTION TECHNIQUES
• VOLTAGE DIVIDER PRINCIPLE
• SIEMENS - 7UR22
44
POWER-LINKER GROUP
POWER-LINKER
ANSI C50.13-1977
FIELD VOLTAGE / CURRENT
112 125 146 208
(PERCENT OF RATED)
TIME (SEC) 120 60 30 10
45
POWER LINKER GROUP
POWER-LINKER
LOSS OF
GENERATOR PROTECTION ELEMENTS EXCITATION
• LOSS OF FIELD
• MAGNETIC COUPLING BETWEEN STATOR MMF &
ROTOR FIELD LOST
• PRIME MOVER STILL DRIVING THE UNIT
• LARGE SLIP FREQUENCY CURRENT INDUCED IN ROTOR
• UNIT BEHAVES LIKE INDUCTION GENERATOR⇒ FIG_GENR_6
• DELIVERING ALMOST SAME ACTIVE POWER
• DRAWING REACTIVE POWER FROM SYSTEM
• VOLTAGE COLLAPSE, IF SYSTEM IS WEAK
• ROTOR OVER HEATING
• PROBLEM MORE SEVERE FOR STEAM UNITS (3000 RPM)
• PROBLEM LESS SEVERE FOR HYDRO & DG SETS 47
SALIENT POLE - PRESENCE OF DAMPER BARS
POWER-LINKER GROUP
POWER-LINKER
SYNCHRONOUS GENERATOR
SYNCHRONOUS MOTOR
LAGGING REGION
LEADING REGION
P_ABSORPTION P_GENERATION
POWER-LINKER
49
POWER-LINKER GROUP
POWER-LINKER
ASYNCHRONOUS OPERATION
SYNCHRONOUS MACHINE.
CONNECTED TO SYSTEM WITH VDC
POLE SLIPPING
SYNCHRONOUS MACHINE
CONNECTED TO SYSTEM WITH
VDC
FIELD WINDING EXCITED
FIELD ON 50
POWER-LINKER GROUP
• SUMMARY OF EFFECTS
• INTENSE HEATING OF ROTOR SURFACE
• SAG IN SYSTEM VOLTAGE AS LARGE MVAR IS DRAWN
FROM SYSTEM
• EFFECT OF PRE - DISTURBANCE LOADING
• IF THE UNIT IS HEAVILY LOADED, THE EFFECT IS MORE
SEVERE
• IF THE UNIT IS LIGHTLY LOADED, THE EFFECT IS LESS
SEVERE
• FOR EXAMPLE, 60 MW UNIT CAN OPERATE SUCCESSFULLY
WITHOUT UNDUE STRESS AT 10 MW WITH FIELD
DISCONNECTED (SUBJECT TO BOILER – TURBINE CONTROL)
53
POWER-LINKER GROUP
POWER-LINKER
LOSS OF FIELD RELAY X
(+ MVAR) NORMAL
OPERATING POINT
R
(- MW) (+ MW)
K1 X'd
K1 = 0.5 to 1.0
K2 X d K2 = 0.5 to 1.0
Ι V QUADRANT
(- MVAR)
POWER-LINKER
• OVER FLUXING ⇒
• SERIOUS OVER HEATING OF METALLIC PARTS
• LOCALISED RAPID MELTING OF GENERATOR
CORE LAMINATIONS
56
POWER-LINKER GROUP
POWER-LINKER
POWER-LINKER
OVER VOLTAGE
59
GENERATOR PROTECTION ELEMENTS
OVER FLUXING PROTECTION [59 V/Hz]
⇒ PERMISSIBLE SIMULTANEOUS
DEVIATION OF VOLTAGE
AND FREQUENCY
58
POWER-LINKER GROUP
120
TRIP
115
VOLTS /
HERTZ
IN %
110
NON-TRIP
105
100
V/f CHARACTERISTICS V%
POWER-LINKER
105
REF: 60 MW TG
95
BIRLA COPPER
– V%
PERMISSIBLE SIMULTANEOUS DEVIATIONS OF VOLTAGE 60
AND FREQUENCY
POWER-LINKER GROUP
POWER-LINKER
POWER- LINKER
REVERSE
POWER
GENERATOR PROTECTION ELEMENTS
OVER VOLTAGE PROTECTION [59]
• SOUNDS ANNUNCIATION
KW
ALTERNATOR KVAR
FAILED CT
PRIME MOVER
GAS, STEAM, DIESEL ON
ΙF LOAD
32
32 - REVERSE
PT KVAR KW
POWER RELAY
32
ALTERNATOR
HEALTHY CT
PRIME MOVER ON
GAS, STEAM, DIESEL KVAR
KW
ΙF FIG 80 64
POWER-LINKER GROUP
11kV
POWER-LINKER
1000/1
CL : PS
PHASE TO
1000/1 PHASE FAULT
1000/1 51 51N
Gen. Tr.
16MVA 400/1 51NT
11/ 6.6KV
1000/1 64T PHASE - PHASE FAULT
PHASE - GROUND FAULT
400A
1500/1
CL:PS
2000/1, 15VA
CL:0.5
1500/1, 30VA 32G 87G 87GT
40X
CL:1.0 2/32G
F.B 27/40V 2/27 2/59
TG 81.1/ 81.3/ 1.5/1
12.5 MW
6.6KV
~ 2/64F1
64F1 64F2
21 51V 27 59VF 59 81.2 81.4 60 CL:PS
1500/1
78 46G 51O/L 51V 40G 21 86A 86B 86C 86E 86T
30VA
5P10 2/46G
40T1 95/52 95/86A 95/86B 95/86C
40T2
1500/1
CL : PS
1500/1
CL : PS
51N PHASE TO GROUND FAULT 67
100/1
5VA 38 Ω
5PS 100A,For 10 sec.
POWER-LINKER GROUP
POWER SETTING
HYDRO : 0.5 to 1% OF PRAT
STEAM, DG, GAS : 3% OF PRAT
TIME DELAY
STEAM, HYDRO, DG : 2 to 5 Sec
GAS : 10 to 30 Sec (TURBINE CAN WITH STAND)
SETTING TO BE DECIDED BASED
ON SYSTEM CRITERIA SAY 1 TO 3 SEC
POWER-LINKER
UNBALANCED ARMATURE CURRENT PROTECTION
• UNBALANCED ARMATURE CURRENT INDUCES DOUBLE
FREQUENCY CURRENT ON ROTOR SURFACE
• DUE TO SKIN EFFECT, CURRENT IS FORCED TO FLOW
ON THE PERIPHERY OF ROTOR:
TEETH, DAMPER BARS AND SLOT WEDGES
• VERY LITTLE CURRENT FLOWS IN THE MAIN CROSS
SECTION OF ROTOR FORGING
• ROTOR SURFACE TEMPERATURE RISES VERY RAPIDLY
POWER-LINKER
-VE
10
SEQUENCE WITHSTAND CAPABILITY OF GENERATOR
Ι22 t = 20
1
-VE SEQUENCE
CURRENT PU
0.1
0.1 1 TIME IN SEC 10 100 72 1000
POWER-LINKER GROUP
• PROTECTION
• OVERCURRENT FAULT DETECTOR PROVIDED TO
SUPERVISE MHO UNIT
• USUALLY THIS PROTECTION DOES NOT TRIP TURBINE 74
POWER-LINKER GROUP
POWER-LINKER
STABILITY : ANALOGY WITH MOVING TRAINS
100 KM / HOUR
δ IJ = 0 STABLE
100 KM / HOUR
100 KM / HOUR
δ IJ = 30° STABLE
110 KM / HOUR
100 KM / HOUR
δ IJ > 30° UNSTABLE
110 KM / HOUR
75
POWER-LINKER GROUP
POWER-LINKER
100
80
RELATIVE
ROTOR OTOR 60
ANGLE IN DEG
40
20
0
0 3 6 9 12 15
76
FIG_ISL_2 TIME IN SEC
POWER-LINKER GROUP
POWER-LINKER
SWING CURVE - UNSTABLE CASE
180
120
60
TIME IN SEC
0
RELATIVE
ROTOR OTOR
0 0.5 1 1.5 2
ANGLE IN DEG-60
-120
POLE SLIP
-180
POWER-LINKER
CRITICAL CLEARING TIME : CCT
POWER-LINKER
CRITICAL CLEARING TIME
180
MARGINALLY
UNSTABLE 11 CYC STABLE
10 CYC
120
STABLE
5 CYC
60
TIME IN SEC
0
ROTOR 0 0.5 1 1.5 2
ANGLE-DEG
-60
-120
-180 79
FIG_ISL_4
MASTER IN GENERATOR
PROTECTION
80
POWER-LINKER GROUP
POWER-LINKER
GROUP
POWER-LINKER
POWER SYSTEM CONSULTANTS
122, NAHAR & SETH ESTATE,
CHAKALA, ANDHERI ( EAST ),
MUMBAI : 400 099 , INDIA.
E-MAIL : powersys@vsnl.com
WEBSITE : www.powersystemconsultant.com 81