1. Mr. Andi, Mr. Imron, Mr. Adi and Miss Komang hold opera onal funds for the purchase of small materials/tools to ensure that urgent field requirements can be met. Purchase receipts must be clear for the auditor (Geral) to verify with the store. 2. For the implementa on of Medium and Large Class projects, Mr. Geral, the Project Coordinator, and the Foremen responsible for the sites will conduct direct site inspec ons to reconcile the Quota on = Breakdown Material = Field Request to ensure that all large- sized materials can be ordered in one go. 3. Field Requests must provide detailed informa on regarding the brand, product, and type to prevent purchase errors. 4. Purchaser (Miss Komang) under Geral's supervision: Field purchase requests to Miss Komang must go through Geral to avoid disrup ons to large-scale purchasing targets. 5. Purchasing Process for Medium and Large-Sized Items: Step 1: Quota on > Breakdown > Field Request > Fix List Step 2: Vendor and Pricing Confirma on Step 3: Purchase Order Approval By Sir Peter Step 4: Sir Peter Payment. Request to Boss: 1. Some of the available electronic equipment is not suitable for the needs and condi ons of the field. The next purchase of electrical equipment will be made together with Mr. Peter, Geral, and the Foreman. 2. For medium and large class projects, simple shop drawings are required for some parts. Please inform on how to request permission from Ms. Hailey to use Ainun (Dra er). 3. The current workers' dormitory is located far from the project site. The workers are reques ng a review of semi-permanent residence (Foreman's request) or a simple dormitory and loca on in the central area of the project to speed up work.