PROJECT SPECIFICATION
FOR
PRESSURE VESSELS
Signature:
Document Class: Z
Denis Saudel
Jean-Marc Maurice
Peter Leemans 2013.09.12 15:07:54
2013.09.12 11:17:08 2013.09.12
+02'00' 14:25:02 +02'00' +02'00'
Sections changed in last revision are identified by a vertical line in the margin.
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
CONTENTS
1. PURPOSE ........................................................................................................................................................... 3
9. REPORTING ...................................................................................................................................................... 8
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
1. PURPOSE
This specification defines the test instruments, test procedure and identification required for a
program of Positive Material Identification (PMI) for Pressure Vessels, to verify that the elemental
composition of Alloy Materials is as ASME Code.
This specification shall be implemented by all SUPPLIERS to reinforce those procedures which are
normally used to identify and control Alloy Materials.
2. REFERENCE DOCUMENTS
ASME SEC II Boiler and Pressure Vessel Code Section II: Part A, B and C
ASME Section VIII Division 2 Alternative Rules for Construction of Pressure Vessels
The following terms used in this document have the meaning defined below:
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
The acronyms used in this document have the meaning defined below:
- FEED Front-End Engineering Design
- PTS PETRONAS Technical Standard
- RAPID Refinery And Petrochemicals Integrated Development
- PQR Procedure Qualification Record
- TOFD Time Of Flight Diffraction
- PWHT Post Weld Heat Treatment
- UT Ultrasonic Testing
- MAP Maximum Allowable Pressure
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
4. EXTENT OF TESTING
PMI testing shall be performed on all alloy material upon receipt at the fabrication facility and on
PMI shall be performed on materials listed in Table 2, with the extent defined in Table 1.
The material to be tested listed in Table 2, is a minimum requirement only. If a material is not
listed in the table but deemed necessary to be inspected and verified during EPCC. EPCC
CONTRACTOR shall include this material in the table accordingly.
COMPONENT EXTENT
CATEGORY CATEGORY CATEGORY CATEGORY
1 2 3 4
Internals
- Tray 100% of incoming goods / 5% after fabrication
- Distributors, nozzles, piping, 100% of welds and components
supporting beams
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
2.25 Cr – 1 Mo Cr, Mo
3XX austenitic stainless steels Cr, Ni, Mo (C if specified in equipment data sheet)
Ti & Nb (for special grades of 300 series, 321, 347)
Titanium Ti
Each component when PMI is accepted shall be identified and marked with the code letters "PMI”
of at least 6mm high (repairs of welding not marked).
Materials PMI tested shall remain identified during all fabrication, erection and testing processes
unless their identity is necessarily obliterated by processing (painting, insulation, or plant
operations).
6. TEST EQUIPMENT
Test equipment or methods used for testing shall be such as defined in API 578 § 5. They shall be
capable of providing quantitative, recordable, elemental composition results for positive
identification of the alloying elements present in the materials.
Chemical spot testing, magnets, alloy sorters and other methods using eddy current or triboelectric
testing methods are not acceptable for PMI examination.
All test equipment shall be fitted with a current calibration sticker and accompanied by the most
recent calibration certificate.
The result of the PMI test shall be within the range specified in the applicable material standard.
Result shall be reported in a dedicated record sheet that details values of elements.
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
8. TESTING PROCEDURES
Checking shall be performed in accordance with written operating procedures which have been
submitted to CONTRACTOR prior to the start of fabrication.
d. Equipment accuracy.
e. Surface preparation, cleaning, sample removal (as applicable), temperature of use (minimum
and maximum).
g. Acceptance criteria.
j. Procedure to follow when identification results are inconclusive (alloy type is unknown).
l. Statement of operating personnel competency for PMI. techniques with supporting CV, validity
of the competency.
m. Reporting format.
n. Color coding.
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
9. REPORTING
A signed and dated report shall be provided to OWNER and/or CONTRACTOR. A report of PMI
test results shall be provided in a format with following information:
- Project / PO No.
- Material manufacturer, MTR number, heat number and lot number, as applicable
- Material and Grade including material certificate and transfer record, as applicable
- Name of person who performs the test, including the qualifications of PMI testing
- PMI Procedure