IT Policy 2023.Mr - en

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 109

Translated from Marathi to English - www.onlinedoctranslator.

com

New Information Technology and Information

Technology Subsidy Policy of Maharashtra State-2023.

Government of Maharashtra

Government of Industry, Energy

This no. ITP-2021/Pro.No.170/Industry-2


and Labor Sector

Madam Cama Road, Martima Rarjaguru Chowk,

Embassy, Mbui-400 032.

Dated:- 27th January, 2023

Introduction :-

The state's Information Technology and Information Technology Assistance Policy


was announced in 1998, and Maharashtra is the first state to formulate Information
Technology and Information Technology Assistance Policy in 2003 and 2009 Savea policy Due
to the continuous increase in activity in this sector due to proper production and effective
implementation, the foundation of the IT sector in Maharashtra has been strengthened If
not, one of the best technology sites in India The duration of the Information Technology
Assistance Policy-2015 has been extended on 30/06/2020. Therefore, with the approval of the
Hon'ble Mahantramdanal, the new Information Technology and Information Technology
Support Allowance Policy will be introduced to the said policy.

Yavenu in this dense, the government is concerned about it This year 25/06/2020 Rorji HanaganIt has been decided
2. In order to draft the new Information Technology Policy document, a wide range of stakeholders in
the Information Technology sector were consulted. Based on the findings of the said discussion, a
detailed discussion was conducted with the experts in the field, experts in the field of information
technology, directors of companies, Nasacom, Telkom industry experts, and other related
organizations. The draft of the present policy has been prepared on the basis of the experience gained
during the implementation of the Information Technology Policy.

Y:-
Government manipulation

Information Technology and Information Technology Support Allowance in the State For wider coverage
Mahhati Technology Park, Mahhati Technology Software Manufacturing, Dataset And the nakedness of the avergc

It is necessary to focus on making the technology a one-stop technology city. In this regard, a
comprehensive Information Technology and Information Technology Subsidy Policy will be prepared,
the new Information Technology and Information Technology Subsidy Policy-2023 of the state of
Marathi and English copies of the said policy are hereby published
Maharashtra will be announced.
(11:00-2 and 11:00-3)This regime abuse Along with this, there are many other things that need to be taken into consideration
In approval

2. Objectives and Targets of Maharashtra State's New Information Technology and Information Technology

Subsidy Policy-2023:-

2.1 Objectives of State Information Technology and Information Technology Assistance


- Policy:- To promote the state of Maharashtra as one of the most comprehensive centers of
knowledge and technology at the national level, and to promote innovation by establishing the
state as the annual technology capital of India. , equitable, inclusive and eternal
To move within the boundaries of technology
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

- Strategic Planning for Information Technology and Information Technology Assistive Technology Initiatives at

Community Level Maharashtra by consolidating competitive opportunities and business friendly environment

To include in the framework of the State's dynamic and innovative initiatives.

- To further strengthen the state's leadership in the field of information technology and information

technology assistance.

- To increase the flow of investment in Information Technology and Information Technology Assistive Technology

(IIT) sectors to achieve sustainable development of the State.

- New technology production/expertise: Scientific research, innovation and development for indigenous

production in Maharashtra. To promote the commercialization of coal technology

- In order to significantly increase the flow of investment in the emerging


technology sector, the state will be a preferred destination for homegrown
- companies by fostering a favorable environment.
Manshutyabal Havkahasat Karan.e

2.2 Information Technology and Information Technology Subsidy Policy of Maharashtra State:-

- 95,000 crore new investment in the state for information technology and information technology

support services across policy sectors.

- Creation of 3.5 million new jobs in the IT and IT-enabled sectors in the state.
Increase in skill generation by 15 percent per year to attract high employability,
talent and quality manpower.
- In the state, we have achieved a target of 10 lakh crore rupees for the state's information technology and

information technology assistance.

2.3 Pillars of Policy Implementation:-

• Social Technology Interface:In order to encourage interest in digital technology, the state
government will launch the Information Technology Interface (MAHITI) to provide time-
bound services, component registration, incentives and other support services on a
voluntary basis.
• StatenUp and Innovate: State of Maharashtra's knowledge-based initiative to promote
technology innovation Maharashtra Hub (M-Hub) initiative to establish the system
To provide financial support to Micro, Small and Medium Enterprises, Innovative Factors, Incubation

Centers in Emerging Technology Sectors to the tune of Rs. 500 crores will be raised.

• Walk to Walk:Mahhati Technology Park and Mahhati Technology and Mahhati Technology Subsidies in
the State Eligibility criteria and area utilization for annual withdrawal of annual quotas and the number

of employees working there during the year. Facilitation of hathkani Hanwara for work by Charyana

Will be made available.


• Future Skills:To promote future employability and skills, Spur Accredited degree in
specialized job roles Four companies have given incentives
Rjail. Such as, AI job search engine, solution armcutket, data engine, optical engine,
embedded solutions etc.

page27cooked2
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

• Talent Launchpad:Wanted 'Talent Launchpad' for Information Technology and Information Technology
across the State To do this, the industry sector, the skill development sector and the higher education

sector will work hand in hand. The present university will be assisted by the skill institutes and skill

courses provided by the training center through competitions and hakathons.

• Representative Claims:zone -Except for 1, interventions will be made to support the


growth of micro, small and medium enterprises with a large information technology
component to promote sustainable coal development in the sector to promote
sustainable coal employment in other sectors.
• In industry System / Configuration:Maharashtra Hub (M-Hub) Atangan Chief Operating Officer
He will be named Technology Ambassador of Maharashtra. According to him, the
policy is from the perspective of the foreign sector Performance
presentation

Mandate) Implementation of state-of-the-art best practices in resource


management and IT industry of the state.
• Work-Hangery Co-operation:The strategy for hydropower generation in land-use market
dynamics. Workforce allocation will be reviewed based on agreed turnover. According to his
agreement, the land loss demand will be made with the necessary adjustments in the policy to
identify the future needs of Maharashtra.
• AVRGC Ahn Udayonmkhu Technology Sector Support:AVirgc ahn Udayonmkhu of the
State In order to support technology sector (AI-ML, Big Data, Robotics etc.), the strategy
will include promotion of Armathak and Hubgar Armathak and support for recruitment,
recruitment etc.
• High Heel Walking:Co-operation of office workers and regular workers by the state
government Cooperation will be encouraged to get the job done. Reducing
congestion in urban centers, enabling 24X7 working for IT and IT support areas,
non-restrictive office space Help with housework for everyone
The reason behind this is

3. In order to achieve the objectives of the Information Technology and Information Technology
Assistance Policy, the Government approves the following measures.
3.1According to this policy Sector Specific Incentives are going to be introduced.
3.1.1 Stamp Duty Exemption:-
For All Entities:If the implementation of a technology or technology support component
is transferred only from one location to another location, the component will not be
eligible for duty waiver if the component would benefit from duty waiver. Watch in policy.
No. 15.8 In accordance with the existing policy, the investment of at least 25 per cent of
the total fixed rent in the Information Technology and Information Technology Subsidies/
EverGC activities may be accelerated. Expansion/Diversification Project) will be considered
And the said component will be eligible for Madurakan Shaluk waiver. Information
technology units to be set up in such Information Technology Parks will be eligible to pay
a fee of Rs.

page27cooked3
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

The following amount shall remain unknown in Madurakan Shaluka of Mahati Technology and Mahati Technology Support Allowance:

a)Except for Zone 1, the newly established Savarj in other areas of the State Nahanak / Kharjagi
1. For the transaction of mortgage, usurpation, mortgage, title deed, charge on
mortgaged property, rent, mortgage or mortgage foreclosure of Mahhati
Technology Park 00 percent interest will be paid.

b)Savarj in Zone 1 area of the stateNew facility in Nahanak Mahhati Technology Park
75 percent of the mortgage, mortgage, pledge, title deed, charge on mortgaged
property, rent, mortgage or mortgage bond for the extension of the Mahhati
technology or Mahhati technology assistance El.

c)New facility in Kharjagi Mahhati Technology Park in Zone 1 area of the state
50 percent of the mortgage, mortgage, pledge, title deed, charge on mortgaged
property, rent, mortgage or mortgage bond for the extension of the Mahhati
technology or Mahhati technology assistance El.

d)Havasresh Armthak in Mahhati Technology Park in Havasresh Armthak


Mortgages, foreclosures, pledges, letters of title, mortgages, mortgages,
mortgages, mortgages, mortgages, mortgages, mortgages, mortgages, mortgages,
mortgages, mortgages, mortgages, mortgages, mortgages, mortgages, mortgages,
mortgages, mortgages, etc Reel charges, rent, mortgage and mortgage interest
Badhampatra's Public Assignment Halz will be 100 percent paid in Madurakan Saluk
for this transaction.
etc)State registered Information Technology and Information Technology Assistant Subsidiary Entity

75 percent of Madurakan will be given as subsidy for modernization, redevelopment of Havabhakta Coal.

3.1.2 Power Rationalization Benefit :-


Mahhati Technology Co., Ltd.
25% of rreo huffstag cost for use of capacity equipment
Paytan Prahatpatu will be paid up to 10 lakh rupees.

3.1.3 Electricity Duty:-


As per the provisions of the Maharashtra Electricity Duty Act, the relevant component and the bottleneck in

the production shall remain exempt from payment of electricity duty subject to the following conditions.

a)Exporters/Sawarges registered with the Industrial Directorate in Zone-1 area Nahanak Mahhati

New units in technology parks will be exempted from payment of cess for a period
of 10 years.
b)Above part (a) Patuna of Hankarsha done by Madhya Namdu Establish this policy for those who do it
The existing entity may establish new information in other parts of the state outside that zone

page27cooked4
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

Technology and information technology components will be exempted from payment of tax
for a period of 15 years.
c) Mahhati Technology in Havasresh Armathak Kshetra New Mahhati Technology in
Havasresh Armathak Kshetra Mahhati Technology in Havasresh Armathak Kshetra
New Mahhati Technology in Havasresh Armthak Kshetra Mahhati Technology in
Havasresh Armthak Kshetra Alone Mahhati Technology park units registered with
STPI or other competent authority 100 A percentage of the applicable IT and IT
support fee will be permanently charged to the entity subject to the said policy limit
and payment of fees.
3.1.4 Certification Assistance :-
Sukushm Ahn Lagh Mahhati Technology Institute will be reimbursed up to 50% of the total cost
incurred for verification of CMM Level 2 above, ISO 27001 Safety and Security COPC and E-SCM
certification or an additional fee of Rs.5 lakh, whichever is higher.
3.1.5 Market Development Assistance :-
Two more exhibitions organized or conducted by Nasacom and ITPO
Small, medium and small enterprises in the information technology sector will be
given 50 percent of the participation fee (occupancy cost/rental fee) or fixed-term
assistance of Rs.
3.1.6 Patent related Assistance :-
Micro, Small and Medium Enterprises:-Every successful Indian who comes for registration of patents

Rs.5 lakh for each successful intra-national plan and up to Rs.10 lakh for 50 per cent
of the total cost will be reimbursed if the interest is less.
3.1.7 Power Tariff :-
Mahhati Technology and Mahhati Technology Subsidiaries will be supplied with electricity at
industrial rates as per the Maharashtra Energy Regulatory Commission (MERC) electricity rate
guidelines.
3.1.8 Open Access :-
a)Implementation cost of Information Technology and Information Technology Subsidies
The state government will allow the parks to procure semen through open access to information technology and

information technology subventions, as there is a large share of the cost of the Hvar.

b)Maharashtra Industrial Opportunities


Maharashtra Industrial Development Corporation is the agency that distributes sperm to the subsidized Sava

component.

3.1.9 Property Tax :-


Property tax shall be levied at the rate equivalent to the resident rate applicable in the jurisdiction in respect of

the information technology and information technology support component. The state government will provide

the required amount to the local self-governing body for giving this benefit to the computer science and science

technology support unit.

page27cooked5
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

3.1.10 Establishment of Information Technology and Information Technology Support Services in any field

(Setting up IT & ITeS Units in any Zone):-

Information technology and information technology assistance in any area of the state.

(Residential, including Non-Havakas Kshetra, Hahrat Kshetra etc.) can be constructed.

3.1.11 Essential Service Status:-


Information technology and information technology support services will provide industry essential services.

Allowed to work 24x7x365 days without any interruption


Hadli Rjail. (If any exceptional emergency situation arises in the State, inform the State/Central Govt

(Except in such cases where the work of the technology industry is considered suitable for temporary accommodation).

L : (Single Integrated IT Portal) :-


3.1.12 Mahhati Potan

Information technology and information technology support services under one roof and airspace within the state

Maharashtra Mahathi Technology Interface (MAHITI) is a standalone unit for maintaining data during the period.

Hakdaki Patan(Single window platform). Said stomach L ha mahhati technology ah mahhati

Worked as a technical assistant in trade, and also as a research center.


3.1.13 Availability of funds for Information Technology and Information Technology Subsidies (Financial

Provisions For IT & ITeS):-Strategy for venture capital fund to build Maharashtra hub

An amount of Rs. 500 crores will be provided during the period. Emergency assistance from this fund

Confusion about doingHeaded by Pradhan Sahchav (Industries) in charge of this matter


Will agree.

3.1.14 Rental Assistance:


To provide affordable housing to new entrepreneurs in urban areas of the state.
Mahhati Technology PolicyRent assistance to the newly established entrepreneur's unit (Rental

Assistance) will be provided. Doing the same with this help The method is useless

Approval of power transfer agreement under the chairmanship of Mr. Makhuya Sachav for Karanse

(Empowered Committee) HannanIt will come in thick.

4. Information Technology and Information Technology Assistance Allowance Foundation allowance to promote the interest of other entities

Sahuvadha Hanaman Karan - Promotion of IT&ITeS


Infrastructure - IT Townships & IT Parks):-

Increase in subsidy related to Information Technology and Information Technology Assistance Allowance and Foundation Allowance in the State

To boost the coal industry, the Mahhati Technology City, the Mahhati Technology Park

Incentive gap in the proposed policy you have been Any exclusions to this policy
Information technology is like a garden, every GC component is information technology and information technology.

Subsidiary allowance is equal to sevaa factor. The said incentive is as follows :-

page27cooked6
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

4.1 Use of Handpieces and Lighting in Mahhati Technology Park


4.1.1 Ahatharakt Chati Kshetra Handashes for Bahrnumbui Kshetra and Uvahanrat Kshetra in Maharashtra are shown below. in the chart

According to Havalyan will remain unknown:

A.No. Hakman road randi Bahrnumbooi Kshetrakaharta Max Maximum unexploited

Unfamiliar mat kshetra handshakes carpet area in Maharashtra

Like hundreds

1 12 m. 3 drinks 3 drinks

2 18 m. 4 drinks 3.5 drinks

3 27 m. 5 drinks 4 drinks

- Maximum area of non-abrasive carpet area after damping or static air. According to the provisions
of the Hanayatran Manual, the number of days allowed will remain unknown. Exceptions will be
made for agricultural areas, non-vacant areas, or any other vacant areas declared by the Municipal
Authority. In this area, the maximum area of non-viable mat area will be maintained according to
the prevailing traffic conditions.
- In accordance with the relevant Hawha Management Authority, the Hawha Hayanatramuli (DCRs), will make

necessary adjustments between the Comprehensive Rights and Incentives Regulations (DCPRs) and the

Unified Rights and Incentives Regulations (UDCPRs).

4.1.2 Provisions to be levied for the Mahhati Technology Park are as follows:

Savanaswarj in Bahrnumbui Mahanagarpahalka Kshetra Nahanak Ahan Kharjagi Mahhati Technology Park /

Avirgc Pakan project has been deprived of the right to adhamluya to levy non-
permanent carpet area due to violation of the Energy Promotion and Promotion
Policy-2034 (DCPRs) by charging non-permanent mat area at the rate of 50 per
cent Co. will remain unknown.

b) For Ubhnarat Maharashtra:

(I) , Marathwada, Dhaleu, Nadanrubar, Ratnahagari etc.


Havdabhan

There will be no additional charge due to local conditions.

(II) Above(a)of that(B)(I)Savarjas established in other Kshetras except Kshetras Nahanak Ahn
In the Unified Development and Promotion Regulations (UDCPRs) for the
development of Kharjagi Mahati Technology Parks (UDCPRs), the utilization
rate has been waived Non-woven mats by charging 50 percent of the rate The
location will remain unknown for a while.

C) Central Business District:-


In accordance with the provisions of the prevailing Right to Work Regulations, any construction permit shall

If the Kshetras Madhyamvati Vyagar Kendra Ghoharshat; A registered savraj in it Nahanak and Kharjagi

Mahhati Technology Park/AVRGC Udyan is the center of the Central Business


District, which is the center of the Central Business District (DCRs).

page27cooked7
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

If the prevailing rate has been destroyed, the non-moving mat area will remain unknown by charging a flat

rate of 50 percent of that prevailing rate.

d)This includes other unrecognized mat areas such as handrails, inflatables, ancillary mat areas.
Note that all related resident rights will remain unrecognized as per the provisions of the Rules of Procedure

(DCR/ UDCPR/ CDCPR).

etc)Needs to be filled for additional mat area in Mahhati Technology Park


Charges, ancillary charges and other charges shall be payable in installments.
4.1.3 Following demand of Mahhati Technology Park decade
The permission of joint use shall remain unrecognized in accordance with the following principles:-

Area utilization percentage

1) Zone-1 MMR and PMR Mahanagarpahalka area


- 60% area-With 2% area of hatchery center as part of Mahhati Technology and Mahhati
Technology Subsidy.

- 40% area-Other services (allied services) / foreign services (support services) will remain

unrecognized, except for industries / activities that will harm the exposure, including the

activities of allied professionals in the said area.

2) Areas other than Zone-1


- 50% area-With 2% area of hatchery center as part of Mahhati Technology and Mahhati
Technology Subsidy.
- 50% area - Other services (allied services) support services (support services) except the industries/

activities that will harm the exposure, the activities of all professionals in the said area including their

domestic use will remain unknown.

- A single building / set of buildings in Mahhati Technology Park having a built up area of 20,000 sq. Feet are

the same as in the table above(1)And(2)The benefit of the discounts here will remain unknown.

4.2 Establishment of Inclusive Information Technology City (IITT):-

- Requirement of Haqman Rajamani:A total of 10 (ten) acres of land shall be available for establishment

of a unitary Information Technology City. Out of which 50% of the area shall be earmarked for use of

Information Technology and Information Technology Subsidies. 50% of the area is used
Any other application may be used depending on the prevailing demand.

- Except for the City Industrial Development Corporation (HSDCO) zone, the Maharashtra Industrial Development

Corporation will be declared as a permanent construction authority like any other zone in Maharashtra. The right to

carry out the master plan in this regard is limited by the Government Order dated 05.07.1996 from the Department of

Industry, Energy and Labor. The above agreements shall remain in force.
- If the area of Unitary Science and Technology City is 10 (ten) acres and 25 acres then the project completion period is 7

½ year (seven and a half years) and KshatraIf it is more than 25 (twenty five) acres then this period will be 10 years (ten

years). If there is a need for this, the increase in aid will be reduced after approval of the agreement established in this

context.

- There will be an option to pay in Staggered installments, which is easy to pay for non-
woven mats. The facility to pay the said rent shall be in two installments within one
year, whichever is earlier than the date of issue of full occupancy/part occupancy
certificate.
page27cooked8
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

- It is permissible to establish a single IT city within any zone of the state. The zone for the
implementation of the project shall be limited to the zone conversion of the zone.
However, the right of appeal for the mat kshetra Hanadashea will remain as per the
prevailing classification of the kshetra. The said project can be carried out in non-
necessary areas, deprived areas, deprived areas etc.
- Unitary Information Technology City is Information Technology and Information Technology Subsidy

Policy- 2015 and Govt. This no. IDC-2015/ Q.No. 93/Udyog-14, dated 27/12/2016
The Industrial Policy-2019 will promote other activities including 'Walk to Walk'
concept.

4.3 Critical Infrastructure Allowance for Information Technology and Information Technology Subsidies

Hanadhi (Critical Infrastructure Fund):-

According to the provisions of this policy, the State Government will approve an
independent fund for the purpose of providing technical support for the technology
and technology support industry and the transfer of this fund The infrastructure
required for the technology industry will be made available for convenience .

Hanarmati of Hanadhi:State Govt Hi-Tech and Hi-Tech Subsidy for Sava Industry
Independent writingUdyad and then agreed to this independent handi.

50 per cent of the total amount collected under the Information Technology and Information

Technology Assistance Fund Schemes for each Production Authority in the State shall be deposited in the capital

fund fund. In the same proportion, the contribution of the State Government/Maharashtra Industrial

Development Corporation will be included in the foundation fund.

4.5 Power Tariff :-


After the registration of Information Technology Park by Directorate of Industry/Employment Authority (ADI),

external information technology units used by external information technology units in common areas (doors,

lobbies, central air conditioning system, elevators) sliding doors (escalators) ) common sewage
(for processing plants, wash rooms etc.) will be charged at industrial rate. This will not
include any other foreign advice. In case of any question arising in the context of general
consultation, the competent authority will be entitled to clarify the same. Every mahathi
technology or mahathi technology support unit shall be required to have an independent air
meter for the leased vehicle or air-dropped space.
4.6 Electricity Power / SubStation :-
Within the total construction area of Mahahati Technology Park, it will be necessary to make
provision for setting up of air conditioning system/air conditioning sub-centres to the extent of 6
square meters. It will be adjacent to the existing Mahhati Technology Park.

4.7 Administrative Measures Scheme:-


If the application for permission to lay cables or permission for erecting towers and antennas
is in the form and if necessary documents are attached with it, such application will be
processed within 30 working days through the related administrative mechanism.

page27cooked9
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

4.8 Green IT Awards:-Airborne Information Technology and Information Technology


Support Services 20 per year for efficient inorganic resource management

The August Rorji (State Information Technology Development) award will be presented in the state.

4.9 Penalty for the use of construction materials in the Mahhati Technology Park for purposes

other than Mahhati Technology use. Wahi-:

The Directorate of Industries is a wbe-potonL laughed. That wabepotan Lovers each know Mahhati technology

Information technology/information technology support staff in the park, name of the


organization, facilities used, activities to be undertaken, manpower employed, etc.
Updates of the year on the commemorative theme
The grain will remain intact by providing a hopper. To the Hanyorjan Prohibition
Applicants shall have the right to make an on-site inspection to verify the authenticity of
the information provided.
Those who have benefited from the temporary assistance provided in the Information Technology
Park and Information Technology Assistance Policy, may use the existing information in the
Information Technology Park for the purpose of the Information Technology Assistance Program or the
vehicle Technology Policy Analysis Other than unknown applications
If there is a complaint about using it for purpose, in such a case the joint team of the Directorate of Industries and

the concerned Hanyorjana Authority will conduct a physical inspection of the site and take the following punitive

action. The amount of fine will be paid in the ratio of 3:1 in respect of Hanyorjan Pradhakaran and Government

Petition.

a)Job Title Area Information Technology Information Technology Assistant Skilled Professional Other
If the power is used for non IT/ITES activities, an amount equal to 0.3 percent (three
tenths percent) of the prevailing rental rate for that area will be charged as
surcharge.
b)The subject is Occupancy Certificate (OC) HanganHabgar Mahhati Tantrjnyan on the date of death
The IT Support Allowance will be charged for the period of usage as it is used.
Kharjagi Mahhati Technology Park, which has approved the building plan of the
Kharjagi Mahhati Technology Park, re-established the use of electricity only for the
purpose for which the letter of intent or registration letter was issued.
c)Expenditure on Expenditure on Energy Technology Park and/or use of electricity
In case of failure to rehabilitate the land for industrial use, the relevant Ministry of Energy,
Industry and Industry shall report the matter under the provisions of the Maharashtra
Provincial and Town Planning Act, 1966 (MRTPAct) delivered.
d)It will also be adjacent to the existing Mahhati Technology Park. etc)

Development of Mahhati TechnologyInformation


Park Technology Assistant / Information Technology Assistant

Savea Kahrata will not be able to use the premises for any other purpose under any
circumstances or rent the vehicle.
f)The levy of charges is the exclusive use of the Mahahati Technology Park Park / Mahhati Technology Unit.

It will be done by the owner.

page27cooked10
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

4.10 a)The duration of the construction of Kharjagi Mahhati Technology Park is according to its area.
Vigilance regarding Unitary Information Technology City. 4.2 Madhya Namdu shall remain after

kalyan. b)Information Technology Policy- 2015, Govt This no. IDC-2015/Pro.No.93/Industry-14, No


27/12/2016 and Savanaskalpana in Industrial Policy-2019. Then read it
will remain

4.11 Issue of Letter of Intent (LoI) and De-Novo-LoI for Mahhati Technology Park
Method :-

(a) The construction of the Mahhati Technology Park is unregistered;


The Kharjagi Mahhati Technology Park which has extended the period of validity
of Letter of Intent (5+1+1) or (3+1+1) and has completed construction within that
period, the Letter of Intent has lapsed. Certificate (OC)/Building Mark
External Information Technology that has obtained a Certificate of Competence (BCC).

A de novo letter of intent for the park will be extended every 3 years without
charging any difference in contract. The Mahhati Technology Parks which have not
obtained De-novo Letter of Intent (De-novo) for the Mahhati Technology Park will
receive this provision from the date of implementation of the Mahhati Technology
and Mahhati Technology Subsidy Policy-2015. During this grace period, IT is
required to set up IT and IT support units on 50% of the occupied area of the
Mahati Technology Park.

This matter will be dealt with on a case-by-case basis.

(b) In the case of construction designated Kharjagi Mahhati Technology Park:

Registration certificate is required for registration of Mahahati Technology Park after construction

of Mahahati Technology Park. The period of registration of foreign Mahhati Technology Park is 5

years (3+1+1) for parks with less than 1 lakh sq.ft area and 1 lakh sq.ft. 7 years (5+1+1) will be for the

park with active area. Again, for any reason, Kharjagi Mahhati Technology Park, which has been de-

registered, will be required to pay a difference of 30% of the agreed rate of the increased rental rate

for de-novo registration of the project and obtain the registration certificate. A new Letter of Intent

will be issued according to Ganuvattane and its validity will remain for 3 years. In the event of the

establishment of such technology during the period of such extension of assistance, the following

increments of assistance shall be calculated on a case-by-case basis according to the industry share.

It will come in thick.”

(c) Act for approval of Letter of Intent (De-novo) of Mahhati Technology Park method

1) Shaluq:For Mahhati Technology Park Letter of Intent / De-novo New Letter of Intent / Extension
of Letter of Intent / Validation Letter along with application Rs. 5000/- under the following
shaluk head A copy of the invoice should be attached.
Harzvanbak as soon as the ears are filled

“0851 Village & Small Industries


102, Small Scale Industries
Cottage & Small Industries
0851-022-6”

page27cooked11
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

A
spring copy of the currency on the banknote Lover can be uploaded.
2) Amount of difference between Ahadhamluya :Clauses in Policy 16.5 (a) De novo fresh letter of intent

issued by the Industry Authority except in cases where it has been notified. Outdoor gardens
The difference between the fee charged at the renter's rate at the time of
signing the new letter of intent and the new renter's rate will be required to be
paid.
3) Letter of Intentions for GaneyaMethod:

i) Proceedings of Khargagi Khargati Khargati Park for which the Letter of Intent has
been issued but the power project has not been registered/registered despite the
expiry of the period stipulated in (a) and (b) above. Ears are bowed
The application along with the document should be submitted to Hawkas Ikut (Industries) along

with the letter of intent. After scrutinizing the said application, Hawkas Ikut (Industries) will issue a

letter of approval in principle to the applicant and a copy of the same will be forwarded to the

relevant planning authority.

ii) (c) (3)(i) above has to be informed in writing to the Rights Commissioner (Industries) after
obtaining the satisfactory agreement, except for sanction of rights.
iii) After receiving the contract recovery report from the concerned HR
authority, HR (Industry) should issue a letter of intent to the HRIT
concerned.
(d) Other Matters :-

Information Technology and Information Technology Assistance Strategy-2023 So benefit

Existing IT Parks are required to comply with both the provisions of this Policy.

Whether the interested parties do not want to claim the park or want to close the park,

they should enter into that policy. Then return the benefit of the incentive incurred on the said application

will take It has to be taken care of in relation to the information technology center which
has become a component of the information technology park. Savan will fall in the middle
of the case Effective immediately, the provisions of this policy will apply automatically
are not Demand for thisDashan
The principle of independence will be proclaimed in the state.

5. Datya Sat (Promotion


The composition trend of Data Centre) :-
Maharashtra Industrial Policy-2019 Mid Date Sat This sector will be known as Thrust Sector
In general, the state government is encouraging the state government to cooperate with the unitary data
center.
5.1 Data centerIncentives not to be given:-
5.1.1 Stamp Duty Exemption7.1 Central Namdu
after doing so):-

Purchase of land/building required for holding or holding


New Dutta Sat
mortgage, usurpation, mortgage, right of way, deed of transfer, tenancy, mortgage,
pledge of mortgage, lease and license agreement, merger No, de-mergerHe and

100% Madurakan Shaluk will be given for this transaction.

page27cooked12
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

5.1.2 Electricity Duty Exemption:-


Maharashtra's New Information Technology and Information Technology Assistance Policy In the state

A data center entity in a new coal entity being established and registered with the Directorate of
Industries will be exempted from payment of dues in perpetuity.
5.1.3 Power Tariff Subsidy :-
- Udyog Sachnalnalayakad Registered Savanadte Sat Year
According to the date of birth
Semen can be procured in an industrial manner.

- For new data centers located in areas other than zone-1, 5 years worth of unit Rs. 1/-
will be waived at the rate of 1/-.
5.1.4 Power Generation Units for Data Center Units:
The State Government is the Central Government's Vehicle and Industry
Department No. P.6/3/2006-SEZ.I dated 27/02/2009
The following demand is supportedDashan
C Tattvanansura, Veerjahanarmati Ghatakadwar Veerjanarmati, broadcasting

He assisted in connection with Havtran.

“Power Distribution License”


If a desire is expressed regarding the attack, the said entity should apply to the State Government for the same.

On the recommendation of the State Government, the Ministry of Transport, Government of India shall send the

necessary documents to the Central Power Ministry as per Section 49 of the Armageddon Act.

Dare to. Accordingly, any State Government shall issue power distribution license (Power
Distribution License) in consultation with the Central Ministry of Energy after consulting the
Central Ministry of Transport for the provision of power distribution facility (Power Distribution
License) in any desired area. Accordingly, the Central Ministry of Transport shall carry out the
necessary registration under Section 49 of the Armageddon Act. Will be encouraged.
Vierja Ahadhanayam-2003 and Vierja Hanayam-2005 among them are the Central
Power Plant and the Airborne Resolution of Virajsedambha, the isolated element in
the airspace, including the Vierja Havtaran Ubadha etc. will continue to suffer.”

Pursuant to the above, the State Government has followed up with the Central Government for approval, broadcast and

distribution of semen to the constituents in Data Center Udyan.

5.1.5 Dispute between any field Construction of :-


Datya Sut
This structure can be constructed in any area of the state (including residential, non-resident areas,

harat areas etc.).

5.1.6 Essential Services Status


The nature of the work and its importance should be taken into consideration.
It is an essential skill and care
Act (ESMA) concerns
It will be considered as an essential skill.

5.1.7 Parking norms:-


Standard parking space required for Mahahati Technology Park/Mahhati Technology Complex
will be allocated according to availability. Within the park, the car parking lot is 400 sq.m. Such
reconciliation will be done.

page27cooked13
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

5.1.8 Power Distribution Licenses:- Section 13 of the


Aviation Act 2003 As per the recommendations of the state government, Maharashtra Industries

The Havkas Mahamandal under its leadership announced that the Satu attack for the Kshetramandhya Veer Havtaran

license would be unconditional.

5.1.9 Renewable Energy Use:-


Existing Govt. to use renewable energy under open access system
Discoms will be allowed after paying the cost component after approval.

5.1.10 Captive Power Farm:-


Companies willing to set up Captive Power Plants (Wind/Solar) will be facilitated by the
Government in this regard as per the prevailing Energy Sector Policy.

5.1.11 Power Supply:-


The Data Centers will be exempted from the state's mandatory electricity quota and will be
provided with electricity 24x7x365.
5.1.12 Open Access :- a)Datya Sut
As the operational cost is a major part of the implementation cost of the scheme, and Rs

Parks will be allowed by the state government to collect semen through


open access. b)Maharashtra Industrial Opportunities Conference Rana Maharashtra Industrial Estate
Mahamandal is a sperm donation agency.
5.1.13 Dial before Dig:- DIAL HUBFOR
DIG STRATEGIES Help data centers manage down time
will be done. Datya sat through that Underground vehicles and cables that have been laid
The system will be air-tightened to protect the structure and ensure the safety of
those working around the infrastructure.

5.1.14 Infrastructure Status:-


Relev, Erast and Virj areas have been accorded the status of infrastructure facilities.
In order to be able to secure loan facilities from the emergency organization related to this project, the foundation

allowance will be given the status of concession.

5.1.15 Continuous Water supply:-


Any Industrial Sector Rights Authority like Maharashtra Industrial Rights Council
Datta Sut is inside and outside of cooking To the Jews
For the second, Datya Sut

24X7 uninterrupted water supply will be provided. In order to make efficient use of
available water, data center units will reuse as much water as possible.

5.1.16 FSI Norms:-


Data center is a unique activity, so watch it in the policy. 8.1.1 and 8.1.2 may be
permitted to be used in non-viable mat areas.

page27cooked14
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

5.1.17 Dutta SutPenalty to be done for use of lighting, information technology and information technology support
services and other matters related to the construction of parks Wahi
If an external data center is subject to the provisions of the policy
If it is found that after the benefit of the hands has been used for the purpose of
information technology or information technology support services or other
unauthorized activities in the park, the following conditions shall apply. in carrying
will come

a) In case of non-IT/ITES activities for non-IT/ITES activities, an amount equal


to 0.3 percent (three tenths percent) of the prevailing rent calculation rate
per day shall be levied.

b) The said charge is Occupancy Certificate (OC) Hangan Habgar Mahhati on the date of death
The technology and know-how technology support charges are recovered
for the period of use as they are used. All those who have agreed to the
building plan of the Dutta Center Park. In the park
A letter of intent or a registration letter was issued for the purpose, and the use of the lamp was re-

established for the same purpose.

Use of iron/or land for payment of charges in other parks


c)Datta Sat in connection with Rajar

In case of failure to re-establish it for use, the concerned Industry Authority


may take action against the data center under the provisions of the
Maharashtra Regional and Town Planning Act, 1966 (MRTPdelivered.
Act).
d) This is a sudden situation in existence This will continue to affect the park.

etc) Datya Center Park C / Havkasak Yanana Dattea Sut Under the responsibility of park management

The premises shall not be used for any other purpose or rented under any
circumstances.
f) The charges will be levied by the ultimate user/owner of the data center
facility.

5.1.18 Activities exempted from FSI


Parking, storage space in the basement, space used to house the generator (Dirji)
adjacent to it, shall not be considered as part of the leasehold.

5.1.19 Relaxed Restrictions on Buildings:-


According to the requirements of the data center and the national infrastructure,
the parking space, floor height, dirt level, carpet area, etc.

5.1.20 Infrastructure Support:-


- Maharashtra Industrial Opportunity Commission Road, semen, concectsvty,
Water and other essential infrastructure will be readily available.

- Maharashtra Industrial Development Authority of India For allotment of land to Pakan


As needed Granted permissions/permissions only worked.
the wind

page27cooked15
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

- The data center to be set up by the Maharashtra Industrial Opportunity Commission will be provided with

necessary financial assistance to facilitate the construction of infrastructure such as transmission lines and

sub-stations.

5.1.21 Legal Education to Facilitate Business Development:-


- Information
Datya Sut to facilitate the process of obtaining necessary permissions from
the State and Government of India for setting up MAHITI is a staggered technique
So it worked
- Business Facilitation Procedures (EoDB) Havahwadh Hanaimatangan The benefit of unknown rates,
Discounts are included in this policyIn order to reap the benefits of the incentive, Dutya Center was given the status of an industry

Rjail.
5.1.22 Deemed Distribution Licences:- Dutta sat
1. Rach Havkasak Operator/H Data Center Udyanataangan It is the same as moving energy

Only use licenses will be eligible for contract.

6. Ahnamshen, Swajyul Effects, Gsemg, Ahn Cohmx (AVRGC) No:-


A.V.G.C. As this component is a part of Mahhati Technology Assistance Scheme, it is entitled to offer benefits Mahhati

unknown to the Mahhati Technology and Technology Assistance Scheme component.

6.1 Emergency Assistance to AverGC Industry:-

6.1.1 Capital Subsidy


- Raj A.V.R.C. Constituent right RsThe first 3 components that will make the highest
of 50 crore people and make the right of 50 people. Eel.

- Rj New Avergc Component Hadan Tenants will vary between goods, equipment etc
A rental subsidy of 20% of the fixed rental investment up to a maximum of Rs.25 lakhs for a
period of 3 years will be given to the unit which will provide employment to at least 10 (ten)
people.
6.1.2 Stamp Duty Exemption from Maduraka:-
Paharchhade 3.1.1 Madurakan Shaluka Mafira benefits will remain unknown after Madhya Namdu.

6.1.3 Electricity Duty Exemption :-


Paharchhade 3.1.3 Benefits will remain unrealized even after the Madhya Namdu.
6.1.4 Power Tariff Subsidy:-
A new AVRC unit established in any area of the state will be given an emission rate of Rs.1
per unit for a period of 5 years.
6.1.5 Certification Assistance:-
50% of the expenses incurred by the Savanever GC for reconditioning of the active component
for certification of conformity certification (CE), Global International (GLI) certification etc. and
subject to a maximum of Rs.2 lakh per component will be reimbursed.
6.1.6 Skill Development Assistance:-
Conduct online courses for highly specialized job roles provided by autonomous
agencies in both offline and online formats.
Consequential fatigue/ Drinks 25% of Shaluka

page27cooked16
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

Prahatpatui Hadli Rjail. Mahhati Potan in that pride Lover 'Certificate of Successful Completion' (Certificate

Of Successful Completion) after uploading the statusA maximum of Rs.50,000 per certificate
Rs.1 lakh for international certification, if the fixed amount is less, the benefit will be provided as
skill requirement assistance.
6.1.7 Market Development Assistance :-
- Commemorative work of M-Hub, Nasacom, Gasemg Development Associations, Automation
Society, Maharashtra State Innovation Society and others. We are conducting competitions in order

done
- Every year for that Armthak assistance of Rs.20 lakhs for Ahan Spadh for the program

will be done.
- Haffaki Frame Ahn Best Ahnmtede Frames Award - Mbuyi.

- Nasacom-game dual choice


Conference - Panu.e

- The Ahnamshen Society of Ihandaya-Ahnfest, Mbuyi. ASIFA-Jagahatak

- Ahnamushen Day-28th October Every Year-Sappunun Bharat MCCIA-

- Hardharztal Material Protection, P.U.

- NTLF-NASSCOM Technology Network Forum.


- M-Hub is based on its own preferences The order/category of competitions is subject to change

- what The order is 1


The number of competitions in the series is 1 per year

- A registered mobile game developer in Maharashtra with more than 5 million


downloads (iOS+Playstore) and 4+ mobile platforms.
If there is an attack, then the reward will be given

20% of the eligible costs incurred on the sale will be provided to each company
up to a maximum of Rs.10 lakh.
6.1.8 Recruitment Assistance:-
Recruitment assistance of Rs.2.5 lakhs will be provided to the employment center for 50
incubators in Hubsanse Incubusen Laboratory/R&D Centers providing Mahhati Technology
and Mahhati Technology Subsidy for 2 years.
6.1.9 Infrastructural facilities (park/s co-construction Rat Rjaga/ Coee.):-
M-Hub alarmEstablishment of Center for AVRGC So production

No gallery
Avergc Stuhdo Ahn Perfohmg Atsus with convenience Nathi Rjaga, Pradshan
Individual facilities like work space etc. will be provided for the artists.
6.2 Hubgar-Immediate Assistance to AVRC Industry:-

6.2.1 Global Joint Ventures-


The State Government will promote joint ventures by signing 10 MoUs with Indian and
foreign organizations during the policy period.
6.2.2 International MattersInternational Promotions-
International event related to AVRC in Maharashtra Rjail will provide support for the sequence.

6.2.3 Intellectual Property-


Bouhaddak Sapanda Qaidsheer is guarded by the guard. A demand from the Government of India's

National Intellectual Property Policy, the Startup Intellectual Property Protection Scheme (SIPP) Dashanc

page27cooked17
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

Accordingly, necessary allowances for patents, designs, copyrights and copyrights shall be
granted.

7. Progress of emerging technology(Promotion of Emerging Technology):-


In this policy t rjagahataka udayonmkhu tantrgyan kshaterapakai 2 Harhalayana dolsanakshatera focus on introducing

To achieve this objective, the following measures of immediate assistance will be provided to this
area.

7.1. Urgent Assistance to Emerging Technologies:-

7.1.1 Rent Agreement - the

bone Water, equipment (including buildings and land) etc., 20% of the rent increase will
be amortized for a period of 5 years up to a maximum of Rs.1 crore. The said rental
agreement is worth an investment of Rs.5 crore and will provide employment to at least 20
people for the first 50 new emerging technology companies. Avergc Ahn Dattasat and Rs

If independent policy items are included in the unit-wise policy, they will not get the benefit
under this head.

7.1.2 Stamp Duty Exemption :-


Paharchhade 3.1.1 Madurakan Shaluka Mafira benefits will remain unknown after Madhya Namdu.

7.1.3 Electricity Duty Exemption:-


Paharchhade 3.1.3 Benefits will remain unrealized even after the Madhya Namdu.

7.1.4 Power Tariff subsidy:-


A grant of Rs.1 per unit will be given for 5 years to the newly established unit in any
area of the state.

7.1.5 Certification Assistance:-


Covers 3.1.4 The cooling assistance shall remain unknown after the central heating.

7.1.6 Recruitment Assistance:-


Recruitment assistance of Rs.2.5 lakhs will be extended to the employment center for 50 candidates from Hubsanse

Incubusen Laboratory/R&D Centers providing Mahhati Technology and Mahhati Technology assistance services for a

period of 2 years.

7.1.7 Patent Related Assistance


Covers 3.1.6 Support in relation to belts shall remain unknown after the mid-point.

7.2 Immediate Support to Emerging Technologies:-

7.2.1 Training & Placement - Ahbhayahantraki


Mahahavdyalaya Rorjgar Hamalwanu Danaar Kayan Will start sequences and suchorder
will validate.

7.2.2 Ease of doing business -


Staten
Rjaldagatin Kayan in Ups SadhamIn devising the best business-friendly way to conduct business
will come Among them Mahhati PotanLadwar Self-certification on its Manned Hotline
Number) 24 hours assistance will be arranged.

page27cooked18
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

7.2.3 Bauhaddhaka Sapanda (IP)

Bouhaddak Sapanda Qaidsheer is guarded by the guard. National Intellectual Property Policy, etc
Staten
Up Bauhadhak Sapanda Sankshan Yojana (SIPP), Madhya Namdu Demand of Govt. of India Dashan
According to the C principle

Patents, designs, copyrights, and infringements are also provided.

8. StateStartups & Innovation:-


8.1 Maharashtra Hub (M-Hub)

Government of Maharashtra has partnered with leading technical institutes, Habzanse schools and Kharjagi

A dedicated
institutes. Center of Excellence (CoE) will be set up to collaborate with academics.
Maharashtra Industrial Development Corporation of the State - Nasacom State Up and down

On a regular basis, such hubs of innovation clusters will be created, in which


House Kayan
new industries based on the origin of new technology, capital, skills and quality will be
encouraged and new ways of doing business will be encouraged. As mentioned in
Maharashtra Industrial Policy-2019, M-Hub also acted as the “State Apex Institute” to
promote industrialization. It will be established on the premises of Maharashtra State
Small Industries Development Council (MSSIDC) at Kalamboli, Harjalha-Raigarh. It will be
a state-of-the-art building with training facilities for 300 trainees including a training and
training facility. Hanwas should be arranged for fodder.
M-Habach's two key tenets are as follows:
- M-Hub is a proposed center of excellence for the development of integrated technology
infrastructure, talent acquisition, business facilitation, academic linkages, collaborative
environment, and a conducive environment for innovative technologies.

- The Chief Operating Officer (Chief Operating Officer) works under the headship of the Pradhan
Sahachav (Industry) as mentioned in the policy. He will continue to follow the policy
Implementation and co-operation will be carried out through strong strategic partnerships
and intra-regional coordination and cooperation for the promotion of climate change,
sustainable ecosystems. The Chief Implementation Officer (COO) is M-Hub Atangan So
Conducted meetingsTask failedThey will monitor satur.

8.1.1 M-Habach list:-


- Staten
To help companies achieve better technology, quality, business planning and other

- Fields,
opportunities.
Technology Labs, Corporations, Governments, Industries, Demand C,
Dashan Artisan expert
By establishing coordination among etc., creating a harmonious overall environment

- A state-of-the-art technology facility with facilities such as a seminar room, conference room, cafeteria, etc. Up we are

Provision of electricity for Inkybushen Center for a period of five years to cover
property tax, water tax, security, maintenance, maintenance of electricity etc.
He will be paid.
- The Chief Implementation Officer (COO) is responsible for M-HUB implementation. It should be implemented

Request for plans will not In which Mahhati strengthens the 4 major kshatres of Tatranjnyan Kshetra
Dashan

4 Taskforces will be set up viz. Center for Engineering, Center for Industrial
Technology, StateA suitable environment will be provided at the request of Ups.
page27cooked19
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

8.1.2 Scope of M-Hub :-


-10,000 stat What up As part of the sequence, M-Hub is an innovation in Maharashtra
Hawstahart Kel Rajeel will be called a Center of Excellence (COE) for industrialists.

- The IIT bomb, given the status of its other illustrious institutes, could have been targeted to become
the fourth largest start-up hub in the state of Mumbai or Hathkani by the government. Harmful
- things presence of force and customer, presence of strong institutional and supplier,
The co-working space's ability to be available at affordable rates, its pilot testing facility, etc.
will benefit from its locational advantage to become the largest center in India. M-Hub is a
Maharashtra State Innovation State Up Policy-2018, Maharashtra Hufnutke Policy-2018 Ahn
Maharashtra State Innovation Society Atangan Immediate implementation of the provisions to be implemented

will be done.
- Rajya Hashkhar Sasantha along with Maharashtra Entrepreneurship Advocacy Committee (MCDP) is a matter of

sequence performed.
coordination and training

8.1.3 The structure of the administrative machinery of M-Hub and State Hashkhar Santha is as under:-

Administrative Officer

Principal Secretary (Industries) Pradhan Sahchav (Higher and Technical Training principal companionship (Information

Division) technology)

Pradhan Sachav (Skills, Authority (Industries) Executive Officer,


The main thing

Employment, Maharashtra Industrial Rights

Entrepreneurship, etc.) Council-Member Co-Chair

main what
Kari authorities, main what
Kari authorities, Nameless entrepreneur in the

Maharashtra State Skill Opportunity (Maharashtra State Innovshen industry

Society convenience)

An unnamed person in the infrastructure Anonymous person in AVGC field Up


Staten in the field

sector unnamed person

Hufflepuff in the field Nameless Udayonmkhu technology in the field Management Organization

person unnamed person

Technology Institute As long as possible

- What is the Administrative Mechanism of M-Hub?Governance of the systemEnjoy this freedomDare to


will come

8.1.4 Framework of M-Hub :-

- Hufnutke Hub :-M-Hub is a central hub Even though Among them research and

There should be room/scope to work independently. Ideal for small community


buildings order and demand C will
Dashan stay. Maharashtra Huffnatke Policy-2018
anxiety
You will benefit from the convenience of the Hufnutke Accelerator.

-Ware House Facilities:-Testing and implementation of new designs/concepts and


products To do this, the component will be provided with space. Ideas and
prototyping initiatives for start-ups will be supported by War House. 10,000
upstat
program

anxiety
It is established Marji Staten10% allowance will be given to Aps. Prathamaka from the generation

phase staton Your partner It will help.


page27cooked20
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

-Entrepreneurship:-With Saikahanak Coal Research Institute for Incentives to


Manufacturers Coordination will be enhanced. A nominal rate of 15% to 50% will be
made available to small and medium-sized industrialists.
- INNOVSHEN POWER HOUSE :-M-Hub Government Counselors and Advisors will
work towards making M-Hub a world-class innovation platform. M-Hub will be
partnered with an environmentally friendly clothing startup. Its status Up and

InnovShen will be prepared for market access.


-Udayonmkhu Technology :-Ahbhayahantraki Mahahavadyalaya is a labor-intensive enterprise Start the sequence

Will do and such thingswill validate the order itself. Staten Rjaldagatin Kayan in Ups SadhamWahi

A business friendly approach will be devised as far as possible. Among them Mahhati Potan Ladwar

Manned Hotline Number 24 hours assistance will be provided for self-


certification.
- Performance Monitoring Mechanism Annual Labor Review and Annual
Report will be published. The General Counsel will conduct a review and
review every six months. o The M-Hub team will be reviewed every three
months by the Advisory Board. o The Empowerment Agreement will be
reviewed once a year.
8.1.5 Fintech Support:-
Huffnatke Spoton with the Air Force Base, Enterprise Let's say part of

will be coordinated. Landscaping Huffnatke State Apsana is an Indian market


The aim is to provide the benefit of 'Launchpada' to help Patheta start his work. of order

Hate Ah
8.1. 6 Suggestive tools & Interventions:-
- Order:Among industrial units spread across six geographical areas
Only for a short time

At the time of production by the producers, access to the market, demand No,
Dashan scale-up strategy,
Damo d etc. with Gatunvankudar Order by order Option not available
Dashan

It will be done.
- Arrangement:Peer StattonOops, wheatNament arg-a-client, gatunvankudar, demandDashan
C/Expert,

Coordinating with corporate networks, service providers.


- Coporte Inovshen: M-Hub is preferably a hybrid hub for corporate members in Zone II
areas. Nas helped.
- Partnership of Govt: M-Hub is a national and international partnership for
product related services and e-governance.
Aid to the poor is from the partner of the government

Required Stats Rjodli Rjatil with up.


- Beneficial partnership:Innovation in the research fieldAround the world to promote them

In-house work with fitness expertsOrder, Paharshad will be held. New


Curriculum development Hashup's facilities will be included in the package.
- M Habach co-ordination will be done by State Govt Information Technology Directorate.

page27cooked21
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

8.1.7 Entities registered with M-Hub shall enjoy the following benefits: a)

Assistance with market access:

-Harmful thingsGradual Participation:Production/research demand for this year's unexploited state So


Ahn rajgahatka Kayan25 lakhs to assist eligible organizations to participate in the programme
will come

-Landmark Innovation Competition:the best2 (Two) innovation ventures will be provided with a grant of Rs.5

lakh each and a government-owned incubator will receive a grant of Rs.2 lakh. Demand for consultants in

the industry sector for those participating in the competition will


Dashan not be done.
-Commemorative Competitions at University Level :-Rs.1 lakh for the first three years of research

and registration.An international certificate will be provided. Participant in competition

Demand for consultants in the industry sector Dashan


will not be done.
b) Assistance for skill requirement :-

- Conducting online courses for highly specialized job roles provided by autonomous
organizations in both offline and online formats. Consequential fatigue
/ 25% of Shaluka
Paytan Prahatpatui Hadli Rjail. Mahhati Potan in that pride After successful completion of Lover course

Login after uploading Certificate of Successful Completion of Courses


A maximum of Rs.50,000 for a certificate and Rs.1 lakh for an international
certificate will be provided if the benefit is less than Rs.50,000.
- The relevant entity will not benefit from the scheme/policy of other areas, unless
the existing scheme will not be repeated.
It's a discount

Benefits are given.


9. What is the need for skills? Skilling & Future workforce
The policy aims to promote high employability and manpower among the IT and IT-
assisted sectors in the state. That's a skill requirement
Special attention will be given to the course (Super Specilised Job Roll)Paharhasasht-2 and
Paharhasasht-315.10 Policy guidelines have been formulated for this purpose, the collaboration of
higher and technical education sector with skill, employment, entrepreneurship and innovation sector
will be emphasized in Maharashtra's reputed educational institutes/Abhayahantraki Mahahavdyalaya
and Incubation Centre This is Sadar An account of the organizationPaharhasasht-2 and
Paharhasasht-3Policy Guidelines 15.20 Information Technology and Information Technology
Assistance Initiatives for Skilled Talented and Qualified Manpower under such recommended
frameworks, Maharashtra Statenmkhyumattri rojgar hanarmmati kayanEmployed through order/
Hub, tasche
Up, hafnatke

At the time of self-employment, the grain is to be harvested. 15 per cent of the annual skill requirement
has been deliberately wasted in order to attract highly employable, motivated and qualitative
manpower.
10. Policy Governance :- Management
Framework for Policy Implementation :-
Consent to provide power: What is necessary for the implementation and monitoring of this policy Methods and

Dashan
the demand A state-level empowerment consensus will be established to facilitate principle C. strength

page27cooked22
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

A commemorative meeting of the grant agreement will be held. Shakti Pradhan Consent to any
department/organization/coordinating authority or individuals for meeting as required.

Shakti grant agreement only structure should be readable:-

1 Hon. Mukhya Sahchava President

2 Apar Makhuya Sahchav, Havatt Havabhag Member

3 Apar Makhuya Sahchav, Hanyorjan Havabhag Member

4 Upper Makhuya Sahchav, Nagar Havkas Havbhag (Nahav-1) Member

5 Pradhan Sahchav (Industry), Industries, Energy and Labor Department Member

6 The main aspects are skill, employment, entrepreneurship and entrepreneurship Member

7 Principal Assistant, Higher and Technical Education Department Member

8 Pradhan Sahchava, Mahahati Tantrajnyan Havabhag Member

9 Pradhan Sahchav (Nahav-2), Nagar Havkas Havbhag Member

10 Kari Ahadkari, Maharashtra Industrial Rights Corporation, Mbuni


The main thing Member

11 Chief Implementation Officer (COO) M-Hub Member

12 Director, Software Technology Initiatives of India (STPI) Member

13 Nominated Person of Nasacom Member

14 A person under the name of Hafaki Member

15 MCHI-Kerdai's Nameless Person Member

16 Commissioner of Employment (Industries), Directorate of Industries, Mbuyi Member Associate

The act of granting power


Class:-

Shakti Pradan Sehami focused on progress and implementation of policy provisions.


Implementation and co-ordination of the policy at the state level is necessary from the said consensus.
Methods and

will be carried. The following points are to address the challenges in the context
The purpose of creating Hanakarsh

Tried.
- Information Technology and Information Technology Assistive Technology, Information Technology and Information

E.R., AVIRGC Ahn Udayonmkhu Technology


Technology Foundation allowance for technical assistance allowance

Immediate incentives for constituents

- Tendency of regional entitlements within Zone II citiesDon't do it

- Efforts should be made to improve the skills and employability of the workforce in the IT sector in
the state.

- Naked brand through M-Hub To encourage entrepreneurs


- Center of Excellence and Task Force He assisted in co-controlling
- M-Hub AtanganThe established task is corruptedProposed layout/action Methodically

Maranjrui Dane.e

- (ii) Inflation period and indemnification for each activity.


-
- Implementation of the policy on the basis of information on policy matters Conduct
effective monitoring and evaluation
- Solving the problems of implementation at the level
page27cooked23
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

- Increasing business accessibility.e

- To review the information technology support services and other services unknown in the information technology park and

make appropriate corrections in them.

- C. The base of the certificate is a non-slip mat


Demands set forth in this policyDashan
Without prejudice to other terms and conditions, in this regard, authorities such as the Housing Self-Government Corporation

and the Maharashtra Industrial Rights Council Financial Institutions and Financial Management Authority Implementation

Don't stick to the way you are doing


- The Empowerment Consensus will review the implementation and effectiveness of the policy
every six months. If necessary, appropriate corrections, changes or corrections will be made.

- Review the best practices


- Kharjagi Mahhati Technology Park, Mahhati Technology / Mahhati Technology Subsidiary Industry
should be exempted from the incentives enjoyed by them, if they are to be migrated, causing undue

harm and violating the terms and conditions.

- The Hawkas Aykut (Industries) shall be responsible for submitting the Annual Report of the Policy.

10.1 Provisions for Facilitating Information Technology and Information Technology Assistance Services:-

Mahhati Technology and Mahhati Technology Subsidies offer the benefits of the following benefits:

Remains:

- Hours of work, hours of work are expensive Dukana Ahan in the Samdambha of Charachanya Nemenkuchacha
Provisions in the Articles of Association shall be subject to the provisions of the Constitution.

- Annual physical record of losses in physical form will be reported.

- Enforcement is being carried out in labor zones13 Power to self-attest Affidavit under
Act No.
- Information technology and information technology support services companies are required to comply with

the labor laws. Railway workers of Chari Samandha to keep the ahbhalke in electronic form
Following the progress of computerization of the Department, provision will be made for electronic submission

of application forms.

- All components of the power technology and technology support equipment do not emit waste water in their

production process and less than 100 percent of such components are produced.He is from Maharashtra
A Consent Letter from the Pollution Control Board should be obtained. Such industrial units
have to prepare annual declaration of hazardous waste materials including electronic waste,
used batteries, used floors and submit it to the Maharashtra Pollution Control Board. Such a
stand-alone industrial unit would need to link up with an established sewage treatment plant.
Subject to the agreement of the Ministry of Labor and Employment as provided in the contract
- labor agreement for units in the permanent Armathak area, in the case of information
technology and information technology support services outside the permanent Armathak
area, the same shall be allowed.
- Information technology and information technology support services, sperm supply In case of application, it

shall be considered as an unbroken operational element.

page27cooked24
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

- Mahhati Technology Park of Maharashtra Industrial Estate along with Mahamandalakstera

Right to Build (DCR) and other requisitions C Tattva Maharashtra


Dashan

Alignment with Information Technology Policy for other sectors including Industrial Opportunity Sector

(Consonance) will be done.

11. Provisions in respect of Armthak Concession :-

500 during the policy period for the venture capital fund for setting up M-Hub
According to this policy

Funds of Rs. crores will be provided. In order to do so, we will open an independent Lakhe Tishar and make it urgent

AhnavayanakhchaatanganGovernment approves to do so.


Providing grains etc. in consultation with the Department of Agriculture and Industry Department.

what C Tattva Independence HanganWill be encouraged.


Methods and DemandsDashan

Except as set out above, this policy Armthak discount on the surplus coming in the grain

During the Anrushagan policy period Rs. 332.71 Crores amounting to Rs. 332.71 Crore So
In consultation with Hawat Havbhaga, the approval of the Government is given to make available.

Demand No : K-7

Mukhya Lakheshirshan- 2852-Industry

Up Makhuyalkheshirsh-N80 SavasNadharan

- 102 Industrial Productivity


subordinate title

- Sub-heading
group header (00) (14) Promotion to Information Technology Unit (Exercise )
(2852 0532)33 Athan
assistance

12. Period of validity of policy -:

Parks/Constituents to which this policy applies The benefits/incentives have been provided by them

This policy shall be valid for the period for which it is maintained
will remain

The validity of the said policy is for a period of 5 years Even so.

13. Addressing Policy Issues -:


If there is any difficulty in enforcing any provision of this policy,
Necessary revisions and clarifications will be made to the industry sector to remove the bottlenecks.

14. The approval given by the Hon'ble Constituent Assembly will be taken into consideration. All related provisions
In Samdambha, the independence of the government from the Ministry of Foreign AffairsY/Ahadhaschuna HanaganHamat Karan is expected

The list related to this is the government's calculation With this “Form-A'Madhya Namdu would have been done, pillar 2 Madhya Ya

Government manipulation Namdu Hananan in its coverIn this havachara, we will add, column 4 from the wetted havahaga
Similar ideals/demandsdecade
1. Principle / Governance
Y / Havkas Hanayatran Hanyamavali Sadhuarana / Ahadhaschuna HanaganHamat

What about doingwill be carried.

page27cooked25
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

15. The said governmentof the Government of Maharashtrawww.maharashtra.gov.in Available on this website

It is calculated as 202306271459543210.
The signature can be removed by witnessing
Aadsheanswar and Nawan of the Governor of Maharashtra, E

Digitally signed by DR. HARSHADEEP SHRIRAM KAMBLE

DR. HARSHADEEP
DN: c=IN, o=GOVERNMENT OF MAHARASHTRA, ou=INDUSTRIES
ENERGY AND LABOUR DEPARTMENT,
2.5.4.20=abe9338c4cb37835a2aa15008d7fc329c11b1640556aa5d5
698bffb566d33473, postalCode=400032, st=Maharashtra,

SHRIRAM KAMBLE serialNumber=995C99CB25735CCC93503D0DC5680E54902C3A705


DFDCDAF9A8A4463856F5154, cn=DR. HARSHADEEP SHRIRAM
KAMBLE
Date: 2023.06.28 13:25:59 +05'30'

(Deep Kabale)
(Dr. Harshan

Pradhan Sachav(industry),Government of Maharashtra

Pratt,

1. Hon. Makhuya Sahchav,Government of Maharashtra, Embassy,Mbuyi

2. Hon,Mukhyamantri Sahachawalay,embassy,Mbuyi.
3. External Secretary to Hon'ble Minister (Industries).,embassy,Mbuyi.

4. Secretary of State (Deputy) Minister,embassy,Mbuyi.

5. Hon. President,Convening of the Havdhansabha,Maharashtra Havdhanmadal Sahachwalaya,Havdhan Bhavan,Mbuyi.

6. Hon'ble Chairman,Havdhan Paharrashad's Kharjagi Sachachav,Maharashtra Havdhanmadal Sahachwalaya,Havdhan Bhavan,

Mbuyi.

7. Honorable Vice President,Convening of the Havdhansabha,Maharashtra Havdhanmadal Sahachwalaya,Havdhan Bhavan,Mbuyi.

8. Hon. Deputy Chairman,Havdhan Paharrashad's Kharjagi Companion,Maharashtra Havdhanmadal Sahachwalaya,Mbuyi.

9. Hon,Co-Chairman of Maharashtra Havdhan Sabha,Maharashtra Havdhanmadal Sahachwalaya, Havdhan

Bhavan,Mbuyi

10. Hon,Joint Chief of Staff of Maharashtra Havdhan Paharshad,Maharashtra Havdhan Madan Sahchawalaya,

Havdhan Bhavan,Mbuyi.

11. Upper Makhuya Sahchav (Havatt),Hawt Havbhag,embassy,Mbuyi.

12. Upper Makhuya Sahachav (Revenue),Revenue and Forest Department,embassy,Mbuyi.

13. UPPER MAKHUYA SAHACHAW (NAHAV-1), NAGAR HAWKAS HAWBHAG, MANTRALAI, MABUNI

14. Apar Makhuya Sahchav (Essential Saveh Varshyai),General Administration Department,embassy,Mbuyi.

15. Pradhan Sahachava,Hanyorjan Havbhag,embassy,Mbuyi

16. Pradhan Sahachava,Knowledge and technology,embassy,Mbuyi.

17. Pradhan Sahachava,Village Havkas Havbhag,embassy,Mbuyi

18. Pradhan Sahachava,Higher and Technical Engineering Department,embassy,Mbuyi.

19. Pradhan Sahachav (Workers),Industry,Energy and Labor Department,embassy,Mbuyi.

20. Pradhan Sahachava,Environment and climate change,embassy,Mbuyi.

21. Pradhan Sahachava (Energy),Industry,Energy and Labor Department,embassy,Mbuyi

22. Pradhan Sahachava (Nahav-2),Nagar Havkas Havbhag,embassy,Mbuyi.

Vasan) revenue and forest area,embassy,Mbuyi.


23. Sahchava (Help and Panun

24. HAWKAS AIKUT (INDUSTRIES),Directorate of Industries,New Administrative Building,Mbuyi.

Kari authority,Maharashtra Industrial Rights Council,Adhanrei (Pavu)n


25. Makhuya Kayan , Mbuyi.

Metropolitan
26. Savana Authority.
27. Managing Director,Maharashtra State Vierj Havtaran Company Halhamtde,Mbuyi.

page27cooked26
These numbers:ITP-2021/Pro.No.170/Industry-2
Government manipulation

28. Managing Director,smile,Mbuyi.


29. Regional Commissioner,Konkan / Panu / Nahshak / Nagparu / Aurangabad / Amravati.

30. Inspector General,Registration and execution,Madurakan Shaluka,P.E

31. Hanamantrak,Industry partner,Mbuyi.

32. Director of Industries (Information Technology),Directorate of Industries,Mbuyi.

33. Director,Software Technology Paksan Off now,Mabui/Panu.e


34. Deputy Inspector General,Madurakan Shaluka,Mbuyi.

35. Areas of industry Co Sahachav/Vap Sahachav/Associate Sahachav/Room Officer.

36. Room Officer (M-1),Revenue and Forest Department,embassy,Mbuyi.

37. Senior Personal Assistant to Hon. Makhuya Sahchav,embassy,Mbuyi.

38. Personal Assistant to Pradhan Sahachav (Industries).,Industry,Energy and Labor Department,embassy,Mbuyi.

39. Personal Assistant to Co. Sahachav (Industry-2).,Industry,Energy and Labor Department,embassy,Mbuyi.

40. Hanwad Nasti (Industry-2).

page27cooked27
Maharashtra State's New Information Technology and Information Technology Assistance
Policy-2023 (Govt.
Department of Industries, Energy and Labor Department No.Matdho-2021/Pro.No.170/U-2, Hinakan

27/06/2023 along with form)


Form - a

A.No Accompanying what


Vahi Havashay what
Vahi hazard
Government The name of the air involved

Of these
Harassment

watch numbers

1. 3.1.1 Information Technology and Revenue and Forest Department

Information Technology Support (sweets)

5.1.1 Data Center Kahrata Madukam Saluk Satu Dane

6.1.2 AVGC units will be provided with the benefit of information

technology and information technology subsidy as well as fee

waiver for unit maintenance.

7.1.3 Waiver of fees for emerging technology


sector

2 3.1.10 Establishment of Information Technology and Nagar Havkas Havbhag

Information Technology Subsidies in any field. (Nahav-1)

4.1 Information Technology Parks for Infrastructural Carpet Area

Management and Space Utilization.

4.9 The use of vacant space in the IT Park


is compulsory if the IT/ IT support
services are being provided.
Vai Karan.e
5.1.5 Setting up data center in any area

5.1.7 Within the Information Technology Park, the air


space for air conditioning is 400 sq.m. To make
such a correction.E

5.1.16 Mat Kshetra Hanadsheak Hankash.

5.1.17 Dutta Centre Construction in the park


Use, information technology and
information technology support
services, including for otherVmatters
5.1.18 Chati Kshetra Hanadsheakamdhanu satu matters.

5.1.19 Flexibility in building constructions.


10.1 Hawakas Hanayatran Hanyamawali and other
requests for setting up of IT Park in
Habitakshetra
C Aligning principles with information
Dasaya

technology policy
3 3.1.9 Levy of property tax at a rate equivalent to the Nagar Havkas Havbhag

resident rate (Nahav-2)

4 2.1 Requirement of manpower High and technical Hashin

7.2.1 Training & Placement- air

8.1.2 Fourth largest in the state of Mirash (M-IB)

8.1.6 (a) At the temple level Bi-annual competition

Research and provide internationalSo we


reviews of its content.
8.1.2 Extent of m-ib.
9 Skill requirement and what the future holds strength

5 2.3 Lack of preferred skills by companies Skill requirement and

in emerging sectors Four numbers Entrepreneurship


To promote the creation of professional cooperation

6.1.7 Market opportunity

8.1.2 Extent of M-ib


8.1.4 Frame of M-ib
Hufnutke B, Various Opportunities, Entrepreneurship,

Innovation Powerhouse

8.1.5 Hafnatke Sapotay

8.1.7 (b) Skill Requirement: Online Courses for


Specialized Job Roles by Independent
Journalists in offline or online format
Sequence

9 Skill requirement and what the future holds strength

6 3.1.2 Information technology and information technology Energy sector

support the benefits of energy modernization. (Power

Rationalization Benefit)

3.1.3 Information Technology and Information

Technology Allowance to be paid to other entities.

3.1.7 Providing affordable electricity to IT and


Information Technology sub-sectors
3.1.8 Approval of Information Technology and Information

Technology Subsidies for Supply of Electricity to Public

Sector

4.5 After registration of IT Park, charging of


electricity at industrial rate in
connection with common services used
by private IT entities.
4.6 even though Energy/Chemicals d- Information technology

To increase the total area in the park, make

provision for the construction of satellites to

facilitate the management of the environment.

5.1.2 Exemption from payment of fees for


data center entities in IT parks or new
entities outside the park Energy sector

5.1.3 Datea SentasayNor electricity tariff


5.1.4 Data center components for power management components

5.1.8 Fees for Power Distribution License

5.1.9 Permitting use of renewable energy


5.1.10 Facilitating companies wishing to
acquire captive power firms
5.1.11 Nor
Datea Sentasay supply of electricity

5.1.12 Khalua Praveshe

5.1.22 Human Rights Permit

6.1.3 Information Technology and Information Technology Grants to

provide benefits to eligible entities without fee waiver.

6.1.4 New AVGC unit to reduce power tariff


7.1.3 Waiver of fees to emerging technology
units
7.1.4 Electricity tariff reduction for new emerging sector

7 7.1.2 According to the State's policy It is 10 years Mahhati technology department

Sq. To provide reasonable rate subsidy (General Administration Division)

for short term housing and housing.


8.1.4 Miraashrach Hafnutke Policy-2018 AtangaySo
Benefit from the convenience of the Hufnutke
Accelerator.

9 Skill requirement and what the future holds strength

8 3.1.9 Levy of property tax at a rate equivalent to the Village Havkas Havbhag

resident rate

9 3.1.11 Information Technology/Information Technology Support General Administration Department

Services to provide essential services to the industry. (adventure)

5.1.6 Essential tips.


10 10.1 Provision of Information Technology / Provision for Facilitating Labor Department

Businesses in Information Technology Support Services.

Information Technology / Information


Technology Subsidy Allowance Benefits under
Fair Labor Act.
11 10.1 Information Technology/Information Technology Environment and Atmospheric

Subsidy Service Consent Letter from Mirashra Pradshun Bill Havbhag

Hanayatran Mandal to Ghaniya.


12 4.3 Information technology and information technology Hawt Havbhag

infrastructure will be a critical infrastructure for the

development of the industry.

10 Provisions in respect of Annual Exemption -

Information Technology and Information

Provision
Technology of funds
Subsidy Policy for setting up
M-IBs and venture capital funds. Opening
of new accounts, making funds available
for the annual year 2021-22.
11 Provisions in respect of Annual Exemption -

Information Technology and Information

Provision
Technology of funds
Subsidy Policy for setting up
M-IBs and venture capital funds. Opening
of new accounts, making funds available
for the annual year 2021-22.
13 11 Provisions in respect of Annual Exemption - Hanyorjan Havbhag

Information Technology and Information

Provision
Technology of funds
Subsidy Policy for setting up
M-IBs and venture capital funds. Opening
of new accounts, making funds available
for the annual year 2021-22.
14 3.1.13 Availability of information technology and information Industry sector

technology support services

4.3 Information technology and information technology

infrastructure are also important for the development of

strategic infrastructure.

4.11(a) Giving fresh letters of intent to IT parks


4.11 (d) other matters

11 Provision in the context of annual discount.E

15 3.1.4 Certificate ink. Authority (Industries)


3.1.5 Market opportunity.
3.1.6 Investments related to leases – Small, Medium and Small

Enterprises.

3.1.12 L.
information stomach

3.1.13 Availability of technical and information


technology assistance.
3.1.14 Available for rent
4.5 After registration of the IT Park, electricity
shall be charged at the industrial rate in the
context of common services used by the
private IT entity.
4.7 Administrative measures.
4.8 Green IT Award
4.9 Use of construction sites in IT parks, IT
use for other purposes, including IT
use, is punishable. V
Karan.E

4.11(a) Giving fresh letters of intent to IT parks


4.11 (d) other matters

5.1.16 Mat Kshetra Hanadsheak Hankash

5.1.17 Dutta Centre Construction in the park


Use, information technology and
information technology support
services, including for otherVmatters
5.1.21 Legal education to facilitate business
development
6.1 AVGC is a vital aid to the industry
Certificate ink
Skills needed
Market opportunity
Recruiting ink

6.1.7 Market opportunity

6.2 The AVGC industry is a hubristic-sense


7.1 Urgent aid to emerging technology
Rent arrears
Available for rent
Ink for certification
Recruiting ink

Help with all matters

7.2 Udayonmkhu technology is a must


Training and Placement

Business Facilitation

Intellectual dream

8 Startups and new ventures

9 Skill requirement and what the future holds strength

10 Business framework for policy


implementation
16 3.1.12 L
information stomach Maharashtra Industrialist

4.2 Building a unified information technology Havkas Mahamandal

city
4.7 Administrative measures
4.3 Information technology and information technology infrastructure

to facilitate the development of strategic infrastructure for the

industry.

4.11(a) Giving fresh letters of intent to IT parks

5.1.12(b) Khalua Praveshe

5.1.13 DIAL HUBFOR DIG

5.1.15 Hard water supply

5.1.16 Mat Kshetra Hanadsheak Hankash

5.1.17 Dutta Centre Construction in the park


Use, information technology and
information technology support
services, including for otherVmatters
5.1.18 Chati Kshetra Hanadsheakamdhanu satu matters.

5.1.20 Foundation Allowance

5.1.21 Legal education to facilitate business


development
8 Up and new activities / Mirashra ib.
Statay
8.1.4 Frame of m-ib-

Huffnutke ib,Performance review process

8.1.7(a) M-Intermediate Enrollment Benefit - Market

Opportunity Allowance

9 Skill requirement and what the future holds strength

10 Business framework for policy


implementation

*******
Annexure-2

New Marathi Technology and Marathi Technology for Master's Degree - 2023
Industries, Energy and Works No.Matoner-2021/Pro.No.170/U-2, Dated 27/06/2023
(Vehicle Run No

Harbatach Ori)

1.Introduction:

1.1.Overview of Marathi Technology Industry - Rjagartak

The global turnover of the information technology industry in the year 2021 is
about 5 billion US dollars and the industry has grown rapidly in the past few years
especially after covid-19 and the information technology industry globally is
around (32%), the center. It is followed by Europe (20%), Asia (14%) and Australia
and New Zealand (11%).
1.2 Overview of the Marathi Technology Industry - Overview

Nasacom'sAfter the evaluation of Techade 2020, SunThe growth rate of India's


information technology and information technology services sector is expected to
be 6.1 percent during 2018-19.
Although the technology sector has grown on a global scale, the state's
information technology sector is expected to grow by 2.3 percent, adding up to
$194 million in gross national income (GDP) The share of this sector will be 8
percent of the total homicides in the region and 50% of the total homicides in the
same period of 2020-21 More employment has been agreed. According to the
Invest India report by the Union Ministry of Electronics and Information
Technology, the Government of India will invest 1 billion US dollars in this sector
by 2025.
I will
Hadhajtal Athas of aim to achieve the system
1.3 Overview of Marathi Technology Industry - Prof

Mirashti is a center of technology and innovation Since the 1990s, Mirashti has
emerged as a state center for information technology and information technology
services, electronics and technology outsourcing S It is also a global competition
The State is able to do so, and the right to invest in capital and funds is constantly available. S
Also, the strategic environment will be favorable for the state and information
technology industry, the expansion of this sector will be followed by the growth of the
sector like Raigad, Nagparu, Aurangabad, Nahshak and Kolipur in the coming years It
will be beneficial for you By:-

1.4 Master Advantages :


1.4.1 Macro Economic Strength
-Increase in R Higher Secondary Income:SunSthalu State for the financial year 2020-21

Gross Domestic Product (GSDP) is expected to be Rs 26,62,619 crore, according to the Budget of

The system contributes 14.2% of revenue and its per capita state income is around Rs.
India.

1,88,784 Rs
-Sunday night Chief among them are:Dear Ehprl,In 2000, Mr. Machus , come 2021
During the period more than 9 lakh crores of rupees were transferred to the state,
which is 29% of the total foreign transfer of India during this period.
1.4.2 Pitavathar Mukh
It is the Father's name (Supply Side Ecosystem):
- Name of the host:In the state of Mirashti11. In the areas of urban development, health,

safety, housing, water and sanitation, mobility, human resources, large scale institutional

facilities have been provided, the standard of living has been raised and the state's

assessment of the state level human rights index is very good.

- Renewable Energy:in the stateThere are more than 1000 technical institutes and 958 industrial training

institutes which annually recruit more than 4 lakh graduates in engineering and management science

through which the state provides the highest level of employability in the state.

- Force:For
The essence of nature the first time by the state, the Mirarashti State Skill Bench Act-2021 Jan

After the implementation of the said Act, Degree, Apprenticeship, Competence in Technology,

Entrepreneurship, Agricultural Business recognized by State Skill College, Mirashti(AI), Industry 4.0

and the like are intense Future-proof skills are also employable
A big boost for attackers
- Innovation Initiatives:Among the investigations conducted by the Human Rights Commission (Innovation Index

(Innovation Index) shows the state's innovation capacity and readiness through which the state has achieved the

highest performance. It has been reported that the state government has filled the most number of patents from

across the country in the year 2019.

- East Lake Turn:The Mumbai-Puu Knowledge Corridor is the flagship of the state's IT industry.

The belt will connect Muni and PU through Expressway. On the basis of Muni-Pu Knowledge

Corridor, the State Government intends to open other such corridors in the State as

mentioned in the Industrial Strategy-2019.

- High Traffic Capacity:There will be good quality power supply in the state for this area

Electricity available at affordable rates

- LOSE IN REGISTERED FOOT:Mirashti Industrial Development Corporation (MIDC), headed by the

Central Industrial Development Corporation (CIDCO) in the State to meet the needs of industries in

the Information Technology and Information Technology (IT) services sector. Jahanak

He also established a private information technology park.

1.4.3 Follower Mukh


It is the Father's name (Demand Side Ecosystem):-
- Growing demand:Mirashti is the largest state and unit of state in India by population. About 75% of the

population is above the age of 15 years and the potential consumers of information technology products

are the said population.

-High Requirement:Large scale through optical fiber network in the state With the
addition, the state has more than half the internet usage in India.
- Vapikata in Maratha PramaSunBy 2021 the state will have 13 crore wireless users, 10 crore

internet users and 107% tele-netta (the number of voice connections for the super rich) etc.
- Uiernmakh StatenUp Ikerrahstum:in DashaDPIIT Accredited Status Yours is the biggest number

11,845 DPIIT Accredited Status in Mirashti as on 11 Feb 2022 Ups


There are 17 of them. Sapnusstatus in the state Average 20% of Marasthi in UP Ecosystem

Contribution of I.E

1.5 The relationship between Marathi technology and Marathi technology is as


follows: The State's first Information Technology and Information Technology
Grant Scheme was announced in 1998 Rachya is correct The plan is effective and
its continuous dynamic growth in the sector has laid the foundation for the
information technology sector in the state of Mirrashti as part of the 2015
Information Technology Strategy One of the best technology hubs not only in
India, but also in India. Neal I.E

Information technology of the state is also an information technology resource, a resource for strategic

and global demand. , which is undoubtedly the driving force behind the growth of this sector.

Anrupap Havkasha Jhal A.E

Master of Marathi Technology and Marathi Technology Wanted Ori-2023

Character Millions of people Prominent


technique

2023 - IT Software Products Data - Unified Social Security System for


- Centers All IT and ITES Segments
- IT enabled services - Law of IT and ITES
- AVGC is an MHAJUNG TECHNOLOGIES segments to all parts
S of the State
- with IT and ITES supporting services. - Tio Chajing Mhjgung TK, AVGC, Green IT,
Innovations & Startups, Data Center ETC.
- Integrated IT Townships Infrastructure

- for Walk to Work Concept - Technology Insiders Promote Brand Excellence Through

Nuns
Improved Knowledge

- Haranydu Focus on IT Expos S Thr

Startups and MSMEs

2.Policy Targets:-
Between Hannan and Kalawi the following remains have been confirmed :-

• The state has information technology and information technology assistance in the area of Rs.95,000 crore to

attract new entrants

• Information technology in the state is also in the field of information technology3.5 million new
employment opportunities; 15 percent annual growth in skill development to create a highly
employable, talented and financially sound workforce;
• The State has Information Technology and Information Technology Siyyabhatu Savea Kshetratanu Rs.10 lakh

crores to achieve the target


3.Vision:-
The State of Maharashtra has a global need for Information Technology and
Information Technology Siyyabhatu Seva Kendra to innovate by establishing the State
as the annual Technology Capital of India.
, the eternal philosophy of equitable, inclusive
Walk with the limits of space
4.Ar Yuan (Mission): Information technology at the global level is also a strategic focus for
information technology initiatives.
By agreeing on a competitive environment and a conducive business environment

The dynamic and innovative initiative of the state of Mirashti is included in the list of the most favorable measures for

the state.

- The State's top position in the field of Information Technology and Information Technology.

Get more excited

- In order to achieve the sustainable development of the state, there is a need to increase the activities in the field

of information technology and information technology support.

- For new technology products/services preferably for domestic production


in Mirashti In order to promote innovation and commercialization of
- technology, the state should create a favorable environment for the
development of technology. Looking for highly employable, motivated
- and highly motivated for growth in the sector Kari

5.EXECUTION PILLARS:-
Pillars of implementation to achieve the target

Single Staten
Up and in nature
Walk-tat-walk
Talent launch
technology innervion quality

Information In the field of technology U


Udayonm in technology Information Technology Park and In the future Employability 'Talent LaChampada' for IT and
Off Daugung Hizansella Barefoot drive Information Technology and Information in Ah skills Encouragement information sector across the
For incentives, State Govt for grain yes Miraashti the State technology Siyyabhatu for grain, Sapur Specialized state laughing in the air

Information Technology to the state the knowledge result Savea Dhori laughing in the air of employment Acknowledgment in the world to do Industry weather,

Start the interface (MAHITI). M-Hub


Athos (M-Hub) to Eligibility to be done is to Less receivedSari having skills right air
career will be At that time set up system draw the area of use by Encouragement by companies Hadal Yes, it is high
Kali majanrui, Tuck activity I.E conducting annual draw and will go such as AI research and 1000 work
records, Encouragement yes subtle, L And medium thereby Between the ages there development, Solyshun will do Current
Other advanced services activities, Innovative work careers budget, persevere Wajainhanak, Mihavidyalaya is a skill
may also be made available tuck, U
Udayonm technology less Forage numbers of work Optical Science, Amidede instituteSkills Course
on a voluntary basis. To provide financial Hathakai of Hanwarya Convenience Solutions, etc. Available by Diari
assistance to universities Available by doing in grain Prahashkshi K Dr competition

in the region Rs. 500 will come It will also be assisted by


crores will be raised. Katathon.

Avery R
In industry Workmanship
Spiritual Uiernmakh Hyrid
what
question/ Haranayantra
Ravkah Technology Kshaterah working
Hinchana
lol

watch 15.5 after the Miraashti (M-Hub) global of the market of the state AVGC yes By State Govt Kayalayan
middle shift Zone-1 So
Atangus Chief Operating Dynamically the leech U
Udayonm technology Kshetras Workers and workers workers
Except others demonstrative Officer's Miraashti
For the lead Said of Dhoria (AI-ML, Big data, To carry out his Sikayan
Kshetramadhya to act yes technology prince Robotics etc.) Air work cooperation
of work empowerment
of employment right now Hanmai (Technology ink to do Incentives will be removed. Shiri Ke
Consensus limit due to
To do this, the satanhulat is Ambassador) minute For recruitment, reduces prose in drama,

eternal of the said Kshetra Hanayakuti in doing will come


Review In the lead will come
placement, recruitment information technology and

demonstrative Havkasala According to him life of Kshetra of that Said Consensus limit and recruitment etc. information technology
Siyyabhatu Savea

Ditto for giving incentives From a perspective Dhori yes global asked for of that For Kshetra 24X7 work
big Information technology Kayas No
display Aims only of Mirashti In the future Will be supported. Permission is also given in
Takasani Sakushma, L yes (Performance mandate) Necessary lines are necessary the office Non-Hakrahatkal

medium Activities to growth resistance yes in the new direction


lessFor fodder Rislia
ink to do Management do And Help with work do Mr
Transfers will be made.
Sign up of the state Information technology The reason for this is I.E

in the industry global


The best version will be
retained.

6.Policy Highlights:
6.1 Basic motivation for air-based technology and air-based technology(Common
Incentives applicable to all IT&ITeS Units):
- Common Promotion is financial and non-financial incentives related to information technology
and information technology allowances in the state. do not including information technology

Also, Information Technology Subsidies include Information Technology Subsidies


including activities in the field of Information Technology Software, Data Centers and
AVGCs (as defined in clauses 15.6 and 15.7).
- IT as an Essential Service:Information Technology Even in the information
technology industry, customers are often spread across the globe and work in
different time zones. It is necessary to work on a 24x7x365 basis for those
clients and strictly adhere to the deadlines given by the IT department to
increase the scope of work Work without stopping 24x7x365 working days will
be allowed. (Except in cases where exceptional circumstances arise in the
State where the State/Central Government deems it fit to suspend the work of
the IT Industry)

Takana will be given essential advice. Work to Data


Essential advice will be Center Data Centers to keep work running smoothly no
given in form and BHAAL ACT (ESMA) AtangasThat's essential advice Minu Gill
substance.
- Creation of IT Infrastructure under Marahati Technology Foundation:It is permissible
to set up a private information technology city, a private information technology park and
an information technology and information technology center in the state-promoted
urban areas, underprivileged areas and backward areas.
- Prominent motivation(Key Incentives): Provision of incentives under this
policy to stimulate the demand for IT and IT grants across the state. ,
However, concessions will be given on property tax and electricity tariff etc. Strong incentives are given to

emerging technology companies to create employment opportunities.

- (MAHITI
Marahati returns Portal):Information technology in Mirashti is information
technology A Single Integrated Window Platform will be created to promote
the Siyyabhatu Sava business.
- Marahati technologyIT Work force:Kayas in the field of information technology To him

Incentives
Giuvattavadhas will be provided for skill development in order to increase new
employability.
- Hinron R Ravkah (Research & Development):Adequate incentives will be given for
commercialization of technology products to promote research and development in the
field of information technology. Eg: Financial aid for market development, certification
and patents etc. Research in the field of information technology is also desirable
(R&Dactivities) The definition of activities falling under this is explained in clause 15.9.

- Financial and Non-Financial Incentive Details Cover No. 7 was clarified in A.E

6.2 IT&ITeS Infrastructure

- Marhati IT Parks:The Information Technology Park is an effective tool for


the development of the Information Technology sector as it is an effective
tool for the development of the Information Technology sector.
As its private information technology park is encouraged
- Redefining of Norms:In order to delineate the environmental impact of
the IT sector, the definition of BUA in the IT Park has been revised by the
State. Floor Space Index for IT Parks:Additional FSI has been sanctioned
- on top of the Base FSI to enable the entrepreneur to get the occupied area
at an affordable rate.

- Integrated IT Township: In order to meet the needs of future employment


generation and to provide social infrastructure support of the state, the
exclusive technical townships with minimum needs will be earmarked as
Special Townships. The jurisdictional area required to create a comprehensive
information technology city has been defined in the document.
-run yak foot lost ranoiCritical Infrastructure Fund):road pair, The said fund has been set up

in the State Government for the construction of power lines, drainage lines etc. and the

State Government has been given permission to construct infrastructure facilities for Paruk

Minnu, Natural Information Technology Park etc.

- Information Technology Infrastructure 8 was clarified in A.E


6.3 Data Centre:
- In Maharashtra Industrial Strategy-2019 Central Data Center Sector and Priority Sector
(Thrust Sector) The autonomous data center will be given direct encouragement from
the state government.
- Data Center Parks:In order to keep Muni / New Muni as the leader in India's
single data center capacity and for Muni to be the 'Data Center Capital of India',
the government will ensure to co-develop a land data center in the Meerashti
industrial area in the Miamdal region.
-handshake (Customized Interventions):In the year 2015, data centers were
given the status of essential service and continuous industry. According to
this standard, the area has to comply with the Standard Parking Norms, and
the data center is eligible for the annual status of the industry and
infrastructure. Captive power plant for the park was allowed to operate
- Key Offerings: Knowledge of Information Technology Priority among Jahanaka,
Dial Hifor Hadag Pohlsi, Chatai Kshetra Handasheakam Hankarshamandhya Hashahthalata etc.

- Further details of incentives given cover no. 9 was clarified in A.E


Dattaa Centersus

6.4 Anime, visual effects, gaming r Cormach (also Avirgy) Excerpts:

- Mumbai is the entertainment capital of India and has one of the largest VFX
studios in the world. In Maharashtra Industrial Policy-2019, information
technology and information technology support sector and priority sector
(Thrust Sector) will be included in this policy in the next five years for the
development of AVGC and Minu Hanami in the state Encourage them to opt for
the state of Meerashti .e
- Customized Interventions:Collectively encouraged, Among the key
incentives offered to AVGC industry are customized rental incentives,
support for market opportunities, access to advanced infrastructure such as
AVGC Parks, production studios, art centers, exhibition galleries, etc. and
information technology support Handicrafts will be arranged for signing.

- The details of the financial and non-financial incentives given to AVGCs have
been explained in Circular No.10.
6.5 Emerging Technologies:
- Global emerging technology markets 2 million US dollars in size and
emerging technologies such as financial intelligence, cloud computing and
others are poised to advance globally and emerging in the state. U technology

Taking necessary measures for the growth of the industry and following this strategy

- Miraashti Industrial Park-2019 Mid-Thrust Sectors to be promoted after Undoubtedly


emerging technologies such as artificial intelligence, 3D imaging, Internet
of Things and robotics, nanotechnology etc.
It was immediately studied
- Dedicated Center of Excellence:Government officials A dedicated Center of
Excellence will be established under the leadership of consultants from both
industry and academia. According to him, a favorable environment for the said
area will be negotiated during the next period.
- Customized Interventions:collective incentive compensation, Funds will be set up to

encourage other deserving individuals, including new entrepreneurs, to receive

customized capital assistance, grants for market opportunities, information technology

and information technology grants for skill development.


- Financial and non-financial incentives given to emerging technologies Ahadhaka
Tapahshal Paharchhade no. 11 was clarified in A.E
6.6 Grounding Innovation in Maharashtra
- M-Hub:Mirashti (M-Hub) and AVGC will be a stand-alone center of excellence

comprising of specialized task forces for pioneering state initiatives on emerging

technologies, innovation and entrepreneurship in information technology, and central

to the overall empowerment and growth of the information technology industry in the

state. Bhumka passed away. Status of M and State


Up Dhori- 2018 Ahi Huffnutke Dhori-

2018 was carried out in coordination. It will be managed by the Chief


Operating Officer under the supervision of M.D. Principal Secretary
(Industries).
- Brand will act as Chief Implementation Officer (COO) of the State of Mirashti and
Technology Ambassador of the State to represent the industry in the field of
Information Technology and Information Technology at national and global
platforms. The COO M will also be the coordinator for the overall IT and IT support
sector development in Maharashtra. There will be jiadars for no.

- M-itch's main feature is midge savas Public Private Partnership Model (PPP Model)
Among them, thought leadership and capacity building were confirmed
with the participation of private players.

- Although these companies are moving on a large scale in research and development, new

ventures Talk and Innovation Value Chain is a talk. Facilitate the


necessary necessary infrastructure, human resources,
tenM-DI will be launched under the Government of Mirashti to provide the
backwards

network etc. in the Mirrashti Industrial Area in Mumbai.

- M's case Further details of the methodology have been explained in Chapter
12
6.7 Kauilya Ravkah R Kayan in Uruvsya Skilling & Future Workforce
This policy aims to ensure that information technology and information
technology skills are highly employable in the state. Emphasis on skill requirement

The data shows that the industry sectors are skill demand, employment,
entrepreneurship and tourism sector and higher and vocational sector sector.
Worked in coordination with Havalyan. 15 per cent per annum increase in skill requirement

during the policy period has been confirmed.


Savvidh Paruvii Rs room
action
Skill Development Department and Higher
Industry Division c

and Technical Education Department

• Krihatram Ihu Matta • Conley Mr. 60 Business

• Ahanamachine and VFX Pragmatic Muni


• Gasemag
• I IT Comm., Muni
• Machine parts
• Hasamiyohasus Internationale Humanitarian, p
• Continuous process automation
• Dr. Dr. Andekar Institute of Technology,
• Internet of Things Industrialists
Lloret, Magaon, Haj. Raigad
• High data availability Dwar Samavathaya So
• Cloud related • Hashwaji Havdyapith, Kolyapuru

• Block chickpeas • Sahavatriai Phul Havdyapith, p


• Virtual reality • Uddyam Panuyashlok Ahiliyaai Bolkar
• Mobile Tk Havdyapith Solapuru
• Air Safety
• Dr. Pajanirao Dashemu Krishi
• 3D Summit
Havdyapith, Akola
• NSQF compliant curriculum
• Havshwashevaraya National Institute of of
Technology (VNIT), Nagparu

Most of the employment is limited


Sequence Miraashti-No Talent Launchpads

6.8 Portal Provisions(Policy Governance) :


- In this section, the administrative structure established for the implementation and enforcement of the said policy has been

explained and its policy components. It is the role of established power-granting consensus
The details of the expropriation were reported to A.E

- Empowerment Consensus and State Level Policy Implementation Bi-annual meetings to


discuss its strategic progress and future prospects reviewed. Yachiroir Hawakas Ikut
(Industries), Directorate of Industries' modest annual performance Annual Performance
Tracker) will also be displayed.
- Further details of this matter vide circular no. 14 was clarified in A.E
7.Common Incentives:
In this section, information technology and information technology Takana was made unknown
assistance were introduced under the policy of common promotion focus.Give a sector specific interview Will
The related information, information technology software, information technology and information
technology support services, data center, AVGC, emerging technologies etc. Clearly not in this episode

It was done by I.E


7.1 Stamp Duty Exemption-
For All Entities:An information technology is also an information technology assistant
If only one Hathakani is transferred to another location, the said Taka will be
eligible for duty waiver if only the said Taka is availed of duty waiver. A watch in
Dhoria. No. 15.8 In accordance with the provisions of this policy, IT and IT support
services/AVGC activities may be extended to the minimum of 25 per cent of the
total floor rental activity Dhikari Project (Expansion / Diversification Project) will be
considered And the said tax or drug will be eligible for duty waiver. If the same
has been obtained from the planning authority for the technology park, such
There will be two Information Technology Centers located in the Information Tuck and maduraka are eligible for shaluk satu hamam

Technology Park.

- Marathi technology and Marathi technology will include the following elements in the
list of elements:
a)zone-Apart from 1, the Savas of New Tasache Apstastva in other Kshetras of the State Public / Private

1. Transactions such as date, certificate, letter, notice letter, land tax


charge, rent, mortgage and mortgage bond for securing information
technology and IT support services in the IT Park 00 percent interest will be
paid.
b)Zones in the State-1 Savas in Kshetra New facilities in Jahanak IT Park
75 percent of the transaction fees for the confirmation of information
technology and information technology services, certificates, letters, letters
of administration, land tax charges, leases, mortgages and mortgages will
come
c)Zones in the State-1 In the absence of new technology in the public information technology park in the region

50 per cent of the transaction fee for information technology and information technology

support services is to pay 50 percent of the transaction fee for documents such as date,

certificate, letter, letter of authorization, charge on property, rent, mortgage and mortgage

will come

d)Information technology in the most economical sector Information technology in the park is most economical

Information technology is new and emerging in the field.


Certificate of interest and STPI fee approved registered information
technology and information technology services including date, certificate,
date, letter of interest, property tax charge, rent, lease and title deed A true
public assignment halz is included in this transaction 100 percent interest
will be paid.
etc)A registered Information Technology Technician in the state is also an Information Technology Assistant Taka's

Havalinikari, Havbhakta Ahi Restructuring will be given 75 percent of the Madurakan Salukta for the same

amount of Public Assignment Halaz.

- Terms & Conditions for Enjoying My Account:-

1) A company which has not availed of exemption/waiver of Maduraka charges and such a company has failed

during project implementation, if such a company has violated the terms and conditions of the “Mirashti

Information Technology and Information Technology Assistance Scheme” shall not be exempted from

Maduraka charges under the first clause. The Madurakas will be willing to pay back the shaluka as well.

Any
2) These Dhoritangas other policies/schemes of the government to waive the drug tax on
this industry. Verification of how to waive the duty of the Simhandhat Udyog Takan Maduraka

Taxes are required to submit a non-exemption certificate from the Competent Authority of the

respective Industries Division, if necessary.


Power Rationalization Benefit :-
7.2 Energy Consumption

Information technology and information technology are also used for retrofitting
energy systems. 25% of Rehoffstug is required to use capacity equipment
A deposit of Rs.10 will be given.
7.3 Electricity Duty:-
According to the provisions of the Mirashti Excise Duty Act, the percentage of production shall

be exempted from payment of excise duty subject to the conditions laid down therein.

a)zone-1 Companies/businesses registered with the Directorate of Industries in the area Important information

New investments in technology parks will be exempted from payment of cess for a period of

10 years.

b)Above part (a) Madhya Namdu hankarsha patoos This strategy will be implemented in Zone-1

Among other parts of the affected state, there is new information technology and information technology

The tax will be waived for a period of 15 years before payment of shaluk.

c)Information technology is a relatively new and emerging information technology in the financial sector.

100 percent of the information technology investment is registered with


STPI or other competent authority This is the subject of information
technology A permanent interest shall be paid on payment of shaluk from
the end of the policy.

Ratap :

1) Production may be started from the above mentioned point and location, provided the services provided are not

identical to those provided.

2) An isolated IT park occupied by IT companies for its own use shall be entitled to
the air rent for the period mentioned above as per its location.

3) Only after submission of registration certificate from Directorate of Industries or Software

Technology Paksof India (STPI) or other Competent Authority, the duly nominated project will be

given free concession.

4) Any refund of shulka already paid before shulka sale is approved.


5) Exemption of fee waiver in case of private information technology and information technology assistance

services are provided by Govt. This no. Backlog in IT 2016/P.No.190/U-2, Ext.17/02/2017 tenc
The reading will continue according to Sachuna and in between.

7.4 Certification Assistance:


CMM Level 2 or above is required for information technology positions.ISO27001 is safe

50% of the total amount paid for COPC or e-SCM certification certification or a
maximum of Rs.5 will be reimbursed.
7.5 Barge Assistance (Market Development Assistance):
Maximum two exhibitions organized or organized by Nasacom or ITPO
Candidates in the field of Information Technology, L And for the middle
Status
of Apsana Sibhag Shaluka (space ch/Rent) 50 percent or more class, it is Rs. 3 lakh
Deadlines will be provided.

7.6 Patent Related Assistance:


Medium, Small and Medium Enterprises:Every successful Indian wants to register for PAT
Rs.5 lakh for patents and Rs.10 lakh for each successful international patent up to 50 per
cent of the total amount, whichever is less, will be reimbursed.

7.7 Power Tariff:-


Information technology is also information technology Takana Miarashti Havdyatu Hanyamak

Electricity will be supplied at industrial rates as per the Electricity Tariff Directive of the Commission

(MERC).

7.8 Open Access :-


a)Information technology is also necessary for the efficient implementation of information technology.

As electricity plays a major role, it is information technology and information technology that will allow the state government to provide

electricity to Siyabhatu Savea Udyan through the state government.

b)Miraashti Industrial Opportunity Miamdanal Area Information Technology is Information Technology

Siyyabhatu Savea Takana Mirashti Industrial Rights Commission and Power Supply Agency.

7.9 Property Tax:-


Property tax will be levied at the rate equivalent to the resident rate applicable in the jurisdiction in which

information technology and information technology services are provided. Information Technology and

Information Technology Subsidies will be provided to the local self-government bodies from the State

Governments for providing services or benefits.

7.10 Setting up IT & ITeS Units in any Zone:

Information Technology is Information Technology in every area of the State (Residents,

Unnecessary areas, left areas etc.) can be raised.

7.11 Essential Service Status:


Information technology and information technology services industry will be allowed to
work 24X7X365 days without any stoppage of work to provide essential services. (Except
in case of any exceptional circumstances arising in the State where the State/Central
Government deems it fit to suspend the work of the IT Industry).
7.12 Marhati returnL : (Single Integrated IT Portal) :
The Maharashtra Information Technology Interface (MAHITI) and a dedicated one-stop shop for providing

information technology and information technology support services under one roof and within a short period

of time. 16.4 More details about Single Window Platform


Nomination was made to the said post Information technology is also a part of information technology

Worked in business, opportunity and information center minutes.

7.13 Financial Provisions for IT&ITeS:

An investment of Rs 500 crores will be made available in the strategic period for the venture capital

fund being set up by Mirashti. The need for immediate support from this fund This situation and

It will be agreed under the chairmanship of Giuvattnesuar Pradhan Sahachav (Industries).

7.14 Rental Assistance for Cars:


Information Technology Initiatives to provide affordable space to new entrepreneurs in urban areas of
the state Rental Assistance will be given to the newly established entrepreneurs. And the case
of the same Hawtari by removing the hand Hon. Mukhya Sachahav Yachanya
Empowered Committee under the Chairmanship of the Consensus Committee Y Will lead.
8. Marahati Technology R Marathi technology to boost air quality
Ranma lost his footing Ki - Marahati Technology Park and Marahati Technology Park (Promotion
of IT & ITeS Infrastructure -IT Townships & IT Parks):
8.1 Development Incentives:
In order to promote the growth of opportunities in the state of information technology and information

technology grants and infrastructure, the promotion of information technology parks and information

You were
technology parks has been introduced. done. Information about AVGC Pak in this policy
Belonging to Technology Park, AVGC is Information Technology and Information Technology Subsidy Service.

Takachanya Roririch Aita.

8.1.1 Additional mat area construction and return of land for Marhati Technology Park:

- Uvas in Drinmunii Kshetra and Mirashti For green areas there will be additional mat area indications

Dasa in chart
Dismissals will be made as follows:

Un. Amount of money Maximum unknown mat area bed


Determine the maximum

No. limits for Brahmabai area unknown mat area for the year

1 12 m. 3 drinks 3 drinks

2 18 m. 4 drinks 3.5 drinks

3 27 m. 5 drinks 4 drinks

- In addition, the maximum area of the mat area indicated above or as per the
provisions of the Residential Tenancies Act, whichever is higher, includes
agricultural areas, non-tenanted areas, and any other areas Exceptions to this will
be the limited area. In this area, the maximum area of non-viable carpet area will
be applied according to the rules of the mobile phone.
- Accordingly, the maximum number of planning authorizations and the current DCRs (DCRs),

Necessary adjustments will be made between the Comprehensive Rights and Promotion

Guidelines (DCPRs) and the Unified Rights and Promotion Guidelines (UDCPRs).

8.1.2 Provisions for construction of additional mat area for Marathi Technology
Park: (a) For Greater Bangalore area:
Services in the Greater Mumbai Metropolitan Region Jahan is a private information technology park/

The AVGC Paks project is in the process of levying a special carpet area
under the contract which is in line with the DCPRs.2034) of
It has been confirmed that, by charging 50 percent of that rate, the extra
carpet area will be left unmarked.
(b) Litter
For Reigning Professor:

(I)Havadbhas
, Marathwada, Dhalu Nadruwar, Ratnahagari and Sasaddugus are among the most important mat areas.

A contract fee will not be charged as an indication.

(II)Above(a)of that(B)(I)New Savas established in areas other than Kshetra Jahanak is also

The prevailing rate of land use has been confirmed in the Unified
Development Guidelines and Promotion Guidelines (UDCPRs) for National
Information Technology Parks/AVGCs. And non-woven mats by charging
50 percent of that rate Area directions will remain unknown.

(c) Central Business District:-


If a trade center is proposed in an area under any planning authority as per the
provisions of the prevailing regulations; Subregistered Savas in it Public and private

Information Technology Park/AVGC Udyan, which has confirmed the prevailing rate of
the contract in the Central Trade Center's Central Trade Center, will be charged 50 per
cent of the prevailing rate of the contract for the non-exclusive carpet area.
(d)This includes other unknown mat areas such as fungal, ancillary mat areas.
The guidelines and guidelines will remain in place as per the provisions of the Civil Rights Regulations

(DCR/ UDCPR/ CDCPR).

(e)Needs to be filled for provision of additional mat area for IT Park


Fees for payment of shulks, ancillary shulks and other shulks and certificates will be left to the applicant.

8.1.3 Following demand of Marhati Technology Park two


C Tattavanhi Ramshra Vapi's permission is unknown

will:
Percentage of land use
1) Zaran-1MMR and PMR Mianagarpahalka area
-60% Area -Information Technology is also a center for information technology education. 2%
Kshaterasi
- 40% area -other habits (Allied services) / support services (support services) will remain
unrecognized in the said area except for the activities of the trade union.
2) Iti Kshaterakanita except Zran-1

- 50% Area -Information technology is also information technology Takakanrita 2% of the central bank

Kshetrasi
- 50% area-Iti Havea (Allied services)/Support services will remain unrecognized in the
said area, except for the activities of supporting services.

- A single building/complex of buildings in an IT Park having an area of 20000


sq.ft.(1)And(2)The benefit of the discount here will remain unknown.
8.1.4 De-novo planning of Marathi Technology Park
The applicant of the Information Technology Park has completed the project within the required period of

time after issuing the letter of intent, the registration certificate and the necessary etc. However, if the

contractor is unable to complete the project within the required period and the letter of intent has lapsed, he

may obtain the occupancy certificate from the planning authority, etc.; A new letter of intent (De-novo
LoI) Co-layered back to remove bottlenecks in data processing tenC Sachuna Pahar. No. 16.5
Madhya Namdu was done.
8.1.5 Unitary Marahati Technology Nagychani (IITT) U and :
- REQUIREMENT OF RACKMAN GERMANY:To establish a unique Information Technology City 10

(day) acre area available for one year tenure. More than 50% of the area is Information

Technology and Information Technology Subsidy is used for other purposes. 50% of the area

May be used for any other purpose depending on usage or trend.

- Except for Shir Industrial Zone (Hasdco) zone, all other zones in Maharashtra will be
accorded maximum planning authority to the Mirashti Industrial Zone. The authority to
grant permission to this person and the Department of Industry, Energy and Labor
Department vide order dated 05.07.1996. High rights granted by Yanvay
Will agree.
- If the area of the exclusive information technology city is 10 (day) acres or 25 acres then the project will be completed.

Duration of swimming 7½ year (seven and a half years) and KshatraIf the area is more than 25 (twenty five)

acres then the period will be 10 years (daily years). If there is a movement to that effect, the approval of the

establishment agreement will be reduced in this context.

- The special mats are easy to fill and easy to fill in staggered increments. The facility
of payment of the said sum and two installments shall be granted within one year
from the date of issue of full occupancy/part occupancy certificate whichever is
earlier.
- Permission will be given to the developer to develop a unique Information Technology City in

any area of the state and for the implementation of the project, the zoning of the area may be

changed. However, for the purpose of mat field only, the draw will continue to be maintained

after classification of the field as per the rules of the Handicrafts. The said project can be carried

out in non-necessary areas, green areas, green areas etc.

- Exclusive Information Technology City and Information Technology and Information Technology Assistance

Scheme- 2015 and Govt. This no. IDC-2015/ Q.No. 93/ Industry-14, dated 27/12/2016
After being introduced in the Industrial Policy-2019, the 'Walk to Walk' concept will encourage

other residents.

8.1.6 Marathi Technology and Marathi Technology Industry Critical


Infrastructure Fund:
According to the provision of this policy, the State Government will agree on an
independent fund for the IT and Information Technology Support Industry for the
amount of investment in the area of special carpets and the transfer of this fund is
only for information All the necessary infrastructure for knowledge industry will be
done to ensure convenience .
Ranoi's Ranthmati:State Government Information Technology is also an information technology resource for the industry The

independence agreement was agreed upon by independent leaders.

A maximum of 50 per cent of the total revenue raised by each planning


authority in the State is Information Technology and Information Technology Grants.
The foundation will be deposited in Handi. In the same amount, the contribution of the State Government/Mirashti

Industrial Development Authority will be deposited in the foundation fund.

Hacrtical foundations are often unstable Eligibility of the project and approval of the proposal

Kayas
View the partner's co-layer details. 16.3 Madhya Namdu Kela I.E

8.1.7 PowerTariff:-
After the Directorate of Industry/Employment Authority (EDI) has granted
registration to the IT Park, public information technology facilities (such as lorries,
central air-conditioning systems, elevators, escalators, etc.)) , a common social function
Electricity will be charged at industrial rates (for computers, wash rooms etc.) including other

external services. In case of any question arising in connection with the General Service, the

competent authority of Ikut (Industrial) will be available to resolve the same. Every information

technology and information technology support service will require an independent electricity

meter service for tenancy or air-oil space.

8.1.8 Electricity Power/Sub Station:-


A total industrial area in Hawacharam in Information Technology Park is 6 Wt Prahat Sq. It will be

necessary to make provision for setting up of air conditioning supply system / air conditioning station as

per ft. This temporary absence will apply to the Information Technology Park.

8.1.9 Administrative Measures:


Permission to cast keels and permission to erect towers and antennas is
required, if in the required form and accompanied by necessary documents,
Such request will be processed within 30 working days.
8.1.10 Green IT Awards:
What is information technology in Havvadh Sri?
Awards will be presented annually on 20th August (State Information Technology Development) for

efficient resource management (Additional Information Circular No. 16.6).

8.2 Deliberative action to be taken for other purposes other than the use of Marathi
Technology Park in Marathi Technology Park Channel :-

Directorate of Industries Information (MAHITI) POTUSThe POTUS said Information about each lover

The name of the technology park is the name of the information technology/
information technology infrastructure in Pakistan and the area of expertise used.
Information about the activities, the number of people employed, etc. will be made
available on an annual basis. At least the planning authority will have the right to make an
on-site inspection of the area to verify the authenticity/verification of the information
provided by the applicant.
Information Technology Parks where there is information technology
and information technology support services are provided under the
Information Technology Policy.
They are unknown
In case of a complaint that it is being used for any purpose other than the purpose, in such a case, the joint

team of the Directorate of Industries and the Integrated Planning Authority shall visit the site directly.
Punitive action will be taken accordingly. The amount of fine shall be paid in the ratio of 3:1 to the

Sindh Development Authority and the Government.

a)For any purpose other than Information Technology in the field of Information Technology.

(Non IT/ITES Activities), an amount equal to 0.3 percent (three tenths percent) of the
prevailing rental rate for that particular area will be charged per day. b)The said rent
or occupancy certificate (OC) Hangus Information technology is not the only thing that can be done

Also information technology allowance will be charged for the duration of the service as soon as the

usage is started. Whose private information technology park buildings were constructed and re-

established the use of the land for the same purpose for which the letter of intent or registration

was issued by the private information technology park.

c)If the information technology park concerned is to pay the fee and/or use of the land
In case of failure to resettle for a specific purpose, the concerned planning authority
shall report to the Directorate of Industries under the provisions of the MRTP Act,
1966 against the Information Technology Park. Did it.
d)The said provision shall remain applicable to the Information Technology Park. etc)

Information Technology Park itself C / Information Technology / Information Technology Assistant

In any case, the land occupied by Cairo is not sold or leased for any other
purpose.
f)Size of the pool and the end user of the information technology park / information technology check

The owner will be contacted.


8.3 a)Duration of completion of Public Information Technology Park and its area wise
8.1.5. b)Information Technology Policy-2015, Government Honeys
This no. IDC-2015/Pro.No.93/ Industry-14, Hadnakam

27/12/2016 & Industrial Policy-2019 Read it and it will start.

9. Datea Hentich trend(Promotion of DATA Centres):-


9.1 Five InvestmentsShe:
- According to DC White's analysis, India's IT industry has a total installed capacity (data
center capacity) of 1790 megawatts by 2021. The state of Mirrashti is the second
largest data center market in the state with over 700 megawatts of IT infrastructure
capacity.

• The country will have more than 200 stations of inter-oceanic transport, connecting parts of

the world to the Pacific and parts of the world.- Neck attached to the western part
It is the largest single data center capacity in the country for market expansion with a

market share of 42% alone.

• State Government is keen to promote Data Centers preferably in Zone-1:


Muni and New Muni area with sustainable power supply, availability of kelly
loading and availability of dedicated technical space It is located in Zone I
-Data center in Pahsahak and Minu Hwakhasat
Incentives
9.2 Due Diligence to Support Data Centres:-
9.2.1 Stamp Duty Exemption: (Subject to No. 7.1) Dates, Deeds, Deeds, Letters of
Intent, Letter of Intent, Lease, Lease, Deed of Ownership, License
Agreement, etc. for allotment of land/building required for acquisition of
new data center or acquisition of new data center. R, D-Majs
R and

100% of Maduraka will be charged for this transaction.


9.2.2 Electricity Duty Exemption:
New Information Technology of Mirashti is Information Technology Siyyabhatu Savea Dhoriaatangas In the state

New and existing data center units registered with the Directorate of Establishments and

Industries will be permanently exempted from payment of fees.

9.2.3 Power Tariff Subsidy:


- Companies registered with the Directorate General of Industries Nor will they be thirsty for the realization

Electricity will be provided at industrial rate.

- For new data centers located in areas other than Zone-1, the total cost per unit for 5 years is Rs. 1/- electricity

tariff will be reduced.

9.2.4 Power Generation Units for Data Center Units:

State Govt., is the most economic zone distributed electricity Hanartmati Prasarhi
Havtriya Central Government Department of Transport and Industries No. P.6/3/2006-SEZ.I,
dated 27/02/2009 vide HangasBack to back tenC Tattwanansur, Vijhanarthamati
Takawandar also helped with electricity generation, transmission and distribution.

"If a power broker wishes to grant a Power Distribution License, the said
power should apply to the State Government. The State Government shall send
the advice of the Ministry of External Affairs, Government of India to the Central
Power Board under Section 49 of the Economic Sector Act. Ahadhaschuna
hanagus Dare to.
Accordingly, the State Government shall issue Power Distribution
License (Power Distribution License) in any economic zone after consulting
the Central Ministry of External Affairs license) paid. Accordingly, the
Central Expatriate Election Commission must provide the required
documents under Section 49 of the Economic Sector Act. Dare to
will come

Electricity Act - 2003 and Electricity Act - 2005 include the provision of
Central Electricity Distribution and Electricity Distribution in the Central
Economic Area including electricity distribution and distribution facilities
Uddha etc. will suffer.”
According to the above, the State Government followed up with
Takanana electricity distribution, distribution etc

the Central Government for the Hawtaria in Data Center Park.

9.2.5 Name of Data Hent within Tax Area:


Setting up of data centers in any area of the state (residential, non-residential, rural

etc.) can be done.


9.2.6 Essential Services Status
The nature of the work and the nature of the data center itself is essential
for the implementation of the data center without hindrance.
That essential service will go to Minu Gil.
9.2.7 Parking norms:
Standard air space required for Information Technology Park / Information
Technology Center will be allocated in accordance with the requirements.
400 sq.m.
9.2.8 Veerj Ravati Pivan (Power Distribution Licenses):
Section 13 of the Aviation Act 2003 State Govt Hashfarshinsuar, Mirashti
The Industrial Rights Commission and its presidents have stopped fighting for
more electricity licenses in the region.
9.2.9 Renewable Energy Use:
In case of open access, electricity distribution companies (DISCOMs) will be
allowed to use renewable energy after paying the cost component based on
government approval.
9.2.10 Captive Power Farm :- Captive Power
Fames (Wind/Solar) Companies willing to set up should approach Govt
In Samdambha, the movement of energy in the atmosphere will be facilitated.

9.2.11 Power Supply:-


The data centers will be exempted from severe power cuts in the state and will be provided

with 24x7x365 power supply.

9.2.12 Open Access :-


a)Since the environment plays a major role in the implementation of data networks, these data networks

The State Government will permit the supply of electricity through Luya Pravshedha.

b)Mirashti Industrial Opportunity Mirashti Industrial Opportunity for Subsidy Centers in Mimdal Region

Electricity and electricity are the other contracting agencies.

9.2.13 Dial before Dig: Dial hifor dig


dhoryatangas Help data centers manage downtime
will be done. Only the underground tunnels laid for the data center will be
evacuated to protect the network and the safety of the workers around this
infrastructure will be ensured.
9.2.14 Infrastructure Status:-
On the same basis as the railway, electricity and electricity sectors have been given the infrastructure

subsidy, the data center will be given the infrastructure subsidy so that the data centers can be provided

with the help of the emergency organization.

9.2.15 Continuous Water supply:-


For data centers in the jurisdiction of any industrial zone authority like the Mirashti
Industrial Zone Authority, 24X7 access to data center locations within and around
the data center park will be provided. Efficient use of available water
Data centers will recycle as much water as possible for use.

9.2.16 FSI Norms:


Avoid data centers and unique activities. 8.1.1 and 8.1.2 may be permitted to
be used in non-viable mat areas.

9.2.17 Deliberative action to be taken for the restoration of Baunkam lamp in Data
Henty Park, Marathi technology and Marathi technology etc. channel:

If a private data center has the benefit of a designated area in accordance with the policy,

then it may be found that the space in the designated area of the park has been used for

information technology and information technology support services and other non-

permitted purposes, etc In the middle there is a lot of work Will be done.
a)Areas of interest are Information Technology and Information Technology Support Services Professionals Other

If used for the purpose (Non IT/ITES Activities), an amount equal to 0.3 percent
(three percent) of the prevailing rental rate for that area will be charged for three
months.
b)The said Tenancy and Occupancy Certificate (OC) Hangus Information about the death of the deceased

Technology and information technology allowances will be charged for the duration of the
service as they continue to be used. Who demolished the buildings of the Data Center Park
and re-established the use of the land for the same purpose for which the Letter of Intent or
Letter of Intent was issued in the Data Center Park.
c)If there is a data center park and fees to be paid/or use of the premises
In case of failure to re-establish for the purpose, the Planning Authority, the Director
of Industries, Data Center Udya, Havrudh, and the Municipal Planning and Town
Planning Act, 1966 (MRTP Act) shall be notified. Did it.
d)The said provision will be applied to the existing data center

park. etc)Dutta Center Park C/ Havkasak of Data Center Park area.


In no event shall the vehicle be sold or rented for any other purpose.

f)Fees will be charged to the end user/owner of the data center facility.
9.2.18 Mat Kshetra RaniekamanonActivities exempted from FSI
Floor space, storage space used to accommodate generators (DGs) and
mats shall not be considered as part of the reference area.
9.2.19 Relaxed Restrictions on Building:- According to the data center requirement
and parameters like airframe, floor height, DG set, mat area index etc. in
accordance with national guidelines, appropriate guidelines will be suggested
in the manual.
9.2.20 Infrastructure Support:-
- Roads, electricity, connectivity, roads and other necessary infrastructure will be readily available around the Mirashti

Industrial Opportunity Zone and Data Center Park.


- The Mirashti Industrial Estate has worked to provide all necessary clearances/
permissions for allotment of land for the Miamdal and Data Center Parks.
- Necessary financial assistance will be provided to the Data Center Udyan to build transmission line and

system comprehensive infrastructure facilities through the Mirashti Industrial Opportunity Agreement

from the State Government.

9.2.21 Administrative U Studying in Law Centers for further relief:


- It worked as a Process Facilitation Information Room (MAHITI) and a key mechanism to
obtain necessary permissions from the State and Government of India for setting up
data centers.
- Database of Business Enablement (EoDB) The benefit of unknown rates,
The discounts are the sameTo take advantage of the incentives, Dutya Center was given the opportunity of the industry
will go
9.2.22 Deemed Distribution License: Data Center itself is a
space/operator and data center park Use green energy only when needed
Licenses shall be subject to attack.

10. Arunman, Swajal Effect, Gamemg R Cormakh (A.V.G.Hi.) is a Kshatera Pravatana No


(Promotion of AVGC):
- AVGC and Savantti are huge potential for employment creation as a
growing sector and current trends predict that India's share of AVGC sector
could grow to $1.5 billion, which is less than 1% of the global market today.
.eBig ollywood is in service here in Mumbai VFX Studio is located in Kaai
Studio. AVGC is located in Kshetra State won't
Provides employment opportunities for professionals in fields including communication,
photography, theater, regional languages, media, publishing, etc.
- The strategy will focus on bridging the supply-demand gap for the people of
the region, attracting global companies to the region, securing a large share of
outsourced international AVGC work and seeking appropriate environmental
protection. By establishing Center of Excellence as well as Task Force
Aims to encourage indigenous content
Eligibility:A.V.G.C. Also: Information Technology as a part of Syayabhatu Scheme.
Entitled to claim benefits unknown to Siyyabhatu Seva Taka
10.1 Averyji is also a pioneer in the industry haha :-

10.1.1 Udanwali Aniyan (Capital Subsidy)


- The first 3 percent of each AVGC that will increase the rent of Rs. 50 crores and
generate employment for 50 people will be given anchor units and they will
receive 25% of the increase in land rent up to Rs. 25 crores will be given as
Capital Subsidy for a period of 5 years.
- The new AVGC Tuck Tenants shall exercise their right to rent, utilities, etc
10 (days) will provide employment to the people, 20% of the land rent will be
given for a maximum of Rs.25 for a period of 3 years.
10.1.2 Exemption of Stamp Duty :-
watch 7.1 The benefits of Maduraka Waiver of Fees shall remain unrecognized after making an offer.

10.1.3 Electricity Duty Exemption:


watch 7.3 The benefit of fee waiver shall remain in effect after making the offer.
10.1.4 Power Tariff Subsidy: The new AVGC electricity tariff will
be given for a period of 5 years after being installed in Takana Prahat Junat Rs. 1 as much

any area in the state.


10.1.5 Certification Assistance:-
50 percent of the fare paid for all AVGC Hanayatpravan tickets for emergency
parking such as Comfort Elevation (CE), Global Limited International (GLI) and Gift
Certificates etc. and guaranteed refund subject to a maximum of Rs.2 per cent.
10.1.6 Skill Development Assistance:-
Online courses for highly specialized roles (as per definition 15.10) provided
by autonomous bodies either offline or online For order
chas
/ A deposit of 25% of the balance will be deducted. In that context, information POTUS Lover successful pass

'Certificate of Successful Completion' will be displayed after uploading


For standard certificate maximum Rs. 50,000 and for international certificates Rs. 1st, additional

minutes will be provided for benefit skill requirements if these requirements are less.

10.1.7 Barge Assistance (Market Development Assistance) :-


- M-IT and NSACOM, such as Development Associations, Innovation Society, Maharashtra

State Innovation Society and other annual events. Competitions were organized in order.

- Every year for that For the program and for competition Rs. 20 lakh financial assistance

will be done.
- Hafkki frames are the best Ahnmtede frames award-winning.

- Nasacom - Game Development Conference - P.U

- The Ahnamshen Society of India-Ahnfest, Mumbai.

- ASIFA - International Ahnmashin Day - 28th October every year - Sapnus Bharat

- MCCIA - Human Resources Council, P.U.

- NTLF - NASSCOM Technology Network Forum. M-

- Hub and its related rights are not waived The title of the order/competition can be given

- Kayas
The number of competitions in order is 1 kayas every year The order is 1 competition within a period of 10 days

- Mobile game developers registered in Maharashtra with more than 5


million downloads (iOS + Play Store) and 4+ mobile platforms will be
rewarded with 20% cashback of eligible purchases up to a maximum of Rs.
10 May be issued to each company.
10.1.8 (Recruitment Assistance):-
Information Technology is an information technology grant providing services to the center providing

employment to 50 resident candidates in the Hizense Inquiries Laboratory/R&D Centre. 2.5 per cent will

be reduced over a period of 2 years.

10.1.9 Lost in the Foothills (Garden/Yahh-Kayn Lighting/HeoI etc.):-


M-Hub AtangasFor the AVGC, it is necessary to establish a center for the AVGC So production

The AVGC studio also has space for perfomgants, displays. There is no gallery

Exclusive facilities like work space etc. will be made available to the artists.
10.2 Avergyhi Udyrgala Rhabgi-Ravattiya Hahay:

10.2.1 Global Joint Ventures


The state government will continue to promote joint ventures by signing 10 MoUs with
Indian and foreign organizations during the limited policy period.
10.2.2 Internal AffairsInternational Promotions:
International case involving AVGC in Mirashti Credit will be provided for the order.
10.2.3 Intellectual Property :-
The international agreement will be protected by the legal framework. National Corporate Governance Policy of

Government of India, also status Back to Top Social Security Protection Plan (SIPP) tenc
Facilitation will be done for patents, designs, copyrights etc. as per
principle.
11. Advancement of Uyarnmakh Technology (Promotion of Emerging Technology):-
Details:Emerging technologies have succeeded in attracting European wind producers to
Maharashtra. If there is, the veins can be straightened in the future. The use of emerging
technologies in disease detection and treatment through artificial intelligence (AI) drones to
help in innovation in the agricultural sector is expected to increase significantly during the
2019-2020 period, according to Hermot Lehng et al They have been talking.
Nasacom's 10,000 startups and startups program will be hosted by the Sikayan
state government, focusing on bringing together incubators, academia, corporates,
mentors and entrepreneurs. Such as Google, Amazon Web Services, etc.
Enterprise status to leading technology companies Ups will be offered. In just 3 years
Almost 50 statusesApsana will benefit Hamla, providing employment to more than 1300+ people in the state
Attacked I.E
2.
Sadar Dhoritangas Global Emerging Technologies on Decentralization
It is hard to get attention and it does not give him time. For the global emerging technology
sector to reach the milestone of 2 billion dollars, the amount required is:
1. Internet of Things (IoT) - 35.2%
2. Cloud Computing - 12.8 %
3. Ahanamachine / VFX - 12.5%
4. Dutta Center - 9.0%
5. Hig Date Ahi Analhetics - 8.8%
6. Blockchain, AI, 3D surrogacy, robotics, e-commerce - 8.3 %
7. Gasemg Ahi Cohmex - 7.5%
8. Sayir Saruksha - 5.9%

11.1. Uiarnmakh technology is ravattiya haha y:

11.1.1 Adanvali Anian - throw

away Taxes, utilities (excluding building and land) etc., 20% on rental income
The rent allowance will be reduced for a maximum period of 5 years up to a maximum of Rs 1 crore. The

said rent agreement and the right of which is Rs. 5 crores and the first 50 new emerging technology

companies that will provide direct employment to 20 people are unknown. AVGC is Data Centre

Since independent policy measures have been included in Takakarita policy, they
have not benefited from this.
11.1.2 Stamp Duty Exemption :
7.1.
11.1.3 Electricity Duty Exemption:
However, the benefit of waiver of charges shall remain unexplained as per Clause 7.3.

11.1.4 Power Tariff subsidy: New growth rate


established in each area of the state will be given Takana Prahat Junat Rs. 1 as much electricity

for a period of 5 years.


11.1.5 Certification Assistance: 7.4.

11.1.6 Recruitment Assistance :


Each center providing employment to 50 candidates Rs. 2.5 per cent will be reduced over a period of 2

years.

11.1.7 Patent Related Assistance


7.6.
11.2 Rabgi-Ravattiya Hahayya to Uyarnmakh Tantrjnana:-

11.2.1 Training & Placement- Ahbhayahantraki


Mihavidyalaya will give employment campaign Will initiate sequences and suchorder
Prakriti will do.
11.2.2 Ease of doing business- Status
Faster speed in apps A business friendly approach will be taken to get wind.
Among them information POTUS Manned Hotline
Number) 24 hours assistance will be planned.
11.2.3 Boric Acid (IP)
The international agreement will be protected by the legal framework. National Insurance Policy, Status

Under the Indian Wildlife Protection Scheme (SIPP), Madhya Namdu, Govt. of India tenAccording to the C principle
Facilitation services will be provided for patents, designs, copyrights etc.
Startups & Innovation:-
12. Staten
12.1 Master Hub (M - Hub)
A premier technical institution by the Government of Maharashtra, Hisense School is a private institution with educational

Education
status. will be led to set up a dedicated Center of Excellence (COE) to train
you. State-level Industrial Opportunities Center NSACCOM-STATUS Up various
Kayas
On a regular basis, such m-door innovation clusters will be created, where new technology
sources, capital, skills and capital will be the basis of new industry needs and new ways of doing
business will be encouraged. “Rajya Hashra Santha” (Rajya Hashra Santha) to promote M-Hub
and entrepreneurship as proposed in the Maharashtra Industrial Policy-2019.State Apex
Institute) A few minutes worked. It will be set up on the premises of Marashtiya State Industrial
Development Corporation (MSSIDC) at Kalinoli, Hajla-Raigarh and will be a state-of-the-art
building with training facilities for 300 students including students and teaching/teaching staff.
Arrangements for entertainment should be provided for the fodder.
Key tenets of M-Hub are as follows are:
- It is a key implementation as proposed in the Center of Excellence and
Strategy to create social and technical infrastructure for future technology,
talent acquisition, entrepreneurship opportunities, global learning
- opportunities etc Dhakari (Chief Operating Officer) Ahadhapityali Kayas of
Pradhan Sahachav (Industries). There will be a lot of people, the policy is from him

Implementation and co-operation, key strategic partnerships and inter-sectoral


coordination and learning will be carried out to promote sustainable ecosystem
development. Chief Executive Officer and M-V Atangas It is organized

Done subtask fosusWill supervise.

12.1.1 M-Habach Name:

- It
Status also helps people to achieve better technology, value, business
strategy.
- Fields, Technology Labs, Corporates, Govt.
Kayas tenC, Agronomist
Create an overall environment by establishing coordination among etc. Information

- technology status with facilities like furniture, conference room, cafeteria etc. - It's up
Provision of affordable space and operations for incarceration centers for a maximum period of

five years with ease on property tax, property tax, security , correctness, ahi paharsarachi de bhal

The taste of etcHe will be paid.


- Chief Executive Officer and those concerned with the implementation of M-I They are living in it
Follow the plantenwill not. In which 4 main areas of information technology are covered.
4 Task Force will be set up viz. AVGC MIA Centre, Emerging Technology
Centre, Stats. Agreeing on a favorable environment for the ups and downs

will come

12.1.2 Scope of M-Hub :-


- 10,000 statusUp Kayas
A part of the sequence is an innovation in M, M, and Mirrashti

A Center of Excellence (CoE) for Entrepreneurship will be created.


- Mumbai has the status of being the 7th largest in the state of Maharashtra, with IITs holding the status of other

academic institutes of its name. Be the target of ups and downs.

- Jahtak KayasThere is also the presence of the consumer, the presence of the principal institutional guardian,
The availability of co-working space at reasonable rates will benefit the largest hubs in

India with additional locational features such as pilot chachi facilities. M-Hub Maafsat

Mirashti State Innovation Status Up Dhori-2018, Miraashti Hafnutke Dhori-2018 is also

Mirashti State Innovation Society Atangas One thousand of these provisions in keeping it

Will be implemented.
- Demonstration case for demonstration of coordination between State Human Resources Organization and Mirashti Entrepreneurship

Development
The sequence will be organized.
12.1.3 The control mechanism diagram of M-Hub and JJya Rikhi Hansi is as follows:
Administrative Procedure

Principal Secretary (Industries) Pradhan Sahchava (High and Tantra Hashakshi Havabhag Pradhan Sahchav (Information Technology)

Pradhan Sahachav (Skills, Employment, Authority (Industries) Mukhya Kayas Kari


Entrepreneurship and Innovation Sector) Authority, Mirarashti Industrial

Development Authority

Kari
Mukhya Kayas Ahadkari, Meerashti Executive Officer, (Mirashti
Mukhya Kayas Nameless entrepreneurs in the

State Skill Development Society State Innovation Society) industry

infrastructure in the field Nameless Anonymous person in AVGC field Status


Nameless person in Up

person Kshetra

A nameless person in the Huffnatke Kshetra An eminent person in the field of emerging Management Organization

technology

Technology Institute Ravire forever

- Case of Administrative Mechanism of M-No Rule of law This is self-inflictedHamat

will be done.
12.1.4 Frame of M Hub :-
- Roughneck Hub:M-Hub Media Support Huffnutke Havbhag Kayas Even though Among them research and

There should be room/scope to work at least one thousand times. Huffnutke is the best choice for

community buildings tenC


Sequence and backward will fall. Mirashti Hafnutke Dhori-2018 AtangasThat's funny
Accelerators will also provide convenience.
- Lose the air:To test and test new plans/ideas and products
Takana will make space available.Status Concepts of apps are also prototypes
The initiative will be approved through various channels. 10,000 status Up program AtangasSo established

Ex status Ups will get 10% seat allowance. From which the status in the first phase Up
It will help to learn.
- Productivity:Coordination with academic and research institutions will be enhanced to
encourage entrepreneurship. 15% seats will be provided at a nominal rate of 50% for
youth and women entrepreneurs.
- Innerveen Powihauh:M-D is the Chief Counsel and Advisory Council and M-D is a Globally,

Dajach will work with the aim of creating a platform for innovation. M-d is a moderate

global naked post-status Up will be partnered with. Its status Up, Innovision

These will be prepared for public access.


-Uiernmakh Technology:Abhayahantraki Mihavidyalaya and employment campaign will be given Start the sequence

Will do and such Status will be verified by the order itself Jaladgatin kayas in Ups Samdambha V

A business friendly approach will be introduced to sleep. Ladwar Self-

It is proposed to arrange a 24-hour manned hotline number for technical


assistance.
12.1.5 Performance Monitoring Mechanism:

A. Goals-
o Professional statusUps

o Rapevinya Generated

o Joe Hackettday

o Tax revenue
o Supporting zone 2 and zone 3 hasties
B. Success Factors -
o Status
number of ups

o Occupancy of Inquisition Center o Joe

Hackettday

o Elephant erection

o Enterprise is Investor Connect


o Market Access (number of Javas, Emojis, Patscurse)
o Events hosted
o Interest generated

C. Review Mechanism
o There is a mandatory performance review and an annual report will be

published o General counsel and review and review every six months Eel.
o Advisory Council and M-IT team will review every three months o Eel.
Empowerment Agreement will be reviewed once a year.

12.1.6 Fintech Support:-


Huffington Post, Enterprises and Government Machinery Part of Minu coordinate

will be achieved. Global Hufflepuff Status It is also attractive to the Indian market
These cases offer the benefit of 'bribes' to help start operations It is the ID of the sequence

Tak
12.1.7 Hutch Hon R Suggestive tools & Interventions:- Few
- things
Order:An entrepreneur in an industry spread over a vast geographical area

At the time of the networking, the public access, back tenNo, scale-up dhori, demo d
etc etc tenOption not to do so will be provided.
Backward in chronological order

- arrangement :Peer statusOops, GavisNament as-a-client, gatumvikudar, magas tenC/Expert, Coporte


Effectively, coordination will be done with the service provider.

- Copoite innervain: M&M preferably covers corporate members in Zone II


area. Nas helped.
- The beginning of the journey: Productivity Services and e-Governance in partnership with M&M

National and International Government Organizations


Helping the poor is the victim of the government

Required status Additions will be added.

- Kishar's Health:Innovation in the field of research Around the world to promote it

In-house case with human rights experts Sequentially, Paharsada will be conducted. New Syllabus

Ethanus by creatingHashup's facilities will be included in the package.

- M-CH coordination will be done by the Information Technology Department of the State Government.

12.1.8 M-Hub Entry No The authorized entity shall have the following lower rail lines:

a) Barge Rwakah Haha Y:

- 1 Slow haha Oog:Production/research demand depends on this year's growth So


What a world To support 25 lakhs of eligible organizations to participate in the programme

will come

- Re-warthork Innovation Spoa:Best (2) Two innovative initiatives worth Rs. 5 lakhs in the
government's bid, the incubator will be allowed as much as Rs.2. Fresh departmental
recruits seek guidance from industry consultants. tenwill not be done.
- Maharvdyalayan Stavi Re-warthork Spoa:The first three need Rs.1st revision and

its presentation International recognition will also be provided.


Consult an industry consultant for detailstenwill not be done.

B) Kauliya Ravkah Hahay :-

- Online courses for highly specialized roles (as per definition 15.10) provided
by autonomous bodies either offline or online For order
chas
/ A deposit of 25% of the balance will be deducted. In that context, information POTUS Lover course

After uploading 'Certificate Of Successful Completion of Courses'


It is a maximum of Rs.50 per certificate and international

For certificate Rs. Additional minutes will be provided for benefit skill requirement if

less than 1.

- In the case of scheme/policy concessions of other areas, the scheme/policy concessions are not availed, but

only after verification of the existing scheme or renewal of the existing scheme, the scheme is approved by

the Directorate of Industries and the Office of the Chief Executive Officer. It's a discount

Benefits are given.

13. Kauilya Ravkah R Ruvshyati KayanSkilling & Future Workforce :-


This policy aims to ensure that information technology and information technology
skills are highly employable in the state. So on skill acquisition course
(Super Specilised Job Roll) will be focussed, such study program has been proposed
in 15.10 along with the above mentioned academic institutes/Abhaya Mantras in
the field of higher and technical skills and skill development, employment
entrepreneurship and skill development. 15.20 The details of this institution with
emphasis on university and inter-university courses are presented here. And, status

Up, Huffnatke Tashe Mukhyamtri Rojgarhanimati kayasThrough order


Allowances are made at the time of employment/self-employment. A 15 per cent per annum increase in

skill requirement has been specifically ensured to create a highly employable, motivated and financially

savvy workforce.

14. Ori Policy Governance :-


Ori Employment Framework for Amal Barjav:

Iktiprian Harmati:It is also necessary for the implementation and enforcement of this policy husband

tenA state-level empowerment consensus will be established to facilitate principle C. A semi-annual meeting of the
And back

Shakti Pradhan Consensus will be held at Shakti Pradhan Consent to any department/ department of the organization/

department of the department or individuals appointed for the post as per requirement.
14.1 Ikti Priyan Harmati's Hinchana reads as follows:
1 Mr. Mukhya Sachav President

2 Apar Makhuya Sahchav, Havatt Havabhag Member

3 Apar Makhuya Sahchav, Hanyojan Havabhag Member

4 Upper Makhuya Sahchav, Nagar Havkas Havbhag (Nahav-1) Member

5 Pradhan Sahachav (Industry), Industry, Energy and Labor Department Member

6 Pradhan Sachava, Skill, Employment, Entrepreneurship and Non-profit sector Member

7 Pradhan Sahchava, High and Tantrahashakshi Havabhag Member

8 Pradhan Sahchav, Information Technology Department Member

9 Pradhan Sahchav, Nagar Havkas Havbhag (Nahav-2) Member

10 Kari
Mukhya Kayas Ahadkari, M.A.H.V.M. Member

11 Chief Operating Officer (COO), M-No Member

12 Director, Software Technology Institute of India (STPI) Member

13 Nominated Person of Nasacom Member

14 A person under the name of Hafaki Member

15 MCHI – Missing Person of Kerdai Member

16 Commissioner of Employment (Industries), Directorate of Industries, Mumbai. Member Associate

14.2 Action of Ikti Priyan Harmati Class:

The progress and implementation of provisions in the Shakti Pradhan Consensus and Policy were monitored.

This agreement also requires implementation and enforcement of the policy at the state level.Method and Hankarsh ready

what to do Will be done. of that Attempts have been made to resolve the issue in the following context.

- Information Technology and Information Technology Subsidy Service Talk, Information Technology and

Information Technology Subsidy Service Funding Facilitation, Data Center, AVGC and Emerging Technologies

There is also incentive for interest

- Zone II venous congestion tends to be symptomatic Don't do it

- Efforts should be made to improve the skills and employability of the workforce in the information technology

sector in the state.

- Not available through M-D Encouragement and entrepreneurship

- Centers of Excellence and Task Forces are coordinated and supported by M-I
- Atangas. Outlines/cases proposed by the established Task Force Ptis
Wages are paid

- Ensures specific duration and targets for each activity.


- Coordinates intra-regionally in line with this strategy.
- Based on the information in the context of the policy budget, the policy implementation

itself has a positive impact and evaluates it.

- Solve operational issues at all levels and increase


- business efficiency.
- Overview of Information Technology Siyyabhatu Services Other Services Unknown in Information Technology Park

It and make appropriate changes in it


- In this method, the dried leaves tenC. The base of the certificate is a non-slip mat
Other terms and conditions are confirmed.
Public Institutions and Financial Planning Authority

According to the method being implemented

- The Empowerment Agreement will review the implementation and effectiveness of the
policy every six months. Appropriate corrections, additions or corrections will be made
if necessary.
- A review of the best practices
- If the private IT Park, IT / IT Subsidized Service Industry is to be freed from
the incentives enjoyed by them and returned to India, confirm the terms
and conditions of the agreement.
- Requirement and right to submit annual report of policy to Commissioner
(Industries).
14.3 Marathi technology and Marathi technology: to buy

Information technology is also information technology Takana will continue to benefit from the following provisions:

- Working hours, working hours are also women less A shop in Charyachanya Namikucha Samdambha
These establishments shall be subject to the provisions of the Constitution from time to time.

- Physical records in physical form will be provided to the students before the record
is kept.
- 13 rules implemented in the Labor Department are also able to self-certify
the annual report and submit it in one place.
- Information technology is also an information technology resource that needs to be kept under
the labor laws. All the workers in Sindh are currently in electronic form
Provision will be made to accept the Bulletin in electronic form following the progress of the
Department of Communication.
- (i) Information technology is an information technology service provided by
its production process and not less than 100 such units. Four times
A consent letter from the Mirashti Exhibition Hall should be obtained. such industry
E-waste, used batteries, waste products and hazardous waste must be
prepared and submitted to the Mirrashti Exhibition and Trade Council. 2.
The need to pair with the technical support system for permanent
residence. Rael.

- Contractual workers in the financial sector shall be subject to the


agreement of the Ministry of Labor, Information Technology and
Information Technology Support Services in the financial sector.
- Information technology is also information technologyTakana, power supply
For the purpose, the above procedure will be considered as minutes.

- Information Technology Parks in Mirashti Industrial Opportunity Zone in


Kshetrasi The need to build a DCR (DCR) and other documents tenC Tattva Mirarashti
Industrial opportunities will be brought into consonance with the Information Technology strategy for other sectors

including the Miamdal sector.


15.Definitions;
In the context of this strategy, the information technology sector includes information technology software, AVGC data

center and information technology support services for emerging technologies.

15.1 Marhati Technology Park :The lonely buildings / Paharsarach Kshaterafal,


Ahatharakt Chaati Kshetra An IT Park exceeding 20,000 sq. ft. including any
commercial/commercial space may be considered.
15.2 IT Software:Any representation of information, information, sound or image, as
readily as possible by information technology software media sources, including
the recording of the foregoing in an easily readable form for use through any
interactive communication medium.
15.3 IT Enable Service Unit: Information Technology Support Services shall be the
services prescribed by the Central Board of Direct Taxes under Section 10 TA of
the Income Tax Rules and shall include the following services.

a) Bank-Office Opinh:Banks, Insurance Companies, Mutual Funds, Non-Issuing Finance Companies

Chari
Administrative functions of such emergency organization are also administrative functions J Settlements, Compliance, Accounting,

He is a professional for running IT and other technology related companies.


These include the following:
- Business Process Outsourcing is primarily provided through the use of
information.
- Data collection, transcription, consultation, integration, coordination, measurement, document review

process

- There is a way to solve the problem


- Front office activities in the financial sector include corporate finance, property
and fund, management brokerage, non-banking financial company, tax and
audit business and management consultancy, taxation services, treasury
operations, risk management and credit services Hufs operations 15.19 Any
other information technology assistance activities as specified in the Ministry of
Emergency Situations, including disaster/recovery and information technology
operations, shall not be limited to office operations .
b)Corporations and Investments (CIB) is natural, disaster / recovery, need
FINANCIAL CARROOM OPERATIONS FOR NON-SCIENTIFIC OFFICES WITH PRODUCTION AND OTHER
Samathas

Up/companies
SERVICES, STATUS and whose client's name is Sindh. Also does not include further

godown/various of e-commerce company/organization through electronic medium. In return,

essential assistance is provided

this)Call centers and contact center services d)

Data processing is also data management etc)

Insurance claim processing f)Halgal Dattaise

desire)HCRATION AND MAINTENANCE OF MEDICAL BANKS EXCLUSION EXCLUDING ADVICE


h)Payroll
i)Harmot maintenance

Rj)eAdvanced Accounting (Information Technology includes Income Tax Office, GST Office, etc.

(should include office operations or any other government or non-government


office or office operations)
k)SPOTSCENTSUS

l)Website Services
m)Hanselshane Services

n)Data is true and accurate


o)Extensive use of content generation/creation software such as OSS, OHD, PHDO, etc.
Artificial content which may be permitted for reproduction
p)Clinical data management services (excluding clinical files), including
Development Services that may or may not be in the nature of Connect Services
are Development Services.
Why?Visa processing facility, visa facility, tourism facility, etc. There is no Manorjan channel

Sports are also travel channels.

and)Ihnjhanaring and Hadzaining eh)

Know geographical information. t)Save

human resources.

c)Supur Specialized Information Technology Skill Development Center IT Competency Training Center V)

Co-working Space / Plug and Play Infrastructure

Note:In case of income tax returns, it is necessary to provide the list in the list. Y
State Govt. A letter of intent or registration is issued by the Regional Office of Information Technology / Information

Technology Support Services, Information Technology Parks, Information Technology Centers, Information

Technology AVGC Pakistan, Directorate of Industries etc. If supported, proceed with the process
Incentives made will continue throughout the policy period. As per the definition above,
information technology infrastructure can be set up in the existing information
technology park.

15.4 Classification of IT Units: Information Technology (IT) Takach Kachyyaatangas


On the basis of activities in keeping it classified into two groups viz
Among them are (a) Information Technology Software (b) Information Technology Services (Information Technology

Support Services).

(a) IT Software Unit:Information Technology Software


A comprehensive list is not possible considering the continuous demand in this sector, which

covers a wide range of intermediate products and is of the same nature. It has therefore been

decided that the Software Talks, in as large a field as possible, which are certified by the

Competent Agency, shall go for registration of the Information Technology Software Talk

Minutes. Information Technology Support Services Information technology for war

The annual turnover of the software firm must be more than 75% of its total
annual turnover in terms of revenue and
(b) IT Enable Service Unit: Information Technology
A definitive list cannot be prepared for this sector, including information technology services,

logistics and logistics services. Minuch, Information Technology Sayyabhutu Seva Definition

Below is a descriptive list highlighting what IT services are.


Tuck Annual turnover of information technology services
Must be more than 75% of total annual turnover in terms of revenue.

15.5 Kshateracha Vagiki (Classification of zone) :-


- Zaran I:Among these are the Mianagarpahalka Kshetras in Muni Mianagar Pradesh and Pu Mianagar

Pradesh. Be inclusive.

-ZaranII:Among these zones-1 Its harbor-industrial complex is aspirational and includes


areas other than Naxal-affected areas.
15.6 Existing IT/ITeS Units:Information technology installed by an organization in a
remote area (Software)/Information Technology Grant Services (ITeS)/AVGC
products, the production/implementation of which has been started on or after
the said policy and or any other information technology is under the
Information Technology Grant Services policy.
That is the benefit of encouragement Tela and (Madurak

Shaluk will be omitted), as Tuck.


15.7 New Marahati r Marahati Technology Haha Yut Havea / Avrijihi Factors:On the other hand

Information Technology/AVGC established in an air-conditioned area


IT IS INFORMATION TECHNOLOGY AND INFORMATION TECHNOLOGY SAYABUTHA SAVE POLICY IS AVAILABLE TO

THE EXTENT OR THE PRODUCTION / IMPLEMENTATION OF THE SAME IS COMMENCED DURING THE POLICY PERIOD

AND IT IS DISTRIBUTED ONLY TO THE PROPRIETARY PERSON, TO THE STRUCTURE OF THE PRIVATE LIMITED OR IN ITS

IMPLEMENTATION. Chana can be revived


15.8 Expansion/Diversification Project:in the absence In accordance with the
provisions of the said policy, if at least 25 percent of the total land lease is
mobilized in the information technology and IT support services / AVGC
activities, the said activity will be considered as an expansion / diversification
project.
15.9 Hinron R Ravkah:Central Electronics is an initiative of the Ministry of Information Technology. The

following activities (with no return limit) are highlighted in the application section: High Performance

Computing (HPC).

- Green IT or IT Sustainability Mobile Computing,

- Networking and Applications of IT and Innovation in

- Sustainability of Water Resources

- Information technology in the field of innovation including digital publishing, green computing,

bioinformatics, participatory e-learning, free and open source software (FOSS)

- Hass-Ducka, Pew's modestly highlighted research is also an initiative in the field.

Research in information technology is the right to conduct activities in the


field of interest.
15.10 Our specialized jobs are:LIL JOE in every area of innovation The contents of
the roll.
- Rebartic prarahe otermien: Service Ehnjahner, Hizense Analist, Rootic Process Automation

Developer, Solution Architect, Development Coordinator Ad-Testing Engineer Interferial

- Interrlarjanh:- All HarshScientists, All HarshScientists Images etc. Videos, Software

Integration Engineers, All Hardware Scientists About Processing, Data Scientists, Data

Architects, Software Engineer-Testing, Software Engineers (Application) Platforms and

others

- Itinte of MiG :-Imidede Husteam Programmer, TyreIII & IV Cloud Support Analyst,
Information Security Analyst, Solution Architect, Hizense Analyst, Data outside

Design Designer Design Designer, Computer Vision Design Designer, Yauy/Yux Design Designer,

NetWorks Wireless Specialist, Software Designer, Data Signer, Testg Designer-IoT, App

, data
Development tables.
- Rough Data Analytics: Big Data Analytics, Data Integrator, Hisense Analytics, Data Scientists,

Solutions and Economics.

- Cloud computing: MigrShen Ihnjhaner, Cloud Economy, Cloud Software Ihnjhaner Block

- chickpeas: Developer, Engineer, Test Engineer, Project Manager, VH Designer begging

- Al Realty:App developer, optical scientist, product developer Vaer Ihanjahanar,

Service Technologist, VFX Artist, Testing Engineer - Vices ul Harahalti, Yauy


Hddesigner, Computer Vision Engineer, Information Security Analyst, Solution Architect,

Sensor Architect, Sound Designer, Virtual Ul Harahulti, Software Engineer, VR


Devise, 3D Modeling Engineer, 3D Graphic Artist
- Marbail Tk:- Social Engagement Manager, Yaui Designer, UX Designer, Application
Developer, Tester
- High quality:- Security Analytics, Analytics Application Security, Analytics Incident
and Access Management, Analyst and Point Security, Analyst Security Operations
Center, Vision Tester, Consultant Network Security, Forensic Specialist, Security
Infrastructure Specialist, Akitke Indity and Access Management
- 3D rendering: Software Engineer Slices, 3D Modeling Engineer/3D Graphic Artist,
Solution Architect, System Setup Engineer, 3D Rendering Technique, Material
Analyst Engineer
- Marine Learning:Machines and artificial intelligence are a subset of human beings. dance

It is defined as the ability of a machine to reproduce. Artificial intelligence is used to


solve human problems and perform complex tasks. Instead of moving the relative
program, the experimenter is willing to program himself. It allows machine tools to be
used in situations that are sometimes impossible under strict and demanding
conditions.
- Roughs:-Financial innovation enabled by HuffNet and technology is a new Financial
markets for business models, applications, processes, or products can have a profound
material impact on both sustainable and immediate service provision.
-N. Eh. Aligning Qt F (National Skilling Qualification Framework):N.S.Q.F.A.
After his death was confirmed vide order dated 27/12/2013 and the case of
transfer
Follow
Disturbing order the approved course. National among them
The Sector Skill Counselors (SSCs) established under the Skill Development Corporation
(NSDC) include a curriculum designed in consultation with renowned entrepreneurs in the
industry.
- Between Employment Commission (Industry), Directorate of Industry and Supur Skills/Future Skills Vacancies

Participants can also change the list of items as needed.


15.11 Startup :Statistics published by Department for Promotion of Industries & Internal
Trade (DPIIT) of Central Government There is a lot of trouble for the up industryWell deserved

The remaining amount will be treated as Startup Minutes.

i) 10 years from the date of registration, if it is registered as a public limited


company (as amended by the Companies Act, 2013) or as a partnership firm (as
per section 59 of the Partnership Act, 2008 (If registered.) In due course
Accountability (as per Expiry Accountability Act 2008)
ii) The turnover of the organization does not exceed five crore rupees for any financial year of operations/

records.

iii) A single product, process or general innovation, working towards


innovation, if it is a scaled business model with high potential for
employment creation or wealth creation.
Up" shall not be considered.

15.12 Dutta Henty:A data center and network infrastructure is a support for networking equipment.

A secure area and including necessary facilities such as connectivity, storage


system etc. to collect, store, transport and allow access to large scale.

15.13 Datta Henti Pakan:Data center to support necessary infrastructure facilities/facilities

Processing zones/buildings shall be facilitated by a single or separate data


center facility to meet the needs of all data processing, storage, networking
and data processing needs.
15.14 Date Henty Dvlpi:It is one such organization which is responsible for the smooth
functioning of the data center itself आवश्यक जमीन सकवा ि◌ाधंकाम सहुवधा, तसचे त्याच्या दे्रे् ◌
ीकरीता पायाभतू सहुवधा जस की, वीज कनपे्क्टप्व्ि◌टी, िहल्ड अप एहरया, पाहकंग, पॉवर ि◌कॅअप, िपाी आिह इतर
िसाय्य सवेा उपलब्ध करुन दईेल.हवकासकामाफसत डटेा सेंटर पाकसमध्य वळेोवळेी पहरभाहर्षत केलले्या मयादते
डटेा सेंटर सव्ि◌स R/ Accelerated and necessary I.E
15.15 Data Henti Opitei:It is one such organization that manages the data center
itself Be willing to do.
15.16 Tier III and Tier IV data henties:Electronics is also the Ministry of Information
Technology data center As highlighted by Policy 2020, a data center building /
centralized hub is a unified secure space that includes the necessary amenities such
as connectivity, storage systems, etc. to collect, store, and allow access to a large
scale.
A data center is a facility that provides uptime after certification by independent agencies
such as Uptime Institute, EPI and other similar independent agencies.
Type III Data Henti:tireIII The data center can be maintained at the same time and the
difference in quality between them is suitable for providing services in adverse weather
In contrast
conditions. to Tier I or Tier II, there is no need to provide these facilities,
although there is a requirement to provide full coverage of the facility. Tier III
units are connected to Tier II units so that any part of IT operations can be
shifted.
Requirements:

- 99.982% up time (Tier III up time) No more


- than 1.6 hours of down time per year.
- N+1 solar panel provides 72 hours power outage protection
- Type IV Data Henti:HotterIV Data Centers are independent of many physical
infrastructures that have redundant capacity and often operate in the back office.
These two systems must be separated to avoid compromise and the interference
between the two processes is not a direct impact on the environment. However, if
unnecessary attention is given to the next line as soon as possible, the risk of
environmental disruption in the event of failure may be high.
Reduces latency in Tier IV or Tier III topologies. If a piece of equipment
goes down or interrupts the transmission, information technology operations
are disrupted. The IT equipment requires fault tolerance power design and a
Tier IV data center requires continuous cooling to remain stable in this
environment.
Requirements:

o 99.995% uptime per year (Tier IV uptime) o


2N+1 puse P Hanrathus
C Foundation Allowance

o 96-hour power outage protection

o Annual down time is 26.3 hours

15.17 Emerging Technology: And there will be new technologies whose demand and practical
application are impractical on a large scale, but they also involve new solutions, such
as software, which separate the existing components. Differences in this technology
General Intelligence, Augmented Intelligence, Artificial Intelligence
(Generative Intelligence), Internet of Things, Block Chain, Robotic Process
Automation (RPA), Spatial Computing, Big Data Analytics, Cloud Computing, etc
Ile Tuck, Sir Huskyhurty, 3D rendering, etc. is included, however, it is limited.
The industries will also be shown in this list from time to time as necessary.

15.18 Arranmen, Svgial Effect, Gamemg R Cormach (AVGC):


• Aaronmen:Aman Machines and Rays, Relational Graphics or Two or Three
Dimensional Objects (Two or Three Dimensional Objects) Photographs
(such as puppets, clay sculptures or paper cutouts) etc.
An effective way of looking is that these cells/spaces are as different as possible from one

another, giving the impression of movement after moving in rapid succession. Animations

include dynamic/anti-motion animations, claymation, paper animations, stop motion, shadow

animations, shadow surface animations, etc. Ahnmachine and can be recorded on analog or

hi-speed media.

-Aranmeen Rickshaw:The region comprises of training institutes across the state and its role as a growing

industry in providing professional training services combined with manual automation. No


Catalyst minutes are used to sleep
- ARANMIEN ATTENTION:This episode includes the Ahnamadey Hachatrapat, TV broadcast show,

Ahnmachine. Advertisements and unedited content are not part of this domain including direct-to-

DVD format and VFX.

- Krrama rakai: Chroma keying is a technique of combining two primary images together in a single frame, in which

color is extracted from one primary image (sakva lin rang shrii) (sakva paradise). K is written), which
That previous Dasuri Prahtama reveals. These technologies include tilting, color-superseding overlays,

green screens, and blue screens.

- Comparerzmatg:Compositing media combines independent sources of


technical data into a single priority. The lines create the illusion that
- everything is part of the same scene. Custom Content Development:E-
Hashkshi in this episode The content may include non-machine content,
and the content may include non-machine content for physical content, as
well as drive simulation content Key is flash and other stuff.

- Dictate DVD:Direct-to-video display quadruple (known as made-for- Pvideo,


s-t-p-video and s-t-dvd are also available) and can be broadcast on a video
or quadruple television, except for home video for video (VHS video). is
displayed for
- Swajal effect:- The process by which an image is created / manipulated
throughout the context of a live action shot. Special effects include the
combination of live-action footage and realistic edges that are dangerous,
difficult, or impossible to capture on film Lee Prathama included and special
effects Mid-Rotoscopy, HDR Cleanup, VFX Paint, Mofung, DMP- (HRD Matte
Paint), Chromakey, Compositing, Sacag, Pre-processing, Pre-wireless,
Beatipass, Face and Body manipulation, Modselg, Shader, Texturesrg,
Listag, Ahanamshen , Harsgag, Mchamovi, FX (m , liquid, rain, water, dust,
earth, wind, fire, flame, explosion, fire, fire etc.) ki ankuri, ankuri - (fur, hair,
cloth, crowd, hudsection, etc.) keground Other content creation and
animation, digital environment creation, animation for VFX, image
processing, digital messaging, color correction, etc.
- games:It is an electronic system in which the user interface is human-
interfaced. Includes 2D, 3D, Video, Digital Video, Mobile, Video, etc.
Includes ul, console etc. Interactive games and entertainment, including
fun activities (which are designed to provide as much fun as possible to
communicate information) and entertainment.Used for playing games
Electronic systems can be moved from platform to platform.
Null Computer, Plussetchen,

Video game consoles such as Xbox or Nintendo Wii, consoles such as Nintendo Game Joy

Advance, PlayStation Portable (PSP) and mobile phones, tablets. Jaguar software and

applications are a platform for a wide variety of Internet and web-based games and are

part of an interactive community.

- Cormac:- A specialized medium that is used to express a specific idea, but is


combined with text, sound, sound or visual information. Comix will include
dendroig, animation, 2D, 3D, motion graphics, motion comix.
-Stereo conven population:- One of the most important features of postharvest metamorphosis.

Process and convert ordinary 2D straight action movies into stereoscopic formats for

immersive experience. Stereo conversion includes rotoscopy, layering, depth-grading,

shading, element compositing, hafnasglug, segmentation, particles, etc.

- :Pvhdo
Game play game atasYou can use mid-ripened and certified video games
Latest Games Full Game Sequences Summary of revision of I.E
- Keyframe Aranmen:A machine is the main frame in a film machine. The beginning of
a series of transitions is also emphasized by Shwet. It is referred to as a "frame" and its
position is measured between frames on the film strip. MMORPG:Massively Multiplayer
- Online Role-Playing Games and Role-Playing Games Aite, hajath ijaro gmer valdus
Vichyas through the medium of Wide Way Ul is also a constant user
Central Actions include theme-based games, web browsers, Internet HelpView clients, other

web-enabled software gateways such as Micro, blog clients, and RSS feeds. .
- Energy Network:Read more about Gasemg console. NGN Console and Advanced
Console Machine It is presented in black console cycle.
- Pipelines:In computers, data processing is connected between pipelines and circuits.

Takchana Sachan Yoy. From which there is only one input after one output.

15.19 IT PAKAN The following categories of Central ITEH activities are available:

• Product/product design
• Automation equipment and systems design
• CAD/CAM/CAE support
• Communication Equipment Design
• Computer repair services
• Computer system integration
• Computer Hastim Hadzine

- Development/production of software, maintenance of software and work with

- diagnostic product design eg. Medical, Biot

- Elpicic motions with design


- Electrical Appliances and Hardware
- Design
- Electronic instruments and hardware devices e.g. IC

- Oil Harg Hadzain

- Opto-Electronics Hardware Design

- Project Plus Nag Ad Management

- With Pubblus

- Hushp Hudzine

- HUSTIC CUSTOMIZATION CENTER

- EHANJHANARING HADZINE

- Factory Automation/CIM Design Fashion,


- Furniture, Jewelery & Exhibition Design
- Hierological Analysis On Wall Samples & Rocks
- Hybrid & Modular Design
- Industrial and IT Skills including

- Information Systems Design Materials

- Application Center Mechanics

- Components Design Office Automation

- Equipment Design of Shore

- Architecture Design

- Plapstuck Product Hudzine

- Product Damonsischen

- Quality Assurance, Testing Services and Technical

- Inspections and Laboratories

- Technical Service Center

- Tusulag Hadzain

15.20 Mukhya Keshar Key Academia & Incubators:


- Conley Mi 60 Hizense Accelerator,

- Mumbai IIT, Mumbai, Mumbai

- Hasamiosis International Institute, Pre CSIR-National Institute of

- Environmental Health Research, Nagpur

- Panyashlaek Ahilya Devi Bolkar Solaparu Havdyapith Enterprise Inquistion Centre, Solaparu Poet

- Hidiai Chaudhary Uttara Mirarashti Havdyapith, Jalgaon

- Center for Agro-Bio-Innovation and Inclusion (CABII), Naande Hashwaji

- Chair, Center for Innovation, Inclusion and Salkage, Kolyapuru Sahwatriai

- Full Chair, SPP Haraschaspaksa Foundation, P.

- Sat Gadgea Amravati Chair, Center for Research and Development Foundation, Amravati

- Amravati Foundation, Mumbai

- Dr. Dr. Indekar Institute of Technology, Magaon, Raigad

- Pajanirao Dashemu Krishi Havadyapith, Haraschasand Inquistion Foundation, Akola

- Naterahart Foundation, Saganli


- Dr. Dr. Andekar Marathwada Havadyapeeth, Aurangabad

- Haraschasinovishen Inquishen Hudzain Laboratory Foundation, Muni

- Nahshak Ihanjahan Asarg Cluster, Nahshak

- Marathwada Accelerator for Growth and Incubation Counselor, Marathwada Smt.

- Nathiai Thackeray Mahila Havdyapith, Incubation Centre, Mumbai INCUBEIN

- Foundation, Rashtistan Takudoji Miraj Nagparu Havdyapith, Nagparu

Among the list of academic institutes/institutes mentioned above, there are vacancies under the Skill

As
Development, Employment, Entrepreneurship and Innovation Sector. per the agreed instructions
will be done.
Guidelines
16. Demand c & Procedures:
Up Etivine:
16.1 Incumbency and Statun
Transition phase status Ups ahi he first page of Hanadhi Hamalpeytan Stage-I
Incumbents will be eligible for relief. Startups will be eligible for the Stage-II Incentive grant after receiving

the first grant application.

Among the incubates in the prime phase are the following parameters Lose will be-
- Vacancies Facilities and Rental Infrastructure
- Legal and Judicial Advice
- Mentorship Session and Connection

- Market Arrangement

- Asset seed funds, angel funds etc.


- Time for networking

The incubation period in this phase is as follows Lose will be-


- Support market growth strategies

- NETWORKS FOR INTERNATIONAL AND GLOBAL EXPANSION

- ASSET VENTURE FUNDING

- Market Salkejse
- Axelshen support
16.2 Status
Incubate upCoast Guard I r How to submit a report on Storage II:
- Private IT Pak name itself

- Location/Postal Address of Private IT Paks

- Private IT Paks Registration Details Total

- Occupied Area of the Park in Sq.Mtrs

- (2% of total BUA) occupied area in sq.m. for incushion allowance.


- Inquistion/ status
A single occupied area has been confirmed for this purpose.

- Vacancies Inquiries/Status Name, activities, area covered,


Inquistion/Status2% occupied area of up to 2500 sq.ft.
More equal and same distributive regime This no. IIT-2016/Pro.No.76/U-2,
Hadnakam dated 18/05/2016 tenC can follow the principle of rotation between them
Will be done after. Case for allotment of 2% vacant area in Information
Technology Park to facilitate startups In reducing the number of women industries

should come
16.3 Strategic Footprint:
-Lost in critical footing Eligible project/work- Come on Sowill
Handhiatangas

The foundation may be divided into project/work basis.

i) Connect the cluster of private IT Paks or IT and ITES units to roads in the state
or roads of Municipal Council/Minagar Pahlaka, Hajliapaharsarhad, PWD or
any other local bodies.
ii) Electronic forms for clusters of private IT Paks or IT and ITES units.
Also, light-related infrastructure projects such as C-Station provide
express power feeders.
iii) Private IT Paks or cluster of IT and ITES units connecting the drainage line to the
main drainage line of Municipal Council / Miamdal, Hajlia Parishad or any other
local body.
iv)Ya Dhoria Atangas
(i) (ii), (ii) and (iii) above in terms of the Powers of Attorney Agreement.

Apart from any other technical infrastructure work, it is also a multi-year work.

-Proposition Maranji's workFather:

Fund management will be done by the State Government: As per the need and requirement of the work, the

Commissioner (Industries) will receive further proposals from the Institutions/Takandanu.

a) State Planning Authority.


b) Information Technology and Information Technology Support Professionals in the field.

c) Field/Ministry level office of Air Force base in conjunction with infrastructure


development. d) Industry, Chains of Comms etc

The industry sector has done research on the availability of funds. These
Dhoritangas
A proposal will be placed before the Constituent Powers Committee. The implementation

of the proposed proposal will be done in accordance with the guidelines for the implementation of

the work. Sinhandhat Samantha will submit a quarterly report on current work and work progress.

A record of work done, work completed, work done, work done, work used and the

agency with which the work has been done shall be maintained by the Directorate of

Industries.

16.4 Withdrawal Return(Maharashtra Information Technology Interface) :- There is a single


integrated IT platform under one roof for information technology and information
technology support services in the state. Udyog Chanalnalal Yadvar is a moderate vs.
POTUS It will be done with ease. Among which It will include the following:
1. No Process of Earning RR:
- Online Application for Registration of Letter of Interest/ D-NOVA Letter of Interest/ IT
and ITES Paks , online ajas for looter of itante/ IT AHI ITES JUNATTS, DATEA
Center records

- Salary to Ajas essential services for grant of Letter of


- Intent / De-Novia Letter of Intent
- For incentives, AJ Co-developer offers 2% interest rate for inclusion in
Information Technology Parks.
- Exclusive Online Simstion
2. Marahati :

Information Technology and Information Technology Support Plan-2023 for


Information Technology
Aims of Government Aimed at:-

- Information Technology and Information Technology Siyabhatu Savea Hanayat Trade Facilitation Ahimahiti

Center Yasi Hahwawadh Center Ahi State Scheme Information, Hanayat only , etc.
- Interactive Promotion Calculator based on the following factors:

- Information Technology and Information Technology only type: IT and ITES Unit, AVGC Unit,

Emerging Technologies, Datacentre.

- New/Recent/Existing Active

- Areas: Zone I, Zone II

- Active range
- Yearly employment in the State for permanent employment

Q Ali (B2B Functionality):and the POTUS A Market Salvage System Minutes


3. B2B activity
What has been done, which is the status of the Air Force Information Technology and Information Technology Support Services

business in Mirashti. It is also to list its services to connect with global demand
Allows B2B transactionsPriali has all the available YouTube channels and all the information is the same
Hathaki made available and agreed to give. It is important for the industry to understand
the dynamics and dynamics of the market.
4. Poralhi pfoman
Nha Raki (Itinal)
The economic portal also contains:IT and ITS/AVGC/Data Center Operations, Tuck, The annual

employment rate of self-employment was prepared for the activities mentioned in the policy on

occupation, occupation and employment. Latch management is also a key implementation of planning

Officer (COO) will be appointed and his case will be presented to the Power
Grant Consensus.

16.5 Proceedings of Letter of Intent (LoI) and De-Novo-LoI for Marathi


Technology Park
Procedure :-

(a) Marhati Technology Park itself is derelict and unregistered.

The information technology park in which the period for obtaining the letter of intent is longer

than the required period is (5+1+1) and (3+1+1) and it will complete the work within that period, but

the letter of intent has lapsed and its claimant is subject to the planning authority. Certificate (OC)/

Building Supply Obtained Health Certificate (BCC) for such IT Parks


A de novo letter of intent will be issued after 3 years without charging any difference
in value. Information Technology Parks which have not received De-novo Letter of
Intent for Information Technology Park till date, all such Information Technology
Parks will have to pay for the implementation of the Policy on Information
Technology and Information Technology Assistance Scheme-2015. During this grace
period, IT is required to establish IT and IT Subsidy Services in 50% occupied area of
the IT Park. If the IT Park fails to set up IT in 50% occupied area, such process will be
withdrawn from the industry. In this case, the honey will be transferred to the oil.
(b) Against the defunct Kharjagi Marathi Technology Park:
Applicants for Information Technology Parks require registration certificate after completion

of the Information Technology Park and the period for completion of private Information

Technology Parks is 5 years (3+1+1) for parks with occupied area less than 1 sq.ft and more

than 1 sq.ft. 7 years (5+1+1) for the park in the occupied area. Again after the completion of

the project, the IT Park will be able to pay the difference of 30% of the increased rental rate

and submit a new letter of intent (De-novo) for the project and issue a registration certificate.

A new Letter of Intent will be issued for the grant and its tenure will be extended for 3 years. If

the IT infrastructure is completed during the said extended grant period, the industry will be

excluded from the grant in each case for the next grant increment. Y
will lead.”
(c) Action for approval of Marathi Technology Park (De-novo) method

1) Click:For Letter of Intent for Information Technology Park /De-novo for fresh Letter of
Intent / Extension of Letter of Intent / Letter of Attestation Rs. 5000/- for the fee of 5000/-
A copy of Herzvishke's currency should be added as soon as the ear is filled.

“0851 Village & Small Industries


102, Small Scale Industries
Cottage & Small Industries
0851-022-6”
travel
A copy of the above currency information POTUS Lover can be uploaded.
2) Amount of Fika in Aromatium :Except as mentioned in Clause 16.5 (a)
above, the De-Novo New Letter of Intent issued by the Director of Industry
for the purpose of de-novo nature park will be charged at the rate of renter's
fee to the letter of intent.

3) Work to get the letterProcedure:


i) Proposed IT Park whose project has been completed/registered within
the period mentioned in (a) and (c) above for the period specified in (a)
and (c) above. Entitlement with required documents in required form

(Industry) to be submitted to the applicant for approval of Letter of Intent. After scrutinizing

the said application, the Authority (Industry) will issue an in-principle approval letter to the

applicant and a copy of the same will be given to the Planning Authority.

ii) Upon receipt of the contract under clause (c) (3)(i) above, the said claim shall
be reported to the Commissioner (Industries) in writing.
iii) The Commissioner of Rights (Industries) should issue a Letter of Intent to the Sindhand Natural

Information Technology Park after receiving the agreement from the Sindhand Rights Authority.

(d) Other Matters :-

Information Technology is Information Technology Sayyabhatu Savea Dhori-2023 Ya Atangas So for profit
Existing Information Technology Parks are expected to comply with both the provisions of the said Policy and the Information

Technology Parks which have a Certificate of Registration are not subject to this policy. It's a huge space
Those who want to develop a park and want to build a park, they should do so. So
For this purpose, the benefits will have to be returned without any incentives. Care had to be taken to ensure

that the interests of the information technology services that were developed and implemented in the

information technology park were safeguarded. In the middle of everything


Lakshi Prabhavan is a trend in this strategy

automatically ((Automatically) log in. Follow this tenC Tattva will issue itself
will go
16.6 Green IT Practices :
Every year on or after 20th August the State Information Technology Day will be
celebrated. The award will be given to the best performing and contributing
Information Technology / Information Technology Assistant.
Remainder:

1. Encouraging the entrepreneurship of the IT industry in the state

2. A record of excellent performance in IT activities is appreciated.


3. Encourage rapid spread of information technology use in everyday life.
4. Encourage the use of minutiae as a means of guaranteeing employment.
5. Effective non-material resource management (Green IT)

Runker:

1. Takachi commercial progress

2. Grika's satisfaction is also MaluyavadhasNo

3. Use of different standards (ISO, CMM, etc.)


4. In emerging markets
5. Higar Shiri IT Entrepreneur.
6. Use of Production/Intermediate Stabilization Weights

7. Implications of advanced technology

8. Progress of the entrepreneur

9. Employment conditions

-This issue will be related to the following SRI components:


IT Software (2), IT Enablement (2), IT (R&D) Innovation (2), IT (R&D) Multi Mehdaya Ahi
Manorjanan (2), IT Service Provider (ISP) Havashresh Award (2), IT Service Provider
(Darushchanar/ ISP) (2), IT Infrastructure Support (2), IT HRD (2), IT (Yhunak) Software
Hasakyahurti Solutions (2), Green IT Award (2), IT Enterprise (Highest Award for Sector) (5),
IT Udayonmu Technology Award (2), IT AVGC Award (2), Data Centsus(2).
- Application Deadline:Kayas in Miraashti Also registered companies/organizations

Application for the same will be invited to submit online. The same application will be
available from 02:00 PM to 05:00 PM at AJAS Information Technology School, Directorate
of Industries, Hatsara Floor, New Administrative Building, Opposite Embassy,
Muni-400032. 1st August is the date of Shwet every year.
17 Ori Achi Woita R Kalavoi :- The
gardens/ Takana Yadhoritangas Those benefits/incentives have been extended to those who
Fees will remain for the period for which they have been sanctioned and even if the policy is
terminated.
The validity of the said policy is for a period of 5 years with every new policy being issued Even so.
18 Here are some of the obstacles in life:-
If any obstacle arises in the implementation of any provision mentioned in this policy, necessary
coordination and clarification will be done in the industry to remove the obstacle.
**********
Annexure-3
New Information Technology and Information Technology Enabled Services Policy of
Maharashtra State-2023
(Enclosures of IE&LD Government Resolution No.ITP-2021/CR-170/Ind-2, Dated
27.06.2023)
1. INTRODUCTION
1.1. Industry Overview – Global
The Global IT Industry is estimated at USD 5 trillion in 2021. The industry has seen
rapid growth in the recent few years further accelerated by COVID-19. Most of the
global IT industry is focused in and around USA (32%); followed by the European Union
(20%), the Asian region (14%), and Australia and New Zealand region (11%).
1.2. Industry Overview - India
As per the 'Techade 2020' by NASSCOM, India's IT & ITeS industry revenues stood at
USD 177 billion in 2018-19 with a growth rate of 6.1%. Despite a dip in global
technology spending amid the coronavirus pandemic, the country's IT sector is set to
post a 2.3% rise in revenues taking the current figure to USD 194 billion. The same
report states that, the IT industry now delivers 8% of Indian GDP, contributes to over
half of services exports, 50% of the Foreign Direct Investment (FDI) and employs more
than 4.3 million people in 2020-21. Government of India targets to build India as a USD
1 trillion digital economy by 2025, reports MeitY, Invest India.
1.3. Industry Overview – Maharashtra
Maharashtra is a major hub of technology & innovation. Since 1990s, the state has
emerged as a key hub for IT & ITES, electronics, and captive business outsourcing
industries, thus developing competitive edge in domestic and global arenas. Through
constant enhancement of infrastructure, talent, and policy ecosystem the state has
become a leading destination for IT companies, with businesses proliferating beyond
Mumbai, Pune, Thane to districts like Raigad, Nagpur, Aurangabad, Nasik, and
Kolhapur. The ecosystem advantages described below will continue to act as a
springboard for growth in the coming years.
1.4. Maharashtra Advantage
1.4.1. Macroeconomic Strength
• Stable Growth & High Per Capita Income:Maharashtra's GSDP is
forecasted to be INR 26,62,619 crore for 2020-21 contributing 14.2% to
India's economy and Per Capita State Income is expected to touch INR
1,88,784.
• Leading FDI Destination:Cumulative FDI inflow to Maharashtra between April
2000 and March 2021 was more than INR 9 lakh crore. Maharashtra received
29% of total FDI inflows to India during this period.
1.4.2. Supply-Side Ecosystem
• Quality of life:Maharashtra's 11 metropolitan cities offer high standard of living
with robust institutional support for education, health, safety, housing, water &
sanitation, mobility, recreation. The state also scores well on state level Human
Development Index
• Employable talent:The state offers highest level of employable new talent in
the country with nearly 4 lakh engineering and management graduates every
year from over 1000 technical institutes and 958 Industrial Training Institute.

• Future Workforce:The state released first of its kind Maharashtra State


Skills University Act 2021. Once operationalized, the Maharashtra State Skill
University will provide major boost to skilling & employability of youth for
future jobs by providing accredited degrees, training, counseling,
internships in various fields including technology , entrepreneurship, AI,
Industry 4.0 and more.
• Innovation Ready:The state is a top performer on the Innovation Index of NITI
Aayog proving its innovation capabilities and readiness. Maharashtra
Also recorded highest number of patent agents and patents filed across
India in 2019.
• Connectivity:The Mumbai-Pune Knowledge Corridor a major belt of IT
industry in Maharashtra, is an expressway linking Mumbai and Pune. Based on
the success of Mumbai-Pune Knowledge Corridor, the state is planning to
develop other corridors as declared in Industrial Policy 2019.
• Highest Power Capacity:Maharashtra has robust power network and
availability of power to cater the needs of IT & ITES sector in the State.
• Robust Infrastructure:Maharashtra Industrial Development Corporation
(MIDC), City and Industrial Development Corporation of Maharashtra
Limited (CIDCO) along with private sector have developed Public and
Private IT parks in the state to cater to the needs of IT & ITES units.

1.4.3. Demand-Side Ecosystem


• Rising demand: Maharashtra is the second largest state in India by
population. Nearly 75% of the state population is above 15 years of age and
are potential consumers of IT products.
• High Connectivity:The state has been connected through an Optical Fiber
Cable Network owing to which Maharashtra is home to the largest base of
internet subscribers in India.
• Vast User-Base: As of 2021 the state has 13 crores wireless subscribers, 10
crore internet subscribers and 107% tele-density (number of telephone
connections per hundred individuals).
• Rising Startup Ecosystem :Maharashtra is home to the largest number of
DPIIT-recognized start-ups in the country. As of 11thFebruary 2022,
Maharashtra has 11,845 DPIIT recognized startups and 17 Unicorns. On
average Maharashtra contributed about 20% to the entire startup
ecosystem of the country.

1.5. IT & ITeS Policy Evolution


Maharashtra remains a pioneer in policy planning being one of the first states in
India to devise an IT & ITeS Policy released in 1998. Early planning and effective
execution of IT & ITeS Policy 2003 & 2009 have led to a strong IT base, and consistent
growth figures for IT exports & investments. Due to effective changes in IT Policy-2015,
the IT ecosystem in Maharashtra has evolved rapidly to keep up with global pace
making it one of the best technology investment destinations, not only in India but in
Asia.
The state's IT Policy has evolved in consonance with the global growth trends, inherent
strengths and goals of Maharashtra and proven strategies that boost the sectors
performance.

Maharashtra's IT & ITES policy-2023


Year Focus Areas Key Strategic Drivers
2023 - IT Software Products - Unified single window system for all IT & ITeS
- Data Centers segments
- IT Enabled Services - Dispersal of IT & ITeS segments to all parts of
- AVGC & Emerging Technologies IT the State
- & ITeS Supporting services - Turbo charging Emerging tech, AVGC, Green IT,
- Integrated IT Townships Innovation & Start up, Data Center etc.
- Infrastructure for Walk to Work - Technology Ambassador to promote Brand
concept Maharashtra through improved governance
- Renewed focus on IT exports through start-ups &
MSMEs
2. POLICY TARGETS
The Government has set the following targets for the Policy Period
- To attract new investment of INR 95,000 Crore towards IT & ITES sector in the State To create
- new 3.5 million job opportunities through IT & ITES sector in the State. For that, increase the
skill development by 15% per annum for developing highly employable, talented and quality
manpower.
- To achieve export of INR 10,00,000 Crore through IT & ITES sector in the State.

3. VISION
To make Maharashtra a global IT & ITES destination and the Technology capital of India, moving
towards innovative, equitable, inclusive and sustainable Technology Development.

4. MISSION
To ensure Maharashtra as the most preferred destination for investment and innovation among
global IT&ITES enterprises through Strategic Policy Interventions, Development of Competitive
Advantage and Enabling Business Environment.
• To strengthen the leadership position in IT&ITES Sector in India.
• To further accelerate IT & ITES investment flows to the State for sustainable and balanced
regional development.
• To promote Intellectual Property creation, innovation, and technology commercialization for
new Technology products/Services especially for indigenous products developed in
Maharashtra.
• Becoming Destination of Choice for Global companies by significantly increasing
investment inflows in emerging technologies with a focus on developing associated
support ecosystems.
• To develop a robust IT & ITES and Emerging Technology talent pool, which is highly
employable, skilled and spurs the growth of the sector in Maharashtra.

5. EXECUTION PILLARS
Focused Execution Pillars to achieve targets
Single Startup and Skills of
Walk to Talent
Technology Innovation the future
work Launchpads
Interface

To promote EoDB in IT, the Maharashtra Hub Relaxation of To promote The Industry, Skill and
state will launch (M-Hub), an initiative eligibilitycriteria, employability and Higher and Technical
Maharashtra Information to promote innovation space utilization skills of the future, education departments
Technology Interface in Emerging norms and support companies with will come together to
(MAHITI) for time bound Technologies & services have been employees recognized develop 'Talent Launch
clearances, unit establish MH as a widened to in Super Specialized pads' for IT/ ITeS sector
registration, Incentives knowledge led accommodate Job roles will be across the state.
and others extension economy. A Fund of workforce trends of incentivized such as AI Existing colleges, skill
services and facilitation INR 500Cr. will set up the future and allow research scientists, institutes and training
through MAITRI. to support MSMEs, for integrated solution architects, centers that provide
startups, incubation working, living and Data scientists, Skilling courses will be
centers, M-Hub and social spaces for Optical scientists, supported through
emerging tech employees in IT embedded solutions competitions &
Parks and IITTs. engineers etc. hackathons

AVGC and
Industry Performance Hybrid
Regional Emerging
Led
Development Led Technologies Working
Monitoring
Governanc e

To generate investment and A Chief Operating To ensure the policy To provide support The state will actively
employment opportunities in Officer (COO) under adapts to the global specifically to the promote a strong mix of
other than Zone I as defined in M-Hub will be market dynamics, state's AVGC and remote workers over in
para 15.5 dedicated appointed as the the policy Emerging technologies office workers. This aims
interventions are devised to Technology performance to be sectors (AI-ML, Big to decongest urban
support the growth of MSMEs Ambassador of reviewed by the data, Robotics etc.) centers, allow 24X7
in tandem with large IT units Maharashtra to drive Empowered the policy lays out working for the IT/ITE
to promote the policy and committee annually dedicated fiscal and sector and support work
sustainable and balanced performance for course non-fiscal from home set ups for
regional development mandate from the correction, new interventions that aim non critical staff at offices
private sector, provisions, adapt to to enhance the
working with the needs of the availability of skill,
industry, startups, state and its sectors coworking spaces,
funds and academia funding, and
recruitment.

6. POLICY HIGHLIGHTS
6.1 Common Incentives applicable to all IT & ITES Units
• Common Incentives describe the fiscal & non-fiscal interventions applicable to all IT &
ITES units in the state. Where, IT &ITES units refer to Enterprises of IT software,
IT enabled services including Data Centers and Animation, Visual Effects, Gaming,
Comics (AVGC)(as defined in Para 15.6 and Para 15.7).
• IT as an Essential Service:The IT / ITES Industry services clients across the globe and in
different time zones. This requires the Industry to work on 24x7x365 mode.
Increasingly the work done by IT / ITES industry is mission critical for global clients it
serves, and very tight deadlines are required to be adhered to. Considering this a
continuous industry status shall be granted to the registered IT / ITES units. The IT /
ITES Industry will be permitted to work 24x7x365 days without any close down (except
some exigencies arising wherein the State / Central Government thinks it fit to keep the
operation in suspension). IT & ITES units are granted essential services status. The Data
Center will be covered under Essential Services and Maintenance Act (ESMA) as an
essential service considering the nature and importance of operations involved which
cannot be interrupted.
• IT Infrastructure creation: Integrated IT Township, Private IT Parks and IT & ITES
units are allowed to set up across all zones including residential zones, no
development zones and green zones as declared by the State.
• Key incentives:To boost the presence of IT & ITES units across the state, the policy
provides incentives, rental expenditure, electricity duty, Power Tariff and property
tax etc. Dedicated incentives for emerging technology companies have also been
allocated to improve job creation.
• MAHITI Portal:An integrated single window platform will be developed to enhance the
experience of conducting IT&ITES business in Maharashtra.
• IT Workforce:To boost talent development and employability of IT workforce, the policy
offers customized skill development incentives.
• Research & Development:Fiscal support for R&D activities in IT, market
development, certification & patents to encourage research activities and
commercialization of technology products. The R&D activities in IT are defined in
the (Para 15.9).
• Details on fiscal & non-fiscal interventions are provided under Para 7.
6.2 IT & ITeS Infrastructure
• IT Parks: Proven to be an effective tool for IT sector as these provide adequate &
quality infrastructure for IT & ITeS units. Government of Maharashtra encourages
Public as well as Private IT Parks.
• Redefining of Norms:To boost the IT ecosystem necessary to support robust and
thriving IT units, the state has redefined the built up area utilization of support
services in IT Parks.
• Floor Space Index for IT Parks:To provide built up space at affordable rates to the
entrepreneurs more additional FSI over the base FSI is made admissible.
• Integrated IT Townships (IITTs):Special townships envisioned to be developed as
integrated technology cities with minimal restriction on support services to
accommodate the needs of the future workforce and reinforce the state's social
infrastructure. The minimum land requirement for developing IITTs is redefined.
• Critical Infrastructure Fund:This will be setup by the State Government for
developing Road Connectivity, Power Infrastructure and Drainage Line.To
Supplement state investment, private IT parks are permitted to establish critical
infrastructure.
• Details on interventions for IT infrastructure are provided under Para 8.

6.3 Data Centers


• Identified in the Maharashtra Industrial Policy 2019 as a thrust sector,The
integrated Data Center Parks and Units have been put under direct lens of support and
incentives from the Government.
• Data Center Parks:To uphold Mumbai/Navi Mumbai's leadership position in India's
total data center capacity and to make Mumbai the 'Data Center Capital of India', the
government will earmark land parcels especially in MIDC industrial areas to be
developed as dedicated Data Center Parks.
• Customized interventions:Data Centers were granted essential services status and
continuous industry status in 2015. The policy now exempts the sector from standard
parking norms, grants industry & infrastructure status, allows eligible units to avail
renewable energy under open access and to develop captive power plants for Data
Center Parks. .
• Key Offerings:Preference in public procurement of IT services, dial before dig
policy, relaxation of FSI norms and more.
• Further details on the support for data centers are provided under Para9.
6.4 Animation, Visual Effects, Gaming, and Comics (AVGC) Industry
• Mumbai is the entertainment capital of India and along with Pune, houses some of the
largest global VFX studios, globally. Continuing the vision of Maharashtra Industrial
Policy 2019 of promoting IT & ITeS as a thrust sector, this policy aims to make the state
India's AVGC Hub over the next 5 years while encouraging global companies,
professionals, and students to choose Maharashtra.
• Customized interventions:In addition to common incentives, key interventions
proposed for AVGC industry include customized capital assistance, market
development assistance, skill development assistance, specialized infrastructure
like AVGC park, production studios, digital art centers, exhibition galleries etc. and a
dedicated IT/ ITeS Promotion fund.
• Para 10 provides further details on all fiscal & non-fiscal offerings for AVGC units.
6.5 Emerging Technologies
• The global emerging technology market is valued at USD 2 trillion; Maharashtra is
poised to become a global leader in emerging technologies like Artificial Intelligence,
Cloud Computing and more. This policy aims to chart out a path for growth of emerging
technology industry in the state.
• In consonance with the vision of promoting Thrust Sectors under Maharashtra's
Industrial Policy 2019, Industry 4.0 including Emerging Technologies such as Artificial
Intelligence, 3D Printing, Internet of Things and Robotics, Nanotechnology, among
others have been given direct support under this policy.
• Dedicated Center of Excellence (CoE):A dedicated CoE will be established led by
government officials and advisors from industry & academia to navigate the novel
sector and build a conducive ecosystem throughout the policy period in the State.
• Customized interventions:In addition to common incentives, the eligible units
including startups are given customized capital assistance, market development
assistance and skill development assistance along with a professionally managed IT &
ITeS Promotion fund.
• Para 11 provides further details on all fiscal & non-fiscal offerings for emerging
technology units.
6.6 Grounding Innovation in Maharashtra
• Maharashtra Hub (M-Hub):An integrated Center of Excellence housing specialized
task forces for leading state initiatives on AVGC, Emerging Technologies, and
Startup & Entrepreneurship in Information Technologies. It will play a critical role in
holistic development and growth of IT industry in Maharashtra and will work in
tandem with the state's Startup Policy 2018 and Fintech Policy 2018. The M-Hub will
be anchored and managed by a Chief Operating Officer (COO) who will be
governed under the Principal Secretary (Industries)
• Chief Operating Officer (COO)of the state of Maharashtra will act as the
Technology Ambassador for Brand Maharashtra to represent the state's IT & ITeS
industry at National and Global platforms. COO will be the convener of M-Hub and
responsible for promotion of relevant IT & ITeS Sectors of Maharashtra.
• A key feature of M-Hub is the Public-Private Partnership Model that will ensure
active participation of private players towards thought leadership and capacity
building.
• Leading companies invest heavily in Research & Development,yetStartups constitute an
essential component of the innovation value-chain. To provide startups with the right
infrastructure, funding options, mentorship and network, Government of Maharashtra
will launch M-Hub governed by MIDC.
• Role of M-Hub is further elaborated in Para 12.
6.7 Skill Development and Future Work Force
To emphasize the importance of skilling under the policy as a means to ensure creation of a
highly employable and specialized IT ITeS workforce in Maharashtra, the Industry
department will work in close coordination with the Skill Development, Employment,
Entrepreneurship & Innovation Department and Higher and Technical Education
departments in the state as shown below. To increase the skill development by 15% per
annum for developing highly employable, talented and quality manpower.

Talent and Employability | Skilling as a focus area

Facilitator Mandate
Industries Deptt. Skills and Higher &
Technical Edu. Dept

- Artificial Intelligence - Cornell Maha 60 Business


- Animation & VFX Accelerator Mumbai
- Gaming - IIT Bombay, Mumbai
- Machine Learning - Symbiosis International
- Robotic Process Automation University, Pune
- Internet of Things - Dr. Babasaheb Ambedkar
Supported by
- Big Data Analytics University, Mangaon
Industry
- Cloud Computing - Shivaji University, Kolhapur
Leaders
- Block chain - Savitribai Phule University, Pune
- Virtual Reality - Punyashlok Ahilyadevi Holkar
- Mobile Tech Solapur University
- Cyber Security - Dr. Panjabrao Deshmukh Krishi
- 3D Printing Vidyapeeth, Akola
- NSQF aligned courses - Visvesvaraya National Institute of
Technology (VNIT), Nagpur

CMEGP Maharashtra-Hub Talent Launch pads

6.8 Policy Governance


• The section defines the governance structure of the policy to mechanize
implementation and monitoring. The roles and responsibilities of the committee
formed are also described.
• An Empowered Committee will monitor the implementation of the policy at the state
level and hold bi-annual reviews to discuss progress and challenges. Development
Commissioner (Industries), Directorate of Industries will also publish an annual
performance tracker.
• Further details are provided under Para 14.
7. COMMON INCENTIVES
This section focuses on the common incentives applicable to all IT & ITES segments. Sector
specific incentives are also offered in this policy and can be found in the Appendix Sections of
promotion of IT software & ITES, promotion of Data centers, Promotion of AVGC and
promotion of emerging technologies.
7.1 Stamp duty exemption:-
All entities: An IT & ITeS unit in production/ operation, shifting from one location to
another and this unit had availed of stamp duty exemption earlier will not be eligible for
Stamp Duty exemption. As mentioned in Para 15.8, If existing unit makes minimum 25%
additional fixed capital investment, on or after commencement of this policy, in IT & ITES /
AVGC activity then such project will be considered as expansion / diversification project and
it will be eligible for stamp duty exemption. Also, IT & ITeS units will be eligible to avail
Stamp Duty exemption only for premises which have valid Commencement Certificate /
Rera Approval from the concerned planning authority / competent authority. IT & ITES,
- AVGC, Data Center & Emerging Technology units will be entitled to stamp duty exemption
as follows.
a) 100% stamp duty exemption for the following transaction to new units in Public/
Private IT Parks & expansions of existing units in the areas other than Zone-I of the
state for articles hypothecation, pawn, pledge, deposit of title deeds, conveyance ,
charge on mortgage property, lease, mortgage deed and security bond on
mortgage deed.
b)75%stamp duty exemption for the following transaction to new units in Public IT Parks
and expansion of existing units in IT parks located in zone I area of state for article
hypothecation, pawn, pledge, deposit of title deeds, conveyance, charge on mortgage
property, lease , mortgage deed and security bond on mortgage deed.
c) 50% stamp duty exemption for the following transaction to new units in Private IT parks
located in zone I area of state for article hypothecation, pawn, pledge, deposit of title
deeds, conveyance, charge on mortgage property, lease, mortgage deed and security
bond on mortgage deed.
d)100%Stamp duty exemption for the following transaction to new units & expansion of
existing units in IT Parks for SEZ, STPI registered units for articles hypothecation, pawn,
pledge, deposit of title deeds, conveyance, charge on mortgage property, lease,
mortgage deed and security bond on mortgage deed & public assignment of lease.

e) 75% stamp duty exemption for following transaction to new units and expansion of
existing units for merger, demerger and reconstruction of registered IT / ITEs units
through out of the state, leave and license agreement & public assignment of lease.
Conditions:-
i. The units defaulting in starting the operation/work for which the concession/waiver has
been given from the stamp duty or breaching any of the conditions in the
Maharashtra's IT & ITeS Policy-2023 will be liable to pay stamp duty and penalty as if
they were not given waiver from the first day itself.
ii. It will be necessary to submit No Objection Certificate for waiver from the Department of
Industries before giving waiver from the stamp duty to the industries coming under the
policy as it is necessary to screen that the concerned industry units have received
waiver under any other policy/ scheme of the Government.
7.2 Power Rationalization Benefit
Cost reimbursement of up to 25% of retrofitting cost or INR 10 lakhs, would be given to
IT & ITeS units to conduct retrofitting study and implement the energy efficiency
equipment.
7.3 Electricity Duty
• As given in Maharashtra Electricity Duty Act Exemption from payment of Electricity
Duty from the date of commencement of production/ activity according to the
following conditions:
a) For a period of 10 years for New IT/ITES units registered with the Directorate of
Industries shall be exempted from payment of electricity duty in public or private
IT Parks in Zone-I.
b) For a period of 15 years for New IT & ITeS units satisfying the criteria referred to the
entry (a) above and established under the said Policy in the state other than those
parts shall be exempted from payment of electricity duty.
c) Permanently for new and existing IT & ITeS units in IT SEZs, in IT Parks in SEZs, single
IT units in SEZs and new or existing 100% Exporting IT & ITeS units under
registration of STPI or other designated competent authority shall be exempted
permanently from payment of electricity duty from commencement of this Policy.
Note:
1)The exemption shall commence with effect from the date when the unit specified
above starts production or rendering the services.
2)The electricity duty shall be exempted for IT parks developed by IT companies for their
own use ie, single units' parks for the period mentioned above as per the location of
the park.
3)The exemption from payment of electricity duty shall be given to the projects
mentioned in the notification only after producing registration certificate of
Directorate of Industries or Software Technology Parks of India (STPI) or other
Competent Authority.
4)No refund will be admissible of electricity duty already paid prior to sanction of the
electricity duty exemption.
5)Procedural Guidelines for Electricity exemption IT/ ITES units in Private IT Park will
be as per Government Resolution No. ITP-2016/ CR 190 (C) /Ind-2, dated
17/02/2017 presently and will be modified suitably if needed.
7.4 Certification Assistance
50% of the expenditure incurred for certification of CMM Level 2 upwards, IS0 27001 for
security & COPC and e-SCM certification, limited to a maximum of INR 5 lakhs will be
reimbursed to micro and small-scale IT units.
7.5 Market Development Assistance
IT & ITeS MSME units and startups:Units shall be eligible for reimbursement of 50%
exhibition participation fee (space cost/rent) for exhibitions approved or organized by
NASSCOM & ITPO subject to a ceiling of INR 3 lakhs per unit and limited to two such events
during the lifetime of the unit/ company.
7.6 Patent Related Assistance
MSME units:Reimbursement of 50% cost incurred on patent registration up to INR 5 lakhs
per successful Indian patent and INR 10 lakhs per successful international patent,
whichever is lower, during the lifetime of the unit.
7.7 Power Tariff
IT & ITES units will be supplied power at industrial rates applicable under Maharashtra
Electricity Regulatory Commission's (MERC) tariff orders.
7.8 Open Access
a) As electricity is a major contributor of operational expenses of an IT & ITES unit, the
state shall allow IT & ITES parks to get power through open access.
b) In MIDC areas, MIDC will be the power distribution agency to all IT & ITES units.
7.9 Property Tax
Property tax shall be levied at par with residential rates as applicable in the relevant
jurisdictions. Government will issue necessary advisory to the local bodies to give this
benefit to the IT / ITES units.
7.10 Setting-up IT & ITES units in any zone
IT/ ITES units will be allowed to be set up in any zone (including residential, no
development zones and green zone etc.)
7.11 Essential Services Status
Essential Services status shall be granted. IT & ITES Units will be permitted to work
24x7x365 days without any close-down (except some exigencies arising where in the State /
Central Government thinks it fit to keep the operation in suspension).
7.12 MAHITI Portal: Single Integrated IT Portal
The state will have a Unified and Integrated Single Window Platform for IT & ITeS –
Maharashtra Information Technology Interface (MAHITI) – under one roof for time
bound clearances. (Details under Para 16.4)The portal will also act as an IT &ITeS
Exports Trade Facilitation and Information center.
7.13 Financial Provisions for IT & ITeS
INR 500 Crore will be allocated for establishment of M-Hub and Venture Capital Fund
during the Policy period. A Committee under the Chairmanship of the Principal
Secretary (Industries) will be constituted, that will take decisions regarding fund
disbursement on a case to case basis based on merit.
7.14 Rental Assistance
In order to provide office space at affordable rates, the Rental assistance will be provided to
new entrepreneur units established under the IT/ITeS Policy-2023 in urban areas. The
amount of rental assistance to be provided & modalities of that will be decided by the
Empowered Committee constituted under the Chairmanship of the Chief Secretary.

8. PROMOTION OF IT & ITeS INFRASTRUCTURE – IT TOWNSHIPS


AND IT PARKS
8.1 Development Incentives
To promote the growth and development of IT & ITeS infrastructure in the state,
dedicated incentives have been delineated specifically to IT Townships and IT Parks,
among others. AVGC Parks envisaged in the policy are similar and at par with Private IT
Parks and AVGC Units are at par with IT & ITeS Units.
8.1.1 Additional FSI and Space Utilization of IT Parks
• FSI may be provided on the basis of the following table to all IT Parks in the Greater
Mumbai region and rest of Maharashtra :

Sr. Minimum Maximum Permissible FSI Maximum Permissible


No Road Width Greater Mumbai Region FSI Rest of Maharashtra
1 12 m Up to 3 Up to 3
2 18 m Up to 4 Up to 3.5
3 27 m up to 5 up to 4

• Additional FSI Limit shall be applicable as above or as per the Local DCR norms,
whichever is higher, excluding in Agriculture Zone, NDZ, or any other special zone,
declared by Urban Development Department, where the maximum Additional Floor
Space Index limit shall remain applicable as per prevailing Development Control
Regulation.
• Relevant DCRs, CDCPRs & UDCPRs will be amended accordingly by all concerned Special
Planning Authorities (SPAs).
8.1.2 Premium for additional Floor Space index for IT Park:
A) For Brihanmumbai Municipal Corporation Area:-
As per Development Control and Promotion Regulations-2034, all Public and Private
Information Technology Parks/AVGC Parks, in the Brihanmumbai Municipal Corporation
area; Additional FSI shall be admissible by levying a premium at the rate of 50 % of
prevailing rate of premium to be charged for the area as mentioned in the respective
DCPRs.
(B) For the Rest of Maharashtra:
(I)Areas in Vidharbha, Marathwada, Dhule, Nandurbar, Ratnagiri and Sindhudurg, no
premium will be charged for additional Floor Space Index (FSI).
(II)As per Unified Development Control & Promotion Rules (UDCPR) & Special Planning
Authority DCRs, the additional FSI shall be permissible to all Public & Private IT
Parks / AVGC Parks by levying a premium at the rate of 50 % of prevailing rate of
premium for areas other than (A) and (B)(I)
(C) For Central Business District :-
If any special planning authority declared any area as a Central Business District as per
applicable DCR norms; all registered public and private Information Technology parks/
AVGC parks; in particular CBD's will be entitled for permissible additional FSI by levying a
premium at the rate of 50 % of the existing rate of premium as mentioned in the DCPR of
Central Business District.
(D)In addition, other applicable FSI's like Fungible, Ancillary FSI will be applicable as per the
local applicable DCR/UDCPR/DCPR norms.
(E)The developer will be allowed to pay the premium, development charges, ancillary
charges and other charges for the increased additional FSI for the IT Park in
installments.
8.1.3 IT parks are permitted mixed use under the following guidelines :
Land Use Percentage
1) In zone IMunicipal Corporations in MMR & PMR area
- 60% -IT & ITeS Units including 2% BUA for incubation centers
- 40%-Allied Services / Support services. It will include all commercial and
residential activities except polluting activities.
2) In areas excluding zone I
- 50% -IT & ITeS Units including 2% BUA for incubation centers
- 50% -Allied Services/ Support services. It will include all commercial and
residential activities except polluting activities.
• Stand alone building / Group of building in IT Parks with a minimum BUA area of 20,000 sq.ft
will also be eligible for above(1)&(2)benefits.
8.1.4 De-novo Letter of Intent for IT Parks:
IT Park Projects are required to be completed within a stipulated period. However,
thoseIT Parks which are unable to complete the construction in stipulated period due
to various exigent reasons and the LOI has expired and the occupancy certificate has
been obtained from the Planning Authority etc; Such private IT Park Developers may
submit an application for De-novo Letter of Intent for the IT Park. For De-Novo LOI, the
IT Parks should adhere to the terms, conditions, and procedures as laid in Para (16.5).

8.1.5 Establishment of IITTs


• Minimum Land Requirement:Ten (10) acres contiguous land with staggered
proportion of usage component. 50% for IT & ITES use and 50% for usage without
any restriction as per prevailing norms.
• MIDC will be declared as Special Planning Authority throughout the State excluding
CIDCO areas. The power to approve the Master Plan shall facilitate by the High Power
Committee constituted under Government Resolution, Industries, Energy and Labor
Department dated 05/07/1996
• If the area of Integrated Information Technology Township is up from 10 (ten) acres to
25 (twenty five) acres, the period of completion of the project will be 7 ½ years (seven
and a half years) and if the area is more than 25 (twenty five) acres, this period will be
10 years (ten years). In case of delay the extension will be considered subject to
approval of the committee constituted in this regard.
• Staggered payment facility for premium to be paid for additional FSI. This is allowed in
two installments with the stipulation that the entire premium is paid within a year or
the date of obtaining the Occupancy / Part Occupancy certificate whichever is earlier.

• Integrated IT Townships are permitted in any zone across the state. The option will be
given to developer for project implementation with or without zone conversion of the
said area. However, the FSI norms will continue to remain as per prevailing
Classification of the area as per DCR in force viz. for projects proposed to setup in No
development zone, Green Zone, Special zone etc.
• IITTs will promote 'walk to work' and all other concepts as outlined in the IT & ITeS
Policy 2015, and Government Resolution No. IDC-2015 /CR 93/Ind-14, dated
27/12/2016 & Industrial Policy-2019.
8.1.6 Critical Infrastructure Fund
• State Government shall create a separate fund viz. “Critical Infrastructure Fund for
IT & ITeS Industries” from the premium paid for availing additional FSI by the
Developers of the Private IT Parks. This fund shall be utilized only for creation of
Critical Infrastructure for IT & ITeS Industries.
• Creation of Fund:The State Government will create a separate special fund viz “Critical
Infrastructure Fund for IT & ITeS Industries” with a separate account head
o Each State Planning Authority will deposit the premium they collect from the
developers of the Private IT Parks for availing additional FSI in this fund created by
them.
o 50% of the total premium collected by State Planning Authority shall be
deposited in this special infrastructure fund at source. The matching
contribution from the state government/MIDC will be deposited in the same
infrastructure fund.
The eligibility of projects details under Para and Manner of approval of the proposal
under Critical Infrastructure Fund are outlined in Para 16.3
8.1.7 Power Tariff
Power consumed will be charged at industrial rate for the common facilities in the IT
Park (such as lobbies, central air conditioning, lifts, escalators, effluent treatment plant,
washrooms, cafeterias, gymnasium, training rooms etc.) which are used by the units. ,
excluding support service areas after the registration is granted to the IT park by the
Directorate of Industries and Development Commissioner of the SEZ for an IT SEZ. In
case of any clarification regarding the common facilities, the Development
Commissioner (Industries) will be the competent authority to issue the same. A
separate meter will have to be provided by the developer to the individual IT & ITeS
units in the IT parks for leased or purchased premises.
8.1.8 Electricity Power/ Sub Station:
Provision of electric power / substation at minimum 6 Watt per sq. ft. of total BUA of IT Park
will be essential. This provision will also be applicable to existing IT parks.
8.1.9 Administrative Measures:
Applications for permission for Right of Way for laying of cables and for erection of
towers and antennae would be approved within 30 working days provided the
application is in the prescribed format and contains required documentation.
8.1.10 Green IT Awards
Awards shall be conferred to IT & ITeS Parks and Units across different categories for
demonstrated efficient natural resource management every year on 20thAugust on the
(State Information Technology Day) (further information in Para 16.6)
8.2 Penalty for use of built-up space for non-IT use in the IT Park
The Directorate of Industries will develop a web portal (MAHITI Portal) on which the
developer of every IT park will be bound to provide/update detailed information about
names of the units in the park, utilization of built-up area and activities being carried out. ,
manpower employed in the IT Park for IT / ITeS and support services on annual basis. The
SPA retains the rights to verify the details of the information furnished by the developer
through inspections.
If a private IT park has availed additional FSI as per the provisions of IT & ITeS
policy, on report of any complaint stating the built-up space in the park is not in
compliance with the IT & ITeS Policy under which the said park was approved , a penal
action as below will be taken; the payment will be made to the concerned planning
authority and government in the ratio of 3:1. The misuse shall be ascertained by
physical site verification of the said private IT park by a team of officers from the
Directorate of Industries and the Planning Authority which has approved the building plans
of the said private IT park.
a) A per day penalty equal to 0.3% (a thirtieth of a percent) of the prevailing ready reckoner
value of the built-up area that has been found to be used for non-IT & ITeS activities.

b) The penalty will be recovered from the date of issue of Occupancy Certificate till the day
non-compliance continues. After payment of the penalty to the concerned Planning
Authority which had sanctioned the building plans of the concerned private
IT park, the said private IT Park will restore the use of premises to the original
purpose for which LOI / Registration was granted.
c) If the private IT park fails to pay penalty and/or restore the use to its original
intended use even after the second instance of offence, the concerned Planning
Authority will take suitable action under the MRTP Act against the erring private IT
park under intimation. to the Directorate of Industries.
d) This provision will also be applicable to existing IT parks.
e) The Promoter / Developer of IT Parks will not be allowed to sell / lease the built up area
reserved for IT / ITES activity to non IT users in any case.
f) Penalty to be imposed on end user / owner of the unit / premises of IT Parks
8.3a) Time limit for completion should be specified for Private IT parks on the basis of plot
areas are provided for IITT's in clause 8.1.5
b) All concepts as outlined in the IT & ITES Policy 2015 and GR No. IDC-2015/CR 93/Ind-
14, dated 27/12/2016 & Industrial policy 2019 to continue in current policy.
9. PROMOTION OF DATA CENTERS
9.1 Background
• As reported by DC Byte, India's total supply of IT Power Capacity (Data Center
Capacity) stands at 1790 MW as of 2021. Maharashtra is the largest Data Center
market in the country with more than 700 MW of IT Power Capacity.
• Mumbai has the highest number of undersea data-cable landing stations in India and
is therefore a critical link for the Asia Pacific Region, connecting the Eastern and the
Western regions of the globe. This is expected to be the biggest driver of the market
expansion. Mumbai alone accounts for 42% of total DC capacity in the country.

• Government of Maharashtra is keen to promote Data Centers. The vision is to position


Zone I cities, especially the Mumbai and Navi Mumbai region, as Data Center Hubs.
With highly reliable power supply, large number of under-sea cable landings and
availability of trained technical man power, Zone-I is poised to grow as Asia-Pacific's
data center hub.
9.2 Incentives to Support Data Centers
9.2.1 Stamp Duty Exemption(as per para 7.1)
100% stamp duty exemption for purchasing land/premises required for setting up a new
Data Center and for its expansion as well as hypothecation, pawn, pledge, deposit of title
deeds, conveyance, lease, assignment of lease, leave and license agreement, merger , de-
merger, and reconstruction.

9.2.2 Electricity duty exemption


-Permanently for New and Existing Data Center Units registered with the Directorate of
Industries established in the state, shall be exempted permanently form payment of
electricity duty.
9.2.3 Power Tariff Subsidy
- All Data Centers registered with the Directorate of Industries will be supplied power at
Industrial Tariff from the date of starting of the operations.
- Subsidy at INR 1 per unit for 5 years for new Data Center Units located in areas other
than Zone-I.
9.2.4 Power Generation Units for Data Center Units
The state government will facilitate the activities related to setting up, generation, and
distribution of power through power generation units as per the guidelines of Ministry of
Commerce & Industry Department, GoI, “No. P.6/ 3/ 2006- SEZ.I, dt. 27/02/2009
Guidelines for Power Generation, Transmission and Distribution in Special Economic
Zones” (SEZs) which read as under :-
In case a power generating plant wishes to obtain distribution license, it may
make such an application to the State Govt. and upon the recommendation of the
State Govt., Deptt. of Commerce will issue necessary Notification under Section 49 of
the SEZ Act in consultation with the Ministry of Power.
Provided that any State Government can recommend to the Deptt. Of
Commerce that any power distribution facility coming up in any SEZ in that State can
be granted distribution license by the Deptt. Of Commerce in consultation with the
Ministry of Power Deptt. Of Commerce will issue necessary notification under
Section 49 of SEZ Act.
All the provisions of the Electricity Act 2003 and Electricity Rules 2005 as amended from
time to time by the Ministry of Power along with various power resolutions issued by the
Ministry of Power will be applicable wherever warranted to power generating units, whether
stand alone or captive power. generating units, transmission facilities and power distribution
facilities in the SEZ.”
Accordingly, the State Government will pursue the Government of India regarding
permission for Power generation, Transmission and Distribution to units in Data Center
Parks.
9.2.5 Setting up of data center in any Zone
Data centers will be allowed to set up in any zone (including residential, No development
zone and green zone etc.)
9.2.6 Essential Services Status
The Data Centers will be covered under Essential Services and Maintenance Act (ESMA)
as an essential service considering the nature and import operation involved which
cannot be interrupted.
9.2.7 Parking norms
Exemption from standard parking norms that are necessary for other IT parks/ IT units. The
norm for parking space inside the park will be modified as one vehicle per 400 sq. m. of
built up space.
9.2.8 Power Distribution Licenses
MIDC to seek Distribution License for MIDC Areas in pursuance of recommendation of the
Government of Maharashtra under Section 13 of Electricity Act, 2003 to undertake
Distribution Business in its notified areas.
9.2.9 Renewable Energy Use
Permitted to avail renewable energy under open access system after paying cost
component to DISCOMs as per existing government norms.
9.2.10 Captive Power Farms
Companies willing to establish captive power farms (wind/solar) will be facilitated by the
government in line with the prevailing policy of Energy Department in this regard.
9.2.11 Power Supply
Data Centers shall be exempted from state's statutory power cuts & will be given
continuous power supply 24X7X365.
9.2.12 Open Access
a) As electricity is a major contributor of operational expenses of Data Center the state
shall allow Data Center parks to get power through open access.
b) In MIDC areas, MIDC will be the power distribution agency to all Data Centers.
9.2.13 Dial before dig
Dial-before-Dig Policy to help Data Centers manage down time. The service will be designed
to protect Data Centers' network of underground lines and cables and ensure the safety of
those working around this infrastructure.
9.2.14 Infrastructure Status
Data Centers shall be given infrastructure status on a par with sectors such as railways,
roadways, and power, to enable the industry to avail benefits such as long-term credit from
lenders at easier terms.
9.2.15 Continuous Water Supply
For Data Centers in the area of any Industrial Area Development Authority such as MIDC, it
will ensure 24X7 uninterrupted water supply to the data center units both inside and
outside the DC Park. To the extent possible, data center units will recycle the water to
minimize their water requirements.
9.2.16 FSI Norms
Data centers, being a unique activity will be permitted to avail additional FSI as
mentioned in para 8.1.1 and 8.1.2
9.2.17 Penalty for use of Built-up space for Non IT use
If a private Data Center Park has availed additional FSI as per the provisions of the said
policy and subsequently it is found that the built-up space in the park is being used for non-
ITeS / commercial activities / any other activity not permitted as per this policy following
action will be taken :-
a. A per day penalty equal to 0.3% (a thirtieth of a percent) of the prevailing ready reckoner
value of the built-up area that has been found to be used for non-IT & ITES activities

b. The penalty will be recovered from the date of issue of Occupancy Certificate till the day
non-compliance continues. After payment of the penalty to the concerned Planning
Authority which had sanctioned the building plans of the concerned Data Center park,
the said Park will restore the use of premises to the original purpose for which LOI /
Registration was granted.
c. If the Data Center park fails to pay penalty and/or restore the use to its original
intended use even after the second instance of offence, the concerned Planning
Authority will take suitable action under the MRTP Act against the erring Data
Center park under intimation to the Directorate of Industries.
d. This provision will also be applicable to existing Data Center parks.
e. The Promoter / Developer of Data Center the Parks will not be allowed to sell / lease
built up area reserved for Data Center case. activity to non Data Center user in any

f. Penalty to be imposed on end user/ owner of the Data Center Premises.


9.2.18 Activities exempted from FSI
Basement parking, storage and space used for Diesel Generator (DG) sets installation will
not be considered as part of FSI.
9.2.19 Relaxed Restrictions on Buildings
DCRs will be suitably amended on parameters such as Parking Norms, Height of Floors,
DG sets, FSI, etc. with respect as per provisions of National Building Code.
9.2.20 Infrastructure Support
• MIDC will serve to set up Data Center Parks with necessary infrastructure like road,
power, connectivity, water, and other essential infrastructure.
• MIDC will take up Data Center Park with all prior clearances/permissions for land being
allotted to Data Centers.
• The State Government will provide financial assistance required for laying
transmission lines and substation related infrastructure to Data Center Parks to be
setup by MIDC.
9.2.21 Initiatives related to Ease of Doing Business
• MAHITI Portal will act as a single window mechanism for facilitation of the
processes involved in setting up of Data Center projects both for getting state and
Government of India approvals.
• Data Center will be granted industry status for availing benefits of tariffs,
concessions, initiatives related to various laws for (EoDB) and incentives under this
policy.
9.2.22 Deemed distribution license
Data center developer / operator shall be eligible for getting licenses for green power energy
distribution and consumption within data center park.

10.PROMOTION OF AVGC
Ecosystem:The AVGC is a sunrise sector in Maharashtra having vast potential for wealth
creation and employment generation. As per the existing trend, India's AVGC market share is
estimated to grow to $ 1.5 billion, which is less than 1% of the global market. Maharashtra is
the entertainment capital of India. Mumbai and Pune are home to some of the largest
Hollywood and Bollywood VFX studios. AVGC sector will bring in a range of employment
opportunities for creative field professionals in the state including communication,
videography, theatre, regional languages, media, publications and more.
This policy focuses on bridging the demand-supply gap for people in this sector
attracting global companies in the field, capturing a larger share of outsourced international
AVGC work, and facilitating the right ecosystem development. The policy envisages to promote
indigenous digital content through the setting up of a dedicated task force and Center of
Excellence under M-Hub.
Eligibility: AVGC is essentially an ITeS activity and shall be eligible for the benefits admissible to
ITeS
10.1 Fiscal Support to AVGC Industry
10.1.1 Capital Subsidy
- Anchor unit status will be given to the first 3 units with a minimum investment of INR
50 Crores and employing minimum 50 people in each unit. Anchor units will be
provided a subsidy equal to 25% of the fixed capital investment subject to a ceiling of
INR 25 Crores, paid over a period of 5 years.
- Capital subsidy of 20% on capital investments such as cost of hardware,
equipment etc., subject to a maximum of INR 25 lakhs paid over a period of 3
years for new AVGC units directly employing a minimum of 10 people in the unit.
10.1.2 Stamp Duty Exemption
Same as in common incentives Para 7.1
10.1.3 Electricity Duty Exemption
Same as in common incentives Para 7.3
10.1.4 Power Tariff Subsidy
Subsidy at INR 1 per unit for 5 years for new AVGC Units located in the State.
10.1.5 Certification Assistance
All AVGC EOU's will get refund of expenses incurred for compulsory marking like
Conformity European (CE), Gaming Lab International (GLI) Certifications, etc. to the
extent of 50% expenses subject to maximum of INR 2 lakhs per unit.
10.1.6 Skill Development Assistance
Reimbursement of up to 25% of expenditure/fee of online courses and programs for
Super Specialized Job Roles (as per definition 15.10), provided by autonomous institutes
in offline or online learning format. The benefit will be provided on uploading
'certificate of successful completion' on MAHITI portal with a maximum ceiling of INR
50,000 for domestic certifications and INR 1 Lakh for International certifications,
whichever is lower.
10.1.7 Market Development Assistance
• M-hub to host annual events and competitions in collaboration with NASSCOM,
Gaming Developers and Associations, Animation Society, Maharashtra State
Innovation Society, among others.
o Financial support of INR 20 Lakh for each event and competition every year
1) FICCI FRAMES & Best Animated Frames Awards-Mumbai,
2) NASSCOM - Game Developers Conference-Pune,
3) The Animation Society of India- Anifest, Mumbai,
4) ASIFA- World Animation Day - 28th Oct every year – all India
5) MCCIA- Digital Content Conference, Pune
6) NTLF – NASSCOM Technology Leadership Forum
• The category of events/competitions may subject to change as per the discretion of the
M-Hub.
• The number of events and competitions are limited to 1 event and 1 competition each
year.
• Mobile game developer registered in Maharashtra with more than 5 million downloads
(iOS + Play store) and 4+ rating on mobile platforms to receive a Gaming Award and
reimbursement of 20% of the qualified expenditure on marketing with a ceiling of INR
10 Lakhs per sanction per company.
10.1.8 Recruitment Assistance
Recruitment assistance of INR 2.5 lakh for employing 50 local students in Business
Incubation Laboratory/R&D Center for IT & ITeS operation within 2 years.
10.1.9 Infrastructure Development (Parks/Co-working Spaces/CoEs etc.) Establishment of Maha
Center for AVGC under the M-Hub including AVGC Centers - An integrated facility including
production facilities, AVGC studios and space for performing arts, exhibition galleries and
workplace requirement for the artist
10.2 Non-Fiscal Support to AVGC Industry
10.2.1 Global Joint Ventures
State Government will encourage Joint Ventures between Indian & Foreign entities by
signing at least 10 MoUs during the policy period.
10.2.2 International Promotion
Support will be provided for international events related to AVGC in Maharashtra in terms
of promotion
10.2.3 Intellectual Property (IP)
Intellectual Property will be protected through legal framework work. The facilitation
services will be provided for patents, designs, copyrights, and trademarks, as per the
guidelines of National Intellectual Rights Policy, and Startup Intellectual Property Protection
Scheme (SIPP), Government of India.

11. PROMOTION OF EMERGING TECHNOLOGIES


Ecosystem:Emerging technologies have enabled Maharashtra to chart a course for the future from
attracting Electric Vehicle manufacturers which will determine the future of urban mobility,
healthcare services that range from disease detection to treatment and agricultural innovation
enabled through Artificial Intelligence (AI) enabled drones. COVID-19 pandemic has accelerated
usage of these technologies by enabling evolved working models like work-from-home, remote
learning and more.
In partnership with NASSCOM, the state runs10,000 Startups Warehouse Program' which
focuses on bringing the state government, incubators, academia, corporates, mentors, and
investors together. The program offers startups with enterprise access to leading technology
players such as Google, Amazon Web Services, Tech Mahindra and many more. In just 3 years,
close to 50 startups have benefited from the program and employed more than 1300+ people in
the state.
The policy focuses on capturing the USD 2 trillion global emerging technologies sector
including but not limited to:
Segments of USD 2 Trillion Global Emerging Technologies Industry are as follows:-
1. Internet of Things (IoT) - 35.2%
2. Cloud Computing - 12.8 %
3. Animation / VFX - 12.5%
4. Data Centers - 9.0%
5. Big Data & Analytics - 8.8%
6. Blockchain, AI, 3D Printing, Robotics, Immersive Tech - 8.3 %
7. Gaming & Comics - 7.5%
8. Cyber Security - 5.9%
11.1 Fiscal Support to Emerging Technologies
11.1.1 Capital Subsidy
Capital subsidy of 20% on capital investments such as cost of hardware, software
equipment (excluding building and land cost) etc., subject to a maximum of INR 1 Crore
paid over a period of 5 years. For first 50 new Emerging Technologies units with a minimum
investment of INR 5 Cr. and directly employing a minimum of 20 people in the unit. The
AVGC and Data Center units will not be applicable under this subsidy as separate policy
guidelines are proposed under this policy.
11.1.2 Stamp Duty Exemption
Same as in common incentives Para 7.1.
11.1.3 Electricity Duty Exemption
Same as in common incentives Para 7.3.
11.1.4 Power Tariff Subsidy
Subsidy at INR 1 per unit for 5 years for new / expansion of Emerging Technologies
Units located in the State.
11.1.5 Certification Assistance
Same as in common incentives Para 7.4.
11.1.6 Recruitment Assistance
Recruitment assistance of INR 2.5 lakh for 50 employing local students per unit.
11.1.7 Patent Related Assistance
Same as in common incentives Para 7.6.
11.2 Non-Fiscal Support to Emerging Technologies
11.2.1 Training & Placement
Engineering Colleges will institute training-based certification and placement
programs.
11.2.2 Ease of Doing Business
Special EoDB measures to fast-track timelines for startups including self-certification
through the MAHITI portal, access to a 24X7 manned hotline number for round the
clock assistance.
11.2.3 Intellectual Property (IP)
Intellectual Property will be protected through legal framework. The facilitation services will
be provided for patents, designs, copyrights, and trademarks, as per the guidelines of
National Intellectual Rights Policy, and Startup Intellectual Property Protection Scheme
(SIPP), Government of India.

12. STARTUPS AND INNOVATION


12.1 Maharashtra Hub (M – Hub)
An integrated Center of Excellence (CoE) between Government of Maharashtra, leading
technical institutes, business schools and private entities to lead initiatives to support tech
startups at subsidized costs. M-hub will be built upon the momentum of the MIDC -
NASSCOM startup warehouse program of Maharashtra to develop clusters of innovation
where new technologies germinate at an astounding rate and where pools of capital,
expertise, and talent foster the development of new industries and new ways of doing
business. As enumerated in the Maharashtra Industrial Policy-2019 M-Hub will also act as
States Apex Institute for promotion of entrepreneurship. It will be established on the land
of Maharashtra State Small Industrial Development Corporation (MSSIDC) at Kalamboli,
dist-Raigad. This will be a State of Art building with training facilities300 students and
residential accommodation for students and tutors / academic staff.
The following are the two key tenets under M-hub:
• M-hub is a proposed Center of Excellence spearheading ecosystem development
for traditional and future technologies with respect to social & technical
infrastructure, talent development, ease of doing business, academia linkages,
global cooperation and more.
• The policy introduces Chief Operating Officer (COO), who works under the ambit of
Principal Secretary (Industries) with the mandate of leading strategic partnerships and
cross-department cooperation for implementation & monitoring of policy and
development of enabling ecosystem. COO will anchor all the task forces organized
under M-Hub.
12.1.1 Aim of M-Hub
• Help startups gain access to better technology, talent, business networks and
funding.
• Holistic ecosystem development with workspace, tech labs, deep synergy between
enablers like corporates, government, investors, mentors, academicians etc.
• Offer a cost advantage by provisioning space and operations for IT start-ups and
incubation centers at a nominal rent for a maximum of five years with all amenities like
furniture, conference rooms, cafeteria etc. and also expenses on property tax, water
tax, security, repairs, and maintenance of premises etc. at actuals.
• The Chief Operating Officer (COO) shall guide the operations and schematics of the M-
hub, wherein 4 key task forces shall deliberate upon strengthening 4 core areas of IT
sector including Center of AVGC, Center of Emerging Tech, Startups and related Eco-
system development in Maharashtra.
12.1.2 Scope for M-Hub
• As a part of 10,000 Startups Program, M-Hub will be extended as a Center of
Excellence (CoE) for innovation and entrepreneurship in Maharashtra.
• Mumbai or any other place decided by GoM will be targeted to become the largest
startup hub in the state of Maharashtra given the presence of IIT Bombay, other
reputed educational institutes.
• Added benefits of the location include presence of a global workforce and clientele,
presence of prominent institutional funding agencies, rising availability and
affordability of co-working spaces and one of the largest demand markets in Asia for
pilot testing and launching solutions at scale.
• M-Hub will integrate initiatives under Maharashtra State Innovative Startup Policy 2018,
Maharashtra Fintech Policy and Maharashtra State Innovation Society.
• Apex Institute will conduct training program entrepreneurship development in co-
ordination with MCED.

12.1.3 The broad governance framework of M-Hub & Apex Institute is added below:
Governing Council
Principal Secretary
Principal Secretary (Higher &
(Information Technology
Principal Secretary (Industries) Technical Education
Department)
department)
Principal Secretary (Skill
Development, Employment & Development Commissioner
CEO, MID
Entrepreneurship Department) (Industries)

CEO, MSSDS (Maharashtra CEO, MSInS (Maharashtra


Industry Champion
State Skills Development State Innovation Society)
Society)
Infrastructure Champion AVGC Champion Statrup Champion
Emerging Technologies
Fintech Champion Management Institutes
Champion
Institutes of Technology Special Invitees

-Guidelines regarding the broad governance framework of M-Hub will be issued separately.
12.1.4 Framework of M-Hub
Innovation
Fintech Hub Warehouse Facility Entrepreneurship
Powerhouse
Dedicated Fin Tech section in M-Hub for A space for idea- Strong integration The M-Hub
R&D and co-working space. Special stage/growth stage with academic and Governing Council
programs and mentors for fintech entities to test and build research institutes to along with M-Hub
community building. Fintech new ideas and products. encourage team & Advisory
accelerator and facilitation for benefits Warehouse will support entrepreneurship. Council will work
under Maharashtra State Fintech Policy proof-of-concept and Minimum 15% seats towards making M-
2018. prototyping activities of will be marked for Hub a global
startups.10% of the student entrepreneurs innovation platform.
space will also be and women M-Hub will forge
dedicated to the alumni entrepreneurs at a strong partnerships
startups of the 10,000 50% of the nominal with global
startups program to help rate that will be innovation leaders
the early-stage startups charged. and improve market
collaborate with peers access for startups
and mentors. and innovators.
Emerging TechnologyEngineering
Colleges will institute training-based
certification and placement programs.
Special EoDB measures to fast-track
timelines for startups including self-
certification through the MAHITI portal,
access to a 24X7 manned hotline
number for round the clock assistance.
12.1.5 Performance Monitoring Mechanism
A. Goals
o Profitable Startups
o Revenue Generated
o Jobs Created
o Tax Revenue
o Supporting Zone II
B. Success Factors
o Number of Startups
o Occupancy of Incubation Centers
o Jobs Created
o Funds Raised
o Enterprises and Investors Connected Market
o Access (No of JVs, MoUs, Partnerships) Events
o Hosted
o Revenue Generated
C. Review Mechanism
o Quarterly Performance Tracker and Annual Report to be published
o Governing Council to review & monitor every six months
o Advisory Council and M-Hub Team to conduct review every three months
o Empowered Committee to review once a year
12.1.6 Fintech Support
• The engagement will be done through various Market connect, enterprise connect,
government connect programs as a part of a Fintech Support. This is aimed to also
attract global fintech startups and offer an 'Launch pad' advantage to setup their
operations in the Indian Market.
12.1.7 Suggestive tools and interventions
• Short-run programs:The gamut of sector agnostic and sector specific programs
spanning industries and geographies provides entrepreneurs with networking
opportunities, market access, mentorship, scale-up strategy, demo day with
investors and more.
• Network:connect with peer startups, government-as-a-client, investors, mentors/
experts, corporate network, service providers
• Corporate Innovation:M-Hub to help digital transformation of corporate members,
especially in Zone II locations
• Government Partnerships:National & international government bodies partnered
with M-Hub to connect with products that help service delivery and e-governance,
along with startups that seek govt. support.
• Academia Partnerships: Academicians from across the globe to participate in in-
house events, conferences etc. to boost research-led innovation. Curating
curriculum and offering internships.
• The co-ordination of M-Hub will be done by State IT Department.
12.1.8 Units registered with M-Hub will be provided the following benefits:
a) Market Development Assistance:
• Participation in global events:Eligible entities up to 25 Lakhs cost of
participation domestic & global events including product/research development
support.
• Bi-annual innovation competition:Where best 2 innovation ideas receive INR 5
lakh and INR 2 lakh development support, and incubation support at government
funded incubators. Participants to be mentored by industry advisors.
• Bi-annual competition at collegiate levelwhere top 3 winners receive INR 1 lakh
research grant, and funded traineeships with domestic and international leaders.
Participants to be mentored by industry advisors.
b) Skill Development Assistance
-Reimbursement of up to 25% of expenditure/fee of online courses and programs
for Super Specialized Job Roles (as per definition 15.10), provided by
autonomous institutes in offline or online learning format. The benefit will be
provided on uploading 'certificate of successful completion' on MAHITI portal
with a maximum ceiling of INR 50,000 for domestic certifications and INR 1 Lakh
for International certifications, whichever is lower.
- Concessions should be given to the concerned units only after verification by the
Directorate of Industries and the office under their jurisdiction that the concerned
units have not availed the concessions through the schemes / policies of other
departments or the existing schemes will not be repeated.
13.Skilling & Future Workforce
To ensure the creation of highly employable and quality manpower in the Information
Technology and Information Technology Support Services component in the State, the focus has
been given on the Skill Development Courses (Super Specialized Job Roll). Details of these courses
given in paragraph 15.10. For this, in collaboration with the Department of Higher and Technical
Education as well as the Department of Skill Development, Employment, Entrepreneurship and
Innovation, in reputed educational institutes / universities / engineering colleges and incubation
centers in Maharashtra emphasis will be laid on the curriculum. Details of these institutions are
given in paragraph 15.20 Through such educational institutes, employment / self-employment
opportunities will be created for talented and quality manpower through information technology
and information technology support services, Maharashtra Hub, Startup, Fintech as well as CM
Employment Generation Program . Annual 15% skilling target has been set up to create highly
employable, talented and quality manpower.

14. POLICY GOVERNANCE

Management Framework for Policy Implementation


• An Empowered Committee (EC)will be constituted at the State level to monitor the
implementation of this policy and develop procedures and modalities. The EC will hold bi-
annual sessions. The EC may invite any Department/ Organization/ Representative of
Association or a person for its meeting as it may deem necessary.
14.1 The composition of the Empowered Committee shall be as follows:
1 Chief Secretary Chairperson
2 Additional Chief Secretary (Finance) Member
3 Additional Chief Secretary (Urban Development /UD-1) Member
4 Principal Secretary (Skill, Employment, Employment & Member
Entrepreneurship Department)
5 Principal Secretary (Industries) Member
6 Principal Secretary (Higher & Technical Education) Member
7 Principal Secretary (Planning) Member
8 Principal Secretary (Information Technology) Member
9 Principal Secretary (Urban Development II) Member
10 Chief Executive Officer, MIDC Member
11 Chief Operating Officer (COO), M-Hub Member
12 Director, Software Technology Parks of India (STPI) Member
13 Nominee of NASSCOM Member
14 Nominee of FICCI Member
15 Nominee of MCHI-CREDAI Member
16 Development Commissioner (Industries), Directorate of Member Secretary
Industries

14.2 Mandate of Empowered Committee


The Empowered Committee will ensure closely monitor progress, implementation, and
challenges in respect of the following key areas of the policy and develop procedure &
modalities were required
• Incentives and Provisions for IT & ITES Units, IT & ITES Infrastructure, Data Centers,
AVCG & Emerging Technologies' Units.
• Promotion of balanced regional development in Zone II cities.
• Skilling and employability of IT workforce in Maharashtra.
• Grounding Innovation and Entrepreneurship through M-Hub.
• Monitoring and assisting Centers of Excellence and task forces.
• Approve the framework/modalities of implementation proposed by the Task Forces
under M-Hub.
• Set timelines and targets for each initiative.
• Bring about inter-departmental co-ordination in respect of matters related to this
policy.
• Institute effective analysis and evaluation of IT Policy implementation based on data on
KPIs.
• Resolve implementation issues at all levels.
• Enhancing Ease of Doing Business.
• Review the list of ITES as well as allied services/facilities permitted in IT Parks and
approve the amendments as may be appropriate.
• Determine the premium and other terms and conditions for grant of additional FSI
within the guidelines laid down in the Policy and harmonize the practices followed in
this respect by local bodies and public bodies such as MIDC and special planning
authorities.
• The Empowered Committee shall review the implementation and effectiveness of the
policy every six months and adopt corrective measures / changes / amendments if
required.
• Review the best practices.
• Determine the premium and other terms and conditions for grant of exit to the private
IT park / IT / ITES unit from the obligations of the incentives availed by it.
• Development Commissioner (Industries), as the member secretary of EC, will be
responsible for publishing the Annual Performance Tracker.
14.3 Provisions for Ease of Doing Business in IT & ITES
• IT / ITES Units will continue to benefit from:
• Relaxation under the Shops and Establishment Act with regard to working hours, work
shifts and employment of women.
• Exemption from maintaining physical records for attendance and salary.
• Option for self-certification and filing of consolidated annual returns under 13 Acts
administered by the Labor Department.
• Provision for IT / ITES units to maintain employee-related records required under
various Labor laws in electronic form, and acceptance of returns in electronic form will
be made in line with the progress of computerization in the Labor Department.
• IT & ITES units not discharging process effluent and employing less than 100
employees will be exempt from obtaining consent from MPCB. Such unit will be
required to submit annual statement to MPCB on disposal of wastes including
electronic wastes, used batteries, and used oil. The registration of such units by the
Directorate of Industries Department will incorporate specific conditions for this
purpose. These units will also have to be connected to local sewage network.
• Relaxations under the Contract Labor Act which have been approved for units in SEZs
will be considered for all IT / ITES units outside also.
• IT & ITES units will be treated as continuous process units for the purposes of power
supply.
• The Development Control Regulation (DCR) including of MIDC and other guidelines for
establishment of IT parks including in MIDC area shall be in consonance with the
IT & ITES policy.

15. DEFINITIONS
In the context of this Policy, the Information Technology industry consists of IT Software, IT
Enabled Services including AVGC, Data Centers and Emerging Technologies as defined below:

15.1 IT Park :The standalone building / premises having built up area more than 20,000 sq.
ft. with or without additional FSI, TDR, will be defined as IT Park.
15.2 IT Software:IT Software is defined as any representation of instruction, data, sound, or
image, including source code or object code, recorded in machine readable form and
capable of being manipulated to provide interactivity to a user with the means of a
computer.
15.3 IT Enabled Services (ITES):IT enabled services refer to companies that provide IT services or
systems integration services, including those specified by the Central Board of Direct Taxes
(CBDT) under section 10 TA of the Income Tax Rules and as decided by the Government
from time to time and are as below .
a) Back-office Operations: The administrative and support staff of a financial institute such as
Banks, Insurance Company, Mutual Fund, Non-Banking Finance Companies which is
responsible for functions related to the running of the company such as Settlements,
Compliance, Accounting , IT and Other Technology.
Back Office Functions are also often outsourced to external companies and/or in different
countries' which include:
• Business process outsource services provided mainly with the assistance or use of
information
• Data entry, transcription, reconciliation, consolidation, co-ordination, proportion,
processing review of documents
• Accounting to reporting and reconciliations
• Activities excluding front offices of financial services such as corporate finance,
asset and fund, Management Broking, Non-Banking Financial Company, Tax and
Audit Business and Management Consultancy, Taxation Services, Treasury
Operations, Risk Management and Credit Services, “Financial Back Office
Operations , Computer/disaster recovery and including but not limited to IT
operations, financial and administrative support and any other ITeS Activities as set
out in Definition 15.19.
b) Financial Back Room operations for Corporate and Investment Bank (CIB) and Private
Bank, Disaster Recovery, IT Development and Support and ancillary office which
includes Back Offices of Manufacturing and other services, Startups/Companies
which have no direct customer interface but provide essential support through
Electronic Media but this will not include delivery Godowns / Warehouse of E-
Commerce Company / Organizations.
c) Call Centers or Contact Center Services
d) Data processing or data mining
e) Insurance Claim Processing
f) Legal Databases
g) Creation and maintenance of Medical Transcription Excluding advice
h) Payroll
i) Remote Maintenance
j) Revenue Accounting (IT should include back office operations of all Income Tax Offices,
GST offices back office operations or any other Government & semi – Government
offices)
k) Support Centers
l) Website Services
m) Translation Services,
n) Data Search integration & analysis,
o) Content generation/creation using audio, video system and extensive use of computer
which can be permitted for education.
p) Clinical database Management-Services Excluding Clinical trials but does not include any
research and development services whether or not in the nature of contract research and
development services.
q) Visa Processing facilitation & back offices of Travel & Tourism facilitation, TV
Entertainment Channels and Sports & Travel Channels
r) Engineering & Designing
s) Geographic Information System Services
t) Human Resource Services'
u) Super Specialty IT Skill Development Centers/ IT related Hi-Tech Training Centers
V) Co-Working Spaces / Plug and Play Infrastructure.
Note:The State Government will take a decision to make necessary changes in the list of
services if there are any changes in the Income tax rules. In cases where the Directorate of
Industries or its field offices have issued Letter of Intent or registration of an IT / ITES unit, IT
Park / IT SEZ / AVGC Park, the incentives sanctioned will continue for the eligible period even
if there are changes in the policy period. The ITES units carrying out activity as per above
definition will also be allowed to occupy space in existing IT parks.
15.4 Classification of IT Units:The Information Technology (IT) units are classified into two
groups depending upon their activities, namely (a) IT Software units (b) IT Service (IT
enabled Service) unit.
(a) IT Software Unit:IT software includes a wide range of products and it is not possible to
draw up a comprehensive list in view of its nature and continuing development in this
sector. It has therefore been decided that the software units, whether in small scale or
large scale sector, which are certified as such by the competent agencies would be
considered for registration as IT Software units. Categorization as an IT Software unit also
requires that the unit's annual turnover of IT Software exceeds 75% of its total annual
turnover in value terms.
(b) IT Enabled Service Unit:IT Services, including IT enabled services, cover a wide and
expanding spectrum. A definitive list cannot be drawn up for this sector. Hence, an
illustrative list has been defined under ITeS definition. Categorization as an IT Service unit
also requires that the unit's annual turnover of IT services exceeds 75% of its total annual
turnover in value terms.
15.5 Classification of Zone:
Zone I area:This area includes Municipal Corporation's in Mumbai Metropolitan Region and
Pune Metropolitan Region.
Zone II area:This area includes areas other than those in Zone I & No Industry Districts,
Aspirational Districts & Naxalite affected area.
15.6 Existing IT &ITES/AVGC Unit:An IT (Software) /ITES/AVGC unit set up by an entity at a given
location which is in production/ operation on or any time prior to commencement of this
Policy or a unit which has availed incentives (excluding Stamp Duty) under any of the earlier
IT & ITES Polices.
15.7 New IT &ITES/ AVGC Unit:An IT (Software) /ITES/AVGC unit set up by an entity which
commences its production/operation at a given location after commencement of this
Policy and during the validity of the IT &ITES Policy 2023 and that it is not formed as a
result of re-establishment mere change of ownership, change in the constitution,
reconstruction or revival of an Existing/ Defunct/ Closed/ Sick Unit.
15.8 Expansion/ Diversification Project: If an Existing Unit, makes on or after
commencement of this Policy, minimum 25% additional fixed capital investment in IT
&ITES/AVGC activity, then such project will be considered as Expansion/ Diversification
Project.
15.9 Research and Development:Activities defined under the Ministry of Electronics and
Information Technology's Research and Development Section, including (but not limited to):

• High Performance Computing (HPC)


• Green IT or IT Sustainability
• Mobile Computing, Networking and Applications
• IT Based Innovations in Sustainability of Water Resource
•IT in Emerging Areas of including Digital Preservation, Green Computing,
Bioinformatics, Perception Engineering, Free and Open Source software (FOSS)
• Any other R&D activities defined by Center for Development of Advanced
Computing (C-DAC), Pune.
The activities under R&D in IT are subject to revision as per the discretion of
Development Commissioner (Industries), Government of Maharashtra.
15.10 Super Specialized Job Roles:The following job roles under each segment of Emerging
Technologies will include:
• Robotic Process Automation: Service Engineer, Business Analyst, Robotic Process
Automation Developer, Solution Architect, Development Coordinator & Testing
Engineer
• Artificial Intelligence: Al Research Scientist, Al Research Scientist Image & Videos,
Software Integration Engineer, Al Research Scientist -Language-Processing, Data
Scientist, Data Architect, Software Engineer – Testing, Software Engineer (Application)
Platform& Al
• Internet of Things: Embedded Systems Programmer, Tier III & IV Cloud Support
Engineer, Information Security Analyst, Solution Architect, Business Analyst,
Hardware Design Engineer Designer, Computer Vision Engineer, UI/UX Designer,
Network Wireless Specialist, Software Engineer, Data Scientist, Testing Engineer –
IOT, App Developer, Data Architect.
• Big Data Analytics: Big Data Analyst, Data Integrator, Business Analyst, Data
Scientist, Solution Architect.
• Cloud Computing: Migration Engineer, Cloud Architect, Cloud Software Engineer.
• Block chain: Developer, Engineer, Testing Engineer, Project Manager, Web Designer

• Virtual Reality: App Developer, Optical Scientist, Product Hardware Engineer,


Service Technologist, VFX Artist, Testing Engineer - Virtual Reality, UI Designer,
Computer Vision Engineer, Information Security Analyst, Solution Architect, Sensor
Architect, Sound Designer - Virtual Reality, Software Engineer - VR Devices, 3D
Modeling Engineer/3D Graphic Artist
• Mobile Tech: Social Engagement Manager, UI Designer, UX Designer, Application
Developer, Testing Engineer
• Cyber Security: Security Analyst, Analyst Application Security, Analyst Identity and
Access Management, Analyst End Point Security, Analyst Security Operations Centre,
Penetration Tester, Consultant Network Security, Forensic Specialist, Security
Infrastructure Specialist, Architect Identity and Access Management.
• 3D Printing: Software Engineer-Slicing, 3D Modeling Engineer/3D Graphic Artist,
Solution Architect, System Test Engineer, 3D Printing Technician, Material Analyst
Engineer
• Machine Learning:Machine learning is a subfield of Artificial Intelligence(AI) which is
broadly defined as the capability of a machine to imitate intelligent human behavior.
Artificial Intelligence systems are used to perform complex tasks in a way that is similar
to how humans solve problems. Machine learning takes the approach of letting
computers learn to program themselves through experience instead of humans writing
programs which is sometimes time consuming, erroneous and in complex cases,
impossible.
• Fintech:-Fintech is technologically enabled financial innovation that could result in new
business models, applications, processes or products with an associated material effect
on financial markets and institutions and the provision of financial services.
• NSQF Online Courses (National Skilling Qualification Framework):-NSQF Online
Courses is a course prescribed by the Ministry of Finance, Government of India
through its notification dated 27/12/2013 and subsequently amended from time to
time. It will include a curriculum developed by the Sector Skill Council, established
through the National Skill Development Corporation (NSDC) in consultation with
Industry leadership.
• The Development Commissioner's (Industries) office may append/modify the list of Super
Skilled/Future Skilled Workforce from time to time as it sees fit.
15.11 Startups:Definition of a startup to be referred from the definition as prescribed by
the department of promotion of industry and internal trade, which is currently defined as :-

An entity shall be considered as Startups :


i. Up to a period of 10 years from the date of incorporation /registration, if it is
incorporated as a private limited company (as defined in the Companies Act, 2013)
or registered as a partnership firm (registered under section 59 of the Partnership
Act, 2008 ) or a limited liability partnership (under the Limited Liability partnership
Act, 2008) in India.
ii. Turnover of the entity for any of the financial years incorporation/registration has not
exceeded100crore rupees.
iii. Entity is working towards innovation, development or improvement of products or
processes or services, or if it is a scalable business model with a high potential of
employment generation or wealth creation.
Provided that any entity form by splitting up or reconstruction of an existing business shall
not be considered a “Startup”
15.12 Data Center (DC):Data Center is a dedicated secure space to house computing systems
and networking equipment along with required infrastructure such as connectivity,
storage systems, etc. for the purpose of collecting, storing, distributing, or allowing
access to large amounts of data.
15.13 Data Center Park (DCP):Data Center Park is a dedicated Data Processing Zone/Building
along with relevant infrastructure and regulatory environment for housing mix of Data
Center equipment of single or different entities to serve the needs of computation,
storage, networking, and provision of wide range of data related services. .
15.14 Data Center Developer:It is an entity who would be responsible to develop and maintain the
dedicated land or build facility along with relevant infrastructure provisions such as power,
connectivity, build up area, parking, power backup, water and other support services
required for smooth functioning of data center. . The developer also
needs to make proportionate investment in Data Center Servers/equipment and house in
the park within the limits defined from time to time.
15.15 Data Center Operator:It is an entity who will be responsible to manage and operate end to
end data center operations.
15.16 Tier III & Tier IV Data Centers:As defined by Ministry of Electronics and Information
Technology' Data Center Policy 2020, Data Center is a dedicated secure space within a
building / centralized location where computing and networking equipment is
concentrated for the purpose of collecting, storing, processing, distributing, or allowing
access to large amounts of data.
Data Centers are premises offering committed uptime certified by independent agencies
like Uptime Institute, EPI, and other similar independent agencies.
• Tier III Data Centers:A Tier III data center is concurrently maintainable with redundant
components as a key differentiator, with redundant distribution paths to serve the
critical environment. Unlike Tier I and Tier II, these facilities require no shutdowns when
equipment needs maintenance or replacement. The components of Tier III are added to
Tier II components so that any part can be shut down without impacting IT operation.

Requirements:
o 99.982% uptime (Tier III uptime)
o No more than 1.6 hours of downtime per year
o N+1 fault tolerant providing at least 72-hour power outage protection
• Tier IV Data Centers:A Tier IV data center has several independent and physically
isolated systems that act as redundant capacity components and distribution paths. The
separation is necessary to prevent an event from compromising both systems. The
environment will not be affected by a disruption from planned and unplanned events.
However, if the redundant components or distribution paths are shut down for
maintenance, the environment may experience a higher risk of disruption if a failure
occurs.
Tier IV facilities add fault tolerance to the Tier III topology. When a piece of
equipment fails, or there is an interruption in the distribution path, IT operations
will not be affected. All of the IT equipment must have a fault-tolerant power design
to be compatible. Tier IV data centers also require continuous cooling to make the
environment stable.
Requirements:
o 99.995% uptime per year (Tier IV uptime)
o 2N+1 fully redundant infrastructure 96-hour
o power outage protection
o 26.3 minutes of annual downtime.
15.17 Emerging Technology:These technologies are evolving technologies whose development
and practical applications are largely unrealized but include new solutions that cut across
components of software and service. These include but are not limited to Virtual reality,
Augmented reality, Artificial Intelligence (Including generative AI), Web 3, Machine
Learning, Internet of Things, Block chain, Robotic Process Automation (RPA), Spatial
Computing, Big Data Analytics, Cloud Computing , Mobile Tech, Cyber Security,
3D Printing, Fintech etc. As per need this list will be modified from time to time by
Industries Department.
15.18 Animation, Visual Effects, Gaming and Comics (AVGC):
- Animationis a way of making a film by using a series of drawings, computer
graphics, or photographs of two- and three-dimensional objects (such as puppets,
clay models or paper cutouts) that are slightly different from one another and that
when viewed quickly one after another create the appearance of movement.
Animation shall include 2D Animation, 3D Animation, Claymation, paper animation,
stop motion, shadow animation, hard surface animation etc. Animations can be
recorded on either analogue media, or on digital media.
- Animation Education:This segment of the industry covers training institutes
across the state. It provides animation related education services and serves as a
catalyst for access to talent in the growing industry.
- Animation Entertainment:This segment broadly covers animated movies, TV
broadcast shows, animation advertising and the direct-to-DVD format of animated
content. VFX is not a part of this segment.
- Chroma Keying:Chroma key is a technique for mixing two images or frames
together, in which a color (or a small color range) from one image is removed (or
made transparent), revealing another image behind it. This technique is also
referred to as color keying, color-separation overlay, green screen, and blue screen.
- Compositing:Compositing is the combining of visual elements from separate
sources into single images, often to create the illusion that all those elements are
parts of the same scene.
- Custom Content Development:This segment covers the development of animation
content for e-education and specialized content development. Specialized content may
include animation training for medical purposes, as well as military terrain and driving
simulation training. The multimedia segment covers multimedia content on the web,
such as flash and other content
- Direct to DVD:A film that is released direct-to-video (also known as made-forvideo,
straight-to video, and straight-to-DVD) is one which has been released to the public on
home video formats (historically VHS) before or without being released in movie
theaters or broadcast on television.
- Visual effectsare the processes by which imagery is created and/or manipulated
outside the context of a live action shot. Visual effects involve the integration of live
action footage and generated imagery to create environments which look realistic, but
would be dangerous, expensive, impractical, or simply impossible to capture on film.
Visual effects include computer generated imagery using the affordable and user-
friendly animation and compositing software. Visual Effects shall include Rotoscopy,
Digital Cleanup, VFX paint, morphing, DMP - (Digital Matte Painting), Chroma key,
Compositing, Tracking, pre-visualization, Prep-wire removal, beauty pass, face & body
replacement, Modelling, shedders, texturing, lighting, animation, Rigging, Match move,
FX (cloud, liquid, rain, water, dust, smoke, wind, fire, flame, blast, snow, ice, etc.) Particle
simulation, Simulation - (Fur, hair, Cloth, crowd, destruction, etc.), Background & Set
creation and extension, Digital environment creation, miniatures for VFX, Image
processing, Digital Imaging (DI), color correction etc.

- A game is an electronic game that involves human interaction with a user interface
to generate visual feedback and immersive experience on a device which shall
include 2D, 3D, video, handheld devices, mobile, virtual, console etc. Interactive
games are used for entertainment, education (edutainment) and for
nonentertainment applications such as serious games (games that are designed
primarily to convey information or a learning experience of some sort) and
simulation. The electronic systems used to play video games are known as
platforms; Examples of these are personal computers, video game consoles such as
Play station, Xbox and Nintendo Wii, handheld consoles such as Nintendo Game
boy Advance, Play station Portable (PSP) and mobile devices such as mobile phones,
tablets. The Internet is also a platform for various forms of web-based games. For
the purpose of clarity, gambling software applications are not a part of interactive
games.
- Comicis a visual medium used to express ideas via images, often combined with text,
voice, sound or visual information. Comics shall include hand drawing, digital, 2D, 3D,
motion graphics, motion comics.
- Stereo conversionis a specialized process in animation post-production where the
normal 2D or live action films are converted to stereoscopic form for an immersive
experience. Stereo conversion shall include Rotoscopy, layer painting, depth grading,
tracking, element compositing, finagling, edging, particles etc.
- Game Art: Video game art involves the use of patched or modified video games or the
repurposing of existing games or game structures.
- Key Frame Animation:A key frame in animation and filmmaking is a drawing that
defines the starting and ending points of any smooth transition. They are called
"frames" because their position in time is measured in frames on a strip of film.
- MMORPG: Massively multiplayer online role-playing games. These are role-playing
games where thousands of gamers play strategy or action theme-based games in a
virtual and persistent end-user through the World Wide Web, by way of a Web browser
or other Web-enabled software like Internet television clients, micro blogging clients
and RSS readers.
- NGN Consoles: Next generation gaming consoles. NGN consoles are advanced console
machines usually introduced at the end of a console cycle.
- Pipelines:In computing, a pipeline is a set of data processing elements connected in
series, so that the output of one element is the input of the next one..

15.19 Types of ITeS Activities allowed in IT Parks


- Audio/Video Product Design - Ship Design
- Automation Equipment and - System Customizing Center
Systems Design - Engineering Design
- CAD/CAM/CAE Support - Factory Automation/CIM Design
- Communications Equipment
Design - Fashion, Furniture, Jewelery and
- Computer related services Exhibition Design
- Computer System Integration - Geological Analysis on well
- Computer Systems Design samples and rocks
- Development/Production of - Hybrid Circuit Modules Devices
Software, Maintenance of Design
Software and User training - Industrial and IT Skills Training
- Diagnostic Product Design eg. - Information Systems Design
Medical, Biotech - Materials Applications Center
- Electric Motors Design - Mechatronics Components Design
- Electrical Appliance Sand
Devices Design - Office Automation Equipment
- Electronic Control Systems Design
Design - Offshore Structure Design
- Electronic Instruments and - Plastic Product Design
Device Design eg. IC - Product Demonstration
- Oil Rig Design - Quality Assurance, Testing
- Opto-Electronics Devices Design Services & Technical Inspection
- Projection Planning & - R&D Laboratories
Management - Technical Service Centers
- Publishing - Tooling Design
15.20 Key Academia & Incubators -
- Cornell Maha 60 Business Accelerator Mumbai
- IIT Bombay, Mumbai
- Symbiosis International University, Pune
- CSIR- National Environmental Engineering Research Institute, Nagpur
- Uddyam – Solapur University Incubation Centre, Solapur
- KBCNMU Center for Innovation, Incubation and linkages, Jalgaon Center for
- Agro-Bio-Innovation and Incubation (CABII), Nanded Shivaji University, Center
- for Innovation Incubation and linkages, Kolhapur Savitribai Phule University,
- SPPU Research Park Foundation, Pune SGBAU Research and Incubation
- Foundation Center, Amravati
- MU IDEAS Foundation, Mumbai
- Dr.Babasaheb Ambedkar Technology University, Lonere, Mangaon, Dist. Raigad
- PDKV Research and Incubation Foundation, Akola
- NETRARIT Foundation, Sangli
- Dr.Babasaheb Ambedkar Marathwada University, Aurangabad
- Research Innovation Incubation, Design, Laboratory Foundation, Mumbai
- Nashik Engineering Cluster, Nashik
- Marathwada Accelerator for growth and Incubation Council, Marathwada
- WISE-SNDTWU Incubation Center, Mumbai
- INCUBEIN Foundation, Rashtrasant Tuktoji Maharaj Nagpur University, Nagpur

The list of above educational Institutions/Universities, will be modified from time to time as per
the direction issued regarding Incubation Center by the Skill Development, Employment,
Entrepreneurship & Innovation department accordingly.
16. GUIDELINES AND PROCEDURES
16.1Incubation Centers & Startups Interventions
The early – stage startup and until there first round of institutional funding should be eligible
for Stage-I incubation facilities. Once the startups get the first round of institutional funding,
they will be eligible for Stage-II incubation facilities.
Stage-I Incubation facilities should include
- Workspace facilities and laboratory infrastructure
- Legal & business advisory
- Mentorship session and connections
- Market Access
- Access to seed funds, angle funds etc.
- Networking Opportunities
Stage-II Incubation facilities should include
- Support in market growth strategies Network for
- International and global expansion Access to
- venture funding
- Market linkages
- Acceleration support
16.2 Report format for Startup Incubators Stage I and Stage II
• Name of the Private IT Park
• Location/Postal Address of the Private IT Park
• Details of Registration of the Private IT Park
• Total Built up Area of the Park in Sq. Meters
• Built up area for the incubation facilities (2% of the total BUA) in Sq. Meters.
• Total BUA allotted for incubation/startup units
• No. of incubation/startup units occupying the space
• List of names, activities, area occupied, date of occupation of incubation/startup units

The 2% of the built-up area which is more than or equal to 2500 sq.ft.will be allotted by
adopting the guidelines laid down vide Government resolution IIT-2016/CR 76/Ind-2, dated
18/05/2016 until they are revised as per the need.

16.3 Critical Infrastructure Fund


• Eligible project/works under Critical Infrastructure Fund:Under this fund following
critical infrastructure projects/works can be undertaken:
i. Roads connecting the private IT parks or the cluster of IT & ITeS units with the roads
of the state or the Municipal Council/Corporation, Zila Parishad, PWD or any other
local body.
ii. Critical power infrastructure projects like providing electric transformer, substation
or express electricity feeder for the private IT parks or the cluster of IT & ITeS units.

iii. Providing drainage line connecting the private IT parks or the cluster of IT & ITeS
units to the main drainage network of the Municipal Council / Corporation, Zila
Parishad, or any other local body.
iv. Any other critical infrastructure work other than (i), (ii) and (iii) above with the prior
approval of Empowered Committee (EC) constituted under this policy.
• Manner of approval of the proposal:
i.Fund Maintained by the State Government:The necessity/requirement of the work
will be received by the Development Commissioner(Industries), Directorate of
Industries from:
a. State Planning Authorities
b. IT & ITeS Industry players
c. Field/Ministry level offices of various departments related to creation of
infrastructure
d. Industries Associations, Chambers of Commerce, etc.
The industries department will assess the demand of works vis-à-vis the
availability of funds. The proposals will be put up before the Empowered Committee
(EC) constituted under this policy for consideration/approval. The proposals sanctioned
will be executed by the concerned agencies as per stipulated norms for execution of
the works. These agencies will submit a quarterly report on the works sanctioned and
the progress of works. A register of the work sanctioned, works completed, grants
sanctioned, grant utilized and agency which has executed the works shall be
maintained by the Directorate of Industries.
16.4 MAHITI Portal: Maharashtra Information Technology Interface :-The state will have a
Unified and Integrated Single Window Platform for IT & ITES under one roof for time bound
clearances. The Directorate of Industries will develop the central web portal which will include:

1. Registration and Application


• Online Application for LOI/ De-novo/ Registration of IT &ITES Parks,
• Online Application for LOI/Registration of IT &ITES Units, Data Centers
• Application for Extension of LOI/De-novo
• Essential services system generated approval
• Application for incentives
• Online submission of report on 2% Incubation Space in an IT Park by a
developer
• Online Submission of Six-Monthly Report
2. Information
• Detailed IT & ITES Policy 2023 and subsequent GRs of the policy
• IT & ITES Exports trade facilitation and information center including information on
different Central and State Schemes, channels of exports, among others.
• Interactive incentive calculator based on:
o Unit Type of IT & ITES: IT & ITES Unit, AVGC Unit, Emerging Technologies, Data
Centers
o New/Expansion/Existing Investment
o Region: Zone I, Zone II
o Investment size
o Employment generated in the state from local talent
3. B2B functionality:The portal will act as a market linkage system that allows different IT
& ITES businesses in Maharashtra to list out their services to connect with the domestic
and global demand. The B2B functionality makes it easy to list all of your available units
and services in one place, so the Industry and Government can browse and understand
the dynamics of the market.
4. Policy Performance Tracker (Internal)
• Annual Policy Tracker: Automatically generating the annual policy performance on
IT & ITES/ AVGC/ Data Center's Investments, Units, Utilized BUA, Exports, and
Employment.
The portal shall be managed and operated by the Chief Operating Officer (COO)
embedded in the empowered committee.
16.5 Guidelines on timelines under LoI & De-novo Letter for IT Parks
A. The construction of the IT park has been completed but is an unregistered park:
Private IT parks that have been in operation for more than stipulated period (5+1+1) &
(3+1+1) have completed the construction; but the LoI has expired, & the developer has
obtained the Certificate of Occupancy/BCC from the relevant Planning Authority, a new
de-novo LOI for three (3) years to such private IT parks shall be given without charging
differential premium. All the IT Parks those who have not obtained De-novo LoI till date,
then this provision would apply to all IT Parks from the date of effect of previous IT
Policy-2015. During this period, at least 50% BUA of the IT park should be occupied by IT
& ITES units. If the park fails to obtain occupancy of 50% BUA, then such cases will be
decided by Industry Department.
B Private IT Parks with incomplete construction:The developer of the information
Technology Park is expected to complete the project and obtain the registration
certificate within the stipulated period. The period of completion of private IT park is
specified as 5 years (3+1+1) for BUA of less than 1 lakh sq.ft. and 7 years (5+1+1) for BUA
of more than 1 lakh sq.ft. However, in the circumstances that the IT park cannot be
completed within the stipulated timelines for whatever reasons, for such cases,
developers will be allowed to complete the IT park project with a new de-novo LoI by
paying 30% differential premium based on the Incremental Ready Reckoner Rates for IT
Parks during the relevant period and obtain the Registration Certificate. The new de-novo
LoI will be granted on the merits of the individual proposal, initially, for a period of 3
years. If the construction of the IT park is not completed despite the extension, then each
case shall be decided separately based on the merits of each case, for further extension if
required, by the Industries Department.
C. Procedure for obtaining the De-novo Letter of Intent
1. Fees:For the letter of intent of the IT park / de-novo for the letter of intent / Fee for
extension of letter of intent / correction letter will be charged INR 5,000/- and the
copy of the challan paid by the promoter under the heading should be sent to:
“0851 Village & Small Industries
102, Small Scale Industries
Cottage & Small Industries
0851-0026”
The same can also be submitted on the upcoming MAHITI Portal.
2. Amount difference in premium:In the event of obtaining De-novo Letter of Intent,
except in the cases of Para 16.5(A) above, developers are required to pay the
premium based on the difference in the rate as per the ready reckoner rate during
the time of original Letter of Intent and De-novo Letter of Intent.
3. Procedures for De-novo LoI:
i) The promoters of private IT park whose project has not been completed/registered
during the stipulated period as mentioned in above (A) & (B) the promoter shall
submit an application along with fee to the Development Commissioner (Industry)
along with the prescribed documents in the prescribed format. Letters of Intent will
be issued to the developer in principle and a copy will be sent to the concerned
planning authority.
ii) As per the clause mentioned in the above paragraph C(3)(i), after receipt of the
charges; Concerned Development Authority should inform in writing to
Development Commissioner (Industries).
iii) After receiving the report from concerned development authority, Development
Commissioner (Industries) shall give the de-novo Letter of Intent to concerned IT Park.

D. Miscellaneous
The existing IT parks are expected to comply with the provisions of the IT & ITeS
Policy in order to avail benefits under this policy. IT Parks that do not have
registration certificate and wish to avail or discontinue the development of IT
Park, then the developer should have to refund all the benefits taken under the
relevant policies. It will also be ensured to protect interests of IT&ITES units
operational in the IT Parks. Prevailing Policy provisions cannot be applied in all the
cases automatically, with retrospective effect. The guidelines regarding this will be
issued separately.
16.6 Green IT Awards
• Introduction:The State's Information Technology Day will continue to be
celebrated on 20thAugust of every year, one awards will be presented to IT/ITES
Units for outstanding contribution and performance.
• Objectives
1. To promote entrepreneurship in IT industries in the state
2. To recognize and appreciate outstanding performance in IT activities
3. To encourage rapid spread of use of IT in society.
4. To encourage use of IT as a means of creating employment opportunities
5. Effective Natural Resource Management (Green IT)
• Criteria
1. Commercial Success of the company
2. Customer satisfaction and value addition to the customer
3. Use of quality standards (ISO, CMM, etc.)
4. Exports to emerging markets
5. Non-Urban IT entrepreneur.
6. Deployment of local language in the product/services
7. Deployment of advanced technology
8. Track record of entrepreneurs
9. Employment Generation
• The awards are presented for the following categories and number of
companies: IT Software (2), IT enabled Services (2), IT (R&D) Innovation (2), IT
(R&D) Multimedia & Entertainment (2), IT Service Provider (ISP) Special Award (2), IT
Service Provider ( Telecom/ISP) (2), IT Infrastructure (2), IT HRD (2), IT (Unique)
Software Security Solution (2), Green IT Award (2), IT Enterprise (Special Awards for
Region) (5), IT Emerging Technology Award (2), IT AVGC Award (2), Data Centers (2).

• Application and Deadlines:Companies/Institutions operating and registered in


Maharashtra are invited to send their Entry forms online. The entry forms are also
available at the Information Technology Branch, Directorate of Industries, 3rdFloor,
New Administrative Building, Opposite Mantralaya, Mumbai, 400 032, between
02:00 pm and 05:00 pm. The last date for receiving entries for each year is 1St
August.
17 Policy Applicability and Validity :-
The Parks / Units which have been sanctioned benefits / incentives under this policy or
earlier policy shall continue to enjoy the benefits for the period for which the benefits incentives
are sanctioned even if the policy period is over; till its eligibility period is valid under relevant
policy.
The policy will be valid for 5 years or till the new policy is announced.
18 Removal of Difficulties :-
If any difficulty arises in giving effect to any provision of this policy, Industry Department
shall issue clarifications and interpretation to such provisions of policy as may appear to be
necessary and expedient for removing the difficulties.

*********

You might also like